Professional Documents
Culture Documents
Skripta CAPP Sistemi I TBP
Skripta CAPP Sistemi I TBP
B2B
(Business-to-Business)
B2C
(Business-to-Consumer)
CAA
CAD
CAE
CAM
CAPE
CAPP
CAQ
CARC
CASA/SME
CAT
CATS
CAx
CE
(Concurrent Engineering)
(Computer Integrated Manufacturing
Open System Architecture)
(College International pour la
Recherche en Productique)
CIMOSA
CIRP
CL data
CM
CMM
CNC
CPC
CPS
CRM
DBMS
(Cellular Manufacturing)
(Coordinate Measuring Machine)
(Computer Numerical Control)
(Collaborative Product Commerce)
(Capacity Planning and Scheduling)
(Customer Relationship Management)
(Data Base Management System)
DEC
DFA
DFM
EDI
EDM
EEC
EI
ER
(Entity Relationship)
ERP
ES
ETO
FDC
FMC
FMG
FML
FMM
FMS
DFMA
GERAM
GRAI/GIM
GT
HTML
IBM
ICAM
ICT
IDEF
IGES
ISO
JIT
JSIC
LAN
LM
MAS
MES
(Integration DEFinition)
(Initial Graphics Exchange
Specification)
(International Organization for
Standardization)
(Just In Time)
(Japan Standard Industry
Classification)
(Local Area Network)
(Lean Manufacturing)
(Multy-Agent System)
(Manufacturing Execution Systems)
(Manufacturing Resource
Management)
(Material Requirements Planning)
(Make To Order)
(Make To Stock)
(North American Industry Classification
System)
(Numeric Control)
(National Institute of Standards and
Technology)
(Open Modular Architecture
Controllers)
(Open System Architecture for Control
within Automation System)
(Open System Environment for
Controllers)
(Part Coding and Classification
Analysis)
(Product Data Management)
(Purdue Enterprise Reference
Architecture and Methodology
PFA
PLC
PLC
PLM
PPC
QMS
RFID
SC
SCE
SCM
SDAI
SET
SME
SPM
SRM
STEP
STEP-NC
TIF
TMS
UML
VDI
WMS
XML
YMS
VDA-FS
1.0 UVOD
Privreda predstavlja najvanije podruje drutvenog ivota ljudi, koja ini njegovu
realnu materijalnu bazu. Razvoj privrede je osnovni uslov za razvoj drutva u celini. Osnova
privrede je proizvodna delatnost, pod kojom se podrazumeva materijalna proizvodnja koja se
realizuje u okviru poslovnog, odnosno proizvodnog sistema.
Proizvodni sistem e dobro poslovati, ostvariti rast i razvoj samo ako zadovolji uslove
trita, odnosno ako proizvodi upotrebljiv, ekonomian, kvalitetno dizajniran, ekoloki
podoban, konkurentan i za trite prihvatljiv proizvod [46].
Meusobno suprotstavljeni zahtevi nikada nisu bili izraeniji, jer tim koji razvija
proizvod mora u to kraem vremenu da projektuje i izradi proizvod koji ima najnie trokove
u ivotnom veku, a pri tome da ima kvalitet i druge atribute koji su maksimalno prilagoeni
promenljivim zahtevima i potrebama kupaca [69,116].
este promene uslova poslovanja na globalnom svetskom tritu proizvoda uslovile su
prilagoavanje proizvodne strategije u vremenu, slika 1.1.
Inovativna
proizvodnja
Fleksibilna
proizvodnjakastomizacija
Brza
proizvodnja
time-to-market
Uenje/
inovacije
Program
proizvodnje/
fleksibilnost
Program
proizvodnje/
fleksibilnost
Vreme
Vreme
Vreme
Kvalitet
Kvalitet
Kvalitet
Kvalitet
Cena/
proizvodnost
Cena/
proizvodnost
Cena/
proizvodnost
Cena/
proizvodnost
Cena/
proizvodnost
1960, 1970
1980
1990
2000
2010
Kvalitativna
proizvodnja
Ekonomina
proizvodnja
Vreme
1.0 Uvod
1.0 Uvod
Prema optoj teoriji sistema, svaki sistem pa tako i tehnoloka priprema proizvodnje,
mora posedovati odreena svojstva kao to su veze sa okolinom, skup ostvarivih funkcija,
strukturu sistema, skup funkcionalnih i strukturnih karakteristika sistema, kao i istoriju
funkcionisanja i razvoja sistema [21]. U osnovi, tehnoloka priprema predstavlja podsistem
poslovnog, odnosno proizvodnog sistema i u vezi je sa drugim podsistemima koji ine
integralno proizvodno okruenje.
Organizacioni sistemi su prirodni i tehniki sistemi zajedniki organizovani za
ostvarivanje odreenog cilja. Specijalnu grupu organizacionih sistema orijentisanih na
poslovanje preduzea ine poslovni sistemi. Poslovni sistem predstavlja veoma sloen
dinamiki sistem, zavisan od uticaja okoline u kome se objedinjavaju mehanizmi trita,
istraivanja, projektovanja, planiranja, proizvodnje, finansija, upravljanja i kontrole [214].
Proizvodni sistem ini podsistem poslovnog sistema, koji je preteno orijentisan na
proizvodnju i esto se u literaturi naziva proizvodno-poslovni sistem. Proizvodni sistem
predstavlja skup osnovnih tehnolokih sistema i ostalih tehniki odreenih informacionih i
energetskih struktura, ureenih na nain da obezbede izvrenje postavljene funkcije cilja i
ostvarenje projektovanih efekata. Proizvodni sistem vezuje tehnoloke sisteme, energetske i
informacione strukture i uesnike u procesu rada vezama odreenog stepena jaine, pravca i
smera [295]. Tehnoloki sistem predstavlja najvaniji podsistem proizvodnog sistema,
projektovan za izvoenje operacija rada na radnim mestima. U tehnoloke sisteme spadaju
obradni, montani, merni, transportni, skladini i upravljaki sistemi [165,247]. Obradne
sisteme u okviru tehnolokog sistema ine maine, sa svim dodatnim elementima u koje
spadaju pribori, alati, merila, obradci i posluioci [112,174,270].
Osnovna funkcija svakog sistema se ostvaruje kroz realizaciju odgovarajuih procesa.
Inenjerski procesi predstavljaju skup meusobno povezanih aktivnosti, pomou kojih se vri
transformacija informacija, materijala i energije, pri emu se na izlazu dobijaju gotovi delovi
ili proizvodi od sirovina i polufabrikata ili pripremaka. Uporedo sa postojanjem opisanih
sistema, postoje i odgovarajui procesi, kao to su poslovni, proizvodni, tehnoloki i obradni
procesi, slika 2.1.
Poslovni proces predstavlja skup procesa proizvodnih, ekonomskih i drutvenih
podsistema i elemenata koji povezuju trite sa poslovnim sistemima.
Proizvodni proces predstavlja skup meusobno povezanih aktivnosti, odnosno procesa rada,
kao to su priprema, obrada, transport, skladitenje, kontrola, odravanje, upravljanje, i dr.,
pomou kojih se vri transformacija sirovina i polufabrikata u proizvode.
Tehnoloki proces je deo proizvodnog procesa koji se sastoji od skupa meusobno povezanih
aktivnosti, odnosno operacija rada sa ciljem transformacije pripremaka u gotove delove, ili
delova u podsklopove, sklopove i gotove proizvode.
4
Obradni proces je deo tehnolokog procesa koji se sastoji od skupa aktivnosti, koje pripremak
transformiu u obradak ili gotov deo, u smislu promena fiziko-hemijskih karakteristika,
oblika, dimenzija, itd. u saglasnosti sa propisanim tehniko-tehnolokim zahtevima pojedinih
operacija izrade koje se izvode na odgovarajuim obradnim sistemima.
POSLOVNI SISTEM
POSLOVNI PROCES
PROIZVODNI SISTEM
SIROVINA, POLUFABRIKAT
PROIZVODNI PROCES
PROIZVOD
TEHNOLOKI SISTEM
PRIPREMAK
TEHNOLOKI PROCES
OBRADNI SISTEM
PRIPREMAK
OBRADNI PROCES
OBRADAK
Upravljanje preduzeem,
Marketing,
Istraivanje i razvoj,
Komercijalni poslovi,
Proizvodnja,
Upravljanje ekonomsko-finansijskim tokovima,
Opti poslovi i sistemska podrka.
UPRAVLJANJE
FINANSIJAMA
ISTRAIVANJE I
RAZVOJ
TRITE
MARKETING
KONSTRUKCIONA
PRIPREMA
PROIZVODNJE
(CAD)
KUPCI
PRODAJA
TEHNOLOKA
PRIPREMA
PROIZVODNJE
(CAPP/CAM)
PLANIRANJE I
UPRAVLJANJE
PROIZVODNJOM
(PPS)
DOBAVLJAI
NABAVKA I
KOOPERACIJA
PROIZVODNJA (CAM)
upravljanje proizvodnim tokovima
izrada - montaa - kontrola
STRATEGIJSKO
PLANIRANJE
SISTEMSKA PODRKA
transport - skladitenje
odravanje - energetika
2.2
Masovna proizvodnja
Serijska proizvodnja (maloserijska, srednjeserijska i
velikoserijska)
Pojedinana proizvodnja
8
Naruivanje
sirovina i
komponenti
Proizvodnja
delova
Montaa
proizvoda
Montaa
proizvoda
Montaa
podsklopova
Montaa
proizvoda
Montaa
proizvoda
Ispitivanje i
kontrola
Montaa
podsklopova
Skladitenje
standardnih
modula (zalihe)
Proizvodnja
delova
Montaa
podsklopova
Montaa
podsklopova
Prilagoeno
projektovanje
Proizvodnja
delova
Proizvodnja
delova
Projektovanje proizvoda i
procesa (novi proizvod ili
znaajne izmene)
Skladitenje
standardnih
delova I kompon.
Projektovanje
proizvoda i
procesa
MTO
ETO
Naruivanje
sirovina i
komponenti
Projektovanje
PiP (modularni
proizvodi)
Naruivanje
sirovina i
komponenti
ATO
Projektovanje
proizvoda i
procesa
Ispitivanje i
kontrola
Ispitivanje i
kontrola
Ispitivanje i
kontrola
Skladitenje
(zalihe)
Pakovanje i
isporuka
Pakovanje i
isporuka
Pakovanje i
isporuka
Pakovanje i
isporuka
MTS
Osnovni
sluaj
ATO
MTO/ETO
Povezanost sa
kupcem
Niska/distanca u odnosima
sa kupcem
Nivo prodaje
Vreme od
narudbe do
isporuke
Veliki
Srednji do veliki
Mali
Mala
Velika
Generalno bazira na
zahtevima i
specifikacijama kupaca
Obim proizvodnje
istog proizvoda
Varijantnost
proizvoda
Karakteristike
proizvoda
Projektna/zanatska,
Pojedinana/radionika,
Serijska/grupisana,
Masovna/protona i
Kontinualna proizvodnja.
Projektna
proizvodnja
Pojedinana
proizvodnja
Serijska
proizvodnja
Kombinacija
opreme opte i
specijalne
namene
Opte namene,
fleksibilna
oprema
Univerzalne
namene,
fleksibilna
oprema
Raspored
procesa i
opreme
Fiksna pozicija
Fokusiranje na
procese,
Procesno
orijentisan tok
Strunost
radnika
Visoko
kvalifikovani i
fleksibilni
Visoko
kvalifikovani i
fleksibilni
Koliine
proizvoda
Uglavnom
jedan proizvod
(jedinstven)
Uglavnom male
koliine, ali
mogu biti i
srednje
Fokusiranje na
procese,
Procesno
orijentisan tok
Srednje do
visoko
kvalifikovani i
fleksibilni
Uglavnom
srednje, ali
mogu biti i
male
Vrste
proizvoda
Jedinstveni
proizvodi
(brodovi,
avioni, itd.),
Velike maine
specijalne
namene
Maine
specijalne
namene, Delovi
i podsklopovi
za avione,
mostove, itd.
Varijantnost
proizvoda
Vrlo visoka
Vrlo visoka
Proizvodnost
Vrlo mala
Mala
Vreme
pripreme
Vrlo dugo i
varijabilno
Proizvodni
ciklus
Vrlo dug i
varijabilan
Tip opreme
Masovna
proizvodnja
Specijalizovane
namene
Fokusiranje na
proizvode,
Predmetno
orijentisan tok
Kvalifikovani
za obavljanje
jedne funkcije
Kontinualna
proizvodnja
Specijalizovane
namene,
bazirana na
visokim
tehnologijama
Fokusiranje na
proizvode,
Predmetno
orijentisan tok
Razni oblici
kvalifikacije u
zavisnosti od
funkcije
Velike
Vrlo velike
Automobili,
proizvodi iroke
potronje (npr.
kuni aparati)
Proizvodi
iroke potronje
(npr. plastini i
stakleni proiz.,
kuna hemija),
proizvodnja
elika, itd.
Srednja do mala
Vrlo mala
Mala do srednja
Srednja do
velika
Vrlo velika
Dugo, ali
varijabilno i
frekventno
Dugo, ali
varijabilno i
frekventno
Dugo i
kompleksno
Dugo,
kompleksno,
skupo,
jednolino
Dug i
varijabilan
Srednje dug i
varijabilan
Kratak i
generalno
konstantan
Vrlo kratak i
konstantan
Delovi i
podsklopovi za
automobile,
maine opte
namene,
montaa elekt.
sklopova, itd.
Visoka do
srednja
Vrlo mali broj proizvodnih sistema pripada jednoj odreenoj kategoriji s obzirom na
oblik proizvodnog sistema i strategiju u proizvodnji. Veina kompanija se moe klasifikovati
kao hibridna. Na primer, kompanija moe da bude hibrid MTS i MTO, to podrazumeva da
poseduje skladite gotovih proizvoda za koje postoji stalan zahtev, ali takoe, ima mogunost
da oblikuje proizvod za potrebe klijenata kada je to potrebno. Jasno je da na putu od MTS ka
ETO raste broj varijanti proizvoda i stepen prilagoavanja proizvoda kupcu, dok se
istovremeno proizvodnja i odgovarajui proizvodni sistemi kreu od kontinualne ka
projektnoj proizvodnji, slika 2.4.
10
POJEDINANA
SERIJSKA
MASOVNA
KONTINUALNA
ETO/MTO
ATO
MTS
Strategija
proizvodnje
Slika 2.4 Relacija izmeu vrste proizvodnog sistema i strategije proizvodnje [177]
Oblik proizvodnog toka i raspored opreme
U tabeli 2.1, za razliite oblike proizvodnih sistema definisan je i odgovarajui oblik
rasporeda maina i opreme, koji moe biti:
Hibridni tok predstavlja kombinaciju predmetnog i procesnog toka, koji se veoma esto
sree u konkretnim proizvodnim uslovima. U okviru hibridnog toka mogu se uvrstiti i
fleksibilne tehnoloke elije (FMC), kao i drugi oblici fleksibilnih tehnolokih sistema kao to
su fleksibilni tehnoloki moduli (FMM), fleksibilne tehnoloke grupe (FMG), fleksibilne
tehnoloke linije (FML), itd. [239,269].
Oblik tehnolokog toka u najveoj meri zavisi od vrste i varijantnosti proizvoda,
projektovanih koliina, raspoloive proizvodne opreme i njenog tipa, kao i usvojenih reenja
tehnolokih procesa, koji su rezultat rada tehnoloke pripreme proizvodnje.
2.3
Organizaciona struktura proizvodnog sistema ima dinamian karakter koji prati ciljeve
proizvodnog sistema, odnosno strategiju njegovog razvoja. Uticaj unutranjih faktora i
spoljanje sredine je veoma vaan za oblikovanje organizacione strukture, naroito ako
proizvodni sistem deluje u nestabilnom proizvodnom okruenja, kada znatno ee mora da
menja svoju organizacionu strukturu.
Izbor odgovarajue organizacione strukture proizvodnog sistema, predstavlja jednu od
najvanijih odluka, jer ako se izabere neodgovarajua organizaciona struktura, funkcionisanje
upravljakog sistema u proizvodnom sistemu nee biti u dovoljnoj meri kvalitetno.
Organizaciona struktura mora da obezbedi ostvarivanje ciljeva organizacije, optimalnu
raspodelu rada, jasno definisane funkcije u organizaciji i odgovornosti njihove realizacije,
racionalnu upotrebu kvalifikacija, iskustva i specijalistikih znanja, efikasnost rada u
timovima, iji se rad zasniva na adekvatnom sistemu informacija i komunikacija [31].
Mesto, uloga i nivo delokruga zadataka tehnoloke pripreme proizvodnje u velikoj meri
zavisi od vrste organizacione strukture proizvodnog sistema, koja je odreena unutranjom
11
podelom rada i formiranjem niih organizacionih jedinica. Postoje tri osnovna modela
organizacione strukture proizvodnih sistema, koje se meusobno mogu kombinovati u sloene
oblike strukture [51,296]:
MARKETING
ISTRAIVANJE I
RAZVOJ
TEHNOLOKA
PRIPREMA
PROIZVODNJE
KOMERCIJALNI
POSLOVI
PLANIRANJE I
UPRAVLJANJE
PROIZVODNJOM
PROIZVODNA
JEDINICA 1
PROIZVODNJA
RUKOVANJE
MATERIJALOM
PROIZVODNA
JEDINICA 2
EKONOMSKO
FINANSIJSKI
POSLOVI
UPRAVLJANJE
ALATOM
PROIZVODNA
JEDINICA j
..
OPTI POSLOVI
UPRAVLJANJE
KVALITETOM
..
INTEGRALNA
SISTEMSKA
PODRKA
ODRAVANJE
TEHN. SISTEMA
PROIZVODNA
JEDINICA n
MARKETING
ISTRAIVANJE I
RAZVOJ
KOMERCIJALNI
POSLOVI
PROIZVODNJA
EKONOMSKO
FINANSIJSKI
POSLOVI
OPTI POSLOVI
INTEGRALNA
SISTEMSKA
PODRKA
PRENOS ODREENIH
FUNKCIJA NA NIVO
PROIZVODNIH JEDINICA
PRENOS ODREENIH
FUNKCIJA NA NIVO
PROIZVODNIH JEDINICA
PRENOS ODREENIH
FUNKCIJA NA NIVO
PROIZVODNIH JEDINICA
TEHNOLOKA
PRIPREMA
TEHNOLOKA
PRIPREMA
TEHNOLOKA
PRIPREMA
PLAN. I UPRAV.
PROIZVODNJOM
PLAN. I UPRAV.
PROIZVODNJOM
PLAN. I UPRAV.
PROIZVODNJOM
PROIZVODNI
PROGRAM 1
RUKOVANJE
MATERIJALOM
PROIZVODNI
PROGRAM j
RUKOVANJE
MATERIJALOM
PROIZVODNI
PROGRAM n
RUKOVANJE
MATERIJALOM
(PROIZVODNA
JEDINICA 1)
UPRAVLJANJE
ALATOM
(PROIZVODNA
JEDINICA j)
UPRAVLJANJE
ALATOM
(PROIZVODNA
JEDINICA n)
UPRAVLJANJE
ALATOM
UPRAVLJANJE
KVALITETOM
ODRAVANJE
TEHN. SISTEMA
UPRAVLJANJE
KVALITETOM
ODRAVANJE
TEHN. SISTEMA
UPRAVLJANJE
KVALITETOM
ODRAVANJE
TEHN. SISTEMA
Upravljanje
projektom
Projekat 1
Upravljanje
projektom
Projekat j
EKONOMSKO
FINANSIJSKI
POSLOVI
OPTI POSLOVI
INTEGRALNA
SISTEMSKA
PODRKA
OS
UK
UA
PROIZVODNJA
RM
KOMERCIJALNI
POSLOVI
TPP
ISTRAIVANJE I
RAZVOJ
PPC
MARKETING
Projekat n
Upravljanje
projektom
.
.
13
2.4
Proizvod ima svoj ivotni vek, odnosno ivotni ciklus. ivotni ciklus proizvoda se moe
definisati kao vremenski period od nastanka ideje o proizvodu pa do njegovog nestanka iz
drutvene i prirodne sredine.
Izuavanje ivotnog ciklusa proizvoda (PLC) datira jo od pedesetih godina prolog
veka, od kada je razvijen znaajan broj koncepta koji se razlikuju po definiciji, fazama od
kojih se sastoje i alata koji se koriste za njihovu realizaciju [9].
Postoje dve osnovne vrste ivotnog ciklusa proizvoda [93,216]:
Ekonomski ciklus proizvoda vremenski period u kome je proizvod prisutan na
tritu (uvoenje, rast, zrelost i opadanje) i
Tehniki ciklus proizvoda vremenski period funkcionisanja proizvoda (razvoj,
proizvodnja, trine aktivnosti, upotreba, odravanje i izlazak iz upotrebe).
U sutini moe se definisati est osnovnih faza ivotnog ciklusa proizvoda, slika 2.8:
Ideja o proizvodu / planiranje proizvoda / postavljanje zadataka
Projektovanje / razvoj proizvoda
Priprema / izrada / montaa / kontrola / korekcije
Marketing / promocija / distribucija / prodaja
Instalisanje / upotreba / odravanje / dogradnja
Revitalizacija / recikliranje / odstranjivanje / prerada / deponovanje
U ivotnom ciklusu proizvoda centralno mesto zauzima faza razvoja, u okviru koje se
generie kvalitet proizvoda, ali i najvei broj greaka (prema pravilu desetica 1), koje je
neophodno otkloniti u to ranijoj fazi razvoja proizvoda.
TRITE/POTREBE/PROBLEMI
POTENCIJAL/CILJEVI KOMPANIJE
PROJEKTOVANJE/RAZVOJ
PROIZVODA
PRIPREMA/IZRADA/MONTAA/
KONTROLA/KOREKCIJE
MARKETING/PROMOCIJA/
DISTRIBUCIJA/PRODAJA
ZAHTEVI, CILJEVI
IDEJA/PLANIRANJE PROIZVODA/
POSTAVLJANJE ZADATAKA
INSTALISANJE/UPOTREBA/
ODRAVANJE/DOGRADNJA
REVITALIZACIJA
RECIKLIRANJE
ODSTRANJIVANJE/PRERADA/
DEPONOVANJE/OKOLINA
Otkrivena greka i njena ispravka u razvoju proizvoda iznosi 1 novanu jedinicu, u proizvodnji 10 novanih
jedinica, dok nakon plasmana proizvoda na trite ona iznosi 100 novanih jedinica.
14
ZATO ?
KAKO ?
KADA ?
MARKETING
TEHNOLOKA
PRIPREMA
UPRAVLJANJE
PROIZVODNJOM
IDEJA
PROIZVOD
TA ?
GDE, KO ?
KONSTRUKCIONA
PRIPREMA
PLANIRANJE
PROIZVODNJE
aktivnost, zahteva eksperte znanja iz svog domena, dok preseci aktivnosti zahtevaju
odgovarajui nivo zajednikog timskog rada.
Geometrijski bazirano
projektovanje
Projektovanje pomocu
tipskih oblika
3D solid modeliranje
Modeliranje bazirano
na tipskim
oblicima (TO)
Odnosi tolerancija
Optimizacija konstrukcije
proizvoda (ogranienja i
alternative TO)
Izdvajanje i
prepoznavanje tipskih
oblika i njihove
meusobne interakcije
Izbor operacija
Izbor maina, alata,
pribora i merila
Definisanje operacija i
zahvata izrade
Izbor pripremka
Izbor materijala
Definisanje strategije
proizvodnje
PROJEKTOVANJE
PROIZVODA
PROJEKTOVANJE
TEHNOLOKIH
PROCESA
(TEHNOLOKA
PRIPREMA)
PREPOZNAVANJE
TIPSKIH OBLIKA
UPRAVLJANJE
PROIZVODNJOM
PLANIRANJE
RESURSA
Planiranje operacija
Izrada NC programa
Organizacija proizvodnje
Raspodela poslova
Terminiranje
proizvodnje u pogonu
Provera kapaciteta
pogona
Planiranje kapaciteta
Planiranje proizvodnje
Proraun i planiranje
proizvodnih kapaciteta
MRPI i MRPII
a)
Tehnoloka priprema
proizvodnje
Projektovanje
proizvoda
Marketing i
prodaja
Proizvodnja
proizvoda
Dobavljai
Inenjering
kvaliteta
Projektovanje
proizvoda
b)
Tehnoloka priprema
proizvodnje
Proizvodnja
proizvoda
Skraenje ciklusa
Proizvod raspoloiv
Ciklus razvoja proizvoda, konkurentno inenjerstvo
Vreme
NOVI
PROIZVOD
PONOVLJENI
PROIZVOD
VEZE SA OKOLINOM
FUNKCIONALNA
STRUKTURA
(KONCIPIRANJE)
FIZIKA
STRUKTURA
(OBLIKOVANJE)
KONSTRUKCIONA
STRUKTURA
(RAZRADA)
TEHNOLOKO I
PROIZVODNO
OSVAJANJE
DELIMINO
POZNATO
NEPOZNATO
ZNAAJNO
POZNATO
POZNATO
PRIKUPLJANJE I
SELEKCIJA
IDEJA
PROJEKTNI
ZADATAK
KONSTRUISANJE
TEHNOLOKO I
PROIZVODNO
OSVAJANJE
ISPITIVANJE
LANSIRANJE I
PROMOCIJA
MODEL
PROIZVODA
PROTOTIP
PROIZVOD NULTE
SERIJE
PROIZVOD
PROBNE SERIJE
PROIZVOD
REDOVNE SERIJE
Osnovno/neophodno
delovanje
Potrebno delovanje
Preventivno/korektivno
delovanje
za masovnu proizvodnju izvede isto kao kod novog proizvoda za pojedinanu proizvodnju. To
znai, da se tehnoloka priprema proizvodnje mora integrisati u proces razvoja proizvoda a ne
da bude faza koja sledi nakon konstruisanja novog proizvoda.
