You are on page 1of 2

ite

system

QTY

days

Staf

1-

11kv/0.4kv oil filled


power transformers

24

2-

Bus duct

12

12

11kv/6.6kv oil filled


transformer

12

-test
engineer 1
-technician 2
-test
engineer 1
technician 2
-test
engineer 1
technician 2

4-

11kv switch board


(SS1)

35

-test
engineer 2
-technician 2

6.6kv switch board


(SS2)

30

-test
engineer 1
technician 2

6-

Low voltage switch


board

45

-test
engineer 1

7-

Dc ups

10

10

-test
engineer 1
technician 2

8-

Ac UPS

technician 2
-test
engineer 1
technician 2

9-

Lighting panel

-technician 2

10-

Earthing system

-test
engineer 1
-technician 2

The technical staff needed can be summarized as:


1-commission engineer 1
2-test engineer

4-safety engineer

5-technician

6- Planning engineer

7-QC

8- Paper work

9-driver with car

10-labours

Period :60 working days