Recap It Ula Tie
Recap It Ula Tie
Investitie 0
Obiect 0
Deviz 0
Hala metalica
Constructie metalica
Infrastructura
Fundatii
Recapitulatie
Coeficient
Material
Manopera
A
1) Total A-Cheltuieli directe
a Transp,manip,aprov.
7447.26
B
10236.63
Utilaj
C
[RON]
Total
D
15858.67
33542.55
0.00000
0.00
0.00
11679.53*
1.00000
11679.53
11679.53
437.32*
0.00
0.00
B*
0.04500
e C.A.S.
(+d)B*
0.20800
2225.03
f C.A.S.S.
(+d)B*
0.05200
556.26
g Aj. somaj
(+d)B*
0.00500
53.49
0.00694
74.24
0.00850
90.93
0.00250
b Transp.aut
c Tr.gara-santie
d Salarii maistri
l Profit(Beneficiu)(Tot+k)B*
0.05000
10697.27
T.V.A.
48709.42
2727.73
57282.27
0.24000
D E V I Z
15858.67
5845.13
Total cheltuieli
T O T A L
460.65
26.74
19126.79
0.00
460.65
13747.75
A N A L I T I C
71030.02
OFERTANT
Data 01.02.2014
Pag.