You are on page 1of 10

135

357

127

Date
July 1- Tuesday

July 2 - Wednesday

July 3 - Thursday
July 4 - Friday
Date
July 7 - Monday
July 8 - Tuesday

July 11 - Friday

Date
July 14 - Monday
July 15 - Tuesday
July 16 - Wednesday
July 17 - Thursday
July 18 - Friday
Date
July 21 - Monday
July 22 - Tuesday

July 23 - Wednesday
July 24 - Thursday
July 25 - Friday
Date
July 28 - Monday

July 30 - Wednesday
July 31 - Thursday
August 1 - Friday

Date
August 4 -Monday

August 5 -Tuesday

August 6 - Wednesday

August 7 - Thursday

August 8 - Friday

Date
August 11 - Monday

August 12 - Tuesday
August 13 - Wednesday

August 14 - Thursday

August 15 - Friday

Date
August 18 - Monday

August 19 - Tuesday

August 20 - Wednesday

Date
August 26 - Tuesday

August 27 - Wednesday

August 28 - Thursday

Date
September 1 - Monday

September 2 - Tuesday

Date

September 9 - Tuesday

September 10 - Wednesday

September 11 - Thursday
September 12 - Friday
Date
September 15 - Monday
September 16 - Tuesday

September 17 - Wednesday

September 18 - Thursday

Date
September 29 - Monday
September 30 - Tuesday

October 1 - Wednesday

October 2 - Thursday

October 3 - Friday

Job Description

Remarks

General Orientation: Learned the history of Amkor, the assembly process,


the kinds of packages, quality policy and Amkor values,

Completed

General Orientation continuation: Learned about the Lot traveller Card, its
attachments, requirements and usual problems with it; learned the ten
commandments of continuous improvement, the types of ESD damage and
the yield

Completed

Examination (ACES); received ID, apparel and sneakers; introduced to the


department

Completed

Contract signing; Geven the access badge; Line tour at Mold; Introduction
of the EOL (End of Line)

Completed

Job Description

Remarks

Renewed the weekly access badge; Line tour; Learned the tasks of an OJT

Completed

Learned the MTBA (Mean Time Between Assist), made a report about the
epoxy molding compound (EMC) leak; Sent units to SAT

Completed

Gathered expired Work Instructions; Started making a report to investigate


why there were bent leads on a TQ package; endorsed units to the Reliablity
lab

Partially Completed

Job Description

Remarks

Finished the report on the investigation why there were bent leads

Completed

Collected expired Work Instructions (WI); Went to the Reliability Lab


(Relab)

Completed

Learned how to make a cavity map on just one press from the mold
machined; Disposed reject units in their proper bins

Completed

Went to Area 6 at warehouse to retrieve reject units; learned to take photos


using the scope

Completed

Learned the different dimensions of a unit and how they are measured using
the smartscope and the comparator

Completed

Job Description
Have a strip of units laser marked; Learned how to update the EL/QL WIP
Tracking for EOL Quad Team
Went tot the Relab to take photos of the cross section of a unit's leads

Remarks
Completed
Completed

Measured dimensions of units using the comparator and smartscope; Took


pictures of handing units in the FVI (Final Visual Inspection)

Completed

Retrieved reject units from the warehouse; Took x-ray photos of the units
with damage wires

Completed

Took photos of the actual mark on units after being processed in the laser
mark

Completed

Job Description

Remarks

Updated the EL/QL WIP Tracking for EOL Quad Team; formed and
sigulated units in a 14x14 strip (TQFP package)

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team;Endorsed units in
the Relab; have a tray of units lead scanned in the Hexamax;

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team;Sent units to SAT;
retrieved units from Relab;

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team; collected and
downloaded expired Work Insturcutions; recreated Work Insturctions to be
posted

Completed

Job Description

Remarks

Updated the EL/QL WIP Tracking for EOL Quad Team; retrieved lead
frames from the issuance at Area 6; have a strip of units laser marked

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team; Measured the
coplanarity of a set of units; retrieved lead frames from front line kitting

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team; retrieved a box of
reject units of Xilinx; Segregated the units by size and been subjected for
x-ray inspection to see the damaged wires

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team; gathered altera 84L
PLCC strips and tubes for functional and other forms of tests; retrieve lead
frames from the front line

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team; retrieved lead
frames from the front line; used the scope to take photos after the actual
mark on the SIW units; handled good altera units subjected for x-ray

