to Km 55.000 of NH-44 in the State of Tripura under SARDP-NE Phase ‘A’ ”.
Authority : National Highways & Infrastructure Development Corporation Limited (NHIDCL)
Authority's
EPC Engineer : M/s. Rodic Consultants Pvt. Ltd.
Contractor
: M/s. KMC Constructions Ltd.
Billing Period : Period from 01-12-2019 to 23.03.2020 GSTIN NO: 16AABCK6483B1ZP
1 2 3 4 6
The estimated amount for the works
a executed in accordance with Clause 19.3.1 68212244 44933442 23278802.11
subsquent to the Last Claim
Amount reflecting adjustment in price for the
b 0 0 0
aforesaid claim
In word: Two Crore Seven Lakh Eighteen Thousand One Hundred Thirty Four Only.
Project Manager Quantity Surveyor Resident Engineer Team Leader General Manager
KMCCL RCPL RCPL RCPL NHIDCL
Contractor Authority Engineer Authority Engineer Authority Engineer Authority
Name of Works Improvement/ widening to two laning with paved shoulder of Agartala - Udaipur section from Km 6.800 to Km 55.000 of NH-44(08) in the
state of Tripura under SARDP-NE Phase 'A'
Authority National Highways & Infrastrucutre Development Corporation Ltd.
EPC Contractor M/s KMC Constructions Ltd.
Authority Engineer M/s Rodic Consultants Pvt. Ltd.
COS RA BILL-03
Abstract of Change of Scope
Type of Work done Amount in Previous COS Approved Percentage of Work
Sl No. Chainage Remarks
Structure Amount (Rs.) RA Bill (Rs.) Amount (Rs.) Completed (%)
54+640 (LHS)
5 Bus Lay Bye 3211027.15 0.00 12891700.00 24.91%
54+632 (RHS)
Total = 23278802.11
Net Amount for COS RA Bill - 03 = 23278802.11
By meachanical Means
IB Upto 3 Metre depth (Ordinary Soil)
For Box Culvert Cum 0.5 10.700 4.800 2.500 64.200 50% Completed
Shear Key for Step -B =2*1/2=1 Cum 0.5 0.800 4.800 0.800 1.536 50% Completed
Shear Key for Step -A Cum 1.0 0.400 4.800 0.800 1.536 50% Completed
Return Wall Cum 4 4.050 5.200 4.200 0.000
For Curtain Wal
Type-I Cum 1 10.500 1.850 2.500 0.000
Type-II Cum 1 10.500 1.500 2.000 0.000
67.272 49.20 3309.78 Page no 69 of 240
PCC below Raft of BoX Culvert Cum 0.5 10.700 3.800 0.150 3.050 50% Completed
Shear Key for Step -I Cum 1 1.150 3.800 0.150 0.656 50% Completed
Shear Key for Step -II Cum 1 0.400 3.800 0.150 0.228 50% Completed
Return Wall Cum 4 3.550 4.000 0.150 0.000
Curtain Wall Type I Cum 1 10.500 1.850 0.150 0.000
Curtain Wall Type II Cum 1 10.500 1.500 0.150 0.000
Curtain Wall Type I Step-I Cum 1 10.500 1.650 0.550 0.000
Curtain Wall Type I Step-II Cum 1 10.500 0.750 0.750 0.000
Curtain Wall Type I Step-III Cum 1 10.500 0.450 0.750 0.000
Curtain Wall Type I Step-IV Cum 1 10.500 0.200 0.450 0.000
Curtain Wall Type II
Curtain Wall Type II Step-I Cum 1 10.500 1.300 0.800 0.000
Curtain Wall Type II Step-II Cum 1 10.500 0.450 0.750 0.000
Curtain Wall Type II Step-III Cum 1 10.500 0.200 0.450 0.000
Toe Wall for Curve Cum 4 5.840 0.600 0.200 0.000
Toe Wall for Curve Cum 4 5.840 0.300 0.800 0.000
Toe Wall for road edge Cum 4 1.800 0.600 0.200 0.000
Toe Wall for road edge Cum 4 1.800 0.300 0.800 0.000
For Guard Stone fixing
Cum 20 0.500 0.500 0.150 0.000
20 0.250 0.226 0.600 0.000
For Appron
UP Stream & Down Stream Cum 2 10.500 4.600 0.150 0.000
Deduction for side slab Cum 4.761 0.000
3.933 6971.10 27417.34 Page no 72 of 240
14.10 2700 PCC M-15 grade leveling Couarse below approch Slab
Complete including all Form works required as per
drawing and Morth Technical Specification Clause 2700
Invert Slab Cum 0.5 12.900 3.600 0.300 6.966 50% Completed
Wall Cum 1.0 12.900 0.300 2.000 7.740 50% Completed
Haunch Cum 1.0 12.900 0.150 0.150 0.290 50% Completed
Shear Key 1 Cum 0.5 3.600 0.800 0.800 1.152 50% Completed
