You are on page 1of 1
Emergency and Standby Power Systems 14.7 TABLE 14.1.2 Condensed General Criteria for Preliminary Consideration (Continued) General Need Specific Need Conveyors Mechanical util. Water (eoling Hysysteme—andgeneral Water tdrinking ‘and sanitary) Boiler power Pumps for water, ‘sanitation, and production fluids Fans and blowers for ventilation and heating Heating Food preparation Process Refrigeration Special equip. mentor devices whieh have cnt ical warmup (ezyogenies) Depositeriesaf {blood banks, Depositories of ‘nonerities! na ture (meat, produce, ete) Production Critical process power (sugar factory steel processes, glass products, eto) ‘Maximam Tolerance Duration of Power Failure 158t01 min 15s min tonore- ‘quirement oas 10stonore. quirement 0.1 storetur of normal power Simin Smin 5 min (10s per |ANSI/NFPA ‘99-1984 (10), 2b Imin Recommended ‘Minimum Auxiliary Supply'Time Biwersency Standby ‘Asanalyzed and ‘economically Justified Sch toroturn of primepower Indefinite untit ‘evaluated Ib toreturn of prime power Indefinite until evaluated Indefinite unit ‘evaluated ‘To return of prime Indefinite until ‘evaluated; nor. ‘mally for time for orderly shut. down, or tore ‘ur ofprime power Toretur of prime power ‘Toretum ofprime power Indefinite until ‘evaluated Toreturn ofprime ‘power or until ‘orderly shut ‘Type of Auxiliary Power System System Justification Completion of production run Completion sfeastomer order Orderly shutdown Continuation of normal activity Continuation of production Prevention of damage to equip- Supply of fire protection Providing ofeustomer service Maintaining personnel perfor- Provention of laa of electric gen: ‘eration andsteam Maintaining production Prevention of damage to equip- Prevention flooding Maintaining cooling facilities Providing santtary needs Continuation of production Maintaining boiler operation ‘Maintaining boiler operation Providing for gasfired unit vent ing and purging Maintaining cooling and heating functions for buildings and production Prevention ofloas of sales and raft Prevention of spoilage of in proces preparation Prevention of in-process product damage Prevention ofproperty damage Continued production Prevention of payment to work ferduring no production Lower insurance rates Prevention of equipment or prod uctdamage Prevention of loss of material sored Prevention of loss of material ‘stored Lower insurance rates Prevention of product and ‘equipment damage Continued normal production Rolwctvur ot pages on guaranteed ws ronproductive period Lower insurance rates Prevention of prolonged shut. ‘down due a nonordely shut ‘down (continued)

You might also like