8 Section Fourteen
TABLE 14.1.2 Condensed General Criteria for Preliminary Consideration (Continued)
General Need
Space condition-
ing
Maximum
‘Tolerance
Duration of
Specific Need Power Failure
Process contra Uninterrupt
power ble UPS) to
Temperature 10s
(ertical appli
cation)
Pressure eritical) 1 min
posing atmo-
Sphere
Humidity erit- 1 min
Teal)
Staticcharge 10s or less
Building heating 30 min
‘and cooling
Ventilation(toxie 158
fumes)
Ventilationtex- 108
plosive atmo.
Sphere)
(building gen
cralh
NSGinimum’ Type of Auxary
Ausilary Power Stern
Supply Time “Bmergency Standby
Toreturnofprime x
power
Imintoretumnof x x
prime power
Imintoreturnol x
‘prime power
‘Toreturn of prime x
power
Toreturnofprime x x
‘Toretorn ofprime x
power
Torotum ofprime x x
power ar orderly
Shutdown
Toreturnofprime x x
‘power or orderly
Shutdown
‘Toroturn of prime x
power
System Justification
Prevention oflase af machine and
process computer control pro:
gram
Maintaining production
Prevention safety hazards from
developing.
Prevention ofout-of-tolerance
praduets
Prevention of personnel hazards
Provention of product or property
‘damage
Tower insurance rates
Continvation of normal activities
Prevention af oss of eomputer
Tunetion
Prevention of personnel hazards
Continuation of normal activities
Prevention of product or property
“sunage
Lower msurance rates
Compliance with leat state, and
federal eodes, standards, and
laws
Prevention ofloss of computer
Tunetions
Maintenance of normal opera:
tions and tests
Preventian af explosions or other
‘hazards
Prevention of static electric
charge and associated hazards
Continuation of normal produc
tion (printing press operation,
painting spray operations)
Prevention of oss de to freezing
Maintenance of personnel ef
‘dency
Continuation of normal activities
Reduction of health hazarde
Compliance with loral, state, and
‘ederal edes, standards, and
laws
Reduction of polation
Reduction of explosion hazard
Prevention of property damage
Lower insurance rates
‘Compliance with local, state, and
federal eles, standards, and
Lower hazard of ire
Reduce hazards to personnel
“Maintaining of personnel ef-
‘ceney
Providing make-up air in build
ing
(continued)