You are on page 1of 3

3/29/2019 Gmail - BSP 7.

BSP 7.0 MT MODEX : Balance work for Makeup Water and Drinking Water system: Package 078A: Transmittal no. 513 _ WATE…

mecon bhilai <meconbhilai@gmail.com>

BSP 7.0 MT MODEX : Balance work for Makeup Water and Drinking Water system: Package
078A: Transmittal no. 513 _ WATER INLET AND SCREEN ARRANGEMENT AT MWPH
anupam swaroop <anupamswaroop@sail-bhilaisteel.com> Mon, Mar 25, 2019 at 10:50 AM
To: projsailbsp@mecon.co.in, gmbhilai@meconlimited.co.in, mecon bhilai <meconbhilai@gmail.com>, NK Garg <nkgarg@mecon.co.in>,
devendrasharma@mecon.co.in, vinayjha <vinayjha@meconlimited.co.in>
Cc: skmehta@sail-bhilaisteel.com, ashok_kumar@sail-bhilaisteel.com, jmpalaiya@sail-bhilaisteel.com, G S Wadhwa <gswadhwa@sail-
bhilaisteel.com>, ssprasad@sail-bhilaisteel.com, viswanath.sarma@sail-bhilaisteel.com, aktripathi@mecon.co.in

Sir/Madam,

Views of BSP for Inlet arrangement at MWPH , are as per the trailing mail for further needful ac on pl.

Regard!

Anupam Swaroop

DGM(Projects-Utility Zone)
Mob-9407983592

From: UTPAL DUTTA [mailto:utpaldutta@sail-bhilaisteel.com]


Sent: Thursday, March 21, 2019 11:41 AM
To: anupamswaroop@sail-bhilaisteel.com
Cc: jpsingh1@sail-bhilaisteel.com; almalodia@sail-bhilaisteel.com; akmondal@sail-bhilaisteel.com
Subject: FW: BSP 7.0 MT MODEX : Balance work for Makeup Water and Drinking Water system: Package 078A: Transmittal no.
513 _ WATER INLET AND SCREEN ARRANGEMENT AT MWPH
Importance: High

Dear Sir,

This is in reference to trailing mail Dtd 16.03.2019 regarding Inlet arrangement at MWPH. May please note pointwise
reply regarding attached clarification sheet :-

Point-1-     Details of cage ladder with dimension to be shown as per MOM 26-29.11.18-  Removable
type ladder is acceptable. It is to be ensured that removable ladder (with wheel as shown in attached
drawing) shall move all along the front & side screen platforms

Point-2-     Platform level to be revised considering high level of Maroda-I as 302.0m as agreed by Voltas
email dated 30.01.19 - Accepted as shown in attached drawing

Point—5-   Screen guide channel  C type embedded in concrete from all side which shall be welded with
inserts shall be provided as per MOM dated 05-08.02.19: Channel shall be welded with inserts (not clear in

https://mail.google.com/mail/u/0?ik=a91ea0aac8&view=pt&search=all&permmsgid=msg-f%3A1628953117281239198&simpl=msg-f%3A16289531172… 1/3
3/29/2019 Gmail - BSP 7.0 MT MODEX : Balance work for Makeup Water and Drinking Water system: Package 078A: Transmittal no. 513 _ WATE…

detail A of attched drawing) as per MOM. MC 75 Frame of Bar screen may stuck in available inside space of
MC 100 guide channel. At least MC 125 channel guide is to be used for proper movement of bar screen.

Point-7-      1 no trolley on each side of the side screens (total 2 nos of trolleys for removable side screens)
mounted on monorail beams accepted

For further necessary action please

Regards

Utpal  Dutta
DGM,WMD

Water Management Department


Bhilai Steel Plant, Bhilai (CG)
(M) 9407981574, (L)0788-2865765
Email: utpaldutta@sail-bhilaisteel.com

From: anupam swaroop [mailto:anupamswaroop@sail-bhilaisteel.com]


Sent: 16 March 2019 14:26
To: almalodia@sail-bhilaisteel.com; jpsingh1@sail-bhilaisteel.com; utpaldutta@sail-bhilaisteel.com
Cc: skmehta@sail-bhilaisteel.com; akmondal@sail-bhilaisteel.com; ashok_kumar@sail-bhilaisteel.com; jmpalaiya@sail-
bhilaisteel.com; 'G S Wadhwa'; ssprasad@sail-bhilaisteel.com; viswanath.sarma@sail-bhilaisteel.com
Subject: FW: BSP 7.0 MT MODEX : Balance work for Makeup Water and Drinking Water system: Package 078A: Transmittal no.
513 _ WATER INLET AND SCREEN ARRANGEMENT AT MWPH
Importance: High

Sir,

This is in reference to the trailing mail.

The revised drawing (subsequent to MOM dated 05/02/19-08/02/19) has been submi ed by Voltas for Inlet arrangement at
MWPH.

The same is forwarded herewith for your views and concurrence pl.

Regards!

Anupam Swaroop

https://mail.google.com/mail/u/0?ik=a91ea0aac8&view=pt&search=all&permmsgid=msg-f%3A1628953117281239198&simpl=msg-f%3A16289531172… 2/3
3/29/2019 Gmail - BSP 7.0 MT MODEX : Balance work for Makeup Water and Drinking Water system: Package 078A: Transmittal no. 513 _ WATE…

DGM(Projects-Utility Zone)
Mob-9407983592

[Quoted text hidden]

3 attachments
clarififcation sheetREV-01.pdf
36K
WATER INLET SCREEN ARRANGEMENT AT MWPH SH-6.pdf
330K
WATER INLET SCREEN ARRANGEMENT AT MWPH SH-7.pdf
285K

https://mail.google.com/mail/u/0?ik=a91ea0aac8&view=pt&search=all&permmsgid=msg-f%3A1628953117281239198&simpl=msg-f%3A16289531172… 3/3

You might also like