Shear Key 2 Cum 1.0 3.600 0.300 0.800 0.864 50% Completed
Bracket 1 Cum 1.0 12.900 0.300 0.300 1.161 50% Completed
Bracket 2 Cum 0.5 12.900 0.300 0.300 0.581 50% Completed
18.754 9273.70 173916.65 Page no 83 of 240
Furnishing and Placing Reinforced/ Prestressed cement
14.1 1500 , 1700 & 2100 concrete in super-structure as per drawing and Technical
Specification
B RCC Grade M- 25
Case II Using Batching Plant, Transit Mixer and Concrete Pump
Height upto 5m
Deck Slab Cum 0.5 12.900 3.600 0.300 6.966 10087.20 70267.44 Page no 90 of 240
14.4 2702 Providing and laying Cement concrete wearing coat M-30
grade including reinforcement complete as per drawing
and Technical Specifications
On Top of Crrageway Cum 1 12.000 3.600 0.065 0
0 12071.20 0.00 Page no 94 of 240
14.11 2704, 1500 , 1600, 1700Reinforcement cement concrete approch Slab including
Reinforcement and form works as per drawing and Morth
Technical Specifications Clause 2704,1500,1600,1700.
13.9 710.1.4 of IRC: 78 & Providing and laying of Filter Media with Granular
2200 materials/Stone crushed aggregates satisfing the
requirement laid down in clause 2504.2.2 of MoRT &H
specifications to a thickness of not less than 600mm with
smaller size towards the soil and bigger size towards the
wall and provided over the entier surface beind abutment
wing wall and return wall to the full height compected to a
firm condition complete as per drawing & Cl. 710.4 of IRC:
78 & MoRTH & H Technical specification 2200
By meachanical Means
IB Upto 3 Metre depth (Ordinary Soil)
For Box Culvert Cum 0.5 10.700 3.800 2.000 40.660 50% already billed
Shear Key for Step -B =2*1/2=1 Cum 0.5 0.800 3.800 0.800 1.216 50% already billed
Shear Key for Step -A Cum 1.0 0.400 3.800 0.800 1.216 50% already billed
Return Wall Cum 0.0 4.050 4.000 3.500 0.000
For Curtain Wal
Type-I Cum 1 10.500 1.850 2.500
Type-II Cum 1 10.500 1.500 2.000
43.092 49.20 2120.13 Page 69 of 240
12.4 2100 Plain cement concrete 1:3:6 nominal mix in
foundation with crushed stone aggregate 40 mm
nominal size mechanically mixed, placed in
foundation and compacted by vibration including
curing for 14 days.
Invert Slab Cum 0.5 12.900 2.600 0.300 5.031 50% already billed
Wall Cum 1 12.900 0.300 2.000 7.740 50% already billed
Haunch Cum 1 12.900 0.150 0.150 0.290 50% already billed
Shear Key 1 Cum 0.5 2.600 0.800 0.800 0.832 50% already billed
Shear Key 2 Cum 1 2.600 0.300 0.800 0.624 50% already billed
Bracket 1 Cum 1 12.900 0.300 0.300 1.161 50% already billed
Bracket 2 Cum 0.5 12.900 0.300 0.300 0.581 50% already billed
16.259 9273.70 150778.77 Page no 83 of 240
Furnishing and Placing Reinforced/ Prestressed
14.1 1500 , 1700 & 2100 cement concrete in super-structure as per drawing
and Technical Specification
B RCC Grade M- 25
Case II Using Batching Plant, Transit Mixer and Concrete
Pump
I) a for Solid slab super-structure
Height upto 5m
Deck Slab Cum 0.5 12.900 2.600 0.300 5.031 10087.20 50748.70 Page no 90 of 240
13.9 710.1.4 of IRC: 78 Providing and laying of Filter Media with Granular
materials/Stone crushed aggregates satisfing the
requirement laid down in clause 2504.2.2 of MoRT
&H specifications to a thickness of not less than
600mm with smaller size towards the soil and bigger
size towards the wall and provided over the entier
surface beind abutment wing wall and return wall to
the full height compected to a firm condition complete
as per drawing & Cl. 710.4 of IRC: 78 & MoRTH & H
Technical specification 2200
Ref. to MoRTH Length in Width in Thickness in Amount PWD SOR 2017 Page
Sr No Descriptions Unit Nos Quantity Rate
Spec. (m) (m) (m) (Rs.) No.
