OPERATIONAL QUALIFICATION
1. Objective
2. Verification of Operating Procedure
3. Operational Testing
4. Acceptance Criteria
OPERATIONAL QUALIFICATION
M/C
1.0
OBJECTIVE:
Verification Date
OPERATIONAL QUALIFICATION
M/C
3.0 OPERATIONAL TESTING:
Operating
Personnel / Dept.
1) Assemblly &
testing
2) QC dept.
Observation
Comments
Operating personnel
understand and follow the
operating Procedure and
requirements
Verified
Verified
Signed
Date
Checked By:
(QC Incharge)
Verified By:
(Works Manager)
Observation
Accepted
Accepted
Accepted
OPERATIONAL QUALIFICATION
M/C
Operating procedure / Preventive Maintenance
procedure were verified for completeness and accuracy.
Sealing at Low Temperature (Recommended from
Supplier of Packing Material)
Sealing at High Temperature (Recommended from
Supplier of Packing Material)
Peeling Test at Low Temperature Sealing
Peeling Test at High Temperature Sealing
Temperature (T) determined for the PQ (Average
between lower limit and upper limit is the ActualTemperature during the test)
Accepted
Accepted
Accepted
Accepted
Accepted
No
Major Deviations (if any)
Acceptable
Signed
Checked By:
(QA Incharge)
Verified By:
(Works Manager)
Date