Kod proizvoda nulte serije interes se pomera prema tehnolokoj pripremi proizvodnje,
odnosno usklaivanju konstrukcije proizvoda sa tehnolokim potencijalima proizvodnog
sistema. Osnovni zadatak proizvoda nulte serije je da se proveri funkcionalnost i
tehnologinost izrade proizvoda u pogledu procesa, alata, pribora, itd. U cilju uspenog
razvoja proizvoda neophodno je da se konstruisanje, tehnoloko i proizvodno osvajanje
proizvoda nulte serije izvede na isti nain kao kod proizvoda za maloserijsku proizvodnju.
Kod probne serije panja je usmerena na optimizaciju konstrukcije proizvoda s obzirom
na tehnologinost izrade i montae proizvoda i organizaciju masovne i velikoserijske
proizvodnje. Osnovni zadatak probne serije je projektovanje, usklaivanje i provera
proizvodnih tokova, najee proizvodnih i montanih linija.
Tip proizvodnje
Uticaj tipa proizvodnje na strukturu razvoja proizvoda je veoma slian kao i uticaj
stepena noviteta proizvoda. Struktura procesa razvoja novog proizvoda koji se proizvodi u
masovnoj proizvodnji znaajno se razlikuje od strukture razvoja novog proizvoda koji se
proizvodi u pojedinanoj i maloserijskoj proizvodnji, dok se u manjoj meri razlikuje od
strukture u srednjeserijskoj i velikoserijskoj proizvodnji. Prethodno izneti stavovi su potvreni
slikom 2.14 i tabelom 2.5.
Tabela 2.5 Uticaj tipa proizvodnje na strukturu procesa razvoja proizvoda
TIP PROIZVODNJE
MASOVNA
VELIKOSERIJSKA
SREDNJESERIJSKA
MALOSERIJSKA
POJEDINANA
PROTOTIP
NULTA SERIJA
PROBNA
SERIJA
REDOVNA
SERIJA
NEPOTREBNO
PREVENTIVNO
NEOPHODNO
Pojedinani i
Grupni, odnosno tipski prilaz.
ULAZ
Program proizvodnje
Individualni prilaz u
projektovanju
proizvoda
Pojedinani crtei
Individualni prilaz u
projektovanju
tehnolokih procesa
Individualni tehnoloki
procesi
Grupni i tipski
tehnoloki procesi
Individualni prilaz u
izvoenu procesa
proizvodnje
Individualno proizvedeni
delovi i proizvodi
Grupe i tipovi
proizvedenih delova
IZLAZ
IZLAZ
a) individualni prilaz
2.5
IZLAZ
PROJEKTOVANJE
TEHNOLOKIH
PROCESA
MANUELNO
(runo)
VARIJANTNI
PRILAZ
AUTOMATIZOVANO
(raunarom podrano)
VARIO-GENERATIVNI
PRILAZ
GENERATIVNI
PRILAZ
2.5.1.2
Obradni
centri
NC strugovi
Brusilice
Builice
Glodalice
Strugovi
Revolver
strugovi
Automati
Individualni delovi
Individualni tehnoloki
procesi
Vizuelna klasifikacija,
Analiza tehnolokih procesa PFA (Production Flow Analysis) i
Konstrukciono-tehnoloki klasifikatori PCA (Part Coding and Classification
Analysis).
25
Hijerarhijski kod ili monokod ima strukturu drveta u kojoj svaki vor pojaava
informaciju prethodnog, tj svaka pozicija odnosno kodno mesto u strukturi zavisi od
prethodno izabrane pozicije (slika 2.19). Orijentisan je za potrebe projektovanja i pogodan za
grupisanje i kodiranje delova na bazi geometrijskog oblika, veliine, mera i sl.
ROTACIONI DELOVI
5XXXXX
51XXXX
52XXXX
53XXXX
59XXXX
531XXX
532XXX
533XXX
539XXX
5321XX
5322XX
5323XX
5329XX
53211X
53212X
53213X
53219X
53213A
53213B
53213C
53219H
53213B
KLASIFIKACIONI BROJ
VREDNOST
MESTO
Klasa
delova
1
2
Spoljanji
oblik
1
2
Unutranji
oblik
1
2
Specijalni
oblici
1
2
Tanost
Materijal
1
2
A
B
Grupa delova
2
3
Delovi
Operacije
Operacije
Grupa delova
Delovi
Kompleksni deo
Slika 2.22 Primer operacijske grupe delova sa kompleksnim delom |56, 59|
Projektovanje grupnog tehnolokog procesa obrade za kompleksne delove, vri se do
nivoa utvrivanja redosleda i sadraja operacija i zahvata, izbora standardnih i projektovanja
grupnih pribora i alata. Na osnovu projektovanog grupnog tehnolokog procesa ili grupne
operacije obrade vri se preciziranje tehnolokog procesa za svaki pojedinani deo iz grupe,
tako to se vri preciziranje ostalih potrebnih resursa, pre svega alata, dimenzija, parametara
obrade i vremena. Faze projektovanja grupnog tehnolokog procesa i grupnih operacija
prikazane su na slici 2.23.
Tipske tehnoloke procese karakterie jedinstvo tehnolokih procesa, odnosno
zajedniki sadraj i redosled operacija i zahvata obrade, za delove sa zajednikim
konstrukciono-tehnolokim karakteristikama koji pripadaju istom tipu [190].
Primenom odgovarajuih metoda grupisanja, daljom klasifikacijom grupa delova dolazi
se do odreenih tipova delova koji imaju vei stepen slinosti, a razlike izmeu delova se
najee odnose samo na dimenzije. Na ovaj nain se postie nepromenljivost strukture grupa
delova du proizvodnog toka, jer svaki deo prolazi iste operacije i zahvate, to znai da se
klasifikacija delova vri samo jednom na ulazu u proizvodni proces i svi delovi zajedno
prolaze kroz proces proizvodnje. U proizvodnim sistemima gde se proizvode vee koliine
tipiziranih proizvoda, projektovanje tipskih tehnolokih procesa je skoro neophodno jer
omoguuje primenu najprogresivnijih naina obrade, ime se osigurava visoka proizvodnost i
najpovoljnije iskorienje raspoloivih proizvodnih resursa.
28
ULAZ
Program proizvodnje
Klasifikacija delova
u grupe
Postoji realan
kompleksan deo
DA
NE
Izbor dela
Projektovanje
imaginarnog
kompleksnog dela
Projektovanje grupnog
tehnolokog procesa
obrade
Preciziranje tehnolokog
procesa obrade za
konkretan deo
IZLAZ
Tehnoloka dokumentacija
Pored svoje primene u tehnolokoj pripremi, grupni i tipski prilaz je naao svoju
primenu i u projektovanju proizvoda (npr. modularni koncept projektovanja), planiranju i
upravljanju proizvodnjom, kao i samom procesu proizvodnje, to je posebno karakteristino
za primenu kod odgovarajuih fleksibilnih tehnolokih sistemima. Iako su grupna i tipska
tehnologija razvijene u cilju poveanja serijnosti izrade delova iroke strukture, odnosno
asortimana u maloserijskoj i pojedinanoj proizvodnji na konvencionalnim obradnim i
tehnolokim sistemima sa ciljem postizanja efekata serijske proizvodnje, ovi koncepti se
uspeno primenjuju i pri projektovanju i proizvodnji na savremenim obradnim i tehnolokim
sistemima sa CNC upravljanjem.
29
2006
2005
2000
1997
1986
1970
1955
1950
1930
1900
1750
1600
Izrada brodova
Runi rad i korienje ivotinja u radu
1980
32
CAPP
STEP
TEHNOLOKA
PRIPREMA
PROIZVODNJE
TEHNOLOKI
PROCESI
MODEL
POIZVODA
MRP
ERP
CAD
PLANIRANJE I
UPRAVLJANJE
PROIZVODNJOM
KONSTRUKCIONA
PRIPREMA
PROIZVODNJE
BAZA PODATAKA
PROIZVODA I
PROCESA
JIT
CAE
IGES
ZAHTEVI
TRITA
PLANOVI
PROIZVODNJE
PROIZVODNJA
NC/CNC/
DNC
FTS
PROIZVODI
ROBOTI
Slika 3.2 Integracija kroz bazu podataka u uem CIM okruenju i mesto tehnoloke
pripreme proizvodnje
Neke od identifikovanih prednosti integracije kroz bazu podataka su:
Mogunost komunikacije izmeu razliitih funkcionalnih jedinica proizvodnog
sistema,
Taan prenos podataka unutar i izmeu sopstvenih proizvodnih pogona i/ili
kooperantskih pogona,
Bra reakcije na zahtevane promene,
Poveana fleksibilnost u smislu uvoenja novih proizvoda,
Poveanje kvaliteta rada u okviru proizvodnih procesa,
Poveanje kvaliteta proizvoda,
Efikasna kontrola i upravljanje tokovima podataka izmeu razliitih
funkcionalnih jedinica,
Smanjenje vremena razvoja i proizvodnje,
Unapreenje proizvodnog toka od narudbe do isporuke,
Holistiki pristup problemima celog proizvodnog sistema, i dr.
Kompleksnost procesa razvoja i proizvodnje proizvoda zahteva bolje upravljanje
poslovnim procesima u kolaborativnom okruenju. Integracioni problemi i potrebe u
proizvodnom sistemu se javljaju iz razliitih perspektiva [179,253,279]:
CIM INTEGRACIJA
INTEGRACIJA APLIKACIJA
- Prenosive aplikacije
- Distribuirana obrada podataka
- Izvrno okruenje / Zajedniki servisi
- Zajedniki informacioni resursi
CIM EVOLUCIJA
1970
1980
1990
2000
2010
Prema nekim autorima kao to je [209], etvrti, odnosno finalni nivo integracije, odnosi
se na integraciju preduzea EI (engl. Enterprise Integration). Pod integracijom preduzea se
podrazumeva mogunost integrisanja tokova materijala, informacija, odluivanja i
upravljanja kroz organizaciju; povezivanje funkcija sa informacijama, resursima,
aplikacijama i ljudima; sa osnovom na unapreenju komunikacije, kooperacije i koordinacije
u preduzeu; u cilju upravljanja preduzeem prema definisanoj strategiji upravljanja.
Na slici 3.4 predstavljen je jedan predloeni okvir za integraciju preduzea, u okviru
koga je definisana i funkcija tehnoloke pripreme kroz procese, tehnologije, alate, ljude i dr.
PREDUZEE
SE
PO
JE
DU
KORISTI
VIZIJA
PROCESI
TEHNOLOGIJA
LJUDI
ALATI
METODOLOGIJA
OBUHVATA &
INTEGRIE
ARHITEKTURA
Zaposleni
Finansije
CIM
PLANIRANJE
CAD/CAE
CAQ
Investicije
Finansije
Zaposleni
Proizvodnja
Proizvod
PRODAJA
PP&C
- Ponuda
- Obrada
porudbina
- Planiranje
prodaje
NABAVKA
Nalog za
naruivanje
Naruivanje
Prijemna
kontrola
Projektovanje
Tehniki
prorauni
Crtei
Sastavnice
Simulacije
Globalno
planiranje
Planiranje
materijala
Planiranje
proizvodnje
Upravljanje
proizvodnjom
CAPP/CAM
Planiranje
kontrole
Procedure
kontrole
Upravljanje
kvalitetom
Dokumentacija
o kvalitetu
Izvetaj o
kvalitetu
Projektovanje
tehnolokih
procesa izrade
Projektovanje
tehnolokih
procesa
montae
NC
programiranje
Simulacije
Ostali resursi
PROIZVODNJA
Uprav. tokom materijala
Upravljanje pogonom
Odravanje
Transport materijala
Skladitenje
Meuoperacijsko
skladitenje (baferi)
Prijem materijala
Dobavlja
Skladitenje
Fino planiranje
Upravljanje nalogom
Akvizicija podataka
Analiza i ocena podataka
Izrada
Montaa
Proizvodna oprema
Dijagnostika
Popravke
Preventivno odravanje
Kontrola kvaliteta
TOK MATERIJALA
Pakovanje
Isporuka
Kupac
Upravljanje implementacijom,
Merenje ostvarenih rezultata,
Unapreenje znanja iz oblasti CIM sistema i
Strategiju unapreenja CIM sistema.
PRIRODA
KOMPANIJE
PODSISTEM A
POSTOJEI
RESURSI
MOGUNOSTI
PODSISTEM B
PODSISTEM G
SPECIJALNE
POTREBE
PODSISTEM N
1A
1B
FUNKCIJA
PLANIRANJA
PROIZVODNJE
1C
FUNKCIJA PRODAJE,
NABAVKE I
KOOPERACIJE
RAUNOVODSTVENA
FUNKCIJA
FUNKCIJA
KONSTRUKCIONE
I TEHNOLOKE
PRIPREME
FUNKCIJA
PROIZVODNJE
MARKETING
FUNKCIJA
FUNKCIJA
UPRAVLJANJA
PROIZVODNJOM I
KVALITETOM
2A
2B
INFORMACIONI
SISTEM
UPRAVLJANJA
2C
INFORMACIONI
SISTEM PODRKE
PROIZVODNJI
INFORMACIONI
SISTEM
PROIZVODNJE
POTPUNO INTEGRISANI
SISTEM
Slika 3.8 Sistemska integracija komponenti CIM sistema u tipinom malom i srednjem
preduzeu [45]
Neke koristi koje se odnose na zaposlene su [170]:
% Preduzea
Unapreenje efikasnosti
Redukcija trokova
Unapreenje kvaliteta
Redukcija vremena "time to market"
Automatizacija
Redukcija zaliha u procesu proizvodnje
Bolje radno okruenje
96
92
71
53
33
67
28
39
1
2
3
4
5
6
7
3.3
Koristi jo
nisu
dokazane
Novi za
pogon i
kompaniju
Novi za
pogon
ali ne i za
kompaniju
Rizian
projekat
Modifikacija
u rasporedu
opreme
Veliki
uticaj na
organizaciju
proizvodnje
0
21
0
16
34
12
17
17
4
21
0
46
12
0
0
4
0
33
12
0
51
4
0
0
55
0
17
24
4
34
0
21
0
29
12
0
21
34
21
0
0
24
Konstrukciona
priprema
proizvodnje
Istraivanje i
razvoj
Mogunost
projektovanja
Selekcija i
izbor ideja
Marketing
Globalno
planiranje
proizvodnje
Mogunost s
obzirom na.
Druge funkcije
proizvodnog
sistema
Mogunost
proizvodnje
Tehnoloka
priprema
proizvodnje
Planiranje i
upravljanje
proizvodnjom
100%
Trokovi
izmene
85%
Znanje
projektanta
Nedostatak znanja
Trokovi
60%
Zahtevi i
potrebe
5-10%
Konceptualno
projektovanje
proizvoda i procesa
Detaljno
projektovanje
Proizvodnja
proizvoda i
i/ili instalisanje
procesa
Vreme
Proces projektovanja i konstruisanja proizvoda se sastoji iz vie faza, iji naziv i sadraj
varira u zavisnosti od razliitih "kola" i teorija razvoja proizvoda. Prema nemakom
standardu VDI 2221 projektovanje i konstruisanje proizvoda se obavlja u etiri osnovne faze
[210,273]:
Definisanje zadatka koji obuhvata prikupljanje informacija i definisanje zahteva
i ogranienja koje treba da zadovolji reenje proizvoda,
Konceptualno projektovanje (nem. Methodisches Koncipieren, engl. Conceptual
Design), obuhvata postavljanje funkcionalnih struktura, pretraivanje
odgovarajuih principa i njihovu kombinaciju u konceptne varijante proizvoda,
Oblikovanje (nem. Methodisches Entwerfen, engl. Embodiment Design), u
okviru koje projektant, poinjui od koncepta, odreuje plan, oblikuje i razvija
tehniki proizvod ili sistem u odnosu na tehnike i ekonomske uslove i
Detaljno projektovanje (nem. Methodisches Ausarbeiten, engl. Detail Design), u
okviru koje se konano postavlja raspored, oblik, dimenzije i osobine povrina
svih pojedinanih delova, tehnike i ekonomske mogunosti se ponovo
proveravaju, i generie se konstrukciona dokumentacija.
Prema amerikom standardu NIST projektovanje proizvoda se deli na dve osnovne faze,
konceptualno projektovanje proizvoda i detaljno projektovanje proizvoda [77]. U okviru
konceptualnog projektovanja proizvoda, na osnovu ulaznih informacija definiu se
odgovarajue karakteristike proizvoda, prema sledeim etapama:
Konceptualno projektovanje
proizvoda
Zahtevi
Funkcionalni
dizajn
Funkcije
Specifikacije
ponaanja
Materijal
Forma
- Glavni oblik
- Tipski oblik (feature)
- Odnosi izmeu tipskih oblika
Zahtevi korisnika
- Koliine
- Ogranienje cene
- Datum isporuke
Forma/Struktura
Proces
- Izrade
- Montae
- Kontrole
Izbor potrebnih
resursa
Oprema/
Mogunosti
Ponaanje
Embodiment
dizajn
Izbor procesa
(tehnologije)
Procena vremena i
trokova
Vreme i Trokovi
Detaljno
projektovanje
tehnolokog procesa
Detaljno
projektovanje
proizvoda
Geometrija
Topologija
Tolerancije
Dimenzije
Stanje povrina
Materijal
Sadraj TP-Operacije
Podoperacije/Pribori
Zahvati
Proizvodni resursi
Parametri
Tano vreme/trokovi
Osnovni izlazni rezultat iz ove faze je preliminarni, odnosno idejni ili skeleton [181]
tehnoloki proces proizvodnje. Preliminarni tehnoloki proces se daje u vidu sadraja
tehnolokog procesa, odnosno redosleda operacija, sa definisanom listom vrsta proizvodnih
resursa i procenom vremena i trokova proizvodnje. Preliminarni tehnoloki proces se koristi
za modifikaciju konceptualno projektovanog proizvoda i pored informacija detaljno
projektovanog proizvoda predstavlja osnovnu podlogu za detaljno ili zavrno projektovanje
tehnolokog procesa proizvodnje proizvoda.
44
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
COMPASS
CPS
EPSS
x
x
x
x
x
x
MaMPS
MAS
Zapremina dela
Masa dela
Opis oblika dela
Sekundarne geometrijske karakteristike
Tolerancije
Kvaliteti povrina
Debljine zidova dela
Mera za kompleksnost dela
Provera unifikacije debljine zidova dela
Koristi CAD bazirano okruenje
Koristi CAD ulazne podatke
DCA
Geometrijske osobine
CAMPS
x
x
x
x
x
x
x
46
U novije vreme istraivaki napori u ovoj oblasti su fokusirani na razvoj i primenu alata
vetake inteligencije, multiagent sisteme, itd., a manje na razvoj metodologija konceptualnog
projektovanja tehnolokih procesa.
Tako je na NIST-u posebna panja posveena integraciji projektovanja i proizvodnje
kroz odreene projekte, kao to su SIMA (Systems Integration for Manufacturing
Applications) i DPPI (Design and Process Planning Integration). U okviru projekta pod
nazivom Integracija projektovanja proizvoda i tehnolokih procesa (DPPI), osnovni zadatak
se odnosio na ostvarivanje komunikacije i integracije izmeu konceptualnog projektovanja
proizvoda i tehnolokih procesa [205]. SIMA projekat je orijentisan na integraciju softverskih
aplikacija iz oblasti projektovanja, izrade i montae za elektro-mainske delove [26].
Primenom rezultata ovih projekata i njihovom nadogradnjom Feng i dr. [78,79] su integraciju
konceptualnog projektovanja proizvoda i tehnolokih procesa zasnovali na primeni
odgovarajuih baza znanja, slika 4.4, a kasnije i inteligentnih softverskih multiagenata.
Detaljniji prikaz aktivnosti konceptualnog projektovanja tehnolokih procesa e se dati
u nastavku, kao i u okviru prikaza funkcionalnog modela tehnoloke pripreme.
Preliminarni tehnoloki
procesi &
Trokovi/Vreme
Sistem za konceptualno
projektovanje proizvoda
Baza znanja za
projektovanje
prozvoda
Integrisani informacioni
model projektovanja
proizvoda i tehnolokih
procesa
Konceptualno projektovanje
tehnolokih procesa zasnovano na
bazi znanja
Maina za zakljuivanje
- Izbor procesa
- Izbor resursa
- Procena trokova i vremena
Informacije projektovanja
proizvoda
Baza podataka
proizvoda
Baza znanja za
projektovanje
tehnolokih
procesa
Baza podataka
proizvodnih
resursa
Preliminarni
dizajn
proizvoda
Da li su
parametri dizajna
zadovoljavajui?
Modeliranje
proizvoda
Analiza
tehnologinosti
proizvoda
Predloene
modifikacije
dizajna
DA
Prihvaeni
konceptualni
dizajn
proizvoda
NE
DA
Da li proizvod
moe da se
modelira
pomou
raspoloivog
skupa tipskih
oblika
NE
Da li postoji
bar jedan
DA
DA
plan izrade
pogodan za
kreiranje
eljenog oblika I
dimenzija
NE
Da li postoji
bar jedan
plan izrade
pogodan za
ostvarivanje
zahtevanih
tolerancija i
kvaliteta obrade
Da li postoji bar
jedan tehnoloki
DA
proces koji
zadovoljava
predviene
trokove i vreme
proizvodnje
NE
DA
Prihvaeni
konceptualni
dizajn
proizvoda
NE
Proizvod,
deo
Baza
pravila
Analiza
tehnologinosti
Rezultati analize
Proizvod,
deo
Preliminarni
tehnoloki
procesi
Proizvodni
zahtevi
Analiza
tehnologinosti
Baza podataka
proizvodnih
resursa
Rezultati analize
51
Povratne informacije za
korekciju dizajna proizvoda
Direktan prilaz ili prilaz baziran na pravilima (rule-base), slika 4.7a. Pravila se
koriste da se identifikuju neodgovarajui atributi dizajna proizvoda. Ovaj prilaz
je pogodan za near-net proizvodnju, ali je manje pogodan za proizvodnju veine
elektro-mainskih delova zbog veeg broja zahvata i operacija, kao i njihove
interakcije, ime je oteano direktno utvrivanje tehnologinosti konstrukcije
proizvoda.
Indirektan prilaz ili prilaz baziran na tehnolokim procesima (plan-base), slika
4.7b. Prvo se na bazi dizajna proizvoda projektuje konceptualno ili idejno
reenje tehnolokog procesa, a potom se modifikuju razni delovi procesa i
odgovarajueg dizajna u cilju smanjenja trokova.
Povratne informacije za
korekciju dizajna proizvoda
2.
Ocena tehnologinosti
3.
Nivo automatizacije,
Nivo automatizacije pokazuje nivo uea projektanta u donoenju odluka, kao i tip
informacija koje se prosleuju projektantu.
