PENYALIRAN TAMBANG
Prosedur Rancangan
Sedimentation Pond
1.
2.
3.
4.
5.
Prosedur Rancangan
Sedimentation Pond
1. Hitung Surface Run off Volume:
V = C x CH x A
Dengan
V = volume
C = runoff coefficient
CH= curah hujan untuk design storm duration tertentu
A = luas catchment.
Prosedur Rancangan
Sedimentation Pond
2. Hitung peak inflow discharge (Q0)
metoda rasional
Qi = debit (m3/s)
C = koefisien limpasan
I = intensitas hujan (mm/h)
A = luas daerah (km2)
Maksimum outflow :
retention time = f (sediment settling)
Prosedur Rancangan
Sedimentation Pond
Q0
S V 1
Qi
Prosedur Rancangan
Sedimentation Pond
4. Retention Basin
(Mengenal hukum Stokes dahulu)
Stokes Law
www.swac.umn.edu
Stokes Law
Drag/Frictional Force
= Fd
Buoyancy Force = U
Gravity Force = W
Fd +U = W
Fd = W U
Fd = Fg
Where
:
Assume particle is typical as a ball
d = diameter of particle
= dynamic viscosity of fluid, water in 20C = 1.01 x 10-6
m2/s
v = terminal velocity
s = density of particle
f = density of fluid
g = gravity
Prosedur Rancangan
Sedimentation Pond
4. Retention Basin
agar semua partikel dengan kecepatan
pengendapan Vs dapat dibuang :
Vs =
Prosedur Rancangan
Sedimentation Pond
5. Depth of storage
; 1.5 m < h < 4 m
Jika :
h < h min S diubah
h > h min A diubah
Penting :
Maintenance
Volume
Maintenance
Maintenance