Professional Documents
Culture Documents
Atlantic Yards: Implementation Plan: Fifth Ave/Pacific ST Closures
Atlantic Yards: Implementation Plan: Fifth Ave/Pacific ST Closures
DRAFT 1
Agenda
• Roadway Closures
• Directional Changes
g
• Mitigation Measures
• Signal Timing Changes
• Lane Reconfiguration
DRAFT 2
Roadway Closures
DRAFT 3
Directional Changes
DRAFT 4
Mitigation Measures: TEA and VMS Locations
TEA Location
Variable Message Sign Location
Temporary Roadway Closure
Permanent Roadway Closure Note: VMS Locations are approximate; additional locations may be added
DRAFT 5
Mitigation Measures: Signal Timing Changes
DRAFT 6
Mitigation Measures: Lane Reconfiguration
5th Av
Re-stripe to left
+ right shared lane
DRAFT 7
Mitigation Measures: Lane Reconfiguration
5th Av
Re-stripe left turn & thru
DRAFT 8
Mitigation Measures: Lane Reconfiguration
Dean St
DRAFT 9
Mitigation Measures: Lane Reconfiguration
Bergen St
DRAFT 10
Mitigation Measures: Lane Reconfiguration
DRAFT 11
Mitigation Measures: Lane Reconfiguration
Re-stripe
Re stripe to left turn
+ thru-right lane
DRAFT 12
Mitigation Measures: Lane Reconfiguration
Re-stripe
p to right
g turn only
y
DRAFT 13
Parking Regulation Changes
No Standing Anytime
on west side
Relocated NYPD
Parking: 11 Spaces*
Remove 6 metered
parking spaces
Relocated NYPD
Parking: 13 Spaces*
Remove approximately 16
parking spaces on north side Remove approximately
7 parking spaces on
west side (Temporary)
No Standing Anytime
on west side
No Standing Anytime
on west side
DRAFT 14
Bus Route Modifications
Bus Stop
Existing Cobble Hill-Bound B63 Route
Future Cobble Hill-Bound B63 Route
Temporary Roadway Closure
Permanent Roadway Closure
DRAFT 15
Atlantic Yards DRAFT
Implementation Plan: Fifth Ave/Pacific St Closures
January 7, 2010