4.1.2.2
- Specifikacije konstrukcije
- Miljenja konstruktora
- Inovacije procesa
PROJEKTOVANJE
PROIZVODA
Procesi
Konceptualno
Procena
zahteva
trita
Oblikovanje
Detaljno
PROIZVODNJA
Projektovanje
tehnolokih
procesa
Planiranje i
upravljanje
proizvodnjom
Proces
proizvodnje
Povratne
informacije
Verifikacija
- Pitanja za kupce
- Sugestije za kupce
DRUGI ASPEKTI
IVOTNOG CIKLUSA
PROIZVODA
Servis
Recikliranje
ivotna
sredina
DFX Metodologije
MARKETING
Finalni proizvod
DFX Metodologije
- Zahtevi trita
- Marketing procene
DFX Metodologije
Informacije
Uspean razvoj novih proizvoda podrazumeva takva reenja koja su pogodna za sve
faze njihovog ivotnog ciklusa, od projektovanja pa do reciklae i odlaganja. U nastojanju da
se pomogne projektantima u to kvalitetnijoj proceni uticaja svih faza ivotnog ciklusa
proizvoda, proizvodne kompanije i istraivai su razvili mnoge alate i tehnike za odluivanje,
koje figuriu pod nazivom Projektovanje za izvrsnost DFX [110], slika 4.8.
:
:
povezani, tako da ako je odluka doneta na osnovu jednog od njih, to moe uticati na ostale
"Xi" u ivotnom ciklusu proizvoda [107,108].
DFX alati za podrku mogu da imaju razliite oblike, od procedura ili skupa smernica
na papiru, do programskih sistema koji su namenjeni za razliite vrste analiza, procena i
odreivanja tehnologinosti proizvoda, trokova, itd. Pojedini alati i tehnike konkurentnog
razvoja proizvoda i mesto posmatranih DFX tehnika su prikazani na slici 4.9.
Pre-projektni
razvoj
Ideja
Detaljno
projektovanje
Verifikacija
Post-projektni razvoj
Proizvodnja/
Distribucija
Primena/
Odravanje...
QFD
FMEA
DFM,DFA,DFP,
DFS,DFR,DFE...
CA
DOE
Alati i tehnike konkurentnog razvoja proizvoda
Slika 4.9 Alati konkurentnog razvoja proizvoda i mesto DFX tehnika [223,215]
Projektovanje za izradu i montau DFMA
Tokom 80-ih i 90-ih godina prolog veka vrena su istraivanja koja su imala za cilj da
otkriju ta japansku industriju ini konkurentnijom u odnosu na industriju u USA. Ova studija
je pokazala da automatizacija ini samo jednu treinu ukupne razlike u ostvarenoj
produktivnosti. Autori studije su zakljuili da ne mogu poboljanjima u procesu rada da
poveaju kompetetivnost i da proizvodi postanu konkurentniji ako dizajn proizvoda nije
dobar. Takoe je zakljueno, za ega sada postoje brojni dokazi, da projektovanje za
proizvodnju i montau DFMA uz podrku drugih DFX metoda imaju kljunu ulogu za
postizanje visoke proizvodnosti u svim proizvodnim delatnostima, odnosno industriji
[17,282].
Sve sloeniji proizvodi i odgovarajue tehnologije proizvodnje, nedostatak proizvodnog
znanja, pritisak na projektante da to pre projektuju proizvod, stava projektanata "mi vama
crte, vi ga proizvedite" ili tzv. komunikaciju "preko zida", sve vea sofisticiranost
proizvodne tehnike, uticali su na to da su projektanti sve manje bili u stanju da izbegnu
nepotrebne trokove proizvodnje. Jo ranih 80-ih je postalo izvesno da je neophodno
razmatrati mogunost izrade i montae jo u ranoj fazi razvoja proizvoda. Jedan od naina
ispunjenja ovih zahteva je da tehnolozi postanu deo tima simultanog razvoja proizvoda.
Projektovanje za izradu DFM i projektovanje za montau DFA su dve najee
primenjivane DFX metodologije i veoma esto se posmatraju objedinjeno kao projektovanje
za izradu i montau DFMA. Prikaz mesta i uloge analize tehnologinosti proizvoda sa aspekta
projektovanja za montau i projektovanja za izradu u ciklusu projektovanja proizvoda dat je
na slici 4.10.
Dva osnovna aspekta za projektovanje kvalitetne konstrukcije proizvoda s obzirom na
izradu i montau su [17]:
DFM u izboru kvalitetnog odnosa materijala i procesa, kao i proceni trokova
izrade delova i
DFA u pojednostavljenju strukture proizvoda i kvantifikovanju trokova
montae.
54
DFA
DFM
Analiza proizvoda i
redukcija broja delova
Projektovanje delova
pogodnih za montau
Trokovi montae
Izbor materijala
Izbor procesa
Projektovanje delova
pogodnih za izradu
Trokovi izrade delova
su
DFMA2, Boothroyd Dewhurst Inc., USA, [64], programski sistem razvijen prema
metodologiji koju su razvili Boothroyd i Dewhurst [32,33],
TeamSET, CSC Computer Sciences Ltd, UK, [257], programski sistem razvijen
prema Lucas-Hull metodologiji koja je nastala u kooperaciji Lucas organizacije
i Hull Univerziteta u UK [251] i
AEM Assembly Evaluation Method, Hitachi Corp., Japan, prema metodologiji
koju su razvili Miyakawa i Ohashi [42,192,251].
Projektovanje za montau
(DFA)
Preporuke za unapreenje i
pojednostavljenje strukture
proizvoda
Preporuke za najekonominije
materijale i procese
Projektovanje za Izradu
(DFM)
Prototip
Proces proizvodnje
U znak priznanja, ko-osnivai Geoffrey Boothroyd i Peter Dewhurst su dobili Nacionalnu medalju iz oblasti
tehnike od predsednika USA
56
USLOVI
UPOTREBE EKSPLOATACIJE
FUNKCIJA
prenos meh.
optereenja,
kretanja, toplote,
itd.
MATERIJALI
izbor
materijala
PROIZVODNI
PROCES
izbor
procesa
PROIZVODNA
OGRANIENJA I
USLOVI IZRADE I
MONTAE
OBLIK I
DIMENZIJE
konstruisanje
USLOVI
DRUTVA I
TRITA
tehnoloki,
estetski,
ekonomski,
okoline, itd.
Slika 4.12 Povezanost konstruisanja, izbora materijala i izbora procesa proizvodnje pri
razvoju proizvoda [86]
57
Kod prilaza prvo materijal pa proces proizvodnje, projektanti prvo biraju klasu
materijala na osnovu ulaznih zahteva, nakon toga se vri izbor moguih pripremaka i procesa
proizvodnje, ukljuujui i mogunost izbora optimalnog procesa proizvodnje.
Kod prilaza prvo proces proizvodnje pa materijal, projektanti prvo projektuju
preliminarni tehnoloki proces, a potom se vri izbor i evaluacija odgovarajuih potencijalnih
materijala na osnovu ulaznih proizvodnih zahteva.
Izbor tehnolokog procesa je jedna od najteih odluka u proizvodnji novih proizvoda. U
proizvodnoj praksi se veoma esto tehnoloki proces bira na osnovu prethodno projektovanog
tehnolokog procesa za sline proizvode. U sluaju mogunosti primene vie alternativnih
tehnolokih procesa, koriste se odgovarajui kriterijumi za izbor najpovoljnijeg reenja [54].
Izbor tehnolokog procesa uslovljen je, uglavnom, ekonomskim, organizacionim i
tehnolokim faktorima. Neki od moguih kriterijuma za izbor primarnog tehnolokog procesa,
kao to su zaostala naprezanja u pripremku, ema napregnutog stanja, obradljivost, stepen
anizotropije materijala, itd., su veoma sloeni i nedovoljno precizni da bi bili osnova za
donoenje odluke o izboru primarnog tehnolokog procesa [56]. Opti algoritam modela za
izbor primarnog tehnolokog procesa je vrlo sloen zbog:
U cilju lakeg izbora i definisanja procesa proizvodnje mnogi autori su izvrili podelu
tehnolokih procesa u odreene grupe. Tako npr. Ashby [16] je izvrio podelu prema vrsti i
redosledu izvoenja procesa na:
Funkcije, odnosno zahtevi koji se oekuju od procesa, kao i vrsta procesa koje je
potrebno primeniti,
Ogranienja u okviru kojih se identifikuje eljena klasa materijala, klasa oblika
i atributi procesa i
Kriterijumi za ocenu i izbor tehnolokih procesa.
U drugoj fazi, koja se naziva fazom izvodljivosti [54], vri se provera postavljenih
ogranienja i eliminacija neodgovarajuih procesa. Ova faza se analitiki najee realizuje
pretraivanjem tabela u kojima su matrino definisane mogunosti ili ogranienja
tehnolokog procesa s obzirom na atribute proizvoda, proizvodnje i procesa. Najei atributi,
odnosno kriterijumi su vrsta materijala, oblik, koliine, tanost, i dr.
Primer kompatibilnosti izabrane vrste materijala i odgovarajueg procesa proizvodnje
dat je u tabeli 4.2, dok je tabeli 4.3 dat primer ogranienja ili mogunosti tehnolokih procesa
s obzirom na odgovarajue atribute ili kriterijume procesa.
59
Legirani elici
Nerajui
elici
Aluminijum i
Al legure
Bakar i Cu
legure
Cink i Zn
legure
Magnezijum i
Mg legure
Titanium i Ti
legure
Nikal i Ni
legure
Vatrootporni
metali
Termoplasti
Duromeri
Livenje u pesku
Precizno livenje
Livenje pod pritiskom
Brizganje
Brizganje pene
Duvanje
Centrifugalno livenje
Termoformiranje
Istiskivanje
Hladno sabijanje
Kovanje u zatvorenom kalupu
Toplo ekstrudiranje
Rotaciono kovanje
Obrada rezanjem
Elektrohemijska obrada EHM
Elektroerozivna obrada EDM
Elektroerozivna obrada icom
Oblikovanje lima
Rotaciono izvlaenje
Ugljenini
elici
Procesi
Siv liv i
Nodularni liv
O
X
X
X
X
X
X
X
X
X
X
X
O
O
X
X
X
X
O
O
X
X
X
X
X
X
O
O
O
O
O
O
O
O
O
O
O
O
O
X
X
X
X
X
X
O
O
O
O
O
O
O
O
O
-
O
O
X
X
X
X
X
X
O
O
O
O
O
O
O
O
O
O
O
O
X
X
X
X
X
O
O
O
O
O
O
O
O
O
O
O
O
X
X
X
X
X
O
O
O
O
O
O
O
O
O
O
X
X
X
X
X
O
X
X
O
O
O
O
X
X
X
X
X
O
O
O
O
-
X
X
X
X
X
X
X
X
O
X
O
-
O
O
X
X
X
X
X
X
X
O
O
O
O
-
X
X
X
X
X
X
X
X
O
X
-
X
X
X
O
O
O
O
O
X
X
X
X
X
X
X
O
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
O - normalna praksa
- manje primenljivo
X - nije primenljivo
Kvalitet povrine
Tanost
dimenzija
Kompleksnost
oblika
Proizvodnost
Obim
proizvodnje
Povrina
projekcije
Relativni
trokovi
N
S
N
N
V
N
N
N
N
N
N
S
N
S
N
N
N
V
S
V
V
S
V
V
V
V
V
V
S
V
S
S
V
V
V
S
S
V
S
V
V
S
V
S
V
S
V
S
V
V
V
V/S
N
V/S
V/S
N
V/S
N
V/S/N
S/N
N
N
V/S
V/S
V/S
V
V/S
V/S
V
S/N
V/S
V/S
V/S/N
V/S
V/S/N
V/S/N
V/S/N
S/N
N
V/S
V/S
V/S
V
V/S
V
S/N
V/S/N
V/S/N
S/N
V/S/N
V/S
S/N
V/S/N
V/S/N
S/N
S/N
S/N
V/S/N
V/S/N
V/S
S/N
N
V
V/S
V/S
V/S/N
V/S/N
S/N
V/S
V/S/N
V/S/N
V/S
V
V/S/N
N
V/S
V/
V/S
V/S
>6,3
1,66,3
<1,6
m
<0,13
0,131,3
>1,3
mm
Visoka
Srednja
Niska
>100
10100
<10
kom/sat
>5000
1001000
<100
komada
>0,5
0,020,5
<0,02
m2
60
VREME CIKLUSA
KVALITET
FLEKSIBILNOST
1.
2.
3.
4.
5.
> 15 min.
od 5 do 15 min.
od 1 do 5 min.
od 20 s. do 1 min.
< 20 s.
ISKORIENOST
MATERIJALA
POGONSKI
TROKOVI
Tabela 4.4 Primer vrednovanja pojedinih tehnolokih procesa na osnovu kriterijuma [17]
Procesi
Oblik
Livenje u pesku
Precizno livenje
Livenje u kokile
Livenje pod pritiskom
Centrifugalno livenje
Brizganje
Obrada rezanjem 1 otricom
Obrada rezanjem s vie otrica
Bruenje
Elektroerozivna obrada
3D
3D
3D
3D puni
3D uplji
3D
3D
3D
3D
3D
Vreme
ciklusa
2
2
4
5
2
4
2
3
2
1
Pogonski
trokovi
1
3
2
1
3
1
5
4
4
1
Ova faza se naziva faza optimizacije, koja se prema [54] moe podeliti na dve
podfaze:
Ukoliko nakon druge faze preostaje veliki broj procesa koji zadovoljavaju
postavljena ogranienja kriterijuma (vie od 6) prelazi se na prvu podfazu, gde
se usvajaju neophodne minimalne vrednosti ponderisanih ocena procesa za
odreene kriterijume. Procesi koji ne ispunjavaju usvojene minimalne vrednosti
ovih ponderisanih ocena se eliminiu.
U drugoj podfazi vri se dodeljivanje teinskih koeficijenta pojedinim
kriterijumima procesa, a nakon toga i proraun ponderisanog ranga vrednosti
preostalih procesa prema formuli (4.1), na osnovu ega se utvruje redosled
procesa, odnosno rangiranje procesa.
n
WRV Pi (Wi )
(4.1)
i 1
gde su:
WRV ponderisani rang vrednosti procesa
n ukupan broj kriterijuma
Pi ponderisana ocena procesa za odreeni kriterijum
Wi teinski koeficijent kriterijuma
U etvrtoj fazi se najbolje rangirani procesi detaljno analiziraju i ispituju u cilju
dobijanja dodatnih i potvrdnih informacija o kvalitetu izbora, razmatraju se eventualne
mogue tetne posledice za neke kriterijume koji nisu uzeti u razmatranje. Ako se utvrdi da
ima nekih bitnih nedostataka usvaja se sledei proces po rangu vrednosti.
U radu [251] razvijene su Informacione mape proizvodnih procesa "PRIMA", koje daju
detaljne podatke o karakteristikama i mogunostima odgovarajuih tehnolokih procesa.
Mapa svakog procesa je podeljena na sedam kategorija:
Vrsta pripremka,
Vrsta i redosled operacija i zahvata,
Proizvodni resursi i
Tehnoekonomski efekti.
Obrada baza,
Gruba obrada osnovnih povrina,
Gruba obrada pomonih povrina, koja je najee ujedno i zavrna obrada,
Specijalne obrade (npr. termika obrada, doterivanje, itd.) i
Zavrna obrada osnovnih povrina.
Opis
Intuitivna
Komparativna
(Metoda
poreenja)
Analogna
Parametarska
Analitika
64
Najbolja
primena za
Globalno
planiranje
proizvodnje
Globalno
planiranje
proizvodnje
Preciznost
(nivo greke)
30-50 %
30-50 %
Konceptualno
projektovanje
14-30 %
Konceptualno
projektovanje
14-30 %
Detaljno
projektovanje
5-15 %
T Tm Ti Tt
(4.2)
i 1
65
jedna/primarna osa
sloeni oblici
nepravilni i/ili sloeni
oblici
sekundarni oblici
A1
A2
A3
A4
A5
rupe/navoji/upusti i ostali
unutranji oblici koji se ne
nalaze na osnovnoj osi
B1
sekundarni oblici
B2
stepenasti oblici,T-ljebovi,
zupanici itd., otvori, navoji,
upusti u jednoj ravni
pravougaone projekcije
du jedne ili vie osa
sloeni oblici
B3
B4
B5
sloene trodimenzionalne
zaobljene povrine koje se
ne mogu svrstati u
prethodne kategorije
C1
pravilni oblici
sloeni oblici
neravnomerni i/ili
zaobljeni oblici
C2
C3
C4
66
C5
Trokovi materijala Tm
(4.3)
(4.4)
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
PROCES
CF
1
1
1
1
1
1
1
1
1
-
CH
1
1
1
1
1
1
1
1
1
-
SC
1.1
1.1
1.2
1.3
1.4
1.1
1.1
1.2
1.3
1.4
1.1
1.2
1.3
1.4
1.6
PDC
CDF
SMW
AM
MM
CNC
1
1.1
1.1
1.2
1.3
1
1.1
1.1
1.2
1.3
1.1
1.1
1.1
1.2
1.3
1.1
1.1
1.2
1.2
1.3
1.1
1.1
1.2
1.2
1.3
1.1
1.1
1.1
1.2
1.3
1.2
1.2
1.4
1.5
1.6
1.6
2
2.5
3
4
1.7
2.2
2.8
4
6
1.8
2.4
4
6
8
PM
1
1
1
1
1.2
1
1
1
1
1.2
1
1
1
1
1.2
IM
1
1.1
1.1
1.1
1.2
1
1.1
1.1
1.1
1.2
1
1.1
1.1
1.2
1.3
SM
1
1.1
1.1
1.2
1.3
1
1.1
1.1
1.2
1.3
1.1
1.1
1.1
1.2
1.3
CPM
1
1.1
1.1
1.2
1.3
1
1.1
1.1
1.1
1.2
1
1.1
1.1
1.1
1.2
VF
1
1.1
1.1
1.2
1.3
1
1.1
1.1
1.1
1.2
1
1.1
1.1
1.1
1.2
GDC
1
1.1
1.1
1.2
1.3
1
1.1
1.1
1.2
1.3
1
1.1
1.1
1.2
1.3
Trokovi izrade Ti
(4.5)
67
gde su:
(4.6)
gde su:
Klasa oblika A
Klasa oblika B
CH
SC
PDC
CDF
SMW
AM
MM
CNC
PM
IM
SM
1.2
1.6
1.3
1.3
1.2
1.2
1.4
1.2
2
2
1
1
1
-
2
2
1
1
1
-
1.3
1.5
1
1
1
-
3
1.5
1.2
-
2
2
1
1
1
-
1.5
1.5
1
1
1
-
2.5
4
1.1
1
1.1
1.1
1.2
1.1
1.1
1.1
1
1
1
-
1
1
1.5
Materijal
Sivi liv
Niskougljenini
elik
Legirani elik
Nerajui elik
Legure Cu
Legure Al
Legure Zn
Termoplastika
Termoseti
Elastomeri
69
CPM
VF
GDC
1.2
1.3
1.5
1
1
1
-
1.2
1
1.5
1
-
1.5
1.2
-
4.2
72
73
12
Modul za
odravanje
sistema
Prema detaljnosti projektovanja, tehnoloki procesi mogu biti statini ili promenljivi
u zavisnosti od raspoloivih proizvodnih resursa. Ako proizvodni sistem koristi
statino projektovanje, tehnoloki proces se ne menja u vremenu. Za fleksibilno
projektovanje vri se samo orijentaciono projektovanje tehnolokih procesa, dok se
detaljno projektovanje vri na nivou pogona. Dinamiko projektovanje podrazumeva
mogunost promena tehnolokih procesa u toku samog procesa proizvodnje s
obzirom na dinamiko stanje u proizvodnom sistemu.
PRISTUP
PROJEKTOVANJA
Generativni
DETALJNOST
PROJEKTOVANJA
Dinamiko
Vario-Generativni
Fleksibilno
Varijantni
Makro
Statino
Operativno
Taktiko
Mikro
Strategijsko
NIVO
PROJEKTOVANJA
VREMENSKA SKALA
PROJEKTOVANJA
75
Tehnika programiranja
- Tabele odluivanja,
- Tehnike vetake
inteligencije,
- ...
Hardwer
- Workstation,
- PC,
- ...
Ulazni interfejs
- Veza sa CAD,
- Razvijen jezik,
- ...
Pristup projektovanju
- Varijantni,
- Generativni,
- Vario-generativni,
- ...
CAPP
SISTEM
Stepen automatizacije
- Interaktivan,
- Delimino automatizovan
- Automatizovan,
Tip delova
- Rotacioni,
- Prizmatini,
- Delovi od lima,
- ...
Metoda obrade
- Struganje,
- Glodanje,
- Buenje,
- ...
Funkcije projektovanja
- Izbor obrade,
- Izbor zahvata,
- Reimi obrade,
- ...
76
Predstavljanje
proizvoda
Nain unoenja
ulaznih podataka
Varijantni
Na principima
grupne tehnologije
Manuelni ulaz
Generativni
Na bazi jezika za
opis dela
Manuelni ulaz
Novi
generativni
CAD model
Automatski CAD
interfejs
Nain generisanja
tehnolokih procesa
Manuelni,
modifikacijom
standardnih TP
Stablo odluke,
Tabline odluke,
Ekspertni sistemi
Stablo odluke,
Tabline odluke,
Metode vetake
inteligencije
Razvijena baza
podataka
Baza standardnih
tehnolokih procesa
Baza znanja i
tehnoloka baza
podataka
Baza znanja i
tehnoloka baza
podataka
Crte proizvoda
Interaktivna ili automatska
klasifikacija dela
Tabele, Dijagrami,
Preporuke, Standardi
Standardni tehnoloki
procesi
Baza podataka
grupa
delova
Baza podataka
standardnih
tehnolokih
procesa
Ostali aplikativni
programi i
baze podataka
Pretraivanje baze
podataka
Standardni tehnoloki
procesi
Modifikovanje
standardnog
tehnolokog procesa
Definisanje tehnolokog
procesa konkretnog dela
Tehnoloka
dokumentacija
Slika 4.25 Faze u okviru razvoja i primene varijantnih CAPP sistema [143]
U cilju efikasne primene varijantnog CAPP sistema, potrebno je prethodno realizovati
pripremnu fazu razvoja sistema, koja obuhvata sledee aktivnosti:
Analizu proizvodnog programa,
Razvoj klasifikacionog sistema ili izbor postojeeg klasifikacionog sistema,
Klasifikaciju i grupisanje delova, kao i formiranje matrica klasifikacionih
brojeva grupa delova,
Razvoj baze podataka za delove,
Projektovanje grupnih tehnolokih procesa za formirane grupe delova i
Razvoj baze podataka za standardne tehnoloke procese.
Prva aktivnost u okviru pripremne faze se odnosi na analizu proizvodnog programa u
okviru koje se prikupljaju i analiziraju podaci o geometrijskim i tehnolokim karakteristikama
proizvoda, nakon ega se vri izbor onih karakteristika koje e se obuhvatiti sistemom
klasifikacije. U narednom koraku se vri izbor i primena konstrukciono-tehnolokog ili
internog sistema klasifikacije, koji treba da obuhvati to vei broj karakteristika delova i
omogui bru klasifikaciju. Naredna etapa predstavlja klasifikaciju i grupisanje svih delova
pomou usvojenog klasifikacionog sistema u odreene grupe, koje se zatim memoriu u
odgovarajuu bazu podataka. Za ove grupe delova u narednom koraku se projektuju grupni
i/ili tipski tehnoloki procesi, koji se razrauju do zahtevanog nivoa preciziranosti.
Standardni, odnosno grupni i tipski tehnoloki procesi se u poslednjem koraku memoriu u
odgovarajuu bazu podataka sa tano definisanom pripadnosti odreenoj grupi.
Faza primene obuhvata sledee aktivnosti:
Klasifikaciju i kodiranje konkretnog dela,
Pretraivanje baze podataka grupa delova,
Izbor odgovarajueg standardnog tehnolokog procesa,
Eventualno modifikovanje standardnog i preciziranje konkretnog tehnolokog
procesa i
Generisanje odgovarajue tehnoloke dokumentacije.
78
Generativni pristup predstavlja napredniji, ali i sloeniji proces razvoja CAPP sistema.
Generativni CAPP sistemi su bazirani na nezavisnom projektovanju tehnolokog procesa za
svaki proizvod ili deo uz minimalno uee tehnologa.
Ovi sistemi generiu tehnoloki proces na osnovu ugraenog logikog algoritma, koji u
sebi sadri odgovarajuu bazu znanja za projektovanje tehnolokih procesa i bazu podataka
raspoloivih proizvodnih resursa. Za razvoj generativnog CAPP sistema je neophodno:
79
Osnovni model generativnog CAPP sistema, koji je prikazan na slici 4.26, sadri tri
bazna modula:
CAD sistemi
Analiza
podataka
Tehnoloko
prepoznavanje
Tehnoloki
procesi
CAPP
Postprocesor
Upravljanje i
planiranje
proizvodnje
Logika
odluivanja
Klasifikacioni brojevi,
Specijalni jezici za lingvistiko opisivanje i
CAD modeli.
