Generator Daily Fuel Consumption Log Book for the Month of ( ____
2007
Name and number of generator:

Date

Fuel
Time /liter

Capacity:

Refueled by
Name

Signature

Timing
Start

End

Meter Reading
Start

End

Total
Hours

Meter

Remarks

Total

Prepared by: generator operator:_____________________

Verified by: Transport Coordinator:__________________

UNDP/AIMS
KABUL OFFICE

Generator Daily Fuel Consumption Log Book for the Month of (


) 2007
Name and number of generator:

Date

Fuel
Time /liter

Refueled by
Name

KAV :110

FG WILSON P110E

Signature

Timing
Start

End

Meter Reading
Start

End

Kw:88

Total
Hours

Meter

Remarks

Total

Prepared by: generator operator:_____________________

Verified by: Transport Coordinator:________________

UNDP/AIMS
KABUL OFFICE

Generator Maintenance Log Sheet for the Month of (April) 2007


Name and number of generator:

Date

Time

Meter
Reading

KAV :65

FG WILSON XP65E1
Parts Received by

Service/Maintenance

Name

Signature

Parts Cost
USD/Afs

Wages
paid

Total Cost
USD/Afs

Remarks

Total

Prepared by: generator operator:_____________________

Verified by: Transport Coordinator:________________

UNITED NATION DEVLPOMENT PROGRAM IN AFGHANISTAN


BUILDING INFORMATION MANGMENT CAPACITY
AIMS

Generators Fuel Consumption/Maintenance

Log Book
For the Month of: (April ).2007

GENERATOR Name/Number :( GEP13.5-B)

UNDP/AIMS
KABUL OFFICE

Generator Daily Fuel Consumption Log Book for the Month of (April)
2007
Name and number of generator: CATERPILER GEP13.5-A
13.5 KVA

Date

Fuel
Time /liter

Refueled by
Name

Signature

Total

Timing
Start

End

Power Rated:

Meter Reading
Start

End

Total
Hours Meter

Remarks

Prepared by: generator operator:_____________________

Verified by: Transport Coordinator:_____________

UNDP/AIMS
KABUL OFFICE

Generator Maintenance Log Sheet for the Month of ( April ) 2007


Name and number of generator:

Date

Time

Meter
Reading

KVA: 110

FG WILSON P110E
Parts Received by

Service/Maintenance

Name

Signature

Parts Cost
USD/Afs

Wages
paid

Total Cost
USD/Afs

Remarks

Total

Prepared by: generator operator:_____________________

Verified by: Transport Coordinator:________________