Disouq field - Daily Production report

Temporary Production Facilities


TO : E gas vice chairman for productionn & development (fax 2405581)
TO : E gas vice chairman for operations
TO : SUCO MD's.
CC : EGPC vice chairman for Production
CC : RWE Production General manager
From : SUCO Operation General Manager
Subject : Daily Production report.
Date:
10/9/2013
(from 06:00 AM on 9 / 9 / 2013 to 06:00 AM on 10 / 9 / 2013).

No.of Wells available/on line


Total Gas Produced From Wells
Wells
Flowing HRS
Well production (MMscfd)
WHP (barg)
FLT ( C )
Well Gas choke opening (1/64")

03/03

52
NWK 1-1
24
16
220
20
24

MMSCF
NWK 1-3
24
23
246
41
34

NWK 1-2
24
13
206
30
24

Note:THE GAS RATE IS ESTIMATED SINCE FLOW METER IS NOT WORKING

1 - Sales Gas
Export Gas
Gas Flow Computer Total
Molecular Weight
Specific Gravity
G.Calorific Value
N.Calorific Value
HC Dew Point @ ------ bar
Water Dew Point
Delivery Pressure
Delivery Temp.

52
N/A
16.47
0.569
1010.7
911
0
0
54
23

---------------'------------------------------------------------------------------------------

MMSCF
SCM

BTU/SCF
BTU/SCF
oC
oC
Bar
oC

2 - Gas Consumption:
Total gas consumption

N/A

SCF

3- Gas Analysis:
Comp.

N2
0

H2O
0

CO2
0

C1
0

C2
0

C3
0

iC4
0

nC4
0

iC5
0

nC5
0

0.09

0.83

97.98

0.92

0.12

0.04

0.02

Feed
Export

Feed/Export Pressure, Barg


Feed/Export Temp.,oC

85/52
13/12

4 - Condensate
1- Movement :
Produced Condensate
Transferred Condensate
Opening Cond. Stock
Closing Cond. Stock

0
0
--60

STB
STB
STB
STB

2- Tank Status:
Tank A

Tank B

Opening cond., bbls

Closing cond., bbls

60

Water stock

3- Analysis

Tank- A
Tank- B
Tank- C

RVP, PSI
0
0
0

Sp.Gr.
0
0
0

API
0
0
0

4- Outstanding Items:
Equipment out standing

Status

Remarks:Well NWK1-2
- Drained annulus pressure of NWK 1-2 from 90 bar to 50 bar , total quantity of liquid is 160 liter (sample is available)
- Annulus pressure is under closed monitoring.
- Follow up Adjusting of operating condions of glycol dehydraion unit is on going
- Noticed a level condensate in production tank ,closed montoring to reach the production target and specefication.
- Calibration of sales gas computer flow meter is still ongoing by Sigma rep.

Operations Gen. Mgr.

C6+ TOTAL
0
0
0

100