80
Pojam "feature" se kod nas moe sresti pod razliitim terminima, kao karakteristika,
osobina, svojstvo, obeleje, oblik, forma, znaajka, itd., dok su u ovom radu usvojeni termini
tipski oblik i tipski tehnoloki oblik.
Prema jednoj definiciji "feature" predstavlja semantiku grupa ili atom modeliranja,
odreen skupom parametara, koji se koristi za opis objekta koji se ne moe dodatno razloiti,
sa aspekta jedne ili vie aktivnosti u vezi sa projektovanjem i primenom proizvoda [173,206].
Metodologije zasnovane na tipskim oblicima su prvo bile centralna tema integracije
CAD/CAM sistema, da bi intenzivnijim razvojem CAPP sistema postale osnova za integraciju
CAD/CAPP/CAM sistema.
Transfer podataka izmeu CAD i CAPP sistema je jedna od najznaajnijih aktivnosti u
razvoju i primeni CIM sistema. Mogu se izdvojiti tri osnovna pristupa povezivanja CAD i
CAPP sistema [19]:
Projektant tumai crte i pomou posebno razvijenog simbolikog jezika ili kroz
odreeni dijalog, daje opis tipskih tehnolokih oblika,
Razvija se sistem za izdvajanje i prepoznavanje tipskih oblika iz CAD modela i
Razvija se CAD sistem koji je zasnovan na tipskim oblicima, gde se pri
projektovanju koriste ovi oblici iz postojee biblioteke oblika. Za svaki tipski
oblik postoji odreeni tehnoloki proces na mikro nivou tako da projektovanje
tehnolokih procesa predstavlja kombinovanje obrade tipskih tehnolokih
oblika primenom tipskih tehnolokih sekvenci, odnosno grupa zahvata.
Tipski oblici koji se koriste pri projektovanju proizvoda, esto se znaajno razlikuju od
tipskih tehnolokih oblika (manufacturing feature) koji se koriste za projektovanje
tehnolokih procesa. Jedan od razloga postojanja ove razlike je razliit prilaz pri
projektovanju proizvoda i tehnolokih procesa, a kao potvrda prethodne tvrdnje dat je jedan
primer na slici 4.28. Upravo zbog toga je neophodan proces preslikavanja iz geometrijskog,
odnosno funkcionalnog domena u tehnoloki domen, to se naziva prepoznavanje tipskih
tehnolokih oblika ili samo tehnoloko prepoznavanje.
82
Slika 4.28 Prikaz razlike u prilazu projektovanja proizvoda i tehnolokih procesa [103]
Tipski tehnoloki oblici se karakteriu preko sledeih skupova informacija [206]:
Inherentne karakteristike, kao to su dimenzije, kvalitet povrina i tolerancije,
Geometrijski odnosi sa drugim tipskim tehnolokim oblicima i
Topoloke relacije sa drugim tipskim tehnolokim oblicima, kao to su
udaljenost ili rang susednosti i preklapanje ili interakcija.
Podela tipskih tehnolokih oblika moe se izvriti na vie naina, prva podela je prema
nainu predstavljanja proizvoda:
Povrinski tipski tehnoloki oblici (surface manufacturing feature), za granino
predstavljanje proizvoda (B-rep), i
Zapreminski tipski tehnoloki oblici (volumetric manufacturing feature), za
predstavljanje proizvoda solid modelom (CSG).
Na slici 4.29, prikazan je proizvod koji je projektovan pomou tipskih oblika i za koji su
potom definisani povrinski i zapreminski tipski tehnoloki oblici za njegovu obradu.
Slika 4.30 Primeri nastanka zapreminskih tipskih tehnolokih oblika [103, 161]
83
PROJEKTOVANJE POMOU
TIPSKIH OBLIKA
PROJEKTOVANJE SA
TIPSKIM TEHNOLOKIM
OBLICIMA
PROJEKTOVANJE SA
TIPSKIM OBLICIMA
PROVERA ISPRAVNOSTI
TIPSKIH TEHNOLOKIH
OBLIKA
TTO
TO
TTO
PRESLIKAVANJE
OBLIKA
TTO
SISTEM ZA
PROJEKTOVANJE
TEHNOLOKIH PROCESA
GM
KONVENCIONALNO
PROJEKTOVANJE
(BEZ UPOTREBE OBLIKA)
INTERAKTIVNO ILI
AUTOMATSKO
PREPOZNAVANJE TIPSKIH
TEHNOLOKIH OBLIKA
GM
TTO
CAD
CAPP
Ekspertni sistemi
86
Projektant ES
Razvoj
Proirenje i
korigovanje
Intervjui
Upotreba
Alat za razvoj ES
Inenjer znanja
Gradnja, korekcije
i testovi
Ekspertni sistem
Auriranje
podataka
Korienje
Operater
Korisnik
Baze znanja,
Mehanizmi zakljuivanja i
Korisniki interfejs.
Na slici 4.34, dat je prikaz opte strukture ekspertnog CAPP sistema, koji pored
navedenih elemenata obavezno poseduje integrisane baze podataka i znanja ili odgovarajue
baze podataka i znanja za proizvode i pojedine elemente projektovanja tehnolokih procesa,
najee proizvodne resurse.
Korisnik
Modul za spregu
sa korisnikom
Baza podataka
proizvoda
Sistem za
upravljanje bazama
podataka (DBMS)
Tehnoloke
baze podataka
Mehanizam
zakljuivanja
Numeriki
moduli i
algoritmi
Radna
memorija
Baze znanja
proizvoda
i procesa
Sistem za
upravljanje bazama
znanja (KBMS)
Dva osnovna prilaza ili sredstva za razvoj ekspertnih sistema su programski jezici i
ljuske ekspertnih sistema [288]. Veliki broj do sada razvijenih CAPP sistema baziran je na
primeni ekspertnih sistema, kao npr. CAM-I, GARI, TOM, XPLAN, KAPPS, KCAPPS,
SAPT, SAPOR i mnogi drugi, od kojih su neki detaljnije prikazani u poglavlju 4.2.4.
Neuronske mree
Mogu da izvedu pravila ili znanje kroz trening sa primerima, pri emu mogu da
toleriu izuzetke i nepravilnosti u bazi znanja i bazi pravila,
Mogu paralelno da razmatraju vie ogranienja.
Povratni ulaz 1
Grubo struganje(1)
Povratni ulaz 10
Osobina 1
Osobina 4
Atribut 1
Atribut 4
Poluzavrno struganje(2)
.
.
.
.
.
.
.
.
.
Ulazni
sloj
Skriveni
sloj
Izlazni
sloj
Zavrno struganje(3)
Bruenje(10)
Slika 4.35 Troslojna neuronska mrea za izbor tehnolokog procesa obrade [197]
Neuronske mree se koriste i za izbor parametara obrade, kroz razvoj dinamikog
modela, to je prikazano u radu [130], potom za inteligentno generisanje putanje alata u
smislu definisanja strategije obrade i redosleda zahvata obrade sloenih povrina [23], kao i
za mnoge druge aktivnosti i zadatke razvoja i primene CAPP sistema.
89
Fuzzy logika
DEFAZIFIKACIJA
Referentni ulaz
r(t)
FAZIFIKACIJA
INTERFEJS
BAZA
PRAVILA
Upravljanje
u(t)
PROCES
Izlaz
y(t)
Genetski algoritmi
91
120
120
110
100
90
80
70
60
110
100
90
80
70
10
15
20
25
30
35
40
45
60
50
10
15
Primer br.
Poetna dubina rezanja
30
35
40
45
50
2.6
25
Primer br.
20
2.4
2.2
2
1.8
1.6
1.4
10
15
20
25
30
35
40
45
1.2
50
Primer br.
10
15
20
25
30
35
40
45
50
Primer br.
Slika 4.37 Odreivanje optimalnih reima obrade primenom genetskih algoritama [198]
Osnovna prednost primene genetskih algoritama pri razvoju CAPP sistema u odnosu na
druge metode je mogunost simultanog reavanja optimizacionih problema izbora procesa,
operacija, zahvata, maina, alata, reima i drugih zadataka projektovanja tehnolokog procesa,
ime je omogueno dobijanje optimalnog reenja tehnolokog procesa za vie postavljenih
kriterijuma, odnosno funkcija cilja.
4.2.3.3
Pojam "agent tehnologije" se prvi put pominje od strane Hewitt 1997. godine, koji je
predstavio model baziran na distribuiranoj vetakoj inteligenciji. U poslednjih desetak
godina agent-bazirane tehnologije su nale iroku primenu u razliitim granama tehnike,
ukljuujui i projektovanje i proizvodnju [288].
S obzirom na njihovu sveobuhvatnost i robusnost, agent-bazirane tehnologije imaju
mnogo razliitih definicija. Agenti predstavljaju softvere koji ima sposobnosti da samostalno,
bez intervencije korisnika, izvravaju postavljeni zadatak i izvetavaju korisnika o zavretku
zadatka ili pojavi oekivanog dogaaja. Druga definicija kae da je agent programski sistem,
koji u interakciji sa okruenjem, ima sposobnost da fleksibilno i samostalno reaguje u skladu
sa ciljevima koji su mu postavljeni. U ovoj definiciji istie se tri kljuna zahteva, interakcija
sa okruenjem, autonomnost, i fleksibilnost [127].
Interakcija sa okruenjem u ovom kontekstu znai da je agent sposoban da reaguje na
ulaz dobijen iz okruenja i da moe da izvodi akcije koje menjaju okruenje u kome agenti
deluju. Autonomnost znai da je sistem u stanju da reaguje bez intervencije korisnika ili
drugih agenata i da ima kontrolu nad sopstvenim akcijama. Takav sistem bi trebao da bude
sposoban da ui iz iskustva.
Bez obzira na oblast primene agenata, oni uvek imaju tri osnovna dela:
Bazu znanja, koja sadri podatke i domene znanja neophodne da agent uspeno
obavlja svoje aktivnosti,
92
CAD
In
CA
uzr forma
Dm
oko
c
ode
v a n ija o k
l
ih p
o
roje nflikt
k t o im a
van
je m
Prepoznavanje
tipskih
tehnolokih
oblika
D-agent
Prostor
problema
i
a
nja
ces
ie istem
ran
pro
Og nog s
ki
o
l
d
o
o
izv
ehn
pro
ni t
ativ
ern
Alt
Prostor
reenja
Odreivanje
redosleda
obrade i
procena
trokova
B-agent
Prostor
predloga
Prostor
konflikta
Izbor i
projektovanje
pribora
Izbor
obradnih
procesa
Izbor
maina
Izbor
alata
CoCAPP
Primenom istog CAx sistema tokom itavog ivotnog ciklusa proizvoda u svim
etapama projektovanja, tako to e nove verzije CAx sistema podravati stare,
Projektovanjem translatora ili konvertora koji e meusobno prevoditi formate
podataka CAx sistema razliitih proizvoaa i
Razvojem neutralnog formata za razmenu podataka izmeu razliitih CAx
sistema.
Na tritu programskih sistema postoji veliki broj komercijalnih CAx sistema, zbog
ega postoji mala verovatnoa da e razliita preduzea posedovati iste programske sisteme,
to prvi nain u dananjim uslovima otvorenog trita ini sve manje primenljivim. Drugi
nain se odnosi na povezivanje funkcija preduzea i programskih sistema kreiranjem
translatora koji omoguuje konverziju podataka iz formata jednog CAx sistema u format
drugog CAx sistema. Ovaj pristup je neekonomian za potrebe povezivanja veeg broja CAx
sistema, usled potrebe razvoja velikog broja translatora, pa se danas sve manje primenjuje.
Trei nain se odnosi na razvoj neutralnog formata podataka koji mogu da itaju svi
CAx sistemi. Prednost treeg naina nad drugim je ilustrovan na slici 4.39, na kojoj se vidi
koliko je manje translatora potrebno koristiti za razmenu podataka izmeu n odreenih
programskih sistema, ukoliko postoji neutralni format za razmenu podataka (NDF).
94
CAx sistem
"A"
CAx sistem
"B"
CAx sistem
"F"
CAx sistem
"C"
CAx sistem
"E"
CAx sistem
"B"
CAx sistem
"F"
CAx sistem
"C"
CAx sistem
"E"
CAx sistem
"D"
CAx sistem
"D"
broj translatora 2n
IGES 1
IGES 2
IGES 3
MIL-PRF-28000A
IGES 4
IGES 5
CALS
PDES
XBF
PDDI
GMAP
T
VDA-FS
E
SET
CAD*I
VDA-PS
CADLIB
CADLIB2
Na osnovu poetnog koncepta, razvijen je kompleksan standard STEP ISO 10303 koji
obezbeuje celovitu podrku razvoju globalno integrisane proizvodnje, kroz:
Metode za opis,
Metode za primenu,
Informacioni modeli, koje zajedno ine Aplikacioni protokoli i Bazni resursi,
Metodologije za proveru konformnosti i
Serije apstraktnih testova.
Naziv serije/dela
Aplikacioni protokoli
Eksplicitno crtanje
Asocijativno crtanje
Projektovanje mainskih delova i sklopova sa upravljanjem konfiguracijom
Mainsko konstruisanje korienjem graninog prikaza
Mainsko konstruisanje korienjem povrinskog prikaza
Mainsko konstruisanje korienjem ianog prikaza
Planiranje i konstruisanje delova od lima
Praenje ivotnog ciklusa proizvoda
Analiza i konstrukcija kompozitinih i metalnih struktura
Projektovanje tehnolokih procesi za mainske delove (zamenjen sa AP-240)
Osnovni podaci za procese proizvodnje u auto industriji
Upravljanje dimenzionalnom inspekcijom vrstih delova i sklopova
Konstrukcioni i proizvodni podaci za delove koji se proizvode livenjem
Konstruisanje mainskih delova za potrebe projektovanja tehnolokih procesa pomou
tipskih oblika (feature)
Konstrukcioni i proizvodni podaci za delove koji se proizvode kovanjem
Tehniki podaci za procese montae, osnovne informacije i razmena
Prikaz podataka sistemskog inenjerstva
Aplikaciono interpretirani model za numeriki upravljane jedinice
Upravljanje ivotnim ciklusom proizvoda
Projektovanje tehnolokih procesa za mainske delove
96
STEP BAZA
PODATAKA
Memorisanje-korienjeraspodela
CAPP
SISTEM
CAM
SISTEM
U svetu je do sada postavljen vei broj razliitih koncepta povezivanja CAx sistema u
procesu proizvodnje proizvoda primenom STEP standarda, a neki od njih su prikazani u
radovima [249,250,287,288], itd. Na slici 4.42 prikazan je koncept projektovanja i
proizvodnje podran STEP standardom, za proizvodnju proizvoda koja se realizuje procesima
obrade skidanjem materijala.
Koncept prikazuje integrisani proizvodni tok kroz odreene korake, odnosno funkcije
koje se izvode u pojedinim fazama toka i upotrebljene STEP standarde, odnosno
odgovarajue aplikacione protokole. Povezivanjem ovih standarda dobija se grupa STEP
standarda za projektovanje i proizvodnju SMS (STEP Manufacturing Suite).
Kontrola
Merna maina
(CMM)
AP224
Ulazni
podaci
AP-240/
AP-224
0
Mikro
projektovanje
tehnolokih
procesa i NC
programiranje
AP
Tipski
tehnoloki
oblici
Aplikacioni
protokol
AP219
238
Makro
projektovanje
tehnolokih
procesa
24
AP
Funkcije
STEP
Generisanje
proizvodnih
podataka
AP
AP224
AP203
AP240
IS
AP238
O1
46
23
Izrada
dela
49
Slika 4.42 Primena STEP standarda u integraciji aktivnosti projektovanja i proizvodnje [246]
Prva funkcija ima ulogu projektovanja proizvoda i pripremaka primenom CAD sistema
ili preuzimanje gotovih modela proizvoda i pripremka iz nekog CAD sistema, a zatim
prevoenje u format podataka AP-224 koji je pogodan za automatizovano projektovanje
tehnolokih procesa. AP-224 je razvijen u cilju povezivanja CAD i CAPP sistema, tako to
omoguuje potpune, tane, raunarom podrane i viekratno upotrebljive informacije o
proizvodu. AP-224 ukljuuje informacije o proizvodu, kao to su CAD geometrija i topologija
u neutralnom formatu, tipski tehnoloki oblici, tolerancije, osobine materijala i procesa i
administrativni podaci [288].
Druga funkcija se odnosi na makro projektovanje tehnolokih procesa, gde se odvija
prihvatanje proizvodnih podataka u AP-224 formatu i vri poetna, odnosno makro faza
projektovanja tehnolokih procesa izrade delova. Na izlazu se dobijaju podaci u standardnom
AP-240 formatu, koji ukljuuje podatke o tehnolokom procesu izrade, ali i druge neophodne
podatke za pripremu i planiranje proizvodnje, prema [244,288].
Trea funkcija je mikro projektovanje tehnolokih procesa ukljuujui i NC
programiranje. U okviru ove funkcije odvija se prihvatanje podataka iz prethodne funkcije u
AP-240 ili pak AP-224 formatu, a zatim se vri zavrna faza projektovanja tehnolokih
procesa. Kao izlaz iz ove funkcije dobijaju se podaci u STEP-NC formatu podataka, koji slue
za upravljanje CNC obradnim i tehnolokim sistemima.
etvrta funkcija se odnosi na izradu delova na CNC obradnim i tehnolokim sistemima,
pri emu se podaci prihvataju u standardizovanom obliku podataka prema STEP-NC
standardu. Peta funkcija se odnosi na ispitivanje, odnosno merenje i kontrolu obraenih
delova. Ova funkcija je podrana AP-219 formatom podataka, koji je kompatibilan sa svim
ostalim AP u okviru ISO 10303 standarda. Tenja je da se u ovaj proizvodni tok ukljue i
98
drugi proizvodne tehnologije, kao to su npr. Tehnologije livenja AP-233, kovanja AP-229,
itd. Pored toga tei se i primeni PDM tehnologija za upravljanje proizvodnim podacima u
ivotnom veku proizvoda.
Znaajan broj istraivanja je realizovan i objavljen je veliki broj radova na temu
primene STEP standarda u razvoju integrisanih CAPP sistema, neki od njih su prikazani u
ranijem tekstu, dok e se deo prikazati u nastavku.
U radu [137] predloen je pristup integracije projektovanja proizvoda i tehnolokih
procesa primenom integrisanog modela proizvoda na bazi primene STEP standarda. Ovaj
pristup podrazumeva prepoznavanje tipskih oblika, ugradnju tehnolokih informacija i
implementaciju neutralnog interfejsa podataka.
U [5] je prikazan STEP baziran modeler tipskih oblika (STEP-FM) kao alat za njihovo
prepoznavanje u cilju integracije zadataka projektovanja proizvoda i tehnolokih procesa, dok
je u radu [144] predstavljeno prepoznavanje tipskih oblika za automatsko projektovanje
tehnolokih procesa, gde se model proizvoda u STEP formatu koristi direktno kao ulazni
podatak za projektovanje tehnolokih procesa. U radu [290] je prikazan sistema za
automatizovano prepoznavanje tipskih oblika i projektovanje tehnolokih procesa primenom
STEP AP 214 formata podataka, dok je u radu [224] prikazan hibridni prilaz za
prepoznavanje tipskih oblika primenom STEP AP 203 formata podataka.
U radu [5] je prikazan CAPP sistem za prizmatine delove baziran na STEP-u koji
koristi tipske oblike (ST-FeatCAPP). Sistem mapira STEP AP 224 XML datoteku podataka
bez primene kompleksnog procesa tehnolokog prepoznavanja, a potom generie zahvate
obrade tehnolokog procesa i odgovarajue STEP-NC programe u XML formatu.
STEP-om podrano projektovanje tehnolokih procesa je doivelo jo intenzivniji
razvoj od vremena razvoja i objavljivanja STEP-NC standarda, a neki od preglednih radova iz
ove oblasti su [287,288,304], itd. U radu [203] ispitana je mogunost distribuirane primene
metoda vetake inteligencije, kroz razvoj kolaborativnog multi-agent sistema u objektnoorijentisanom CAPP sistemu za prizmatine delove u STEP-NC podranom okruenju. U
radu [202] dat je prikaz razvoja softverske platforme za projektovanje tehnolokih procesa i
upravljanje (IP3AC) u cilju podrke STEP-NC podranom projektovanju tehnolokih procesa.
U radovima [47,249,250] predloen je model varijantnog projektovanja tehnolokih procesa
na bazi STEP-NC standarda, gde je predstavljen razvijeni algoritam za optimizaciju
tehnolokih procesa. Razvijeni model varijantnog projektovanja i optimizacije tehnolokih
procesa testiran je u sistemu pod imenom TurnSTEP.
Znaaj STEP standarda u integraciji CAD/CAPP/CAM i CNC sistema
Iako je tehnologija numerikog upravljanja pretrpela velike promene, programiranje
numeriki upravljanih obradnih sistema se i dalje bazira na modelu podataka ISO 6983
standarda, koji je ustanovljen jo pri samim poecima razvoja numerikog upravljanja. ISO
6983, poznatiji pod nazivom G-kod, je jezik niskog nivoa, orijentisan na sekvencijalnim
instrukcijama za upravljake jedinice maina, uz malo ili nimalo inteligencije. Pokazao se kao
idealan za procese projektovanja upravljakih programa runim programiranjem, ali ne
zadovoljava savremene trendove razvoja integrisanih CAD/CAPP/CAM/CNC sistema.
Osnovni nedostaci i problemi koji se javljaju primenom ISO-6983 su [201,287]:
U cilju prevazilaenja ovih problema pokrenut je razvoj novog standarda ili modela
podataka za upravljanje numerikim obradnim sistemima pod imenom ISO-14649, ire poznat
kao STEP-NC. Ovaj standard se bazira na objektno-orijentisanim podacima i kompatibilan je
sa standardima serije STEP ISO 10303. AP-238 predstavlja njegovu tehniku definiciju.
Prednosti primene STEP-NC standarda u projektovanju i proizvodnji su [122,124,233,287]:
Posledica
75% redukcija broja crtea poslatih od CAD-a
ka CAPP-u i CAM-u
35% redukcija CAPP/CAM projektovanja
tehnolokih procesa
50% redukcija vremena mainske obrade
Uporedni prikaz toka informacija primenom ISO-6983 i ISO 14649, odnosno G-koda i
STEP-NC, sa naznaenim osnovnim nedostacima i prednostima istih, dat je na slici 4.43.
Za primenu STEP standarda sa novim modelom podataka potrebna je primena
savremenih upravljakih sistema koji su zasnovani na otvorenoj arhitekturi i poseduju mnogo
vei stepen inteligencije.
ISO 14649 je podeljen na vie delova, gde deo 10 definie opte informacije o
procesima, delovi 11, 12, 13, ... tehnoloki-specifine informacije, dok delovi 111, 121, 131,
....alate za pojedine tehnologije, glodanja, struganja, EDM, itd., slika 4.44.
ISO 14649-10 definie procesne podatke potrebne za NC programiranje koji su
zajedniki za razliite tehnologije obrade. Elementi podataka ovog dela standarda opisuju
interfejs izmeu CNC i programskih sistema (npr. CAPP, CAM...). Ovi programi obuhvataju
geometrijske i tehnoloke informacije i mogu se generisati upotrebom ISO 14649 dela 10
zajedno sa delom za specifinu tehnologiju (npr. ISO 14649-11) i delom za odgovarajue
alate (npr. ISO 14649-121). EXPRESS-G ema definisana u ISO 14649-10 sadri informacije
koje su podeljene na opis zadatka (task description), opis tehnologije (technology
description), opis alata (tool description) i opis geometrije (geometry description) [124,288].
100
Nivo
projektovanja
%
N05
N10
N15
N20
N30
N35
N40
N45
N50
N55
N60
CAD/CAPP/CAM
ISO 6983
Rupa 2
-zabuivanje
-buenje
G54
G00 Z10.000
G91 G0 Z200
T5 D1 WW
G90 M5
G00 X0.000
G00 Z5.000
M08
S3183.000
M03
F1477.000
CAD/CAPP/CAM
Nivo
pogona
NC maina
alatka
ljeb 1
-glodanje
-gruba obrada
-zavrna obrada
STEP-NC
Nizak nivo
informacija
Jednostavna
kretanja i
uklj.-isklj.
komande
Specificne
ekstenzije
proizvodaca
NC upravljacka
jedinica
Rupa 1
Dvosmerni
transfer
informacija
Post-procesiranje
Specifican
ISO 6983
Stepenik 1
-gruba obrada
-zavrna obrada
ISO 14649
NC upravljacka
jedinica
NC maina
alatka
deskription {filename=ncfile.pgr?
date=20-01-1999?}
const {placement1=
axis2_placement_3d(..)?}
program ( )
{set_placement(setup)?
exec plan.hole1drill?
exec plan.pocket_plunge?
exec plan.pocket_roughing?}
Visok nivo
informacija
Objektno
orijentisan
opis
Koricenje STEP
geometrije
Neutralan
format
Slika 4.43 Uporedni prikaz toka informacija primenom ISO-6983 i ISO-14649 [194]
Strukturu datoteke ISO 14649 ine dve osnovne celine, slika 4.45, kao i kod datoteke
ISO 10303 dela 21, i to su:
1. Zaglavlje (header) za informacije koje su neophodne za identifikaciju datoteke,
odnosno generalne informacije.
