You are on page 1of 12

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.

com

KO-MAG
(

User s Book

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

1.

---------------------------------------

Safety Regulations
2.

---------------------------------------

Parameters and Specification


3.

---------------------------------------

Features
4.

-------------------------------------

Inspection and Alignment


5.

----------------------------------------

Operation Process
6.

----------------------------------------

Debubbling process
7.

----------------------------------------

Maintenance
8.

-------------------------------

Relation between Vacuum Degree and Altitude

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

1.
Safety Regulations

For your safety, please read this handbook carefully to be more familiar
with the application and limitations of the machines and the related
potential risks.
A.
Read the instructions before using the equipment
B.
Do not boot the equipment before closing the bin gate
C.
This machine adopts the third grounding method. It is important to
keep the grounding normal. Poor grounding will cause the dangers
towards the machine and user
D.
Electricity Box should not be opened without professional staffs are
present

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

2.
Parameters
AC220V 1500W
Power:
AC110V

AC220V

Selective:
20-30
Work Environment: 20-30

, clean and dust-free

Laminating: Flat Type Lamination


40S/2pcs
Production Efficiency:
Heating Method: Constant temperature
7
Applicable Size: Below 7
510*480*380mm
Size of Equipment: 510*480*380mm
66kg
Height of Equipment: About 66kg

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

3.
Features
*
No Modules Needed, No Debubbling Process Needed
*
Press to Boot, Easy Operation
*
Smart Constant Pressure; Automatic Shift to the Lamination and
Debubbling Mode
*
Connect the power supply can be used; built-in vacuum pump and air
compressor;

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

4.
Inspection and Alignment

Check that whether the tray is smooth

Check that whether there are

some foreign matters on the silicone pad

4
IC

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

Module Alignment

Alignment on the silicone (LCD


screen is on the silicone
while

IC

is

beyond

the

silicone

Put into the laminator

If the scree is with long flat


cable, put the product on the
external part of the anvil cell
and close the door

2
mode2 Open the door in
addition to the bubble machine,
the product put to

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

5.
Operation Process
1
Screen-Pressing Process Mode 1 No Need Remove Bubble
1.
Check whether the connected power
2.
Switch on the power and press the button to boot the equipment
to check that whether the equipment can operate normally or not.
3.

OCA

IC

;
Put the LCD with the OCA glue on the cut silicone (please stagger
the silicone away from the IC position of the flat cable)
4.

;
Open the gate and put the tray on the cabinet

5.

;
Close the cabinet gate

6.

1
Switch to the "mode 1" in the control system

7.

;
Press button to boot the equipment

8.

2~6

Wait patiently for 2 to 6 minutes


9.

;
Wait until the two indicator lights off or the vacuum table turns to
the minimal value. Open the cabinet gate and take out the
product

10.
The process completed, check whether the product is normal or
not.

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

2
Screen-Pressing Process Mode 2

In addition to the bubble machine

usee
1-5

1.

Repeat the above steps 1-5


2.

2
Switch to the "mode 2" in the control system

3.

;
Press button to boot the equipment
40

4.

Wait 40 seconds
5.

;
Wait until the two indicator lights off or the vacuum table turns to
the minimal value. Open the cabinet gate and take out the product

6.
In addition to the bubble machine by pressing the "open" button
7.

0
Wait for the pressure display table is displayed as zero and the
"open" indicator light;

8.
Open the door in addition to the bubble machine, the product put
to
9.
Close and fasten the handle in addition to the bubble machine,
release the "open" button
10.

4-10

6-9

Patiently waiting for 4-10 minutes, then repeat steps 6-9 above, the
product is taken out

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

7.
Maintenance

Projects

Items

Formwork

Check that whether there are some


foreign matters. If positive, please
clean them

Lamination Guide Pillar and Work


Platform Sideway

Add some lubricating oil to the


guide pillar and sideway regularly
to make sure the movement is
smooth

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

8.
Relation between Vacuum Degree and Altitude

1
Generally, the design and tested parameters of the vacuum pump are
conducted under the standardized air pressure environment. If the
altitude is changing, the exact performance will also change. The exact
parameters are displayed in Table 1.

Altitude

Vacuum Degree

(m)

(-Mpa)

0.1013

760

200

0.0990

742.7

400

0.0968

726.2

500

0.0957

717.9

1000

0.0902

676.7

1500

0.0846

634.7

2000

0.0790

593.3

505.9
1057.5

mmHg

93~95
88~90

Examples: Chengdu of Sichuan Altitude 505.9 Vacuum Degree ranges


from 93 to 95, normal
Yulin of Shanxi Altitude 1057.5 Vacuum Degree ranges from 88 to 90,
normal

Global Cell Phone Repair Parts & Machines Wholesale Online Store - Xicart.com

Debugging of Vacuum Pressure Gage


1

Panasonic

Panasonic Vacuum Pressure Gage Debugging

DP-100
Only need to press the
value shown in Table 1
Main
displayed in Main
Sub
displayed in Sub
0

0 action is needed (no need for operation) to display the present and
reference values.

You might also like