By meachanical Means
IB Upto 3 Metre depth (Ordinary Soil)
For VUP Cum 1 14.700 14.100 1.700 0.00 Already Paid
Retaining wall ,(A1 & A2 side on BHS ) for 6 m Cum 1 12.500 8.700 2.500 271.88 A1 Side RHS
Retaining wall ,(A1 & A2 side on BHS ) for 5 m Cum 1 70.000 8.700 2.000 1218.00
1489.88 49.20 73301.85 Page no 69 of 240
Ref. to MoRTH Length in Width in Thickness in Amount PWD SOR 2017 Page
Sr No Descriptions Unit Nos Quantity Rate
Spec. (m) (m) (m) (Rs.) No.
Ref. to MoRTH Length in Width in Thickness in Amount PWD SOR 2017 Page
Sr No Descriptions Unit Nos Quantity Rate
Spec. (m) (m) (m) (Rs.) No.
Ref. to MoRTH Length in Width in Thickness in Amount PWD SOR 2017 Page
Sr No Descriptions Unit Nos Quantity Rate
Spec. (m) (m) (m) (Rs.) No.
13.9 710.1.4 of IRC: 78 & Providing and laying of Filter Media with Granular
2200 materials/Stone crushed aggregates satisfing the
requirement laid down in clause 2504.2.2 of MoRT
&H specifications to a thickness of not less than
600mm with smaller size towards the soil and bigger
size towards the wall and provided over the entier
surface beind abutment wing wall and return wall to
the full height compected to a firm condition complete
as per drawing & Cl. 710.4 of IRC: 78 & MoRTH & H
Technical specification 2200
Ref. to MoRTH Length in Width in Thickness in Amount PWD SOR 2017 Page
Sr No Descriptions Unit Nos Quantity Rate
Spec. (m) (m) (m) (Rs.) No.
In Under pass for WMM Layer Sqm 1 12.900 12.000 0.00 29.10 0.00 Page no 30 of 240
Ref. to MoRTH Length in Width in Thickness in Amount PWD SOR 2017 Page
Sr No Descriptions Unit Nos Quantity Rate
Spec. (m) (m) (m) (Rs.) No.
In Under pass Sqm 2 12.900 12.000 0.00 9.50 0.00 Page no 30 of 240
In Under pass Cum 1 12.900 12.000 0.095 0.000 11921.20 0.00 Page no 3 1& 32 of 240
Ref. to MoRTH Length in Width in Thickness in Amount PWD SOR 2017 Page
Sr No Descriptions Unit Nos Quantity Rate
Spec. (m) (m) (m) (Rs.) No.
13.5 1600 & 2200 Supplying, Fitting and Placing un-coated HYSD bar
Reinforcement in Foundation complete as per
Drawing and Technical Specifications.
100 kg/cum MT 814.563 81.456 53218.60 4334987.59 Page no 85 of 240
14.2 1600 Supplying, Fitting and Placing un-coated HYSD bar
Reinforcement in Foundation complete as per
Drawing and Technical Specifications.
100 kg/cum MT 120.10 12.010 54367.40 652947.04 Page no 93 of 240
Total Amount (Rs.) 14394360.28 A
By meachanical Means
IB Upto 3 Metre depth (Ordinary Soil)
For VUP Cum 1 14.600 14.100 1.050 0
Retaining wall ,(A1 & A2 side on BHS ) for 6 m Cum 1 12.500 8.700 2.500 0
Retaining wall ,(A1 & A2 side on BHS ) for 5 m Cum 1 34.000 8.700 2.000 591.6
591.6 49.20 29106.72 Page no 69 of 240
14.11 2704, 1500 , 1600, Reinforcement cement concrete approch Slab including
1700 Reinforcement and form works as per drawing and Morth Technical
Specifications Clause 2704,1500,1600,1700.
A. RCC M-30 Grade
Approach Slab Cum 2 12.900 3.500 0.300 0 10794.50 0.00 Page no 95 of 240
12.6 1500, 1700, 2100 Plain/Reinforcement cement concrete in Open foudation as per
drwaing and Morth Technical specification clause 1500,1700,2100
(including centring shuttering staging extera but excluding
reinforcement.)