2. Sekcija sa podacima (data section) koja sadri sve informacije vezane za
proizvodne zadatke i geometriju.
ISO 10303 (STEP)
STEP AP 203
Geometrija i
topologija
STEP AP 224
Tipski
tehnoloki
oblici
STEP deo 21
STEP deo 11
Sintaksa za
opis podataka
EXPRESS
jezik
koristi tipke
tehnoloke
oblike
povezan
koristi
koristi
ISO 14649
Deo 10: OPTI PODACI O PROCESU
Deo 11
Glodanje/
buenje
Deo 12
Struganje
Deo 111
Alati za
glodanje/
buenje
Deo 121
Alati za
struganje
Deo 13
EDM ianom
elektrodom
Deo 14
EDM punom
elektrodom
Deo 131
Alati za EDM
Deo 1x
Druge
tehnologije
Deo 1xx
Alati za
druge
tehnologije
Slika 4.44 Osnovna struktura STEP-NC standarda i veze sa STEP ISO 10303 [124]
101
Sekcija sa podacima
Tehnoloki proces
(Project)
A
Operacije obrade
(Workplan and Executable)
Opis tehnolokih
podataka: zahvata,
alata, strategije...
Izvrenje sekvenciranih
zadataka
Opisivanje
geometrijskih
podataka
B
Opis tehnologije
(Technology description)
C
Opis geometrije
(Geometry description)
Pored ovih podataka u zaglavlju se jo navode i vreme nastanka datoteke, ime autora
fajla, ime institucije u kojoj je formira fajl. Na slici 4.46 je prikazan primer jednog zaglavlja.
HEADER:
File description(('Primer NC programa za obradu glodanjem'),1');
File_name('Primer1.STP',$,'2011-02-02',('ISO14649'),'LUKI','FTN','SCG');
File_schema(('Machining_schema','Milling_schema'));
ENDSEC
DATA:
#1=Project (Workplan#10);
#10=Workplan (#20,#35,#71,......);
..
#12=Workpiece(.......);
..
#35=Machining_workingstep(......);
ENDSEC
END-ISO-10303-21
workplan
machining_workingstep
21
20
22
manufacturing_feature
workpiece
..
35
22
11
71
workplan
machining_workingstep
12
..
..
..
..
..
machining_workingstep
..
..
..
..
machining_operation
..
milling_cuting_tool
10
25
27
29
31
..
..
milling_technology
..
..
milling_machine_function
..
..
machining_strategy
..
..
Konvencionalno upravljanje,
Novo upravljanje i
Novo inteligentno upravljanje.
Konvencionalno
upravljanje
Novo
upravljanje
G-kod
interpreter
Novo
inteligentno
upravljanje
Inteligentne
funkcije
Post
procesor
ISO 14649
Tehnoloki
proces
Geometrija
Tehnologija
Alat
sistema i zakljukom kako ona nije u dovoljnoj meri razvijena, pa je predloio revitalizaciju
varijantnih CAPP sistema. U ovom radu je istaknuto predvianje da e budui CAPP sistemi
biti graeni sa inteligentnom arhitekturom sistema i primenom metoda vetake inteligencije.
Cay i Chasapis su u radu [38] predstavili pregled istraivanja u oblasti CAPP sistema za
period od 1990 do 1997. Godine, sa akcentom na oblasti primene tipskih tehnolokih oblika i
njihovog prepoznavanja. Jedan od poslednjih optih pregleda CAPP sistema je dat u radu
autora Marri i dr. [171] u kome su analizirane prednosti i mane generativnog prilaza u razvoju
CAPP sistema.
U radu [286] autora Xu i dr. iz 2011. godine dat je pregled razvoja CAPP sistema, sa
akcentom na periodu od 2000. Godine. U radu su analizirane savremene tehnike i metode u
razvoju CAPP sistema kao to su metode zasnovane na tipskim tehnolokim oblicima, tehnike
vetake inteligencije, agent-bazirane metode, internet bazirane metode i STEP bazirane
tehnike. Pored toga, dat je pregled pojedinih metodologija razvoja CAPP sistema, kao i
statistika analiza objavljenih rezultata iz ove oblasti u eminentnim asopisima iz oblasti
proizvodnih i informacionih tehnologija u periodu od 2000. Do 2009. Godine, to je
delimino prikazano u uvodnom delu rada. Na kraju su dati osnovni pravci i trendovi budueg
razvoja integrisanih CAPP sistema.
Naravno, pored preglednih radova iz oblasti razvoja CAPP sistema, postoji i mnogo
vei broj znaajnih radova koji obuhvataju samo pojedine oblasti, tehnike i faze CAPP
sistema a koji se ovde nee posebno razmatrati. U nastavku je dat kratak pregled nekih od
poznatijih razvijenih CAPP sistema u svetu i kod nas.
CAPP (CAM-I) [20,38] predstavlja jedan od prvih i najire korienih CAPP sistema
koji su u saradnji razvile kompanije CAM-I i McDonell Douglas. Razvijen je prvenstveno kao
istraivaki alat sa ciljem prikaza izvodljivosti projektovanja tehnolokih procesa primenom
raunara. Model sistema se sastoji od pet modularnih celina koje se odnose na aktivnosti
projektovanja tehnolokih procesa obrade i integraciju sa upravljanjem proizvodnjom.
Zasniva se na konceptu grupne i tipske tehnologije, ima mogunost pretraivanja baze
podataka i interaktivnog editovanja. Izbor klasifikacionog sistema sa maksimalno 36 cifara i
formata izlaznih izvetaja preputen je korisniku.
GENPLAN (GENerative process PLANning) [220,300] predstavlja vario-generativni
CAPP sistem razvijen 1976. Godine na Loughborough Univerzitetu za tehnologije u Velikoj
Britaniji za potrebe kompanije Lockheed. U okviru ovog sistema podrane su pojedine
aktivnosti makro i mikro projektovanja tehnolokih procesa. Ovaj sistem ima mogunost
automatskog generisanja alternativnih zahvata obrade za definisane tipske oblike, na osnovu
kojih se grupiu zahvati u operacije obrade na raspoloivim proizvodnim resursima. Kod ovog
sistema je posebno izdvojeno baziranje i stezanja od grupisanja zahvata. U kasnijim verzijama
ovog sistema izvreno je povezivanje sa funkcijama planiranja i upravljanja proizvodnjom.
GARI [256,300] je generativni CAPP sistem, razvijen na Univerzitetu u Grenoblu
1981. Godine, za primenu na delovima sa otvorima, ljebovima, stepenicama i drugim
jednostavnim tipskim oblicima. Prestavlja prvi CAPP sistem koji se bazirao na upotrebi
vetake inteligencije kroz primenu 50-ak logikih pravila u if-then obliku. Zasniva se na
izdvajanju tipskih tehnolokih oblika i definisanju zahvata za njihovu obradu, nakon ega se
zahvati grupiu po operacijama i podoperacijama uzimajui u obzir raspoloive obradne
sisteme. Znanje koje je predstavljeno u vidu produkcionih pravila, definisano je faktorima
prioriteta, odnosno teinskim koeficijentima izmeu 1 i 10, prema stepenu primenljivosti
raspoloivih maina i alata. Jedna od osnovnih osobina sistema se odnosi na reavanje
konfliktnih situacija.
106
108
90-ih godina prolog veka pojavljuju se CAPP sistemi novije generacije koji se
zasnivaju na sve veoj primeni savremenih proizvodnih i raunarskih tehnologija i dostignua
u razvoju CAx i internet tehnologija, razvoju neutralnog modela podataka koji se najvie
ogleda kroz primenu STEP standarda, intenzivniju primenu metoda vetake inteligencije i
multi agent sistema, objektno-orijentisane tehnike programiranja i baza podataka, i dr. Ovi
CAPP sistemi su omoguili znatna unapreenja u integraciji sa CAD, CAM i drugim CAx
sistemima, primeni simultanog inenjerskog projektovanja, podizanju nivoa automatizacije,
arhitekturi gradnje koja postaje modularna i fleksibilna sa mogunou nadogradnje. Isto tako,
ovi sistemi u znatnoj meri omoguuju distribuiranu i kolaborativnu proizvodnju na nivou
pogona, korporacije i globalnog trita.
U prethodnom poglavlju 4.2.3 dat je prikaz pojedinih karakteristinih CAPP sistema za
svaku od metoda i tehnika koja se koristi za razvoj savremenih CAPP sistema. U nastavku e
se prikazati pojedini savremeni CAPP sistemi koji baziraju na kombinovanoj primeni ovih
metoda i primeni metoda distribuiranog, kolaborativnog i internetom podranog inenjerstva.
IMPlaner sistem [253,254] predstavlja integrisani CAPP sistem za distribuirano
definisanje proizvodnih aktivnosti, koji se oslanja na postojee CAD/CAM sisteme i
specijalizovano CAPP reenje, realizovan primenom Java i XML jezika. Ovaj sistem je nastao
kao nadgradnja CAPP sistema 3I-PP (Integrated, Incremental and Intelligent Process Planner)
i na iskustvima jo ranije razvijenog CAPP sistema RTCAPP (Real-time Computer-Aided
Process Planning).
U radu [301] dat je pregled CAPP sistema koji su bazirani na kooperativnom prilazu
razvoja, kao to su CDPS (Cooperative Distributed Problem-Solving) sistem, AAPP (AgentBased Adaptive Process Planning) sistem, IDCPPS (Integrated, Distributed and Cooperative
Process Planning System) sistem, i dr.
OPPS-PRI (Optimised Process Planning System for Prismatic Parts) [206] predstavlja
integrisani CAD/CAPP sistem razvijen na Univerzitetu Gaziantep. Osnovna karakteristika
arhitekture sistema je izrazita modularnost, sistem poseduje esnaest modula grupisanih u pet
klastera, gde je svaki modul poseban sistem koji se moe nezavisno koristiti. Druga znaajna
karakteristika je iroka primena optimizacionih metoda i tehnika vetake inteligencije.
CyberCut [186] je kolaborativni sistem baziran na Internetu koji omoguuje generisanje
3D prizmatinih delova, na osnovu definisanih parametara obrade. Kod ovog sistema korisnik
jo u fazi projektovanja proizvoda predlae vrste obrade, operacije i njihov redosled, zahvate i
njihov redosled, kao i alate koji e se koristiti.
U radu [241] dat je pregled kolaborativnih CAPP sistema, kao to su Bleackboard
sistem, IPP (Incremental Process Planning) sistem, DPP (Distributed Process Planning)
sistem, IPPD/RIOS sistem, WTMSS sistem, MASSCAPP sistem, CHOLA sistem, MKM
sistem, WebMAS sistem, VCAPP sistem, i dr.
U naoj zemlji je realizovano nekoliko projekata razvoja CAPP sistema, namenjenih
uglavnom za rotacione delove, kao to su npr. SAPOR [90], CAPROT [166], PROTEH-R
[140], potom za delove prizmatinog oblika kao to je npr. SiMoTeP [220] i SAPT [183], koji
se sastoji iz dva sistema, SAPT-R za rotacione delove i SAPT-P za prizmatine delove. Osim
ovih sistema, razvijeni su i pojedini specijalizovani CAPP sistemi, kao to je [187] za delove
klipno-cilindarskog sklopa, koji je potom nadograen i prerastao u kolaborativni CAPP sistem
[186], kao i CAPP sistem za izradu alata za brizganje plastike [162] i dr. U nastavku je dat
kratak prikaz dva najpoznatija CAPP sistema iz navedene grupe, SAPOR i SAPT.
SAPOR-S (Sistem za Automatizovano Projektovanje u podruju Obrade Rezanjem)
[90] je sistem koji razvijen na Institutu za proizvodno mainstvo Fakulteta tehnikih nauka u
Novom Sadu. Ovaj sistem je namenjen za automatizovano projektovanje procesa obrade
rezanjem i generisanje upravljakih programa za obradu rotacionih delova koji se obrauju na
NC strugovima. Arhitektura sistema se sastoji iz podsistema za formalizovanje ulaznih
109
110
ANALIZA
ZAHTEVA TRITA
PRIKUPLJANJE
IDEJA O
PROIZVODU
REVERZIBILNO
INENJERSKO
PROJEKTOVANJE
RE
PROJEKTOVANJE PROIZVODA
ZAVRNO
PROJEKTOVANJE
FAZA II
FAZA III I IV
KONSTRUKC. I
TEHNOLOKI
PODACI
(CAD Modeli
+
Preliminarni
tehnoloki
procesi)
ZAVRNO PTP
MAKRO I MIKRO
CAPP (CAPP sistem)
PROJEKTOVANJE
ALATA, PRIBORA,
UREAJA, itd.
PROJEKTOVANJE
PRIPREMKA
IZBOR VRSTE
PRIPREMKA
PRIPREMAK
KONCEPTUALNO PTP
KONCEPTUALNI
CAPP (CCAPP)
VETAKA
INTELIGENCIJA,
STEP, GRUPNA
TEHNOLOGIJA,
ITD.
PROJEKTNI
PODACI
(CAD Modeli
prototipa,
proizvoda,
sklopova,
podsklopova,
delova, alata,
pribora, itd.)
PLANIRANJE I
UPRAVLJANJE
PROIZVODNJOM (PPC)
SIMULACIJA
TEHNOLOKIH
PROCESA
FAZA VI
OPTIMIZACIJA
VREDNOVANJE I
USVAJANJE TEHN.
DOKUMENTACIJE
FAZA VII
UPRAVLJAKI
PROGRAMI
UPRAVLJANJE
KVALITETOM
(TQM)
FAZA V
KOMPJUTERIZOVANI TOK
PROCESI GENERISANJA
UPRAVLJAKIH
INFORMACIJA
(CA alati)
KONVENCIONALNI TOK
KONSTRUKC. I
TEHNOLOKI
PODACI
(CAD Modeli
+
Detaljni
tehnoloki
procesi)
IZRADA PROTOTIPA
CAM
KONCEPTUALNO
PROJEKTOVANJE
CARC
FAZA I
CAT
GLOBALNO
PLANIRANJE
PROIZVODNJE
KONKURENTNO INENJERSTVO,
KOLABORATIVNO INENJERSTVO,
DIGITALNA PROIZVODNJA
E-PROIZVODNJA,
ITD.
CATC
112
CAA
SELEKCIJA I
IZBOR IDEJA
KONSTRUKCIONOTEHNOLOKA
DOKUMENTACIJA
TRITE
PROTOTIP
DEO
PROIZVOD
TEHNOLOKI
SISTEMI
UESNICI
BAZA ZNANJA
ZA:
Proizvode
Delove
Pripremke
Tehnoloke
procese
Resurse
Parametre
obrade, itd.
BAZA PODATAKA
ZA:
Proizvode
Delove
Pripremke
Tehnoloke
procese
Resurse
Parametre
obrade, itd.
vremena i trokova proizvodnje. Kao izlazni rezultat ove faze dobija se neophodna tehnoloka
dokumentacija u vidu sadraja tehnolokog procesa, karti operacija, karti toka procesa,
uputstava za rad, a ponekad se ve u ovoj fazi generiu upravljake informacije za upravljanje
obradnim i tehnolokim sistemima. Osnovni programski sistemi namenjeni projektovanju
tehnolokih procesa su odgovarajui CAPP sistemi, dok se u novije vreme sve vie razvijaju
integrisani koncepti CAPP sistema sa CAD, CAM, PPC i drugim CAx sistemima.
Faza V Generisanje upravljakih informacija
Ova faza tehnoloke pripreme se odnosi na aktivnost detaljnog projektovanja
tehnolokih procesa u okviru koje se vri generisanje upravljakih informacija/programa za
obradne, montane, merne i kontrolne, transportne, skladine i druge tehnoloke sisteme. U
okviru ove faze koristi se vei broj programskih CAx sistema, najee su to odgovarajui
CAM sistemi u uem smislu, kao programski sistemi za generisanje upravljakih programa za
numeriki upravljane obradne i tehnoloke sisteme, CARC za robote, CATC za transportne i
skladine sisteme, CAT za merno-kontrolne sisteme i CAA za montane sisteme.
Faza VI Simulacija tehnolokih i proizvodnih procesa
Faza simulacije obuhvata modeliranje, simulaciju i optimizaciju tehnolokih i
proizvodnih procesa u cilju postizanja visokih efekata rada tehnolokih sistema, kao i
proizvodnih sistema u celini. Osnovni podaci za realizaciju ove faze ine izlazni rezultati faza
projektovanja tehnolokih procesa (II, III i IV faze), kao to su vrsta i redosled operacija,
potrebni proizvodni resursi, odgovarajua vremena i koliine, itd. Na osnovu ovih i drugih
potrebnih podataka razvijaju se simulacioni modeli, koji ine eksperimentalne modele realnog
sistema na kojima se vre raunarski eksperimenti u cilju izbora najpovoljnije varijante
procesa proizvodnje i razvoja optimalne strukture proizvodnih jedinica i sistema u celini.
Faza VII Vrednovanje i usvajanje tehnolokih procesa i tehnoloke dokumentacije
Ova faza obuhvata zavrnu proveru, korekciju i vrednovanje tehnolokih i proizvodnih
procesa, upravljakih informacija, uputstava za pripremu i podeavanje tehnolokih sistema i
druge tehnoloke dokumentacije. Tehnoloka dokumentacija predstavlja praktino i izlazni
rezultat tehnoloke pripreme proizvodnje, koja se na kraju usvaja, overava i arhivira u
informacionom obliku u odgovarajue baze podataka.
Opti model tehnoloke pripreme proizvodnje je detaljnije opisan u nastavku poglavlja,
kroz razvoj odgovarajueg funkcionalnog modela, koji ukljuuje sve elemente funkcionalne
strukture, kako pojedine faze, tako i odgovarajue aktivnosti.
5.2
I Input (ulaz), materijal ili informacija koja se koristi ili transformie u cilju
definisanja izlaza,
C Contol (kontrola ili upravljanje), kontrole ili uslovi odgovorni za to kako,
kada i da li e se aktivnosti realizovati. Najee su to pravila, politike,
procedure ili standardi,
O Output (izlaz), materijal ili informacija nastali kao rezultat aktivnosti i
M Mechanism (mehanizam), izvori koji izvode aktivnost ali se ne troe.
Najee su to ljudi, maine, oprema i objekti. Strelice mehanizma koje su
okrenute na dole definiu se kao strelica poziva (Call Arrows).
Kontrola
Ulaz
Izlaz
Mehanizam
Poziv
Elementi prikazani na slici 5.2 mogu se opisati reenicom "Aktivnost pod Kontrolom, od
Ulaza pravi Izlaze, koristei Mehanizme". Dekompozicija poslovnih procesa realizuje se kroz
definisanje dijagrama, kao to su :
118
5.2.2.1
Zahtevi kupaca
(cena, rokovi, kvalitet, itd.)
Standardi za kvalitet
Standardi za tolerancije (GD&T)
C1
C2
(
Konceptualni dizajn proizvoda
(2D crtei i/ili 3D modeli)
Detaljni dizajn proizvoda
(2D crtei i/ili 3D modeli)
Raspoloivi proizvodni resursi
(pripremci, maine, alati, itd.)
Obim proizvodnje
Zahtevi za promenu tehnolokih
procesa i tehn. dokumentacije
C3
I1
TEHNOLOKA
PRIPREMA
PROIZVODNJE
I2
I3
I4
I5
A0
(
M1
M2
M3
M4
M5
M6
)
M7
BP i BZ za pripremke i sirovine
BP i BZ za proizvodne resurse
(maine, alate, pribore, merila, itd.)
BP i BZ za standardne tehnoloke procese
BP i BZ za parametre obrade i obradljivosti
BP i BZ za standardne elemente
trokova i vremena proizvodnje
BP i BZ za procese proizvodnje
NODE:
A_0
TEHNOLOKA
TEHNOLOKA PRIPREMA PROIZVODNJE
PROIZVODNJE
TITLE:
TITLE:
NO.:
120
Mehanizmi su:
Baza podataka i baza znanja za pripremke i sirovine (M1)
Baza podataka i baza znanja za proizvodne resurse (M2)
Baza podataka i baza znanja za standardne tehnoloke procese (M3)
Baza podataka i baza znanja za parametre obrade i obradljivosti (M4)
Baza podataka i baza znanja za standardne elemente trokova i vremena
proizvodnje (M5)
Baza podataka i baza znanja za procese proizvodnje (M6)
Projektanti i programski sistemi (M7)
121
Baza podataka i baza znanja za pripremke i sirovine (M1): Ova baza podataka se odnosi na
podatke kojima se definie vrsta, tip, oblik, dimenzije, kvalitet i materijal pripremaka i
sirovina koji su na raspolaganju u proizvodnom sistemu ili se po potrebi mogu nabaviti. Baza
znanja se odnosi na pravila koja slue za izbor odgovarajueg pripremka.
Baza podataka i baza znanja za proizvodne resurse (M2): Baza podataka proizvodnih resursa
sadri podatke koji se odnose na geometrijske, tehnoloke, eksploatacijske i odgovarajue
funkcionalne karakteristike resursa. Baza znanja se odnosi na pravila koja slue za izbor
odgovarajuih proizvodnih resursa.
Baza podataka i baza znanja za standardne tehnoloke procese (M3): Ova baza podataka se
odnosi, kako na postojee tehnoloke procese, tako i na pojedine elemente tehnolokih
procesa, kao to su elementi operacija, zahvata, itd. Baza znanja se odnosi na pravila za izbor
tehnolokog procesa ili nekog njegovog elementa, kao to je npr. izbor zahvata ili grupa
zahvata za obradu odreenih tipskih tehnolokih oblika, itd.
Baza podataka i baza znanja za parametre obrade i obradljivosti (M4): Baza podataka
parametara obrade u okviru obradnih procesa se odnosi na reime obrade koji mogu biti
standardni literaturni podaci ili pak podaci preporueni od strane proizvoaa resursa. Baza
podataka obradljivosti definie uslove obrade pri kojima se koriste alati i maine pri obradi
odreenih materijala, kao i kod prorauna i preciziranja parametara obrade. Baza znanja se
odnosi na pravila za izbor parametara obrade i obradljivosti.
Baza podataka i baza znanja za standardne elemente trokova i vremena proizvodnje (M5):
Ova baza podataka se odnosi na podatke o standardnim elementima trokova i vremena
proizvodnje koji su neophodni za njihovu procenu i proraun. Ovi podaci mogu biti
standardni statistiki podaci iz literature ili konkretni podaci iz posmatranog proizvodnog
sistema. Baza znanja se odnosi na pravila za izbor ovih elemenata trokova i vremena.
Baza podataka i baza znanja za procese proizvodnje (M6): Baza podataka tehnolokih procesa
treba da sadri detaljne podatke o karakteristikama i mogunostima pojedinih procesa, kao to
je npr. navedeno u PRIMA mapama [251] koje su opisane u poglavlju 4.
Projektanti i programski sistemi (M7): Prvi deo ovog mehanizma se odnosi na uesnike u
aktivnostima tehnoloke pripreme proizvodnje, kao to su projektanti tehnolokih procesa i
upravljakih informacija, projektanti alata, pribora, merila, ureaja, i dr. Drugi deo se odnosi
na odgovarajue programske sisteme koji se koriste u realizaciji ovih aktivnosti tehnoloke
pripreme proizvodnje.
Kontrole su:
Zahtevi kupaca (C1) predstavljaju zahteve, odnosno ogranienja kupaca, koja su definisana u
obliku cene ili trokova proizvoda, vremena izrade i isporuke, kvaliteta, itd.
Standardi za kvalitet (C2) se odnose na internacionalne standarde kvaliteta proizvoda, kao to
je npr. serija standarda ISO 9001.
Standardi za tolerancije (C3) se odnose se na nacionalne i internacionalne standarde za
tolerancije dimenzija, oblika i odnosa povrina.
