GENERAL NOTES

6.
7.
8.

9.
10.
11.
12.
13.
14.

NOTES :
1.

FOR EFFECTIVE DRAINAGE, THE SLOPE OF EDGE OF PAVEMENT


(S) SHALL BE 3% GRADE. FOR GRAVEL SHOULDER AND 1.5% FOR
CONCRETE SHOULDER.

2.

e=s max. CAN BE TAKEN FROM TABLE OF DESIGN VALUE FOR SUPERELEVATION.

3.

THE SLOPE OF SHOULDER SHALL ALWAYS FILL IN THE DIRECTION OF


THE OUTSIDE EDGE OF THE TRAVELLED WAY.

4.

WHEN THE SUPER ELEVATION IS GREATER THAN 3% THEN THE SLOPE OF


LOWER SHOULDER SHALL BE THE SAME AS FOR THE TRAVELLED WAY.

5.

WHEN SUPER ELEVATION IS 4% OR LESSER, THEN THE LOWER SHOULDER


SHALL HAVE A SLOPE OF 3%.

6.

7.

IF THE SUPER ELEVATION IS 5% THEN THE CROSS SLOPE OF THE HIGHER


SHOULDER IS 2%. BUT FOR A MAXIMUM SUPER ELEVATION OF 8%. THE
SLOPE OF THE HIGHER SHOULDER WILL BE -1%.
SUPER ELEVATION SHOWN ON THE PROFILE ARE BASED ON CONSTANT
6.10 PAVEMENT WIDTH AND NOT ON VARYING PAVEMENT WIDTH DUE
WIDENING.

8.

THE CROSS SLOPE OF SUB BASE IS ALWAYS FALLING.

9.

ALGEBRAIC DIFFERENCE OF CROSSOVER SHOULD NOT EXCEED 7%.

10.

FOR e> 7% SHOULDER SHOULD BE PAVED.

a)

b)

III. STATIONINGS
a) THE ROAD STATIONING AND ELEMENTS OF CURVES ARE RELATIVE TO THE ULTIMATE CENTERLINE OF THE ROAD.
b) EQUATION OF STATIONS WHEN USED (BACK STATION/AHEAD STATION) ARE PROVIDED AT THE BEGINNING
OR END OF THE CURVE AND/OR AT FULL STATION.

UNLESS OTHERWISE INDICATED ON THE PLANS. THE MINIMUM CYLINDER STRENGTH OF


STRUCTURAL CONCRETE AT 28 DAYS SHALL BE 21.00 MPa.

THE MINIMUM COVERING FRO SURFACE OF CONCRETE TO THE FACE OF THE NEAREST BAR SHALL BE 50mm.
ALL CONCRETE SHALL BE POURED WHERE THERE IS A PERMISSIBLE WEATHER CONDITION AND NO OTHER
ENVIRONMENT HAZARD WILL AFFECT THE POURING.
X.2) REINFORCING STEEL

a)

IV. HORIZONTAL CONTROL


a) BASIC TRAVERSE STATIONS WERE ESTABLISHED BASED ON STATIONS OF EXISTING KM. POSTS AND
EXISTING PERMANENT STRUCTURES AT THE PROJECT SITE.
b)

V. VERTICAL CONTROL
a) ELEVATIONS WERE ASSUMED AT THE FIRST BENCH MARK AT THE BEGINNING OF EACH SECTION OF THE PROJECT
b) BENCH MARKS WERE ESTABLISHED AT EXISTING UNDISTURBED STRUCTURES AT DIFFERENT INTERVALS
ALONG THE PROJECT.

REINFORCING BARS FOR ALL STRUCTURES SHALL BE GRADE 60 (FY=414 MPa) FOR BARS LARGER THAN
16 MM DIAMETER . GRADE 40 ( Fy=275.8 MPa) FOR BARS 16 MM. DIAMETER OR SMALLER. ALL REBARS SHALL
BE FREE OF MILL SCALES, OIL OR ANY SUBSTANCE THAT MAY IMPAIR/WEAKER BOND WITH CONCRETE.

REINFORCING BAR SPLICING

WHERE SPLICING IS PERMITTED THE MINIMUM LAP LENGTH OF BARS SHALL BE AS PER AASHTO ARTICLE 8.32
ALL SPLICES SHALL BE STAGGERED AT LEAST 40 BAR DIAMETER. WHERE BUTT WELD IS USED INLIEU OF
LAPPED CONNECTIONS, THIS SHALL DEVELOP AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH OF THE
REINFORCING STEEL BAR.

