Date
July 1- Tuesday
July 2 - Wednesday
July 3 - Thursday
July 4 - Friday
Date
July 7 - Monday
July 8 - Tuesday
July 11 - Friday
Date
July 14 - Monday
July 15 - Tuesday
July 16 - Wednesday
July 17 - Thursday
July 18 - Friday
Date
July 21 - Monday
July 22 - Tuesday
July 23 - Wednesday
July 24 - Thursday
July 25 - Friday
Date
July 28 - Monday
July 30 - Wednesday
July 31 - Thursday
August 1 - Friday
Date
August 4 -Monday
August 5 -Tuesday
August 6 - Wednesday
August 7 - Thursday
August 8 - Friday
Date
August 11 - Monday
August 12 - Tuesday
August 13 - Wednesday
August 14 - Thursday
August 15 - Friday
Date
August 18 - Monday
August 19 - Tuesday
August 20 - Wednesday
Date
August 26 - Tuesday
August 27 - Wednesday
August 28 - Thursday
Date
September 1 - Monday
September 2 - Tuesday
Date
September 9 - Tuesday
September 10 - Wednesday
September 11 - Thursday
September 12 - Friday
Date
September 15 - Monday
September 16 - Tuesday
September 17 - Wednesday
September 18 - Thursday
Date
September 29 - Monday
September 30 - Tuesday
October 1 - Wednesday
October 2 - Thursday
October 3 - Friday
Job Description
Remarks
Completed
General Orientation continuation: Learned about the Lot traveller Card, its
attachments, requirements and usual problems with it; learned the ten
commandments of continuous improvement, the types of ESD damage and
the yield
Completed
Completed
Contract signing; Geven the access badge; Line tour at Mold; Introduction
of the EOL (End of Line)
Completed
Job Description
Remarks
Renewed the weekly access badge; Line tour; Learned the tasks of an OJT
Completed
Learned the MTBA (Mean Time Between Assist), made a report about the
epoxy molding compound (EMC) leak; Sent units to SAT
Completed
Partially Completed
Job Description
Remarks
Finished the report on the investigation why there were bent leads
Completed
Completed
Learned how to make a cavity map on just one press from the mold
machined; Disposed reject units in their proper bins
Completed
Completed
Learned the different dimensions of a unit and how they are measured using
the smartscope and the comparator
Completed
Job Description
Have a strip of units laser marked; Learned how to update the EL/QL WIP
Tracking for EOL Quad Team
Went tot the Relab to take photos of the cross section of a unit's leads
Remarks
Completed
Completed
Completed
Retrieved reject units from the warehouse; Took x-ray photos of the units
with damage wires
Completed
Took photos of the actual mark on units after being processed in the laser
mark
Completed
Job Description
Remarks
Updated the EL/QL WIP Tracking for EOL Quad Team; formed and
sigulated units in a 14x14 strip (TQFP package)
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team;Endorsed units in
the Relab; have a tray of units lead scanned in the Hexamax;
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team;Sent units to SAT;
retrieved units from Relab;
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team; collected and
downloaded expired Work Insturcutions; recreated Work Insturctions to be
posted
Completed
Job Description
Remarks
Updated the EL/QL WIP Tracking for EOL Quad Team; retrieved lead
frames from the issuance at Area 6; have a strip of units laser marked
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team; Measured the
coplanarity of a set of units; retrieved lead frames from front line kitting
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team; retrieved a box of
reject units of Xilinx; Segregated the units by size and been subjected for
x-ray inspection to see the damaged wires
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team; gathered altera 84L
PLCC strips and tubes for functional and other forms of tests; retrieve lead
frames from the front line
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team; retrieved lead
frames from the front line; used the scope to take photos after the actual
mark on the SIW units; handled good altera units subjected for x-ray
Completed
Job Description
Remarks
Completed
Took photos of actual mark reject errors; Updated the EL/QL WIP Tracking
for EOL Quad Team
Completed
Actual laser mark for Atmel; Updated the EL/QL WIP Tracking for EOL
Quad Team in a brand new format
Completed
Searched the line for measureing tools and machines and determine what
packages use them; Updated the EL/QL WIP Tracking for EOL Quad Team;
escorted four people to Mezzanine for a meeting
Completed
Actual laser mark for four different customers and took photos of each units
per strip; Updated the EL/QL WIP Tracking for EOL Quad Team
Completed
Job Description
Retrieved reject a box of reject units at the warehouse; Updated the EL/QL
WIP Tracking for EOL Quad Team
Remarks
Completed
Scanned formed and singulated units to get the RVSI results; Updated the
EL/QL WIP Tracking for EOL Quad Team; measured the coplanarity of
units using the comparator; retrieved units form Area 6
Completed
Retrieved lead frames from front line kitting and warehouse issuance;
Sorted PTR's (Production Trouble Report); Went to hermetics kitting to
retrieve lead frames; Updated the EL/QL WIP Tracking for EOL Quad
Team
Completed
Job Description
Retrieved lead frames from the kitting in hermetics; Updated the EL/QL
WIP Tracking for EOL Quad Team
Remarks
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team adding the Lead
Frame SID Number column; helped measured EPAD flash, lead pitch, tipto-tip and foot angles of a tray of units
Completed
Completed
Job Description
Remarks
Completed
Retrieved plated units from Central Lead Finish; Updated the EL/QL WIP
Tracking for EOL Quad Team; endorsed units to Reliablity Lab
Completed
Job Description
Remarks
Completed
Completed
Updated the EL/QL WIP Tracking for EOL Quad Team; Went to Reliablity
lab to retrieved decapped units
Completed
Completed
Job Description
Remarks
Completed
Phototgraphed leads of fifty units; Updated the EL/QL WIP Tracking for
EOL Quad Team
Completed
Completed
Completed
Job Description
Retrieved one container of sample units with heat slug from warehouse at
Area 6
Remarks
Completed
Completed
Completed
Assisted with taking photos of wires having the frame slanted; sent and
retrieved units to Central Lead Finish for slderabilty Test; Updated the
EL/QL WIP Tracking for EOL Quad Team; Searched for the SID numbers
of different tubes; finding the expired pyrometers
Completed
Retrieved units from Central Lead Finish after Solderability; tested the
functionality of the retrieved pyrometers or mold tool temps by means of
measuring the temperature of the mold machines
Completed
WEEK
1
2
3
4
5
6
7
8
9
10
11
12
13
TOTAL HOURS
NUMBER OF HOURS
38.25
28.25
48.00
48.00
38.25
48.00
48.00
29.25
29.25
19.50
38.25
39.00
48.00
500.25
500.00