Na osnovu definisane granice modela izvreno je definisanje stabla aktivnosti, slika 5.4,
u okviru koga su uspostavljene vertikalne hijerarhijske veze izmeu aktivnosti. Stablo
aktivnosti se definie metodom odozgo na dole, kojom se sloena aktivnost razlae na vie
podreenih aktivnosti.
122
KONCEPTUALNO
PROJEKTOVANJE
TEHNOLOKIH
PROCESA
A1
A11 ANALIZA
TEHNOLOGINOSTI
PROIZVODA
MAKRO
PROJEKTOVANJE
TEHNOLOKIH
PROCESA
A2
A21 A21' PRECIZIRANJE
PRIPREMAKA
MIKRO
PROJEKTOVANJE
TEHNOLOKIH
PROCESA
A22 A22'
PREPOZNAVANJE I
IZDVAJANJE TTO I/ILI
POVRINA ZA OBRADU
A3
A31 DEFINISANJE
DODATAKA ZA OBRADU I
ELEMENTARNIH TTO
A32 DEFINISANJE
NAINA STEZANJA I
POZICIONIRANJA
A24 GRUPISANJE
ZAHVATA U OPERACIJE I
DEFINISANJE
REDOSLEDA IZVOENJA
A24' DEFINISANJE
REDOSLEDA ZAHVATA U
OPERACIJAMA
A34 DEFINISANJE
TOLERANCIJA I
KVALITETA OBRADE
ZAHVATA
GENERISANJE
UPRAVLJACKIH
INFORMACIJA
SIMULACIJA
TEHNOLOKIH I
PROIZVODNIH
PROCESA
A4
A41 DEFINISANJE
OBRADNOG MODELA
A42 GENERISANJE
PUTANJE ALATA I
DRUGIH RESURSA
A43 PRECIZIRANJE
PARAMETARA I
STRATEGIJE OBRADE
A44 SIMULACIJA,
VALIDACIJA I
GENERISANJE
UPRAVLJAKIH
PROGRAMA
A5
A51 DEFINISANJE
PROSTORNOG
RASPOREDA
PROIZVODNIH RESURSA
A52 DEFINISANJE VRSTE
SISTEMA ZA
TRANSPORT I
RUKOVANJE
MATERIJALOM
A53 PRECIZIRANJE
VREMENA U
PROIZVODNOM
PROCESU
A54 SIMULACIJA
TEHNOLOKIH I
PROIZVODNIH PROCESA
A35 DEFINISANJE
PARAMETARA I
VREMENA IZRADE
VREDNOVANJE I
USVAJANJE
TEHN. PROCESA I
DOKUMENTACIJE
A6
A61 ODREIVANJE
TROKOVA
PROIZVODNJE
A62 SUMIRANJE
POTREBA ZA
PROIZVODNIM
RESURSIMA I
PROCESIMA
A63 FINALNE
PREPORUKE ZA
PROMENU DIZAJNA
PROIZVODA
A64 USVAJANJE, OVERA
I ARHIVIRANJE
TEHNOLOKE
DOKUMENTACIJE
C1
I1
KONCEPTUALNO
PROJEKTOVANJE
TEHNOLOKIH
PROCESA
I3
I4
I5
O7
O10
Preliminarni
tehnoloki proces (O1)
A1
M1
M2
M3
M6
I2
I3
I4
I5
O11
C1
C3
MAKRO
PROJEKTOVANJE
TEHNOLOKIH
PROCESA
Sadraj
tehnolokog procesa (O3)
A2
M1
M2
M3
I2
I3
C3
C1
O9
MIKRO
PROJEKTOVANJE
TEHNOLOKIH
PROCESA
O11
A3
I5
M2
C3
C1
O10
M4
GENERISANJE
UPRAVLJACKIH
INFORMACIJA
I2
O11
Upravljaki programi (O5)
A4
C1
M4
SIMULACIJA
TEHNOLOKIH I
PROIZVODNIH
PROCESA
I4
O10
C1
A5
M4
M5
VREDNOVANJE I
USVAJANJE
TEHNOLOKIH
PROCESA I
TEHNOLOKE
DOKUMENTACIJE
I2
I3
A6
O1
O2
O3
O4
O5
O6
O7
O8
O9
O10
O11
M5
NODE:
A0
TITLE:
NO.:
C3
I1
I3
I4
ANALIZA
TEHNOLOGICNOSTI
PROIZVODA
O11
I5
A11
C3
C1
IZBOR OSNOVNIH
PROCESA
PROIZVODNJE
A12
M1
M2
M3
Izabrani procesi i
vrste pripremaka
C1
IZBOR VRSTE
PROIZVODNIH
RESURSA
A13
M2
C1
O1
PROCENA
VREMENA I
TROKOVA
O7
O10
A14
O11
M5
IZBOR PROCESA
NA OSNOVU
MATERIJALA
I4
Kandidati
tehnolokog procesa
I5
A121
M1
C1
M3
Kandidati
tehnolokog procesa
IZBOR PROCESA
NA OSNOVU
KOLICINA
I1
I4
A122
C1
M3
IZBOR PROCESA
NA OSNOVU
OBLIKA I VELICINE
I1
Kandidati
tehnolokog procesa
C3
C1
A123
IZBOR PROCESA
NA OSNOVU
TOLERANCIJA I
KVALITETA
POVRINA
M3
I1
Kandidati
tehnolokog procesa
C1
A124
IZBOR PROCESA
NA OSNOVU Xi
ATRIBUTA
I1
A125
M3
C1
I1
I3
I5
Izabrane vrste
obradnih i tehnolokih
sistema
IZBOR VRSTE
OBRADNIH I
TEHNOLOKIH
SISTEMA
A131
M2
C1
I1
I3
I5
IZBOR VRSTE
ALATA/PRIBORA/
MERILA/UREAJA
Izabran vrste
alata/pribora/merila/ureaja
A132
M2
C1
I3
I5
DEFINISANJE
POTREBNIH
PROIZVODNIH
VETINA
Izabrana vrsta
proizvodnih resursa
Zahtev za novim resursima
O11
A133
M2
NODE:
A13
TITLE:
NO.:
C1
I2
I3
PRECIZIRANJE
PRIPREMAKA
I4
I5
A21
M1
I2
I5
C3
PREPOZNAVANJE I
IZDVAJANJE TTO I/
ILI POVRINA ZA
OBRADU
A22
I3
I5
C1
C3
IZBOR ZAHVATA
OBRADE ZA TTO I/
ILI POVRINA ZA
OBRADU
A23
M2
M3
I5
C3
C1
GRUPISANJE
ZAHVATA U
OPERACIJE I DEF.
REDOSLEDA
IZVOENJA
A24
M3
I3
Redosled zahvata
grupisanih u operacije
C1
IZBOR OBRADNIH I
TEHNOLOKIH
SISTEMA
IzabranI
obradni i tehnoloki sistemi
I5
A25
C1
O2
M2
O3
DEFINISANJE
REDOSLEDA
OPERACIJA
O9
I5
A26
O11
M3
NODE:
A2
126
NO.:
C1
I2
I3
PRECIZIRANJE
PRIPREMAKA
I4
I5
A21'
M1
I2
I5
C3
PREPOZNAVANJE I
IZDVAJANJE TTO I/
ILI POVRINA ZA
OBRADU
A22'
I3
C1
C3
IZBOR OPERACIJA
I PODOPERACIJA
I5
A23'
M2
M3
I5
Izabrane operacije i
podoperacije
C3
C1
DEFINISANJE
REDOSLEDA
ZAHVATA U
OPERACIJAMA
Redosled zahvata
u operacijama
A24'
C1
M3
I3
IZBOR OBRADNIH I
TEHNOLOKIH
SISTEMA
Izabrani
obradni i tehnoloki sistemi
I5
A25'
C1
O2
M2
O3
DEFINISANJE
REDOSLEDA
OPERACIJA
O9
I5
A26'
O11
M3
Slika 5.10 Dijagram A2' Makro projektovanje tehnolokih procesa - drugi nain
Aktivnost A23' se odnosi na definisanje ili izbor operacija i podoperacija obrade na
osnovu prepoznatih i izdvojenih tipskih tehnolokih oblika i/ili povrina dela. Nakon toga se,
u okviru aktivnost A24' definiu zahvati obrade i redosled njihovog izvoenja u izabranim
operacijama i podoperacijama.
Aktivnost A25 ili A25' se odnosi na izbor obradnih i tehnolokih sistema za izabrane
operacije. Izbor obradnih i tehnolokih sistema moe da zavisi od mnogo faktora, kao to su
NODE:
A2
TITLE:
127
NO.:
6'
obim proizvodnje, veliina radnog prostora maine i dimenzije obradka, snaga maine, tanost
maine, stepen zauzetosti maine, itd. Primenom metoda tehnoekonomske optimizacije,
viekriterijumskog vrednovanja, metoda vetake inteligencije, itd. mogue je izabrati
optimalno reenje za konkretne proizvodne uslove.
Aktivnost A26 ili A26' se odnosi na definisanje redosleda izvoenja operacija, odnosno
preciziranje sadraja tehnolokog procesa izrade proizvoda, sa odgovarajuim alternativnim
reenjima koja namee savremena organizacija proizvodnja, koja je sve vie orijentisana na
male serije razliitih proizvoda.
Aktivnost A3 se odnosi na mikro projektovanje tehnolokih procesa, slika 5.11. U
okviru ove aktivnosti detaljno se precizira svaka operacija u okviru tehnolokog procesa, tako
to se vri definisanje dodataka za obradu i tolerancija zahvata, definisanje naina
pozicioniranja i stezanja delova na obradnom i tehnolokom sistemu, izbor ili projektovanje
alata, pribora, merila i ureaja, kao i definisanje parametara obrade i odreenih vremena
proizvodnje. Osnovni izlazni rezultat je karta operacije i/ili instrukcija rada za pojedine
operacije. Aktivnost A3 je dekomponovana na subaktivnosti A31-A36.
C3
C1
I2
I5
TTO i povrine
Zahvati obrade
DEFINISANJE
DODATAKA ZA
OBRADU I
ELEMENTAR. TTO
A31
M1
I2
I3
C3
C1
DEFINISANJE
NACINA
POZICIONIRANJA I
STEZANJA
I5
A32
M2
I2
I3
I5
C3
C1
IZBOR ILI
PROJEKTOVANJE
ALATA/PRIBORA/
MERILA/UREAJA
A33
M2
I2
C3
C1
DEFINISANJE
TOLERANCIJA I
KVALITETA
OBRADE ZAHVATA
I5
Definisane tolerancije i
kvaliteti obrade
zahvata
A34
C1
M4
DEFINISANJE
PARAMETARA I
VREMENA IZRADE
I5
A35
M4
M5
C1
DEFINISANJE
KARTI OPERACIJA
I/ILI INSTRUKCIJA
RADA
I5
O4
O9
O11
A36
NODE:
A3
TITLE:
128
NO.:
Aktivnost A33 se odnosi na izbor i/ili projektovanje alata, pribora, merila i drugih
ureaja. Aktivnost A33 je dekomponovana na etiri aktivnosti, A331-A334, u zavisnosti od
naina definisanja ovih resursa, slika 5.12.
]
C1
C3
I2
I3
I5
Izabrani standardni
alati/pribori/merila/ureaji
IZBOR ALATA/
PRIBORA/MERILA/
UREAJA
Stezanje i pozicion.
A331
M2
M4
C3
C1
I2
I3
I5
Projektovani modularni
alati/pribori/merila/ureaji
PROJEKTOVANJE
MODULARNOG
ALATA/PRIBORA/
MERILA/UREAJA
Stezanje i pozicion.
A332
M2
M4
C1
I2
I3
I5
C3
PROJEKTOVANJE
SPECIJALNIH
ALATA/PRIBORA/
MERILA/UREAJA
Stezanje i pozicion.
A333
M2
Projektovani specijalni
alati/pribori/merila/ureaji
C1
Izabrani ili projektovani
alati/pribori/merila/ureaji
M4
ODREIVANJE
TROKOVA ALATA/
PRIBORA/MERILA/
UREAJA
A334
Odreeni trokovi
alata/pribora/merila/ureaja
Zahtev za promenu TP
O11
M5
C1
I2
Karte operacija/instrukcije rada
Definisana geometrija
obradnog modela
DEFINISANJE
OBRADNOG
MODELA
C3
C1
A41
M1
GENERISANJE
PUTANJE ALATA I
DRUGIH RESURSA
I2
Karte operacija/instrukcije rada
A42
C3
C1
M4
I2
Karte operacija/instrukcije rada
Definisani parametri i
strategije rada
PRECIZIRANJE
PARAMETARA I
STRATEGIJE
OBRADE
C1
A43
M4
I2
SIMULACIJA,
VALIDACIJA I
GENERISANJE
UPRAVLJACKIH
PROGRAMA
O5
O11
Zahtevi za
promenu TP
A44
M2
130
NO.:
10
DEFINISANJE
PROSTORNOG
RASPOREDA
PROIZVODNIH
RESURSA
Definasana prostorna
struktura pogona
C1
A51
M2
I3
DEFINISANJE
VRSTE SISTEMA
ZA TRANSPORT I
RUKOVANJE
MATERIJALOM
C1
A52
M2
I4
PRECIZIRANJE
VREMENA U
PROIZVODNOM
PROCESU
A53
M5
Definisana vremena u
proizvodnom procesu
C1
SIMULACIJA
TEHNOLOKIH I
PROIZVODNIH
PROCESA
A54
131
11
Proraunati trokovi
proizvodnje
ODREIVANJE
TROKOVA
PROIZVODNJE
C1
A61
M5
I3
SUMIRANJE
POTREBA ZA
PROIZVODNIM
RESURSIMA I
PROCESIMA
Specifikacije proizvodnih
resursa
C1
A62
M2
I2
Zahtevi za promenu
dizajna proizvoda
FINALNE
PREPORUKE ZA
PROMENU
DIZAJNA
PROIZVODA
C1
Preliminarni tehn. procesi (O1)
A63
USVAJANJE,
OVERA I
ARHIVIRANJE
TEHNOLOKE
DOKUMENTACIJE
NODE:
A6
TITLE:
obzirom na nivo strukture moraju se posebno razmatrati tehnoloki procesi izrade delova i
tehnoloki procesi montae. U okviru razvijenog modela akcenat je dat na tehnoloku
pripremu izrade diskretnih, odnosno pojedinanih delova proizvoda.
Projektovanje tehnolokih procesa merenja i kontrole u prikazanom modelu tehnoloke
pripreme se nije detaljno razmatralo, jer bi koncepcija i sam model aktivnosti bili mnogo
sloeniji, ali su detaljno analizirani i ovakvi modeli aktivnosti. Tako, na primer u radu [84]
razmatran je samo model aktivnosti tehnolokih procesa kontrole, dok je u radu [302]
paralelno razmatran model aktivnosti detaljnog projektovanja tehnolokih procesa obrade
rezanjem i projektovanja tehnolokih procesa kontrole, pri emu je ovaj model
dekomponovan na dva podmodula za dva razliita naina izvoenja. Prvi model podrazumeva
projektovanje tehnolokih procesa izrade pre projektovanja tehnolokih procesa kontrole, dok
drugi podrazumeva integralno izvoenje ova dva procesa projektovanja.
U osnovi, opti model tehnoloke pripreme proizvodnje omoguuje primenu svih vrsta
CAPP sistema, kao to su generativni, vario-generativni i varijantni. Meutim, posmatrani
funkcionalni model tehnoloke pripreme proizvodnje orijentisan je pre svega za primenu
generativnih CAPP sistema, ali se uz odreene adaptacije moe uspeno primeniti i kod druge
dve vrste CAPP sistema. U nastavku su navedene osnovne razlike u primeni ovih sistema:
133
6.0 LITERATURA
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
[11]
[12]
[13]
[14]
[15]
[16]
[17]
[18]
[19]
Adithan, M.: Process Planning and Cost Estimation, New Age International (P) Limited,
Publisher, New Delhi, 2007, ISBN 978-81-224-2655-7.
Algeo, M.E., Feng, S.C., Ray, S.R.: A state-of-the Art Survey on Product Design and Process
Planning Integration Mechanism, NIST Interagency Report 5548, National Institute of
Standards and Technology, 1994.
Alting, L., Zhang, H.: Computer Aided Process Planning the State-of-the-art Survey,
International Jurnal of Production Research, 1989, Vol. 27, No. 4, pp. 553-585, ISSN 00207543.
Alting, L.: Manufacturing Engineering Processes, Marcel Dekker Inc., University of Rhode
Island, New York, 1994, ISBN 978-0824791292.
Amaitik, S.M., Kilic, S.E.: An Intelligent Process Planning System For Prismatic Parts Using
STEP Features, International Journal of Advanced Manufacturing Technology, 2007, Vol. 31,
No. 9-10, pp. 978-993, ISSN 0268-3768.
Amaitik, S.M., Kilic, S.E.: STEP-based Feature Modeller for Computer-aided Process
Planning, International Journal of Production Research, 2005, Vol. 43, No. 15, pp. 3087-3101,
ISSN 0020-7543.
Amirov, J.D.: Tehnologinost konstrukciji izdelija, Spravonik, Mainostrojenije, Moskva,
1990, ISBN 5-217-01121-1.
Ang, C.L., Luo, M., Gay, R.K.L.: Automatic Generation of IDEF Model, Journal of Intelligent
Manufacturing, 1994, Vol. 5, No. 2, pp. 79-92, ISSN 0956-5515.
Anii, Z.: Razvoj i menadment proizvoda u toku ivotnog ciklusa, Fakultet tehnikih nauka,
Novi Sad, 2011.
ANSI, Dimensional Measuring Interface Standard, DMIS 5.0 Standard, Part 1, ANSI/CAM-I
105.0-2004, Part 1. 2004.
Anti, R., Mitrovi, R., Stefanovi, S.: Osnove razvijenog Fuzyy CAPP sistema, Zbornik radova
31. Jupiter konferencije, 18. simpozijum CAD/CAM, Mainski fakultet, Beograd, 2005, str.
2.85-2.88, ISBN 978-86-7083-508-8.
Antoli, D.: Procena vremena izrade proizvoda regresionim modelima, Magistraski rad,
Fakultet strojarstva i brodogradnje, Zagreb, 2007.
Anjard, R.P.: Computer Integrated Manufacturing: A Dream Becoming a Reality, Industrial
Management and Data Systems, 1995, Vol. 95, No. 1, pp. 34, ISSN 0263-5577.
Arsovski, S., Arsovski, Z., Perovi, Z.: Razvoj CIM sistema, CIM monografije, CIM centar,
Mainski fakultet, Kragujevac, 1995, ISBN 86-427-0461-6.
Arsovski, Z.: Informacioni sistemi, CIM edicija, Mainski fakultet, Kragujevac, 2000, ISBN 8680581-36-4.
Ashby M.F.: Materials Selection in Mechanical Design, 3rd edition, Butterworth-Heinemann,
2005, ISBN 0-7506-6168-2.
ASM Handbook, Material Selection and Design, Vol. 20, ASM, Ohio, 1997, ISBN 0-87170386-6.
Attaran, M.: CIM: Getting Set for Implementation, Industrial Management and Data Systems,
1997, Vol. 97, No. 1-2, pp. 39, ISSN 0263-5577.
Babi B., Nei, N., Miljkovi, Z.,: A Review of Automated Feature Recognition With Rulebased Pattern Recognition, Computers in Industry, 2008, Vol. 59, No. 4, pp. 321-337, ISSN
0166-0615.
134
9.0 Literatura
[20] Babi, B.: Projektovanje tehnolokih procesa, Mainski fakultet, Beograd, 1999, ISBN 867083-356-5.
[21] Backlund, A.: The Definition of System, Kybernetes, 2000, Vol. 29, No. 4, pp. 444451, ISSN
0368-492X.
[22] Bai, G., Zhang, C., Wang, B.: Optimization of Machining Datum Selection and Machining
Tolerance Allocation with Genetic Algorithms, International Journal of Production Research,
2000, Vol. 38, No. 6, pp. 1407-1424, ISSN 0020-7543.
[23] Bali, J., Korosec, M.: Intelligent Tool Path Generation for Milling of Free Surfaces Using
Neural Networks, International Journal of Machine Tools and Manufacture, 2002, Vol. 42, No.
10, pp. 1171-1179, ISSN 0890-6955.
[24] Bangsow, S.: Manufacturing Simulation with Plant Simulation and SimTalk, Springer-Verlag,
Berlin, 2010, ISBN 978-3-642-05073-2.
[25] Banjac, D.: Tehnoloki postupci i alati - II deo, Fakultet tehnikih nauka, Novi Sad, 1975.
[26] Barkmeyer, E.J. editor and other: SIMA Reference Architecture Part 1: Activity Models, The
National Institute of Standards and Technology Internal Report 5939, Gaithersburg, Maryland,
1996.
[27] BenKhalifa, R., BenYahia, N., Zghal A.: Integrated Neural Networks Approach in CAD/CAM
Environment for Automated Machine Tools Selection, Journal of Mechanical Engineering
Research, 2010, Vol. 2, No. 2, pp. 25-38, ISSN 2141-2383.
[28] Birkofer, H.: The Future of Design Methodology, Springer-Verlag, London, 2011, ISBN 978-085729-614-6.
[29] Bjorke, O., Myklebust, O.: IMPPACT-Integrated Modelling of Products and Processes Using
Advanced Computer Technologies, Tapir, Trondheim, Norway, 1992, ISBN 978-8251909730.
[30] Bo, Z.W., Hua, L.Z., Yu, Z.G.: Optimization of Process Route by Genetic Algorithms, Robotics
and Computer-lntegrated Manufacturing, 2006, Vol. 22, No. 2, pp. 180-188, ISSN 0736-5845.
[31] Bobrek, M., Tanasi, Z., Travar, M.: Procesna organizacija, Mainski fakultet, Banja Luka,
2007, ISBN 978-99938-39-16-3.
[32] Boothroyd G., Dewhurst P., Knight, W.: Product Design for Manufacture and Assembly, 2nd
edition, Marcel Dekker, New York, 2002, ISBN 978-0824705848.
[33] Boothroyd, G., Dewhurst, P. Knight, W.: Product Design for Manufacture and Assembly,
Marcel Dekker Inc., New York, 1994, ISBN 978-0824791766.
[34] Borojevi, S., Jovievi,V., Jokanovi, S.: Modeling, Simulation and Optimization of Process
Planning, Journal of Production Engineering, 2009, Vol. 12, No. 1, pp. 8790, ISSN 18214932.
[35] Bralla, J. G.: Design for Manufacturability Handbook, 2nd Edition. McGraw-Hill, New York,
1998, ISBN 978-0-07-007139-1.
[36] Brown, R.L.E.: Design and Manufacturing of Plastics Parts, John Wiley & Sons, New York,
1980, ISBN 978-0471053248.
[37] Burbidge, J.L.: The introduction of group technology, Heinemann, London, 1978, ISBN 9780470123003.
[38] Cay, F., Chassapis, C.: An IT View on Perspectives of Computer Aided Process Planning
Research, Computers in Industry, 1997, Vol. 34, No. 3, pp. 307-337. ISSN 0166-3615.
[39] Chan, K., King, C., Wright, P.: COMPASS: Computer Oriented Materials, Processes and
Apparatus Selection Systems, Journal of Manufacturing Systems, 1988, Vol. 17, No. 4, pp. 275286, ISSN 0278-6125.
[40] Chang, P.T., Chang, C.H.: An Integrated Artificial Intelligent Computer-aided Process
Planning System, International Journal of Computer Integrated Manufacturing, 2000, Vol. 13,
No. 6, pp. 483-497, ISSN 0951-192X.
[41] Chang, T-C., Wysk, R.A., Wang, H-P.: Computer-aided Manufacturing, 3rd Edition, PrenticeHall, New York, 2005, ISBN 0131429191.
135
9.0 Literatura
[42] Che Zainal Abidin Nik Mohd Farid: Incorporating Design for Manufacture and Assembly
Methodologies Into the Design of a Modified Spark Plug, Masters thesis, Universiti Teknologi
Malaysia, Faculty of Mechanical Engineering, 2007.
[43] Chen, Y., Huang, Z., Chen, L., Wang, O.: Parametric Process Planning Based on Feature
Parameters of Parts, International Journal of Advanced Manufacturing Technology, 2006, Vol.
28, No. 7-8, pp. 727-736, ISSN 0268-3768.
[44] Cheng, K., Bateman, R.J.: e-Manufacturing: Characteristics, Applications and Potentials,
Progress in Natural Science, Elsevier Science Ltd., 2008, Vol. 18, No. 11, pp. 1323-1328, ISSN
1002-0071.