Completed

Job Description

Remarks

Project-cycle time reduction proposal; measured the dimensions of a tray of


units; Updated the EL/QL WIP Tracking for EOL Quad Team

Completed

Took photos of actual mark reject errors; Updated the EL/QL WIP Tracking
for EOL Quad Team

Completed

Actual laser mark for Atmel; Updated the EL/QL WIP Tracking for EOL
Quad Team in a brand new format

Completed

Searched the line for measureing tools and machines and determine what
packages use them; Updated the EL/QL WIP Tracking for EOL Quad Team;
escorted four people to Mezzanine for a meeting

Completed

Actual laser mark for four different customers and took photos of each units
per strip; Updated the EL/QL WIP Tracking for EOL Quad Team

Completed

Job Description
Retrieved reject a box of reject units at the warehouse; Updated the EL/QL
WIP Tracking for EOL Quad Team

Remarks
Completed

Scanned formed and singulated units to get the RVSI results; Updated the
EL/QL WIP Tracking for EOL Quad Team; measured the coplanarity of
units using the comparator; retrieved units form Area 6

Completed

Retrieved lead frames from front line kitting and warehouse issuance;
Sorted PTR's (Production Trouble Report); Went to hermetics kitting to
retrieve lead frames; Updated the EL/QL WIP Tracking for EOL Quad
Team

Completed

Job Description
Retrieved lead frames from the kitting in hermetics; Updated the EL/QL
WIP Tracking for EOL Quad Team

Remarks
Completed

Updated the EL/QL WIP Tracking for EOL Quad Team adding the Lead
Frame SID Number column; helped measured EPAD flash, lead pitch, tipto-tip and foot angles of a tray of units

Completed

Measure the tip-to-tip and package length of ST ARM; printed colored


Work Instructions; Updated the EL/QL WIP Tracking for EOL Quad Team
and removed over extended units

Completed

Job Description

Remarks

Delivered units to Central Lead Finish (CLF) for plating; Segregated


wirebond rejects from DTFS and Mold rejects; Updated the EL/QL WIP
Tracking for EOL Quad Team

Completed

Retrieved plated units from Central Lead Finish; Updated the EL/QL WIP
Tracking for EOL Quad Team; endorsed units to Reliablity Lab

Completed

Job Description

Remarks

Sorted PTR's (Production Trouble Report); Updated the EL/QL WIP


Tracking for EOL Quad Team; Printed Work Instruction; retrieved lead
frames from hermetics kitting, reject units from warehouse and lead frames
from front line

Completed

Endorsed units to Reliability Lab; Checked for frequency and model of


molding machines; Learned how to check for reject count in WIP; Updated
the EL/QL WIP Tracking for EOL Quad Team

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team; Went to Reliablity
lab to retrieved decapped units

Completed

Updated the EL/QL WIP Tracking for EOL Quad Team

Completed

Job Description

Remarks

Updated the EL/QL WIP Tracking for EOL Quad Team

Completed

Phototgraphed leads of fifty units; Updated the EL/QL WIP Tracking for
EOL Quad Team

Completed

Transferred Work Instruction to Micrososft powerpoint; X-rayed PLCC


units for damaged wires; Cavity mapped reject units; Updated the EL/QL
WIP Tracking for EOL Quad Team

Completed

Cavity mapped of three pressed strips; Displayed Work Instruction to


gallery; Photographed trays and units with flashing and void damage;
Updated the EL/QL WIP Tracking for EOL Quad Team; disposed reject
units

Completed

Job Description
Retrieved one container of sample units with heat slug from warehouse at
Area 6

Remarks
Completed

Sorted out Production Trouble Reports; Retrieved reject units from


warehouse

Completed

Printed a Work Instruction and displayed at gallery; Retrieved reject units


from warehouse and lead frame from issuance; Sent units to Central Lead
Finish for Solderability Test

Completed

Assisted with taking photos of wires having the frame slanted; sent and
retrieved units to Central Lead Finish for slderabilty Test; Updated the
EL/QL WIP Tracking for EOL Quad Team; Searched for the SID numbers
of different tubes; finding the expired pyrometers

Completed

Retrieved units from Central Lead Finish after Solderability; tested the
functionality of the retrieved pyrometers or mold tool temps by means of
measuring the temperature of the mold machines

Completed

WEEK
1
2
3
4
5
6
7
8
9
10
11
12
13
TOTAL HOURS

NUMBER OF HOURS
38.25
28.25
48.00
48.00
38.25
48.00
48.00
29.25
29.25
19.50
38.25
39.00
48.00
500.25

500.00

You might also like