Project : Subject : Prepared : Date : Data: Length of pipe (L) Density () : : 1,500 4,922 0.87 870 54.31 34 0.034 136 599 4 13.12 8 0.67 0.20 meter feet gr/cm3 kg/m3 lb/cuft cP Ns/m2 m3/hr gpm m/second ft/second in feet meter Design Engineering CPO Tank Farm & Facilities Project Pressure Drop Calculation AM Checked : AG December 16, 2012
Approved :
ARL
: : : :
7.149 Re
0.8981
.4
k=Roughness in feet
= = = = =
13,866.09 0.00015 0.0011 0.0288 45.4583 Psi / 100 ft feet (for Commercial Steel and Stainless Steel)
Note: This document shall be checked and verified by vendor/contractor for during construction stage