PERFORMANCE GUARANTEES

PYRO-PROCESSING PLANT

S.No.

Particulars

Units

FLS

BLENDING & KILN FEED

A-1

Blending Efficiency : Ratio of SD of CaCO3 of Feed &


Discharge.

A-2

Maximum variation of following in blended meal.


- CaCO3
- LSF

10:1

%
%

0.2%

kwh/ton

0.9

A-3

Power Consumption w.r.t.


- Extraction system

AA

Pre-conditions
- Silo feed

t/h

<650

- Kiln feed
- Min. stock in silo

tph
%

<600
75

- Raw meal moisture max.


- Ra meal loose B.D. min.

%
t/m3

1
1

t/day

9000

kwh/ton

11.2

kcal/kg clk.
%
C

696
1.5
65 above amb.

- Kiln feed system

B
B-1
B-2
B-3
B-4
B-5
BB

ROTARY KILN & COOLER


Throughput
Power Consumption w.r.t. P.H. fan, cooler fans, cooler
drives & cooler vent fan.
Fuel Consumption
Max. Free Lime in Clinker
Clinker Temperature
Pre-conditions
- Moisture - Raw meal

15% R on 90 micron and 1.5% R


on 212 micron

- Fineness - Raw meal


- Calorific Value Coal
- Fineness Pulverised Coal
- Moisture Pulverised Coal (Surface)
- Ash in Coal
- Heat of Reaction for Clinker (from FLS lab report)
Note :

kcal/kg
%
%

>4000
15% R on 90 micron
1
34% with S.D.1%

kcal/kg clk.

407

The above guarantees shall be seen in conjunction with various pre-conditions cited in Performance guarantee document of o

PERFORMANCE GUARANTEES
PYRO-PROCESSING PLANT

Remarks
(Conditions Required
Tender Document)

as

per

0.2% max.

For other preconditions please


refer PG document

average

ith various pre-conditions cited in Performance guarantee document of our offer