GENERAL COMPLIANCE
2.1) TECHNICAL DOCUMENTS / PROJECT SPECIFICATION
Compliance to Material Requisition, Specification, Datasheets and all
general specifications attached to this requisition.
I/0/H
I/0/H
Compliance
By Bidder
4.0
DESIGN LIFE
20 Years
5.0
SCOPE OF SUPPLY
The Material Handling Equipment scope shall include but not limited to
the following :
Monorail Hoist
Monorail Hoist
Monorail Hoist
Pump Suction strainer for each pump
Calibration Pot
Pressure Vacuum Safety Valve (for the tank)
Pressure Safety Valve (at pump discharge)
Pulsation Dampener
Pressure Control Valves (at tank vent line and tank inlet line)
All instrumentation and control necessary for safe and effective operation of
the package, fittings for control, monitoring and protection
All electrical cabling, cable trays and cables supports required within the
package, wired to junction boxes, including trays for motor power cabling
and motor control station cabling.
Skid(s) edge junction boxes
Earth bonding including earth bosses / lugs
Emergency stop push button for each electric motor
Terminations at the Package edge as per the respective equipment P&ID
All piping, valves, specialty items, support etc. within the package limit
including all necessary drains and vents.
First fill of consumable
Control panels (if required)
All other items stipulated in Scope of Supply BN-MLS-30-TECH-092011,
datasheet and P&ID.
5.2
By Bidder
By Bidder
By Bidder
By Bidder
By Bidder
By Bidder
By Bidder
3.0
5.1
I/0/H
BIDDER INFORMATION
Bid Reference Number :
Bidder Contacts : Contact Person
E-mail Address
Tel. Nos.
Bidder' Country of Origin
Location of design, manufacturing, final testing & assembly
ISO 9000 Certification
2.0
Technical Requirements
Structural
Supply of all documentations as per Requisition SR Part II
Painting and Coating as per specification
Packing, preservation and preparation for shipment
Spare parts & First Fill
Erection, pre-commissioning, commissioning and startup spare parts
Special tools and spare parts for normal operation and maintenance
Per Diem Rates
Supply of all documentations as per Requisition SR Part II
Services
Third party certifications
Material Certifications
Codes and Standards
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
5.3
5.4
5.5
6.0
6.1
Tank Agitator
Make
Model Number
Quantity of mixer - Nos
Electricity supply
Absorbed Power - kW
Name Plate rating - kW
Agitator speed data
Propeller Diameter
Material:
Propeller
Shaft
Dimension
Weight
Dimention
6.2
6.3
Technical Requirements
I/0/H
I/0/H
I/0/H
BY BIDDER
BY BIDDER
1
415V / 50Hz / 3 Phase
BY BIDDER
BY BIDDER
BY BIDDER
BY BIDDER
SS316L
SS316L
BY BIDDER
BY BIDDER
BY BIDDER
BY BIDDER
Energizer:HEP
2 x 100%
Control Volume / Metering Pump / BY BIDDER
1.072
0.019
Amb / 65
5-50/50
5-100
ATM
1
10
BY BIDDER
BY BIDDER
BY BIDDER
non hazardous
415V / 50Hz / 3 Phase
BY BIDDER
BY BIDDER
BY BIDDER
D-O-L
IP 55
BY BIDDER
85 dBa
6.4
Pump Material:
Liquid End
Diaphragm
Plunger
Packing Gland
Valve
Valve Seat
Valve Guide
Pump / Motor Dimension - Length x Width x Height - mm
Pump / Motor Weight - Empty / Operating - Kgs
MISCELLANEOUS
Overall skid dimention (LxWxH) mm
Overall Skid weight (Operation/Dry/Test)
Sub - Vendor List
SS 316L
BY BIDDER
SS 316L
BY BIDDER
BY BIDDER
BY BIDDER
BY BIDDER
BY BIDDER
BY BIDDER
Required
Required
Required
Required
Required
Required
Required
Required
BY BIDDER
BY BIDDER
Page 2 of 3
Technical Requirements
DELIVERY
BY BIDDER
BY BIDDER
I/0/H
I/0/H
I/0/H
7.0
8.0
14.0
15.0
Page 3 of 3