[45] Chirachavala, C.: Enterprise Integration for Small to Medium Enterprises, MEng Thesis,
University of South Australia, Mawson Lakes, Australia, 2001.
[46] Chryssolouris, G.: Manufacturing Systems: Theory and Practice, Springer Science and Business
Media, Inc., New York, 2006, ISSN 978-0387-25683-2.
[47] Chung, D.H., Suh,S.H.: ISO 14649-based Nonlinear Process Planning Implementation for
Complex Machining, Computer-Aided Design, 2008, Vol. 40, No. 5, pp. 521-536, ISSN 00104485.
[48] Committee on Visionary Manufacturing Challenges Board on Manufacturing and Engineering
Design Commission on Engineering and Technical Systems National Research Council. In:
Visionary manufacturing challenges for 2020, Washington, DC: National Academy Press, 1998.
[49] Conrad, K.J.: Grundlagen der Konstruktionslehre, Hansen-Verlag, Mnhen, 1998, ISBN 978-3446-41408-2.
[50] Corrado, P. Design for Manufacturing: A structured Approach, Butterworth-Heinemann,
Woburn, MA, 2001, ISBN (10) 0-7506-7341-9.
[51] Coward, D.G.: Manufacturing Management- Learning Through Case Studies, MacMillan, 1998,
ISBN 978-0333647776.
[52] Crandell B., Masui T.: e-Manufacturing Requirements, Proceedings of SEMI e-Manufacturing
Workshop, Tokyo, Japan, 2001.
[53] Creese, R.C., Moore. L.T.: Cost Modeling for Concurrent Engineering, Cost Engineering, 1990,
Vol. 32, No. 6, pp. 23-27, ISSN 0274-9696.
[54] Creese, R.C.: Introduction to Manufacturing Processes and Materials, Marcel Dekker, Inc.,
New York, 1999, ISBN 0-8247-9914-3.
[55] osi, I., Mili, D., elija, D.: Montani sistemi prirunik za vebe, Fakultet tehnikih nauka,
Novi Sad, 1991, ISBN 86-7621-042-X.
[56] osi, P.: Planiranje procesa u Web okruenju, Fakultet strojarstva i brodogradnje, Zagreb,
http://ptp.fsb.hr (preuzeto 10.05.2010)
[57] Dangayach, G.S., Pathak, S.C., Sharma A.D.: Advanced Manufacturing Technology: A Way of
Improving Technological Competitiveness, International Journal of Global Business and
Competitiveness, 2006, Vol. 2, No. 1, pp. 1-8, ISSN 1059-5422.
[58] Dargie, P.P., Parmeshwar, K., Wilson, W.R.D.: MAPS-1: Computer-Aided Design System for
Preliminary Material and Manufacturing Process Selection, Journal of Mechanical Design,
Transactions of the ASME, 1982, Vol. 104, pp. 126-136. ISSN 0161-8458.
[59] Dai, P.: Put ka drutvu znanja i trendovi evropske RTD misije, asopis IMK-14 Istraivanje i
razvoj, Vol. 24-25, No. 1-25, pp.77-92, Kruevac, 2006, ISSN 0354-6829.
[60] Deb, K.: Multi-objective Optimization Using Evolutionary Programming, Wiley, London, 2001,
ISBN 978-0-471-87339-6.
[61] Deb, S., Ghosh, K., Paul, S.: A Neural Network Based Methodology for Machining Operations
Selection in Computer-aided Process Planning for Rotationally Symmetrical Parts, Journal of
Intelligent Manufacturing, 2006, Vol. 17, No. 5, pp. 557-569, ISSN 0956-5515.
[62] Denkena, B., Shpitalni, M., Kowalski, P., Molcho, G., Zipori, Y.: Knowledge Management in
Process Planning, 2007, Annals of the CIRP, Vol. 56, No. 1, pp. 175180, ISSN 0007-8506.
136
9.0 Literatura
[63] Depinice, P., Amara, H., Hacoet, J. Y.: May Human Intervention Improve the CAPP System
Abilities?, International Journal of Production Engineering and Computers, 2002, Vol. 4, No. 4,
pp. 29-39, ISSN 1450-5096.
[64] Design for Assembly Software, Boothroyd Dewhurst, Inc., http://www.dfma.com
[65] Devedi, G.: Softverska reenja CAD/CAM sistema, Mainski fakultet, Kragujevac, 2004.
ISBN 86-80581-67-4.
[66] Devireddy, C.R., Eid, T., Ghosh, K.: Computer-aided Process Planning for Rotational
Components Using Artificial Neural Networks, International Journal of Agile Manufacturing,
2002, Vol. 5, No. l, pp. 27-49, ISSN 1536-2639.
[67] Ding, L., Yue, Y., Ahmet, K., Jackson, M., Parkin, R.: Global Optimization of a Feature-based
Process Sequence Using GA and ANN Techniques, International Journal of Production
Research, 2005, Vol. 43, No. 15, pp. 3247-3272, ISSN 0020-7543.
[68] Dorador, J.M., & Young, R.I.M.: Application of IDEF0, IDEF3 and UML Methodologies in the
Creation of Information Models, International Journal of Computer Integrated Manufacturing,
2000, Vol. 13, No. 5, pp. 430-445, ISSN 0951-192X.
[69] api, M.: Evidencioni sistemi u razvoju proizvoda i procesa, Monografija br.9 iz serije
Inteligentni tehnoloki sistemi, Lola Institut, Beograd, 2005, ISBN 978-86-906973-0-6.
[70] ElMaraghy A.H.: Evolution and Feature Perspectives of CAPP, Annals of CIRP, 1993, Vol. 42,
No. 2, pp. 739-751, ISSN 0007-8506.
[71] Esawi, A.M.K., Ashby, M.F.: Computer-Based Selection of Manufacturing Processes: Methods,
Software and Case Studies, Proceedings of the Institution of Mechanical Engineers. Part B:
Journal of Engineering Manufacture, 1998, Vol. 212, No. 8, pp. 595-610, ISSN 0954-4054.
[72] Evbuomwan, N.F.O., Sivaloganathan, S., Jebb, A.: Concurrent Materials and Manufacturing
Process Selection in Design Function Deployment, Concurrent Engineering: Research and
Applications, 1995, Vol. 3, No. 2, pp. 135-143, ISSN 1063-293X.
[73] Eversheim, W., Schneewind, J.: Computer-Aided Process Planning State of the Art and
Future Development, Robotics & Computer-Integrated Manufacturing, 1993, Vol. 10, No. 1/2,
pp. 65-70, ISSN 0736-5845.
[74] Fagerstrom, J., Moestam-Ahlstrom, L.: Demands on Methods for Development Work Focused
on Concurrent Engineering, Proceedings of International Conference on Production Research,
Prague, 2001, ISBN 80-02-01438-3.
[75] Farris, J., Selection of Processing Sequences and Materials During Early Product Design, Ph.D
Thesis, University of Rhode Island, 1992.
[76] Febransyah, A.: A Feature-based Approach to Automating High-Level Process Planning,
Doctoral thesis, Faculty of North Carolina State University, 2001.
[77] Feng, S., Song, E.: Information Modeling on Conceptual Design Integrated with Process
Planning, Proceedings of Symposia for Design For Manufacturability, International Mechanical
Engineering Congress and Exposition, Orlando, Florida, 2000, pp. 160-168.
[78] Feng, S., Song, E.: Preliminary Design and Manufacturing Planning Integration Using
Intelligent Agents, 7th International Conference on Computer Supported Cooperative Work in
Design (CSCWiD), Rio de Janeiro, 2002, pp. 270-275.
[79] Feng, S., Stouffer, K.A., Jurrens, K.K.: Manufacturing planning and predictive process model
integration using software agents, Advanced Engineering Informatics, 2005, Vol. 19, No. 2, pp.
135-142, ISSN 1474-0346.
[80] Feng, S., Zhang Y.: Conceptual Process Planning A definition and functional decomposition,
Manufacturing Science and Engineering, Proceedings of the International Mechanical
Engineering Congress and Exposition, 1999, Vol. 10, pp. 97-106.
[81] Feng, S.: A machining process planning activity model for system integration, Journal of
Intelligent Manufacturing, 2003, Vol. 14, No.6, pp. 527-539, ISSN 0956-5515.
[82] Feng, S.: Open Systems Interface Specification for Machining Process Planning Integration,
Proceedings of the 12th International Conference on CAD/CAM, Robotics, and Factories of
Future, London, England, August 14-16, 1996, ISBN 978-1898253037.
137
9.0 Literatura
[83] Feng, S.C.: A Machining Process Planning Activity Model for Systems Integration, NISTIR
5808, National Institute of Standards and Technology (NIST), Gaithersburg, 1996.
[84] Feng, S.C.: Dimensional Inspection Planning Based on Product Data Standards, NISTIR 5183,
National Institute of Standards and Technology (NIST), Gaithersburg, 1993.
[85] Ferreira P.M., Lu, S.C.-Y., Zhu, X.: Conceptual Model for Process Planning. Consortium for
Advanced Manufacturing International (CAM-I): Arlington, Texas, 1990.
[86] Filetin, T.: Izbor materijala pri razvoju proizvoda, Fakultet strojarstva i brodogradnje, Zagreb,
2000, ISBN 953-6313-33-2.
[87] FIPS Publication 183: Integration Definition for Function Modeling (IDEF0), 1993.
http://www.itl.nist.gov/fipspubs/idef02.doc. (preuzeto 15.06.2011)
[88] Fowler, J.: STEP for Data Management Exchange and Sharing, Technology Appraisals Ltd.,
Twickenham, UK, 1995, ISBN 1-871802-36-9.
[89] Gatalo, R., Navalui, S., Zeljkovi, M.: CAD/CAM tehnologije pogled u budunost, Zbornik
radova 8. Meunarodne konferencije fleksibilne tehnologije MMA, Fakultet tehnikih nauka,
Novi Sad, 2003, str. 85-86.
[90] Gatalo, R., Zeljkovi, ., Zeljkovi, M., Hodoli, J.: Manufacturing Process Planning Based on
the Principles of Expert System Building, within SAPOR-S System fo Automated NC
Programming, Advancement of Intelligent Production, JSPE Publication, Series No. 1, pp. 106111, Elsevier Science B. V., Amsterdam, Tokyo, 1994.
[91] Giachetti, R.E.: A Decision Support System for Material and Manufacturing Process Selection,
Journal of Intelligent Manufacturing, Vol. 9, No. 3, 1998, pp. 265-276, ISSN 0956-5515.
[92] Godec, D.: Doprinos sustavnosnom razvoju kalupa za injekciono preanje plastomera,
Magistarski rad, Fakultet strojarstva i brodogradnje, Zagreb, 2000.
[93] Grieves, M.: Product Lifecycle Management, Driving Next Generation of the Lean Thinking,
McGraw-Hill, New York, 2005, pp.32-44, ISBN 0071452303.
[94] Grzesik, W.: Advanced Machinning Processes of Metallic Materials - Theory, Modelling and
Applications, Elsevier Science Ltd., 2008, ISBN 978-0-080-44534-2.
[95] Gunasekaran, A., Virtanen, I., Martikainen, T., Yli-Olli, P.: The Design of Computer-Integrated
Manufacturing Systems, International Journal of Production Economics, 1994, Vol. 34, No. 3,
pp. 313327, ISSN 0925-5273.
[96] Gupta S.K., Nau S.K.: A Systematic Approach for Analyzing the Manufacturability of Machined
Parts, Computer Aided Design, 1995, Vol. 27, No. 5, pp.343-352, ISSN 0010-4485.
[97] Gupta, S.K., Regli, W.C., Das, D., Nau, D.S.: Automated Manufacturability Analysis: a Survey;
Research in Engineering Design, 1997, Vol. 9. pp. 168190, ISSN 0934-9839.
[98] HMida, F., Martin, P., Vernadat F.: Cost Estimation in Mechanical Production: the Cost Entity
Approach Applied to Integrated Product Engineering, International Journal of Production
Economics, 2006, Vol. 103, No. 1, pp. 17-35, ISSN 0925-5273.
[99] Halevi, G., Weill, R.D.: Principles of Process Planning A Logical Approach, Chapman &
Hall, Inc., 1995, ISBN 978-0412543609.
[100] Ham, I., Hitomi, K., Yoshida, T.: Group technology, Application to Production Management,
Kluwert-Nijhoff Publishing, Boston, 1985, ISBN 0-89838-090-1.
[101] Ham, I., Lu, S.C.-Y.: Computer-Aided Process Planning: The Present and the Future, Annals
of CIRP, 1988, Vol. 37, No. 2, pp. 591-601, ISSN 0007-8506.
[102] Hammer, M., Champy, J.: Reengineering the Corporation. A Manifesto for Business Revolution.
Hammer and James Company, New York, 1993.
[103] Han, J., Pratt, M., Regli, W.C.: Manufacturing Feature Recognition From Solid Models: A
status report, IEEE Transaction on robotics and automation, 2000, Vol. 16, No. 6, pp. 782-796.
ISSN 1042-296X.
[104] Hannam, R.: Computer Integrated Manufacturing: From Concept to Realisation, AddisonWesley, Reading, MA, 1997, ISBN 0-201-17546-0.
138
9.0 Literatura
[105] Harrington, J.: Computer Integrated Manufacturing, Industrial Press, New York, 1973.
[106] Haudrum, J.: Creating the Basis for Process Selection in the Design Stage, Ph.D. dissertation,
Institute of Manufacturing Engineering, Technical University, Denmark, 1994.
[107] Hauschild, M., Jeswiet, J., Alting, L.: Design for Environment Do We Get the Focus Right?,
Annals of CIRP, 2004, Vol. 53, No. 1, pp. 14, ISSN 0007-8506.
[108] Hauschild, M., Jeswiet, J., Alting, L.: From Life Cycle Assessment to Sustainable Production:
status and perspectives, Annals of CIRP, 2005, Vol. 54, No. 2, pp 7087, ISSN 0007-8506.
[109] Hercigonja, I.: Tehnika priprema proizvodnje, Privredni pregled, Beograd, 1963.
[110] Herrmann, J.A, Cooper, J., Gupta, S.K, Hayes, C.C., Ishii, K., Kazmer, D., Sandborn, P.A.,
Wood, W.A.: New Directions In Design For Manufacturing, Proceedings of the 8th Design and
Engineering Technical Conference, DETC 2004-57770, Salt Lake City, Utah, 2004, pp. 853861, ISBN 0-7918-4696-2.
[111] Hodoli, J., Matin,, I., Stevi, M., Vukeli, .: Development of Integrated CAD/CAE System of
Mold Design for Plastics Injection Molding, Materiale Plastice, 2009, Vol. 46, No. 3, pp. 236242, ISSN 0025-5289.
[112] Hodoli, J., Vukeli, .: Pribori, Fakultet tehnikih nauka, Novi Sad, 2008, ISBN 978-86-7892121-6.
[113] ICAM, Integrated Computer-Aided Manufacturing: Architecture Part III, Vol. VI Composite
Information Model of "Manufacture Product" (MFGI), Wright-Patterson AFB, Ohio. AFWALTR-82-4063, 1983.
[114] IGES. Initial Graphics Exchange Specification (IGES), http://ts.nist.gov/standards/iges/
[115] Integrated DEFinition method, http://www.idef.com (preuzeto 15.06.2011)
[116] Ishii, K.: Design for Manufacturability Course, Department of Mechanical Engineering,
Stanford University, 1999.
[117] Ishii, K.: Modeling of Concurrent Engineering Design, In Kusiak, A.(Ed.), Concurrent
Engineering: Automation, Tools and Techniques, John Wiley & Sons, Inc., 1993, pp. 19-39,
ISBN 978-0-471-55492-9.
[118] ISO 10303-203: Industrial automation systems and integration Product data representation
and exchange Part 203: Application Protocols: Configuration controlled 3D design. 2007.
[119] ISO 10303-214: Industrial automation systems and integration Product data representation
and exchange - Part 214: Application Protocal: Core data for automotive mechanical design
processes, 2001.
[120] ISO 10303-219, Industrial automation systems and integration-Product data representation and
exchange-Part 219: Application protocol: Dimensional inspection information exchange. 2004.
[121] ISO 10303-224: Industrial automation systems and integration Product data representation
and exchange - Part 224: Application protocol: Mechanical product definition for process
planning using machining features, 2006.
[122] ISO 10303-238: Industrial automation systems and integration Product data representation
and exchange - Part 238: Application Protocols: Application interpreted model for
computerized numerical controllers, 2004.
[123] ISO 10303-240: Industrial automation systems and integration Product data representation
and exchange - Part 240: Application protocol:Process plans for machined products. 2005.
[124] ISO 14649-1, Data model for Computerized Numerical Controllers: Part 1 Overview and
fundamental principles, 2002.
[125] ISO 6983/1, Numerical control of machines Program format and definition of address words
Part 1: Data format for positioning, line and contouring control systems, 1982.
[126] ISO/FDIS 10303-213, Product data representation and exchange Part213: Application
Protocols: Nimerical Control Process Plans for Machined Parts, Draft ISI standard, 1995.
[127] Jennings, N.R., Wooldridge, M. J.: Applications of Intelligent Agents, In Jennings, N.R.,
Wooldridge M.J., (Ed.): Agent Technology: Foundations, Applications, and Markets, Springer,
Berlin, 1998, pp. 328, ISBN 978-3540635918.
139
9.0 Literatura
[128] Jin, Y.: Engineering Design Theory and Methodology, Department of Mechanical Engineering,
University of Southern California, Los Angeles, 1998.
[129] Jockovi, M., Ognjanovi, Z., Stankovski, S.: Vetaka inteligencija, inteligentne maine i
sistemi, Krug, Beograd, 1997.
[130] Joo, J., Yi, G.R., Cho, H.B., Choi, Y.S.: Dynamic Planning Model for Determining Cutting
Parameters Using Neural Networks in Feature_based Process Planning, Journal of Intelligent
Manufacturing, 2001, Vol. 12, No. 1, pp. 13-29, ISSN 0956-5515.
[131] Jovanovi, V., Tomovi, M., Filipovi, S.: Internetom podrana saradnja u distribuiranim
proizvodnim sistemima, Zbornik radova 33. Jupiter konferencije, 26. Simpozijum CIM u
strategiji tehnolokog razvoja industrije prerade metala, Zlatibor, 2007, pp. 1.26-1.31, ISBN
978-86-7083-592-4.
[132] Jovanovi, V., Tomovi, M., Filipovi, S.: Uvod u digitalnu proizvodnju, Proceedings of XIV
International Scientific Conference on Industrial Systems (IS'08), Faculty of Technical Science,
Novi Sad, 2008, ISBN 978-86-7892-135-3.
[133] Jovievi, V.. Automatizacija projektovanja tehnolokih procesa, Monografija, Mainski
fakultet, Banja Luka, 2002, ISBN 99938-623-4-7.
[134] Jovievi, V.: Projektovanje tehnolokih procesa, Mainski fakultet, Banja Luka, 2005, ISBN
99938-39-05-1.
[135] Kalajdi, M.: Tehnologija mainogradnje, Mainski fakultet, Beograd, 2002.
[136] Kamrani, K.A., Sferro, P., Handelman, J.: Critical Issues in Design and Evaluation of Computer
Aided Process Planning System, Computers and Industry Engineering, 1995, Vol. 29, No. 1-4,
pp. 619-623, ISSN 0360-8352.
[137] Kang, M., Han, J., Moon, J.G.: An Approach For Interlinking Design and Process Planning,
Journal of Materials Processing Technology, 2003, Vol. 139, No. 1-3 spec., pp. 589 595, ISSN
0924-0136.
[138] Kesavan, R., Elanchezhian, C., Vijaya Ramnath, B.: Proces Planning and Post Estimation, New
age International (P) Limited Publisher, New Delhi, 2009,. ISBN 978-81-224-2941-1.
[139] Kess van Luttervelt: Research Challenges in CAPP, Production Engineering and Computers,
2002,Vol. 4, No. 5, Faculty of Mechanical Engineering, Belgrade, pp. 5-18, ISSN 1450-5096.
[140] Kikojevi, Babi, J.: Razvoj sistema za automatizovano projektovanje tehnolokih procesa za
klasu rotacionih delova, Magistarski rad, Mainski fakultet, Beograd, 2002.
[141] Ko, M., Ni, J., Lee, J., Bandyopadhyay, P.: Introduction to e-Manufacturing, The Industrial
Information Technology Handbook, Chapter 97, CRC Press, 2005, pp. 97.1-97.9, ISBN 0-84931985-4.
[142] Kochan, D.: Fertigugsprozessgestaltung und Informations-ferarbeitung, VEB Verlag Technik,
Berlin, 1977.
[143] Kuric, I., Matuszek, J., Debnar, R.: Computer Aided Process Planning in Machinery Industry,
Politechnika Lodzka, Bielsko-Biata, 1999, ISBN 83-87087-00-9.
[144] Lau, H.C.W., Lee, C:K:M:; Jiang, B., Hui, I:K:, Pun, K.F.: Development of a Computer
Integrated System to Support CAD to CAPP, International Journal of Advanced Manufacturing
Technology, 2005, Vol. 26, No. 9-10, pp. 1032-1042, ISSN 0268-3768.
[145] Law, A.M., Kelton, W.D.: Simulation Modeling and Analysis, 3rd edition, McGraw-Hill, New
York, 2000, ISBN 978-0071165372.
[146] Lawson, M., Karandikar, H.M.: A survey of Concurrent Engineering, Concurrent Engineering:
Research and Applications, 1994, Vol. 2, No. 1, pp. 1-6, ISSN 1063-293X.
[147] Layer, A., Ten Brinke, E., Van Houten, F., Kals, H., Haasis, S.: Recent and Future Trends in
Cost Estimation, International Journal of Computer Integrated Manufacturing, 2002, Vol. 15,
No. 6, pp. 499510, ISSN 0951-192X.
[148] Lenau, T.: The Missing Element in Design for Manufacture, Annals of the CIRP, Vol. 45, No.1,
1996, pp. 105-108, ISSN 0007-8506.
140
9.0 Literatura
141
9.0 Literatura
[167] Manufacturing Infrastructure: Enabling the Nations Manufacturing Capacity, published by the
National Science and Technology Council, 1997.
[168] Marcicin, J-N.: Computer Aided Production Engineering (CAPE) as Subsystem of CIM, WEB
Journal - CA Systems in Production Process Planning, 2002, ISSN 1355-3799.
http://fstroj.utc.sk/journal/engl/papers/027_2002.pdf
[169] Markovi, A.: Objektno orjentisane specifikacije simulacionih modela baziranih na znanju,
Doktorska disertacija, Fakultet organizacionih nauka, Beograd, 2000.
[170] Marri, H.B., Gunasekaran, A., Bulent, K.: Implementation of Computer - Integrated
Manufacturing in Small and Medium Enterprises, Industrial and Commercial Training, 2003,
Vol. 35, No. 4, pp. 151-157, ISSN 0019-7858.
[171] Marri, H.B., Gunasekaran, A., Grieve, R.J.: Computer-Aided Process Planning: A State of the
Art, International Journal of Advanced Manufacturing Technology, 1998, Vol. 14, No. 4, pp.
261268. ISSN 0268-3768.
[172] Martin, P., Dantan, J.Y., Siadat, A.: Cost Estimation and Conceptual Process Planning, In
Cunha, P.F. and Maropoulous, P.G. (ed.) Digital Enterprise Technology: Perspective and
Future Challenges, Springer Science+Business Media, LLC., New York, 2007, pp. 243-250,
ISBN 978-0387498638.
[173] Martin, P.: Some aspects of Integrated Production and Manufacturing, in Bramley, A.,
Brissaud, D., Coutellier, D., McMahon, C. (Ed.): Advanced in Integrated Design and
Manufacturing in Mechanical Engineering, pp. 215-226, Springer, Netherlands, 2005.
[174] Matalin, A.A.: Tehnologija mainostroenija, Mainostroenije, Lenjingrad, 1986.
[175] Matin, I., Hadistevi, M., Hodoli, J., Vukeli, ., Luki, D.: A CAD/CAE Integrated Injection
Mold Design System for Plastic Products, DOI: 10.1007/s00170-012-3926, International
Journal of Advanced Manufacturing Technology, ISSN 0268-3768.
[176] Mayer, R.J.: IDEF0 Function Modeling: A reconstruction on the Original Air Force Reports,
KBC Inc. College Station, Texas, USA, 1990.
[177] McMahon, C., Browne, J.: CAD/CAM - From Principles to Practice, Addison-Wesley, 1993,
ISBN 978-0201565027.
[178] Meeker, D., McWilliams, F.J.: Structured Cost Reduction: Value Engineering by the Numbers,
The 18th Annual International Conference on DFMA Newport, RI, June, 2003.
