You are on page 1of 2

BILL OF QUANTITY

NAME OF WORK:
SUB HEAD:
S/No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

PROVISION OF ADDITIONAL FACILITIES IN GOVT: COLLEGE IN KPK ADP NO: 430/120273 DURING 2014-15.

02 NOS SUITS IN GOVT: GIRLS DEGREE COLLEGE DIR UPPER

Item Name
Excavation as in foundation.
P.c.c (1:4:8) as in foundation.
Feb of mild steel reinforcement.
R.c.c (1:2:4) as in raft foundation.
R.R stone masonry (1:6) csm.
R.c.c (1:2:4) as in column beam.
B.B masonry (1:6) csm.
S/F of D/wood joinery.
S/F of D/wood trusses.
S/F of CGI sheet.
S/F of PGI sheet.
S/F of D/wood ceiling 1/2" thick.
S/F of D/wood Eve board.
P.c plaster 1/2" thick (1:4).
P.c pointing (1:3) csm.
S/F of D/wood Almerah 22 depth.
P/lay floor of white glazed tile 1/4"
Earth filling as under floor.
Sand filling as under floor.
P.c.c (1:4:8) as under floor.
P/lay marble fine dressed stone flooring on surface
S/F of steel grill to windows.
P/lay glazed tiles 1/4" thick dado jointed in white cement complete
Distempring 3 coats on walls
B.B masonry in B/wall (1:6) csm.
Oil painting 3 coats.
Pcc (1:3:6) as plain
Excavation/cutting in shingle gravel formation.
P/F of earthen ware WC as spd
P/F of WC Europian type.
P/F of low level flushing tank.
S/F of PVC pipe 2" dia.
S/F of PVC pipe 4" dia.
S/F of shower rose.
Constt: of septic tank as spd.
Constt: of soakage pit spd 5' dia.
P/F of bib cock 1/2" dia.
P/F of WHB
Constt: of gully grating chamber complete concrete gully trap with
main hole Rcc cover.
S/F of paper holder.
S/F of F trape
S/F of soap dish.
S/F of GI pipe 1/2" dia
S/F of Mascer
P/F of glass shelf
S/F of GI pipe 3/4" dia
S/F of water tank 400 Gyl super tuff
S/F of GI pipe 1" dia
P/F of Looking glass mirror

Unit
M3
M3
Ton
M3
M3
M3
M3
M2
M3
M2
M
M2
M2
M2
M2
M2
M2
M3
M3
M3
M2
M2

Qty
233.62
45.22
9.16
43.90
212.00
25.94
74.64
109.10
16.62
420.08
71.92
263.02
22.58
702.04
271.00
20.08
18.32
194.08
17.22
20.00
232.52
60.22

M2

256.50

M2
M3
M2
M3
M3
No
No
No
M
M
No
No
No
No
No

638.66
202.00
500.00
34.00
400.00
4.00
2.00
6.00
140.00
200.00
4.00
2.00
2.00
40.00
6.00

No
No
No
No
M
No
No
M
No
M
M

Rate

Amount

6.00
6.00
10.00
4.00
1300.00
4.00
4.00
1200.00
4.00
400.00
6.00

Total
Contractor sign:

Sub Divisional Officer


C&W Sub Division Dir Upper