You are on page 1of 2

M.N.

DASTUR & COMPANY (P) LTD, CHENNAI


E-MAIL TRANSMISSION

20th July 2010


MD-26306ELE-66A

` To:

Macawber Beekay Pvt. Ltd, Kolkata


Attn: Mr. Aloke K. Banerjee, General Manager(Project)/
Mr. Saswata Sengupta, Sr. Design Executive(Projects)
E-mail:
Aloke.Banerjee@mbl.in ,
Saswata.Sengupta@mbl.in ,
Subhankar.Mukhopadhyay@mbl.in

cc:

Madhucon Projects Limited, Hyderabad


Attn: Mr G. Balaji Divakar, General Manager (Energy Division)
E-mail: gmenergy@madhucon.com

Cc:

Madhucon Projects Limited, Hyderabad


Attn: Mr.Ch.Raja Rao, General Manager Projects
E-mail:gmpenergy@madhucon.com
E-mail:satech@madhucon.com
Attn Mr. P. Nageswar Rao
Sr. Manager - Electrical
Email: smepp@madhucon.com
Attn Mr. P. Ganga Rao, Manager (Elec)
E-mail:mepp1@madhucon.com, mepp@madhucon.com

From: T. Mahendran, Project Manager


M.N. Dastur & Company (P) Ltd, Chennai

Re:

1.

MPL - 2 X 135 MW Thermal Power Plant Phase-1 AHP Package


Reply to clarifications on our comments on Doc. No. MB/C961/35879, Rev. 1 titled Power Cable Schedule.

This has reference to your e-mail message dated 15.07.2010 with


clarifications to our observations on power cable schedule.

2.

Please note that Isolator/MCCB in the incomer of starter panel is in


your scope. Hence the Cable from ACB of PMCC of AHP switch gear
will be supplied by BOE vendor up-to the isolator/MCCB of your
starter panel. From Isolator to Starter and starter to motor all cabling
with necessary trays & accessories will be in your scope. When both
equipments are supplied by one vendor the respective cabling is also
in the scope of the same vendor. However if only the equipment is
supplied by the vendor, the cabling for the respective equipment is in

Page 1 of 2

M.N. DASTUR & COMPANY (P) LTD, CHENNAI


E-MAIL TRANSMISSION

20th July 2010


MD-26306ELE-66A

the scope of BOE vendor. Hence please provide power cabling


Isolator/ MCCB to starter panel & starter panel to motor.
3.

Please

refer

our

observations

vide

MD-26306ELE-47A

dated

12.02.2010 on the scheme of the compressor motor on for the


provision of breaker in your panel.
4.

Please

forward

the

revised

cable

schedule

incorporating

our

observations. Please note that we have already forwarded the tagging


philosophy for your incorporation in the cable schedule vide our
earlier e-mail message no. MD-26306-38A darted 03.09.09. We once
again attach the same for your ready reference.

Regards,

T. Mahendran
Project Manager
M. N. Dastur & Company (P) Ltd
Chennai.
SSU_SGGS

Attachment: Tagging Philosophy

Page 2 of 2

You might also like