You are on page 1of 1

200-GB-001

200-CR-001

200-CK-001

200-CK-002

200-HS-006

200-HS-007

200-FA-002

PRIMARY CRUSHER
DUST SEAL AIR BLOWER

PRIMARY CRUSHER

PRIMARY CRUSHER
LUBRICATION SYSTEM
AIR COOLER

PRIMARY CRUSHER
LUBRICATION SYSTEM
AIR COOLER

SPIDER LUBRICANT DRUM


MAINTENANCE HOIST

MOTOR MAINTENANCE
MANUAL HOIST

PRIMARY CRUSHER
LUBRICATION ROOM
VENTILATION FAN

200-LU-003

V
YS
1802

XA
1802M1

XA
1802

PI
1806

3/8"-LO-200-021-S1-ET

AKER SOLUTIONS

AKER SOLUTIONS

GREASE DIVIDER
BLOCK

VENDOR

3/4"-LO-200-048-S1-ET

FIT
1507

P
V
FAL
1508 A

V
V
V

P
03
1L8
B

AIR

200-GB-001
P

3"-LO-200-041-S1-ET

FILTER

V
V

V
PI
1904B

ZLO
1906 A

PIT
1903

PI
1903

V
NC

ZSO
1906

NOTE 4

PSV
+
1902

XU
LU001M1

TDY
1920

TE
1920

LFF1
V

TI
1919

LG
1919

LFF1

XU
M

XU
M

PLC1
XU
CK001M1

TE
1921

1-1/2"-LO-200-043-S1-ET

TI
1920

TAH
1920

TAHH
1920

V
TIT
1921

TIC
1921

TAL
1921

TAHL
1921

TITLE

INSTRUMENTATION CRUSHER OVERVIEW

HEATER No. 1

DESCRIPTION

ISSUED FOR INTERNAL COORDINATION

HEATER No. 2

HEATER No. 3

DISCIPLINE MANAGER NAME

-SPH-6

XU PLC1
CK002M2

BY

JI

CHECK

APPROVED

DATE

11/16/09

MMB

80015214 SH 2.08

SPIDER BUSHING LUBRICATION SYSTEM

ISSUED FOR CLIENT APPROVAL

MKM

VVD

TT

CRUSHER LUBE OIL SYSTEM

REVISED AND RE-ISSUED FOR CLIENT APPROVAL

JMR

MMB

JHL

1.532274

LUBE AND OIL SYSTEM

ISSUED FOR CONSTRUCTION

JMR

SKR

1.532275

SPIDER LUBRICATION SYSTEM

UPDATED AND RE-ISSUED FOR CONSTRUCTION

CAC

MMB

JHL

3.508190

BLOWER ASSEMBLY SCHEMATIC

UPDATED AND RE-ISSUED FOR CONSTRUCTION

ZDM

JHL

JHL

000-PI-T-001/002

PIPING LEGEND P&ID / INSTRUMENTATION LEGEND P&ID

JHL

RC

02/23/10

AIH

10/12/10

RC

01/10/11

RC
RC

04/11/11

NO.

DESCRIPTION

BY

CHECK

APPROVED

SIGN

DOCUMENT CONTROL

NOTICE

REVISIONS

80015214 SH 2.09

6/3/2011 1:30:19 PM

V
NC

ZSC
1909

SIGN AND STAMP

NAME

REVISIONS
NO.

I
V

DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL

THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN

REFERENCES

4"x3"

ZSO
1909

LCS

NOTE 3

DWG. NO.

ZLC
1909 A

QUALITY CONTROL

LUBE OIL PUMP No. 2


V

80015214 SH 2.05

ZLO
1909 A

3"x1-1/2"

LCS

LCS

LUBE OIL PUMP No. 1

KIC
1909

TDI
1920

200-CK-002
P

TIT
1920

LFF1

XU
M

ZLC
1909 B
KV
+
1909

3"x1-1/2"