G. RCC Grade M-30
Case: II Using With Baching Plant, Transit Mixture and Concrete
Pump
Invert Slab ( Raft) Cum 1 12.900 13.200 0.600 0.000
RCC Wall Cum 2 12.900 0.600 5.65 0.000
Haunch =4X1/2=2 Cum 2 12.900 0.300 0.300 0.000
Bracket for Step -I Cum 2 12.900 0.300 0.300 0.000
Bracket for Step -II=2X1/2=1 Cum 1 12.900 0.300 0.300 0.000
Shear Key for Step -I Cum 2 12.900 0.500 0.300 0.000
Shear Key for Step -II=2X1/2=1 Cum 1 12.900 0.600 0.500 0.000
Foot Path for Drain
Raft Cum 2 12.900 1.350 0.050 0.000
Wall Cum 4 12.900 0.125 1.000 0.000
Drain Slab Top Cum 2 12.900 1.350 0.050 0.000
0.000 8750.9 0 Page no 72 of 240
13.4 1500, 1700 & 2200 Plain/Reinforced cement concrete in sub-structure complete as per
drawing and Technical Specifications including centring shuttering
staging extra but excluding reinforcement.
VII a). RCC M-30 Grade, (upto5 m height)
Case: II Using With Baching Plant, Transit Mixture and Concrete
Pump
Retaining wall Section for 6 Mts Height
(Raft) Step 1 Cum 4 12.500 1.600 0.950 0.000
Step 2 Cum 4 12.500 1.400 1.400 0.000
Step 3 Cum 4 12.500 3.600 0.950 0.000
Wall Cum 4 12.500 0.950 7.100 0.000
1500 , 1700 & Furnishing and Placing Reinforced/ Prestressed cement concrete in
14.1
2100 super-structure as per drawing and Technical Specification
C RCC Grade M- 30
Case II Using Batching Plant, Transit Mixer and Concrete Pump
I) a for Solid slab super-structure
Height upto 5m
Deck Slab Cum 1 12.900 13.200 0.600 0 10151.40 0 Page no 90 of 240
14.4 2702 Providing and laying Cement concrete wearing coat M-30 grade
including reinforcement complete as per drawing and Technical
Specifications
In side of Underpass Cum 2 12.900 12.000 0.065 0
On Top of Crrageway Cum 2 12.000 13.200 0.065 0
0 12071.20 0.00 Page no 94 of 240
13.9 710.1.4 of IRC: 78 Providing and laying of Filter Media with Granular materials/Stone
& 2200 crushed aggregates satisfing the requirement laid down in clause
2504.2.2 of MoRT &H specifications to a thickness of not less than
600mm with smaller size towards the soil and bigger size towards the
wall and provided over the entier surface beind abutment wing wall
and return wall to the full height compected to a firm condition
complete as per drawing & Cl. 710.4 of IRC: 78 & MoRTH & H
Technical specification 2200
13.7 2706 ,2200 Providing Weep holes in Brick masonry, Stone masonry, Plain/RCC
abutment ,wing wall,return wall with 100 mm dia AC pipe or PVC pipe
(110 mm OD of 6.0 kg/Cm2 pressure ) extended through the width of
structures with slope of 1 (V): 20(H) towards drawing and MoRTH & H
Technical Specification clause 2706, 2200.
14.1 1500,1700 & 2100 Plain Reinforced cement concrete in superstructure including all form
works required as per drawing amd MoRT&H technical specifications
caluse 1500,1700 ,2100 (including centering and shuttering , staging
etc.but excluding reinforcement.
In Under pass Cum 1 12.900 12.000 0.200 0 5119.7 0.00 Page no 25 of 240
13.5 1600 & 2200 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in
Foundation complete as per Drawing and Technical Specifications.
100 kg/cum MT 312.800 31.280 53218.60 1664677.81 Page no 85 of 240
14.2 1600 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in
Foundation complete as per Drawing and Technical Specifications.
100 kg/cum MT 0.00 0.000 54367.40 0.00 Page no 93 of 240
Total Amount (Rs.) 4826654.65 A
Prime Coat
5.1 502
Top 115 mm+Inner Expose Face 150 mm Sqm 1 320.990 0.265 85.06
0.00 63.90 0.00 Page no 49 of 240
Amount for Single Bus Lay By (Rs.) = 1605513.58 A
Total Amount for 2 Nos. Bus Lay Bys (Rs.) = 3211027.15