ESD
Total plant and wells shut down due to HHP on 1st stage condensate stabilizer as a result of
complete opening the condensate outlet from the slug catcher LCV 5013 which increase the 1st
stage condensate stabilizer pressure up to 19 bars and shut down.
NSG wells
NSG wells are subjected to the PIG launcher line, in case the flow line pressure increased and the
HIPPS not closed then the safety valve on PIG launcher are opened and vent this pressure excess
98.5 bars on atmosphere
WHCP
All wells are on automatic mode except SSG1-2 well on manual, and all chemical pumps are
working except SSG1-2.
SSG 1-2
On 14/1 the FLP was suddenly reduced to 80 bars and the well head pressure also reduced about
10 bars and the FLT increased with water production increasing on produced water tanks on CTP
to higher values first day water production was 290 BBL/day and yesterday produced water WAS
240 bbl. /day. Observe this levels frequently.
HIPPS
During the ESD of the CTP, Well SSG 1-1 HIPPS was not closed and the FLP reached 135 bars without
HIPPS sense today all the HIPPS on all wells were actuated to 97 bars and oil levels were checked
and HIPPS on operation.
pump
condensate
transfer pumps P
4401 A/B
water degaser
pumps
P
4201 A/B
accumulator
pumps
P
5602 A/B
glycol storage
pumps
P
5601 A/B
action
LIC
LIC 4412
HIGH
700
LOW
350
LIC 4203
840
270
LIC 5602
700
350
LIC 5601
950
250
RANGE