LUBE OIL RESERVOIR


M

ZLO
1909 B

4"-LO-200-042-S1-ET

4"-LO-200-042-S1-ET

3"-LO-200-041-S1-ET P
3"-LO-200-041-S1-ET
P

4"x3"
V

V
TI
1920A

LIT
1918

3"-LO-200-043-S1-ET

VENDOR

LI
1918

XU
LU001M2

200-CK-001

PI
1907

AKER SOLUTIONS

LAL
1918

PSV
+
1901

3"-LO-200-045-S1-ET

TI
1908

3"-U-15

LALL
1918

3"-LO-200-044-S1-ET

3"-SPH-6

NC

4"x3"
P

2"-LO-200-059-S1-ET

ZSC
1906

S1

L3

ZLC
1906 A

TE
1911

AKER SOLUTIONS

V
PI
1903

PSV
+
1910

KIC
1906

TIT
1911

KV
+
1906

TI
1911 A

4"-LO-200-046-S1-ET

FILTER

V
PI
1904A

PDAH
1904

VENDOR

V
TAHL
1911 A

V
PDIT
1904

ZLC
1906 B

NC

TI
1911 B

3"-LO-200-059-S1-ET

ZLO
1906 B

V
TIC
1911

V
V

TAHL
1911 B

VENT

11/
2"
-B
A20
0-

2-1/2"

PI
1502

3"x2-1/2"

FIT
1508

2-1/2"-LO-200-047-S1-ET

OP
SL

PSV
+
1502

2-1/2"x2"

TI
1913
P

3"-LO-200-046-S1-ET

1-1/2"-LO-200-043-S1-ET

PI
1912

6"-LO-200-051-S1-ET

XU
GB001M

FAL
1508 B

PLC1

PDI
1905

200-FA-002

3"x2"

DRUM BLANKET
HEATER

M 200-HS-006

E
VENDOR

FAL
1507 B

WE
1805

XU
FA002M

V
FAL
1507 A

3"-LO-200-046-S1-ET

WIT
1805

KS
1803

KV
+
1803

LFF1

LCS

V
PSV
+
1804

2"-LO-200-050-S1-ET

2"-LO-200-052-S1-ET

WAL

WI
1805 A

FIT
1505

200-HS-007

200-CR-001

WI
1805

200-LU-001
FAL
1505 B

2"-LO-200-050-S1-ET

1. EQUIPMENT AND INSTRUMENTATION SHOWN ON THIS DRAWING ARE SUPPLIED BY


FLSMIDTH MINERALS, WITH EXCEPTION OF PROCESS AUTOMATION SYSTEM (PAS).
PIPING SHALL BE PROVIDED BY AKER SOLUTIONS.
2. INSTRUMENTS, PIPING, COMPONENTS, AND EQUIPMENT SHALL BE INSTALLED BY
AKER SOLUTIONS' ASSIGNED CONTRACTORS. PRE-ASSEMBLED COMPONENTS SHALL
BE CONSIDERED A PACKAGE AND ARE NOT INDICATED ON THIS DRAWING.
3. DRAIN TO COLLECTION CONTAINER (BY OWNER).
4. LUBE OIL SUPPLY BY OTHERS.

XU
LU003M1

NOTES:

PRIMARY CRUSHER
LUBRICATION SYSTEM

V
FAL
1505 A

XIC
1802M1

200-LU-001

200-PI-T-006

200-LU-003
PRIMARY CRUSHER
SPIDER BUSHING LUBRICATION
SYSTEM

SCALE :

THIS DRAWING IS THE PROPERTY OF AND EMBODIES


PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.

TOROMOCHO PROJECT

A1

DATE
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.

PROJECT

SHEET SIZE

DRAWN BY:

JIB

DATE :

11/04/09

AREA

CHECKED BY:

JHL

DATE :

06/02/11

TITLE

APPROVED BY:

JHL

DATE :

06/02/11

SPIDER LUBRICATION SYSTEM

AUTHORIZED BY:

RC

DATE :

06/02/11

& LUBE OIL SYSTEM

C-560

200-PRIMARY CRUSHING & CONVEYING

REVISION

CAD NO.

PRIMARY CRUSHER
560-200-PI-T-006
DWG. NO.

06/01/11
MCP APPROVED:

TO/JFW

DATE :

03/01/10

MINERA CHINALCO PERU S.A.

P & ID

200-PI-T-006

You might also like