VI. HORIZONTAL ALIGNMENT


a) THE HORIZONTAL ALIGNMENT SHOWN IN THESE DRAWINGS FOLLOWS THE LONGITUDINAL JOINT OF THE
PCC PAVEMENT (WHICH IS DEFINED AS THE EXISTING CENTERLINE) WITH MINOR DEVIATION DUE MAINLY
TO SOME CONSTRUCTION ERRORS DURING ORIGINAL CONSTRUCTION STAGE. MINOR ADJUSTMENT OF THE
HORIZONTAL ALIGNMENT MAY BE MADE AS DIRECTED BY THE ENGINEER TO SUIT THE ACTUAL
FIELD CONDITION.

REINFORCING BARS SHALL BE ACCURATELY FORMED TO THE SHAPES AND DIMENSIONS INDICATED ON THE PLAN
UNLESS OTHERWISE PERMITTED. ALL REINFORCING BARS REQUIRING BENDING SHALL BE BENT COLD.
WHEN REINFORCING BARS ARE BENT BY HEATING THE ENTIRE OPERATION SHALL BE APPROVED BY THE ENGINEER.
A)

VII. REMOVAL OF EXISTING STRUCTURES & OBSTRUCTIONS

HOOKS AND BENDS

HOOKS AND BENDS SHALL BE AS SHOWN IN THE FOLLOWING TABLE

a) ALL WORKS SHALL COMPLY WITH CLAUSE 39 "REQUIREMENTS AND CONDITIONS OF CONTRACT VOLUME-1
OF THE STANDARD SPECIFICATION FOR PUBLIC WORKS AND HIGHWAYS, 1988.
b) PORTIONS OF EXISTING UTILITIES, SUCH AS WATER MAINS. IRRIGATION CHANNELS, TELEPHONE POST AND
TRUNKLINES, ETC. THAT MAY CAUSE OBSTRUCTION TO THE CONSTRUCTION OF THIS PROJECT SHALL BE
RELOCATED BY THE ENTITY OR OWNER CONCERNED, EXTREME PRECAUTION SHALL BE EXERCISED BY
THE CONTRACTOR NOT TO DAMAGE ANY SECTION OF THE EXISTING PUBLIC UTILITIES DURING
CONSTRUCTION. ANY REPAIR OF DAMAGE THEREOF SHALL BE ON THE ACCOUNT OF THE CONTRACTOR,
ANY REMOVAL OF MISCELLANEOUS STRUCTURES THAT MAY BE REQUIRED SHALL BE CONSIDERED
SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT ITEM. NO DIRECT PAYMENT SHALL BE MADE
FOR THIS WORK EXCEPT FOR SPECIFIC ITEMS EXPLICITLY FOR PAYMENT IN THE BID SCHEDULE.

A
SIZE OF
BARS
10
12
16

END HOOKS
125
150
175

150
200
250

STIRRUP & TIE


100
113
150

100
113
138

STIRRUP TIE

125
163
200

VIII. ROAD CONNECTIONS AND PRIVATE ENTRANCES

Do

a) APPROACHES AND ROAD ENTRANCES SHALL BE CONSTRUCTED BY THE CONTRACTOR AS SHOWN ON THE
PLANS OR AS DIRECTED BY THE ENGINEER IN SUCH A MANNER TO ENSURE SMOOTH CONNECTIONS AND
RIDING QUALITY.
b) NO OPENING FOR DRIVEWAYS OR PRIVATE ENTRANCES SHALL BE ALLOWED EXCEPT WITH THE PRIOR
APPROVAL FROM THE PROPER AUTHORITIES.

END HOOK

Do

STIRRUP & TIE HOOK


Do = 6 do for do < 30
Do = 8.7 do for do < 30

Do

5.

X.1) CONCRETE

II. DIMENSIONS
a) ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES,
AND AIRPORTS, REVISED 2013. SPECIAL PROVISIONS AND SUPPLEMENTAL SPECIFICATIONS PERTAINING
TO THE PROJECT.

4.

STRUCTURAL CONCRETE STRUCTURES

X.

Do

2.

MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE ''DPWH STANDARD SPECIFICATIONS
FOR HIGHWAYS, BRIDGES AND AIRPORTS, 2013"
CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT IS POURED AHEAD
AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE.
AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN
THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB.
TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BAR SHALL BE SMOOTH ROUND STEEL BAR FREE FROM
RUST AND OTHER DEFECTS WHICH MIGHT RESTRICT THEIR MOVEMENT.
TYPE OF WEAKENED JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY ONE TYPE SHALL BE USED
FOR THE WHOLE PROJECT.
MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18OF BLACK IRON FREE
FROM RUST AND LINKS.
AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AS NORMAL JOINT SPACING SHALL BE PROVIDE BEFORE OR
AFTER AN EXPANSION JOINT.
THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED WITH 30-50
PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER THE CONCRETE HAD BEEN
CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC.
ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT, SHALL BE CONTINUOUS FROM EDGE TO EDGE.
ALL LONGITUDINAL JOINT SHALL MEET AT INTERSECTION WITH NO GAPS OR OFFSET.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
AVOID STOPPAGE OF FRAMEWORKS ALONG CURVES.
TRANSVERSE CONSTRUCTION (CONTACT) JOINT SHALL BE PROVIDE AT THE END OF ANY RUN WHERE LAYING OF
CONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTES OR LONGER.
TRANSVERSE CONSTRUCTION JOINTS WHICH OCCUR LOCATION OF WEAKENED PLANE JOINTS WITH DOWELS IF
JOINT OCCURS IN THE MIDDLE THIRD OF THE WEAKENED JOINT INTERVAL (1500-300mm) IT SHOULD BE KEYED JOINTS
WITH THE BARS.

Do

1.

Do

GENERAL NOTES

I. STANDARD SPECIFICATIONS
a) ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES,
AND AIRPORTS, REVISED 2013. SPECIAL PROVISIONS AND SUPPLEMENTAL SPECIFICATIONS PERTAINING
TO THE PROJECT.

STIRRUP TIE
D = 4 do for do < 30
D = 8.7 do for do < 30

IX. DRAINAGE STRUCTURES


a)

b)

c)

EXACT LOCATIONS, SLOPES, OUTFALLS, AND INVERT ELEVATIONS OF DRAINAGE STRUCTURES SHALL BE
CHECKED IN THE FIELD BY THE ENGINEER. MINOR ADJUSTMENT MAY BE MADE WITH THE APPROVAL OF THE
ENGINEER TO SUIT ACTUAL FIELD CONDITIONS.
ANY REVISIONS REMOVAL AND /OR RELAYING OF DRAINAGE STRUCTURE AS DIRECTED BY THE ENGINEER TO SUIT
EXISTING FIELD CONDITIONS SHALL BE CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER
CONTRACT ITEMS NO DIRECT PAYMENT SHALL BE MADE FOR THIS WORK UNLESS OTHERWISE SPECIFICALLY
IDENTIFIED FOR PAYMENT IN THE BID SCHEDULE.
EXISTING DRAINAGE STRUCTURES OR PART THEREOF REMOVED BY THE CONTRACTOR THAT ARE STILL
SERVICEABLE SHALL BE TURNED OVER TO THE GOVERNMENT AND SHALL BE DEPOSITED AT A PLACE WITHIN
THE PROJECT SITE DESIGNATED BY THE ENGINEER WITHOUT ANY EXTRA COMPENSATION. EXTREME
PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE THESE MATERIALS DURING THE
REMOVAL AND HANDLING.

NOTE:
THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS AND PROVIDE ACCESIBILITY FACILITIES FOR PERSONS WITH
DISABILITY IN ACCORDANCE WITH D.O. 37, SERIES 2009

XI.

a)

b)

c)
d)

SLOPE/EMBANKMENT PROTECTION WORKS (GROUTED RIPRAP/STONE MASONRY)

FOUNDATION OF EMBANKMENT PROTECTION WORKS SHALL SIT ON A FIRM AND STABLE FOUNDATION. ALLOWABLE SOIL BEARING CAPACITY SHALL NOT
LESS THAN 196 KPa. SOIL BORING TEST SHALL BE CONDUCTED DURING CONSTRUCTION TO VERIFY THE ACTUAL SOIL BEARING CAPACITY OF SOIL SPOTS
UNDER
THE FOUNDATION SHALL BE REMOVED AND REPLACED WITH SUITABLE BEDDING MATERIALS OR CONCRETE CLASS "B"
SOFT SPOTS BETWEEN THE CUT FACE AND SLOPE/ EMBANKMENT PROTECTION WALLS MUST BE FILLED WITH ROCKS OR SUITABLE MATERIALS SUCH
BACKFILL MATERIALS PLACED BEHIND THE WALL SHALL BE FREE DRAINAGE NON EXPANSIVE AND WATER SHALL BE DRAINED BY WEEPHOLES PLACES AT
SUITABLE INTERVALS AND ELEVATIONS.
THE DEPTH OF PENETRATION SHALL BE MEASURED FROM THE LEVEL OF THE ORIGINAL GROUND SURFACE AND SHALL NOT INCLUDE EXCAVATED
MATERIALS
THE THICKNESS OR DIAMETER OF STONES FOR STONE MASONRY SHALL NOT BE LESS THAN 150mm.