You are on page 1of 2

RJENIK: HRVATSKO - ENGLESKI

priredio: Stjepko Vrsalovi, dipl.ing.gra.


Aktivni sustav (primarni sustav)

Active system (Primary system)

Duljina istine

Clearance distance

Duljina pada (zaustavna udaljenost)

Fall length (Arrest distance)

Faktor pada

Fall factor

Granino radno optereenje (GRO)

Work load limit (WLL)

Meusidrite

Intermediate anchor

Mjerodavna osoba

Competent person

Najmanje prekidno optereenje (NPO)

Minimum breaking load (MBL)

Ograniavanje pristupa

Work restraint

Omjer sila

Force ratio

Osobna oprema za zatitu od pada

Personal fall protection equipment

Osobna zatita od pada

Personal fall protection

Osobna zatitna oprema (OZO)

Personal protective equipment (PPE)

Plan rada na siguran nain

Safety method statement

Priuvni sustav (sekundarni sustav)

Back-up system (Secondary system)

Pristup uetom

Rope access

Procjena rizika

Risk assessment

Rad na visini

Work at height

Radna linija (aktivna linija)

Working line (active line)

Radno pozicioniranje

Work positioning

Sidrena linija

Anchor line

Sidrina toka

Anchor point

Sidrite

Anchorage

Sigurnosna linija (priuvna linija)

Safety line (Back-up line)

Sigurno radno optereenje (SRO)

Safe working load (SWL)

Sloena linija

Assembled line

Spaavanje

Rescue

Trauma uslijed ovjeenja


(ortostatska intolerancija)

Suspension trauma
(Orthostatic intolerance)

Udarna sila (ok sila)

Impact force (Shock force)

Visinski tehniar

Rope technician

Zaustavljanje pada

Fall arrest

VERTIKO d.o.o. Vrbje 42a, Zagreb 01 3865 000 info@vertiko.hr www.vertiko.hr

RJENIK: ENGLESKO - HRVATSKI


priredio: Stjepko Vrsalovi, dipl.ing.gra.
Active system (Primary system)

Aktivni sustav (primarni sustav)

Anchor line

Sidrena linija

Anchor point

Sidrina toka

Anchorage

Sidrite

Assembled line

Sloena linija

Back-up system (Secondary system)

Priuvni sustav (sekundarni sustav)

Clearance distance

Duljina istine

Competent person

Mjerodavna osoba

Fall arrest

Zaustavljanje pada

Fall length (Arrest distance)

Duljina pada (zaustavna udaljenost)

Fall factor

Faktor pada

Force ratio

Omjer sila

Impact force (Shock force)

Udarna sila (ok sila)

Intermediate anchor

Meusidrite

Minimum breaking load (MBL)

Najmanje prekidno optereenje (NPO)

Personal fall protection

Osobna zatita od pada

Personal fall protection equipment

Osobna oprema za zatitu od pada

Personal protective equipment (PPE)

Osobna zatitna oprema (OZO)

Rescue

Spaavanje

Risk assessment

Procjena rizika

Rope access

Pristup uetom

Rope technician

Visinski tehniar

Safe working load (SWL)

Sigurno radno optereenje (SRO)

Safety line (Back-up line)

Sigurnosna linija (priuvna linija)

Safety method statement

Plan rada na siguran nain

Suspension trauma
(Orthostatic intolerance)

Trauma uslijed ovjeenja


(ortostatska intolerancija)

Work at height

Rad na visini

Work load limit (WLL)

Granino radno optereenje (GRO)

Work positioning

Radno pozicioniranje

Work restraint

Ograniavanje pristupa

Working line (Active line)

Radna linija (aktivna linija)

VERTIKO d.o.o. Vrbje 42a, Zagreb 01 3865 000 info@vertiko.hr www.vertiko.hr

You might also like