[179] Mertins, K., Jochem, R.: Architectures, Methods and Tools for Enterprise Engineering,
International Journal of Production Economics, 2005, Vol. 98, No. 2, pp. 179-188, ISSN 09255273.
[180] Mertins, K., Sssenguth, W., Jochem, R.: Planning Enterprise Related CIM Structures,
Advanced in Factories of Future, CIM and Robotics, Elsevier, North-Holland, Amsterdam,
1993, pp.67-76, ISBN 0-444-89856-5.
[181] Miko, B., Szegh, I., Kutrovacz, L.: Preliminary Planning of Part Manufacturing Process,
Periodica Polytechnica Ser. Mech. Eng., 1999, Vol. 43, No. 2, pp. 97-106, ISSN 0324-6051.
[182] Milaic, V.R., Spasic, .: Kompjuterski integrisani tehnoloki sistemi CIM-sistemi, Mainski
fakultet, Beograd, 1990.
[183] Milai, V.: Teorija projektovanja proizvodnih sistema, Mainski fakultet, Beograd, 1987,
ISBN 86-7083-054-X.
[184] Milling, P.M.: Computer Integrated Manufacturing in German Industry: Aspirations and
Achievements, International Journal of Operations and Production Management; 1997, Vol. 17,
No. 10, pp.10341045, ISSN 0144-3577.
[185] Miloevi M., Todi V., Luki D.: Model Development of Collaborative System for Process
Planning, Journal of Production Engineering, Faculty of Technical Sciences, Novi Sad, 2009,
Vol. 12, No. 1, pp. 95-98, ISSN 1821-4932.
[186] Miloevi, M.: Kolaborativni sistem za projektovanje tehnolokih procesa izrade proizvoda
baziran na internet tehnologijama, Doktorska disertacija, Fakultet tehnikih nauka, Novi Sad,
2012.
142
9.0 Literatura
143
9.0 Literatura
[206] Nei, N.: Razvoj sistema za tehnoloko prepoznavanje i projektovanje tehnolokih procesa za
delove koji se izrauju na obradnim centrima, Magistarska teza, Mainski fakultet, Beograd,
2007.
[207] Nielsen, J.: Information Modeling of Manufacturing Processes: Information Requirements for
Process Planning in a Concurrent Engineering Environment, Doctoral Dissertation, Royal
Institute of Technology, Department of Production Engineering, Stocholm, 2003.
[208] Opiyo, E.Z.: Development of hybrid system for product development and production, Research
report, PTO, 1998.
[209] Ortiz, A., Lario, F., Ros, L.: Enterprise IntegrationBusiness Processes Integrated
Management: a proposal for a methodology to develop Enterprise Integration Programs,
Computers in Industry, 1999, Vol. 40, No. 2, pp. 155171, ISSN 0166-0615.
[210] Pahl B., Beitz W.: Engineering Design: A Systematic Approach, The Design Council, London,
1988, ISBN 978-0387504421.
[211] Park, M.W., Park, B.T., Rho, H.M., Kim, S.K.: Incremental Supervised Learning of Cutting
Conditions Using the Fuzzy ARTMAP Neural N etwork, CIRP Annals - Manufacturing
Technology, 2000, Vol. 49, No. 1, pp. 375-378, ISSN 0007-8506.
[212] Park, S.C.: Knowledge Capturing Methodology in Process Planning, Computer Aided Design,
2003, Vol. 35, No. 12, pp.1109-1117, ISSN 0010-4485.
[213] Parkan, C., Wu, M.: Process Selection with Multiple Objective and Subjective Attributes,
Production Planning and Control, 1998, Vol. 9, No. 2, pp. 189-200, ISSN 0953-7287.
[214] Perovi, M., Arsovski, S., Arsovski Z.: Proizvodni sistemi-struktura, upravljanje i pravci
razvoja, CIM centar, Mainski fakultet, Kragujevac, 1996, ISBN 86-23-43035-2.
[215] Peters, A.J., Rooney, E.M., Rogerson, J.H., McQuater, R.E., Spring, M., Dale, B.G.: New
Product Design and Developmet: A Generic Model, The TQM Magazine, 1999, Vol. 11, No. 3,
pp. 172-179, ISSN 0954-478X.
[216] Petrovi, B.: Razvoj proizvoda, Monografija, Fakultet tehnikih nauka, Novi Sad, 1997.
[217] Planak, M.: Brza izrada prototipova, modela i alata (Rapid Prototyping and Rapid Tooling),
Fakultet tehnikih nauka, Novi Sad, 2004, ISBN 86-80249-96-3.
[218] Poliuk, J.: Projektovanje informacionih sistema, Elektrotehniki fakultet, Podgorica, 2007.
www.etf.ac.me/materijal/1190887507PIS.pdf (preuzeto 10.08.2010.)
[219] Popov, M.E., Popov, A.M.: Development of Design and Technological Planning Methodology
in Integrated Production Preparation and Control Systems, Russian Engineering Research,
Allerton Press, Inc., 2007, Vol. 27, No. 6, pp. 365370, ISSN 1068-798X.
[220] Puzovi R.: Razvoj sistema modeliranja tehnolokih procesa FTS-a primenom raunara,
Doktorska disertacija, Mainski fakultet, Beograd, 2000.
[221] Radenkovi, B., Stanojevi, M., Markovi, A.: Raunarska simulacija, Fakultet organizacionih
nauka i Saobraajni fakultet, Beograd, 1999, ISBN 86-7395-074-0.
[222] Radhakrishnan, P., Subramanyan, S., Raju, V.: CAD/CAM/CIM, New age International
Publishers, New Delhi, 2008, ISBN 81-22-42236-5.
[223] Rahim, A.R.A; Baksh, M.S.N.: The Need For a New Product Development Framework For
Engineer-to-order Products, European Journal of Innovation Management, 2003, Vol. 6, No. 3,
pp. 182-196, ISSN 1460-1060.
[224] Rameshbabu, V., Shunmugam, M.S.: Hybrid Feature Recognition Method For Setup Planning
From STEP AP 203, Robotics and Computer Integrated Manufacturing, 2009, Vol. 25, No. 2,
pp. 393-408, ISSN 0736-5845.
[225] Ranky P.G.: Computer Networks for World Class CIM Systems, CIMware Ltd. Guildford, U.K,
1990, ISBN 978-1-87-263101-1.
[226] Regodi, D., Cvetkovi, D.: Automatizacija, proizvodni sistemi i raunarski integrisana
proizvodnja, Univerzitet Singidunum, Beograd, 2011, ISBN 978-86-7912-367-1.
[227] Rehg, J.A., Kraebber, H.W.: Computer-Integrated Manufacturing, 2nd edition, Prentice-Hall,
New Jersey, 2001, ISBN 0-13-087553-8.
144
9.0 Literatura
[228] Rekecki, J., Gatalo, R., Zeljkovi, M., Borojev, LJ., Hodoli, J.: Fleksibilni tehnoloki sistemi za
obradu rotacionih izradaka, Knjiga I, Stanje, tendencije i podloge za razvoj, Fakultet tehnikih
nauka, Institut za proizvodno mainstvo, Novi Sad, 1989.
[229] Risti, M.: Projektovanje proizvoda sa aspekta tehnologinosti, Magistarski rad, Mainski
fakultet, Ni, 2012.
[230] Rocha, J., Ramos, C., Vale, Z.: Process Planning Using a Genetic Algorithm Approach,
Proceedings of the IEEE International Symposium on Assembly and Task Planning, 1999, 2124 July, Porto, Portugal, pp. 338-343, ISBN 0-7803-5704-3.
[231] Rozenfeld, H., Kerry, H.T.: Automated Process Planning for Parametric Parts, International
Journal of Production Research, 1999, Vol. 37, No. 17, pp. 3981-3993, ISSN 0020-7543.
[232] Russell, R., Taylor, B.W.: Operation Management: Creating Value Along the Supply Chain, 6th
Edition, John Wiley & Sons, Inc., 2009, ISBN 978-0-470-09515-7.
[233] Sski, J. Salonen, T. Paro, J. Integration of CAD, CAM and NC with Step-NC. VVT Industrial
systems, 2005, ISBN 951-38-6580-0.
[234] Saaty, T.L.: Multi-criteria Decision Making: The Analytic Hierarchy Process. Pittsburgh, PA:
RWS Publication, 1990, ISBN 978-0962031724.
[235] Salehi, M., Tavakkoli-Moghaddam, R.: Application of Genetic Algorithm to Computer-Aided
Process Planning in Preliminary and Detailed Planning, Engineering Applications of Artificial
Intelligence, 2009, Vol. 22, No. 8, pp. 1179-1187, ISSN 0952-1976.
[236] Scallan, P.: Process planning: The Design/Manufacture Interface, MA: ButterworthHienemann, Boston, 2003, ISBN 0-7506-5129-6.
[237] Schleipen, M., Sauer, O., Friess, N., Braun, L., Shakerian, K.: Production Monitoring and
Control Systems within the Digital Factory, Proceedings of the 6th CIRP-Sponsored
International Conference on Digital Enterprise Technology, Springer Berlin/Heidelberg, 2010,
Vol. 66, pp. 711-724, ISBN 978-3-642-10429-9.
[238] Shea, C., Reynolds, C. Dewhurst, P.: Computer-Aided Materials and Process Selection,
Proceedings of the Fourth International Conference on Product Design for Manufacture and
Assembly, Rhode Island, USA, Vol. I, pp. 399-414, 1989.
[239] Shivanand, H.K., Benal, M.M., Koti, V.: Flexible Manufacturing System, New age International
(P) Limited, New Delphi, 2006, ISBN 978-81-224-2559-8.
[240] Shunmugam, M.S., Mahesh, P., Bhaskara Reddy, S.V.: A Method of Preliminary Planning for
Rotational Components With C-Axis Features Using Genetic Algorithm, Computers in Industry,
2002, Vol. 48, No. 3, pp. 199-217, ISSN 0166-0615.
[241] Siller, H.R., Estruch, A., Vila, C., Abellan, J.V., Romero, F.: Modeling Workflow Activities for
Collaborative Process Planning with Product Lifecycle Management Tools, Journal of
Intelligent Manufacturing, 2008, Vol. 19, N0. 6, pp. 689-700, ISSN 0956-5515.
[242] Singh, P.K., Jain, P.K., Jain, S.C.: Simultaneous Optimal Selection of Design and
Manufacturing Tolerances with Different Stack-up Conditions using Genetic Algorithms,
International Journal of Production Research, 2003, Vol. 41, No.11, pp. 2411-2429, ISSN 00207543.
[243] Smith, C.S.: The Manufacturing Advisory Service:Web Based Process and Material Selection,
Ph.D Thesis, University of California, Berkeley, 1999.
[244] Sakamoto, C., Inouye, T.: Overview of Feature Based Process Planning System Using AP240,
Manufacturing Engineering Research Inc., Fujitsu Kyushu System Eng. Ltd., 2004.
[245] Stefanovi, M.: CIM sistemi, Mainski fakultet, Kragujevac, 2006, ISBN 86-80581-96-8.
[246] STEP Application Handbook ISO 10303, version 3, SCRA South Carolina Research Authority,
SC., 2006.
(preuzeto 10.10.2010.)
http://www.uspro.org/documents/STEP_application_hdbk_63006_BF.pdf
[247] Stevi, M. Poveanje tanosti merenja numeriki upravljanih mernih maina, Monografija,
Fakultet tehnikih nauka, Novi Sad, 2006, ISBN 86-7892-028-9.
145
9.0 Literatura
[248] Sudiarso, A., Putranto R.A: Lead Time Estimation of A Production System using Fuzzy Logic
Approach for Various Batch Sizes, Proceedings of the World Congress on Engineering, 2010,
Vol. III, London, pp. 2231-2233, ISBN: 978-988-18210-8-9.
[249] Suh, S. H., Cheon, S. U.: A Framework for Intelligent CNC and Data Model, International
Journal of Advanced Manufacturing Technology, 2002, Vol. 19, No 10, pp. 727-735, ISSN
0268-3768.
[250] Suh, S. H., Lee, B. E., Chung, D. H., Cheon, S. U.: Architecture and Implementation of a Shopfloor Programming System for STEP-compliant CNC, Computer-Aided Design, 2003, Vol. 35,
No. 12, pp. 1069-1083, ISSN 0010-4485.
[251] Swift, K.G., Booker, J.D.: Process Selection: From Design to Manufacture, Second edition,
Butterworth-Heinemann, Oxford, 2003, ISBN 0-7506-5437-6.
[252] erifi, V.; Dai, P.; Jemenica, R., Labovi, D.: Functional and Information Modeling of
Production Using IDEF Methods, Strojniki vestnik Journal of Mechanical Engineering,
2009, Vol. 55, No. 2, pp. 131-140, ISSN 0039-2480.
[253] ormaz, D.: Distributive Modeling of Manufacturing Activities using Integrative Manufacturing
Process Model, International Journal of Industrial Engineering and Management, 2010, Vol. 1,
No. 1, pp. 9-18, ISSN 2217-2661.
[254] ormaz, D.N., Arumugam J., Ganduri, C.: Integration of Rule-based Process Selection with
Virtual Machining for Distributed Manufacturing Planning, in Wang, L., Shen, W. (Ed.)
Process Planning and Scheduling for Distributed Manufacturing, Springer Series in Advanced
Manufacturing, 2007, pp. 61-90, ISBN 978-1846287510.
[255] ormaz, D.N., Arumugam, J., Rajaraman, S.: Integrative Process Plan Model and
Representation for Intelligent Distributed Manufacturing Planning, International Journal of
Production Research, 2004, Vol. 42, No. 17, pp. 3397-3417, ISSN 0020-7543.
[256] Tan, W., Khoshnevis, B.: Integration of Process Planning and Scheduling A Review, Journal
of Intelligent Manufacturing, 2000, Vol. 11, pp. 51-63, ISSN 0956-5515.
[257] TeamSET software, CSC Manufacturing, Solihull, UK., www.teamset.com
[258] Tecnomatix Plant Simulation,
http://www.plm.automation.siemens.com (preuzeto 06.11.2011.)
[259] Tepi, J., Todi, V., Luki, D., Miloevi, M., Borojevi, S.: Development of the Computeraided Process Planning (CAPP) System for Polymer Injection Mold Manufacturing,
Metallurgy, 2011, Vol. 50, No. 4, pp. 273-277, ISSN 0543-5846.
[260] Teti, R., Kumara, S.R.T.: Intelligent Computing Methods for Manufacturing Systems, Annals of
CIRP, 1997, Vol. 46, No. 2, ISSN 0007-8506.
[261] Toboak, D.: Studij rada, Tehnika knjiga, Zagreb, 1971.
[262] Todi, V., Banjac, D.: Projektovanje i optimizacija tehnolokih procesa obrade, Prirunik,
Fakultet tehnikih nauka, Novi Sad, 2000, ISBN 86-80249-06-8.
[263] Todi, V., Luki, D., Miloevi, M., Borojevi, S., Vukman, J.: Application of Simulation
Techniques in The Development and Implementation of Flexible Manufacturing Systems,
Proceedings of XV International Scientific Conference on Industrial Systems (IS'11), Faculty of
Technical Science, Novi Sad, 14-16. September, 2011, pp. 23-28, ISBN 978-86-7892-341-8.
[264] Todi, V., Luki, D., Miloevi, M., Vukman, J.: Technological basis for the development and
implementation of flexible manufacturing systems, Proceedings of 10th Anniversary
International conference an accomplisments in Electrical and mechanical Engineering and
Information Technology, Faculty of Mechanical Engineering, Banja Luka, 26-28. May, 2011,
pp. 427-432, ISBN 978-99938-39-36-1.
[265] Todi, V., Luki, D., Stevi, M., Miloevi, M.: Integrated CAPP System for Plastic Injection
Mold Manufacturing, Materiale Plastice, 2008, Vol. 45, No. 4, pp. 381-389, ISSN 0025-5289.
[266] Todi, V., Penezi, N., Luki, D., Miloevi, M.: Tehnoloka logistika i preduzetnitvo, Fakultet
tehnikih nauka, Novi Sad, 2011, ISBN 978-86-7892-368-5.
[267] Todi, V., Stani, J.: Osnove optimizacije tehnolokih procesa izrade i konstrukcije proizvoda,
Fakultet tehnikih nauka, Novi Sad, 2002, ISBN 86-80249-52-1.
146
9.0 Literatura
[268] Todi, V., Tepi, J., Kostelac, M., Luki, D., Miloevi, M.: Design and Economic Justification
of Group Blanks Application, Metallurgy, 2012, Vol. 51, No. 2, pp. 269-272, ISSN 0543-5846.
[269] Todi, V., Zeljkovi, M., Tepi, J., Miloevi, M., Luki, D.: Techno-Economic Method for
Evaluation and Selection of Flexible Manufacturing Systems, Metallurgy, 2012, Vol. 51, No. 3,
pp. 349-353, ISSN 0543-5846.
[270] Todi, V.: Projektovanje tehnolokih procesa, Fakultet tehnikih nauka, Novi Sad, 2004, ISBN
86-80249-93-9.
[271] Ullman, D.G.: The Mechanical Design Process, 3 edition, McGraw-Hill, New York, 2002,
ISBN 978-0072373387.
[272] Uroevi, S.: Tipska i grupna tehnologija u metalskoj industriji, prirunici IAMA br.1, Mainski
fakultet, Beograd, 1967.
[273] VDI 2221: Methodik zum EntWickeln und Konstruiren technischer Systeme und Produkte,
Beuth Verlag, Berlin, 1993.
[274] Veljovi, A.: Elementi ekspert sistema za projektovanje tehnolokih procesa, Monografija br.4
iz serije Inteligentni tehnoloki sistemi, Mainski fakultet, JUPITER Asocijacija, Beograd,
1990, ISBN 86-7083-141-4.
[275] Veljovi, A.: Informaciono upravljanje razvojem preduzea, Kompjuter biblioteka, aak,
2004, ISBN 86-7310-307-7.
[276] Veljovi, A.: Razvoj informacionih sistema i baze podataka, CIT, Beograd, 2004.
[277] Vernadat, F., Zelm, M.: Advanced Modeling Approach to CIM Systems, in Cotsaftis, M.,
Vernadat, F. (Ed.) Advanced in Factories of Future, CIM and Robotics, Elsevier, NorthHolland, Amsterdam, 1993, pp. 77-89, ISBN 978-0444898562.
[278] Vernadat, F.: Enterprise Modeling and Integration: Principles and Applications, Chapman &
Hall, London, 1996, ISBN 0-412-60550-5.
[279] Vernadat, F.B.: Enterprise Modeling and Integration Myth or Reality, Proceedings of
CARS&FOF 99 Conference, Aquas de Lindoia, Brazil, 1999.
[280] Wang, C.C.L., Chen, S.F., Yuen, M.M.F.: Fuzzy Part Family Formation Based on Grey
Relational Analysis, International Journal of Advanced Manufacturing Technology, 2001, Vol.
18, No. 2, pp. 128-132, ISSN 0268-3768.
[281] What ic CIM?
http://css.engineering.uiowa.edu/~ie_231/WHATisCIM.pdf
(preuzeto 10.10.2011.)
[282] Womack, J.P., Jones, D.T., Roos, D.: The Machine that Changed the World, Rawson
Associates, New York, 1990.
[283] Womack, J.P., Jones, D.T., Roos, D.: The Machine that Changed the World: The Story of Lean
Production, Seamon & Schuster UK Ltd, 2007.
[284] Wong, T.N., Chan, L.C.F., Lau, H.C.W.: Machining Process Sequencing WIth Fuzzy Expert
System and Genetic Algorithms, Engineering with Computers, 2003, Vol. 19, No. 2-3, pp. 191202, ISSN 0177-0667.
[285] Xu, X., Hinduja. S.: Determination of Finishing Features 2 1/2D Components, Proceedings of
the Institution of Mechanical Engineers. Part B: Journal of Engineering Manufacture, 1997, Vol.
211, No. 2, pp. 125-142, ISSN 0954-4054.279.
[286] Xu, X., Wang, L., Newman, S.T.: Computer-Aided Process Planning - A Critical Review of
Recent Developments and Future Trends, International Journal of Computer Integrated
Manufacturing, Taylor Francis, 2011, Vol. 24, No. 1-3, pp. 1-31, ISSN 0951-192X.
[287] Xu, X.,W., He, Q.: Striving for Total Integration CAD, CAPP, CAM and CNC, Robotics and
Computer-Integrated Manufacturing, 2004, Vol. 20, No. 2, pp. 101-109, ISSN 0736-5845.
[288] Xu, X.: Integrating Advanced Computer-Aided Design, Manufacturing, and Numerical Control
- Principles ans Implementation, Information Science Reference, New York, 2009, ISBN 9781-59904-714-0.
[289] Yao, S.: Computer-Aided Manufacturing Planning (CAMP) of Mass Customization for Nonrotational Part Production, Ph.D. Dissertation, Worcester Polytechnic Institute, 2003.
147
9.0 Literatura
[290] Yifei, T., Dongbo, L., Changbo, L, Minjian, Y.: A Feature-extraction-based Process Planning
System, International Journal of Advanced Manufacturing Technology, 2008, Vol. 38, No. 1-2,
pp. 1192-1200, ISSN 0268-3768.
[291] Yoshimura M.: System Design Optimization for Product Manufacturing, Concurrent
Engineering: Research and Applications, 2007, Vol. 15, No. 4, pp. 329-343, ISSN 1063-293X.
[292] Yu, J.C., Krizan, S., Ishii, K.: Computer-Aided Design for Manufacturing Process Selection,
Journal of Intelligent Manufacturing, 1993, Vol. 4, No. 3, pp. 199-208, ISSN 0956-5515.
[293] Yue, Y., Ding L., Ahmet K., Painter, J., Walters M.: Study of Neural Network Techniques for
Computer Integrated Manufacturing, Engineering Computations, 2002, Vol. 19, No. 2, pp. 136157. ISSN 0264-4401.
[294] Zelenovi, D., osi, I.: Montani sistemi, Nauka, Beograd, 1991, ISBN 86-8621-045-4.
[295] Zelenovi, D.: Projektovanje proizvodnih sistema, Fakultet tehnikih nauka, Novi Sad, 2003.
[296] Zelenovi, D.: Tehnologija organizacije industrijskih sistema preduzea, Fakultet tehnikih
nauka, Novi Sad, 2005, ISBN 86-85211-40-9.
[297] Zeljkovi, M.: Sistem za automatizovano projektovanje i predikciju ponaanja sklopa glavnog
vretena maina alatki, Doktorska disertacija, Fakultet tehnikih nauka, Novi Sad, 1996.
[298] Zeljkovi M., Borojev Lj., Tabakovi S., Anti A., ivkovi A.: Savremeni obradni i tehnoloki
sistemi - Programiranje numeriki upravljanih maina alatki za obradu rezanjem, Prirunik,
Fakultet tehnikih nauka, Novi Sad, 2010, ISBN 978-86-7892-329-6.
[299] Zhang, D.: Object-Oriented Modeling for the Integrated Process Planning and Production
Scheduling System, Doctoral thesis, Faculty of Texas Tech Universisty, 1998.
[300] Zhang, H. C., Alting, L.: Computerized Manufacturing Process Planning System, Chapman &
Hall, London, 1994, ISBN 978-0-412-41300-1.
[301] Zhang, W.J., Xie, S.Q.: Agent Technology for Collaborative Process Planning: A Review,
International Journal of Advanced Manufacturing Technology, 2007, Vol. 32, No. 3-4, pp. 315325, ISSN 0268-3768.
[302] Zhao, F., Proctor, F.M., Horst, J. A.: A Machining and Measurement Process Planning Activity
Model for Manufacturing System Interoperability Analysis, NIST Interagency/Internal Report
(NISTIR) 7734, May 2010.
[303] Zhao. F., Hong, Y., Yu, D., Yang, Y.: A Genetic Algorithm Based Approach for Integration of
Process Planning and Production Scheduling, Proceedings of International Conference on
Intelligent Mechatronics and Automation, Chengdu, Aug. 26-31, 2004, pp. 483-488, ISBN 07803-8748-1.
[304] Zhao. Y.F., Habeeb. S., Xu. X.: Research Into Integrated Design and Manufacturing Based on
STEP, International Journal of Advanced Manufacturing Technology, 2009, Vol. 44, No. 5-6,
pp. 606-624, ISSN 0268-3768.
[305] Zhou, Y., Chuah, K.B.: Computer-Integrated Manufacturing in China. A Report of Industrial
Field Surveys, International Journal of Operations and Production Management, 2002, Vol. 22,
No. 3, pp. 271288, ISSN 0144-3577.
148