RESUME

T.SANTHOSHKUMAR
East Street, vazhuthalaikudi,
41, Radhanallur (po),
Sirkali (Talk). Pin: 609115
Nagai (D.T)
Tamil nadu.

D.O.B

: 02 May 1986

E-mail

: trlotus056@gmail.com

Contact no

: 04364-264607

Mobile

: +91 9626163129
: +91 9092021479

Objective:
I believe in interest and an effort of involvement in the work I do. I would like to be a
part of rapidly growing team working in telecommunication network where I can use
my experience and get opportunities to face new challenges that would help me to
enhance my existing skills and develop new skills.
EDUCATIONAL QUALIFICATION:
Professional Qualification:
Bachelor of Engineering Degree in Computer Science from the Annamalai
University of Chidambaram, Tamilnadu (From August 2003 to May 2007).
Work Experience:
Six years of experience in the Telecom industry
Presently I am working as a (O&M) operation& maintenances engineer
Nutek India Private Ltd., New Delhi.
One year worked as a (O&M) operation& maintenances engineer Wipro
InfoTech., Chennai .
Two year worked as a (O&M) operation& maintenances engineer Nutek
India Private Ltd., New Delhi.
Two year worked as a Project Engineer for Reliance, Tata, Uninor, Vediocon,
MTS Project in SS Telecommunications in Chennai.
One year worked as a Project Co-coordinator for broadband Internet
Access at Reliance Communications in Coimbatore.
Carrier to Date:
NuTek India Private Ltd(Since january2014 to Till date)

Wipro InfoTech. (February 2013 to january2014)


NuTek India Private Ltd. (june 2011 to February 2013 )
Project : SSTL (Sistema Shyam Telelink Ltd) Project
Designation:

BTS/MW ENGINEER

Client

ZTE Telecom India PVT LTD

Description:
The Project Involves development of CDMA 1X & DO service Network for both Voice
and Data Services. The total network includes 1 MSC, 3 BSC & 1071 cell sites all
over TN.
Roles and Responsibilities
Operations and Maintenance of ZTE BTS (ZXSDR B8200) Equipements CDMA
Project.
Trouble shooting the faults in ZTE BTS .
Various hardware in BTS, GPS antenna to clear alarms.
Measure VSWR & Troubleshoot the problems regarding high VSWR, Alarm Termination.
Proficient in handling maintenance operations with ability to reduce machinery down time
and optimize efficiency of machines and equipments.
Ensuring Zero fault code at an O&M engineer, BBU entities Alarms reduction.
With the central RF team to improvise the network quality indicators.
Microwave:

External Alarm generation and checking


Troubleshoot the Intracom equipments (IDR, ISR and UBR).
Microwave LOS Survey.
Microwave planning and implementation of ring topology in already existing sites.
Configuration changes of existing sites for capacity enhancements,
Implementations and others
Experience in 1+1, 1+0 and 2+0 configurations in microwave.E1 Transmission.
Collect the photographs of the Site and Maintain in the Site Folder.
Handing of software such as IDR_LCT_C, IDR_LCT_CSNMP and Radwin
manager. Prepare and maintain the site microwave database.
Verify the Punch Points Clearance. Conduct preventive maintenance audit for
sites.

SS communications (Since June 2009 to may2011)


As a Project Engineer:
Experienced in co-ordination with Team Members & with management for
rapid project.
Installing the Microwave antenna and GSM antenna.
Microwave Survey and RF survey done for customer and get the idea to fix
the Microwave antenna and analyze the RF Signal Levels.
Basic Knowledge in GSM and CDMA.
Working knowledge in civil foundation, Tower Erection, Battery
Commissioning
Supervising Installation, commissioning of PDH and SDH link (1+0, 1+1 HSB)
NEC and Huawei microwave.
Installation, commissioning huawei BTS under Uninor project(Indoor and
outdoor)
Operation and Maintenance of transmission equipments like RRI card, FIU,
ODU etc
VSWR measurement of RF cables through site master.(Bird & Anritsu)
Expansion of BTS from 2,2,2 configuration to 3,3,3 or 4,4,4 configuration
Checking the earthing of the Equipment and power connection
Responsible for Acceptance test of BSC and BTS
Swapping of BTS as per project required
Preparation and Definitions of data for loading new BTS, rectification of faults
and cell data changes in network configuration for BTS sites
Customer Complaints Solutions implementations like indoor repeaters,
outdoor repeaters
NMS(Network management serves)
Site infrastructure Build up for New sites
Reliance Communications Limited (Since Aug 2007 to oct 2008)
As a Project Co-coordinator Engineer:
Interacting with various cross function for all wire line activities for successful
delivery of POTS lines (DLC & EDP) and BIA (Broadband Internet Access)
Responsible for ISO documentation & uploading in Web Portals
Preparing master data and reports for wire line activities
Handling Fault management and through OSS platforms such as CLARITY

Planning, Installation, configuration and Commissioning of Router and


switches in various locations
Architecting, Designing, managing and troubleshooting network of LAN/WAN
configuration and connectivity issues
Coordinating with various teams for successful delivery of the projects

ACADEMIC CHRONICLE
B.E (Computer science)
Annamalai University (FEAT) Chidambaram, Tamil Nadu (2007) 62.3%

Higher Secondary
SMH Higher Secondary School sirkali, Tamil Nadu (2003) 62%
Secondary School - Tenth Standard
SMH Higher Secondary School sirkali, Tamil Nadu (2001) 60%
TECHNICAL SKILLS:
1 Operating System
2 Languages
3 Protocols

: MS DOS, Windows XP, 2000, 98, me & vista.


: C, C++, JAVA
: TCP / IP

DECLARATION

I hereby declare that the particulars mentioned above are true to the best of my
knowledge and belief.
Place: Sirkali

yours faithfully,

Date: 21-NOV-14

(T.SANTHOSHKUMAR)