Professional Documents
Culture Documents
화포교 설계 보고
화포교 설계 보고
( )
Planning and Design of Hawpo(Asymmetric Cable-Stayed Concrete) Bridge
*
Suk-Koo Suh
**
Seok-Yong Lee
***
Sung-Il Hwang
1.
****
*****
Cheol-Kyun Yoon Bong-Seob Song
, 205
260 m ,
(landmark)
< 3>.
, 1
< 1>. ,
, .
46.5+113.5+260+100=520 m
()
2.
. ,
, 520m
. 9
( 1)
(PY1)
10 m , (PY1)
90m .
* , ()
sksuh@seoyeong.co.kr
** ()
*** ()
**** , ()
***** ()
20 4 2008. 7
1.
63
Technology Articles
pe
2.
3.
. ,
260
m . < 1>
< 4(b)>
75%
4.
3.
1/2 .
. Edge
. < 4(a)>
Edge
< 5>. ,
1.
Severn Bridge
Second Severn Bridge
Sidney Lanier Bridge
Grosvenor Bridge
Kessock Bridge
Meihern Deising Bridge
64
(m)
987.5
456.0
381.0
66.0
240.0
70.0
260.0
150.0
Severn
Severn
Brunswick
Thames
Moray
Danube
()
20 4 2008. 7
Technology Articles
(a)
(b)
4.
5. Edge
. 10 m,
109 313
52 .
2 ,
.
.
6.
Form Traveller(F/T)
19.5 m, 10 m
. H
F/T
, Edge
, .
, 1
. F/T Upper type Below type ,
F/T Upper type
Below type < 6>.
5.
6.
,
, Tatara
Br., 2 < 7> PWS
(Parallel Wire Strand) .
, 2
20 4 2008. 7
7. PWS
65
Technology Articles
pe
8.
,
. 2
.
, < 8>
L/3.7 160 m
(a) PY1
2 320 m 86.5 m,
200 m 54.1 m .
- 70 m-40 m, 85 m-55 m,
100 m-70 m 3 ,
,
< 9> PY1 85 m, PY2
56 m .
(PY1) 5.0 m5.0 m(,
=1.0 m), (PY2) 4.5 m4.5 m(,
=1.0 m) .
.
40 MPa ,
(b) PY2
9.
3.0 m,
4.0 m < 10>.
,
,
climbing form .
.
7.
,
10. Lot
66
20 4 2008. 7
Technology Articles
11. 2
12.
2
, 2
75 m/sec ,
(40.6 m/sec) ,
80 m/sec
15.
< 13,
14>. ,
.
8.
1 ,
,
260m
.
,
16.
. ,
,
,
.
(a)
(b)
13.
2
,
,
.
,
.
(a)
(b)
14.
20 4 2008. 7
67