Pile Cap Design (ACI318-02) PDF
Pile Cap Design (ACI318-02) PDF
Job Ref.
The Pearl
Q09077
Section
Sheet no./rev.
DAR GROUP
QQ
Calc. by
Date
Eng.TK
Chk'd by
09-Mar-08
Date
App'd by
Eng.IC
Date
Dr.AE
w2
e
dpile
X
P1
Loaded area ac, bc
Ldiag
0.866s
Y
Y
ac
P2
P3
0.288s
s
w1
bc
X
b
Pile diameter;
d pile = 450.0 mm
P cap = 750.00 kN
Pile spacing;
s = 1350.0 mm
Pile spacing OK
;
e = 500.0 mm
Edge distance OK
Pile cap details
Pile cap dimensions
dimension in x-x axis direction ;
b = s + d pile +2 e = 2.800 m
w 1 = d pile + 2 e = 1.450 m
w 2 = d pile + 2 e = 1.450 m
h = 750.0 mm
e c = 160.0 mm
Embedment distance OK
;
Concrete cover;
d c = 75.0 mm
d bar = 19.1 mm
Project
Job Ref.
The Pearl
Q09077
Section
Sheet no./rev.
DAR GROUP
QQ
Calc. by
Date
Eng.TK
Chk'd by
09-Mar-08
Date
Eng.IC
App'd by
Date
Dr.AE
Effective depth;
d bx = h - e c - d c - d bar/2 = 505 mm
d by = d bx - 1.0 d bar = 486 mm
d b = (d bx + d by) / 2 = 496 mm
Column details
;
a c = 400.0 mm
b c = 600.0 mm
Material properties
;
fy = 415 N/mm 2
Concrete strength;
fc = 40.000 N/mm 2
Concrete density;
c = 24.0 kN/m 3
Loading details
Note: The following calculations assume that the centroid of the pile cap coincides with that of the pile group.
;
P dl = 1250.000 kN
Surcharge load;
P sur = p sur (L b - (sin(60) L side_diag 2 )/2 - a c b c ) = 0.000 kN
;
P ll = 425.000 kN
P n = P dl + P ll = 1675.000 kN
Pile capacity OK
Total column load (factored);
Project
Job Ref.
The Pearl
Q09077
Section
Sheet no./rev.
DAR GROUP
QQ
Calc. by
Date
Eng.TK
;;;
09-Mar-08
Chk'd by
Date
Eng.IC
App'd by
Date
Dr.AE
Compression - OK
ACI 22.5.2
A 2 = A cap = 6544410 mm 2
Bearing - OK
ACI 22.5.5
A 1 = a c b c = 240000 mm 2
P brg = 0.65 0.85 fc A 1 min(2, sqrt( A 2 / A 1 )) = 10608.000 kN
Column Bearing - OK
ACI 10.17.1
;;;
;;;
;;;
= if(fc < 27.58 N/mm 2 , 0.85, max( .65, 0.85 - 0.05 (fc - 27.58 N/mm 2 ) 6.89 N/mm 2 )) = 0.760
= 0.319 = 0.242
Ru
= t (1 0.588 t) = 0.208
R reqd
= M uy / ( fc d b 2 ) / b w = 0.021153
min = 0.001800
ACI 10.5.1
Project
Job Ref.
The Pearl
Q09077
Section
Sheet no./rev.
DAR GROUP
QQ
Calc. by
Date
Eng.TK
Chk'd by
09-Mar-08
Date
App'd by
Eng.IC
Date
Dr.AE
A st_min = 3780 mm 2
A s_req_normal = max(A sflex , A st_min , A s_T) = 3780 mm 2
A s_req = A s_req_normal / (2 cos(30)) = 2182 mm 2
;
Try 9 No #6 bar(s);
Each set of bars should be placed in the direction of axis connecting center of piles (triangular pattern)
A s_prov = 2565 mm 2
d bar = D t = 19.0 mm
a con = A s_prov f y / (0.85 fc b) = 11.182 mm
c con = a con / 1 = 0.048
t= 0.003 ((d bx c con ) / c con ) = 0.100
Assume reinforcing is put into a strip w ith a width equal to 3 pile diameters
Bar spacing, c-c; sp cc = max(0 mm, (3 d pile - d bar)/(L nt - 1)) = 166.4 mm
Clear spacing;
sp max = 457.2 mm
ACI 7.6.5
Bar spacing - OK
DEVELOPMENT OF TENSION STEEL
All bars must be provided with standard 180 end hooks.
Check hook development length (ACI 12.5)
;;;;;;;;; ldh_1 = (0.02 fy (fc )) d bar = 301.076 mm
mod 1 = if(((d bar<=35.814 mm)&&(d c >=63.5 mm)),0.7, 1.0 ) = 0.7
ldh = max(ldh_1 mod 1 , 152.4 mm, 8 d bar) = 210.8 mm
Project
Job Ref.
The Pearl
Q09077
Section
Sheet no./rev.
DAR GROUP
QQ
Calc. by
Eng.TK
Date
Chk'd by
09-Mar-08
Eng.IC
Date
App'd by
Date
Dr.AE
b o = (d pile + d b ) = 2971.8 mm
V c = 4 (fc) b o d b = 3096.086 kN
V s = 0 kN
V n = 0.75 (V c + V s) = 2322.065 kN
V up = P u_pile = 773.1 kN
b o = (d pile + d b ) + 2 s = 5671.8 mm
V c = 4 (fc) b o d b = 5909.015 kN
V s = 0 kN
V n = 0.75 (V c + V s) = 4431.762 kN
V up = 2 P u_pile = 1546.1 kN
fc = 40.000 N/mm 2
; w = A s_prov / ( b x d b ) = 0.002522
f1 = (d b /xface ) (3.5 - 2.5 VM rat) = 0.536
f2 = 1.9 (fc ) = 0.998 N/mm 2
f3 = 2500 w/ VM rat = 0.038 N/mm 2
V c1 = f1 (f 2 + f3 ) b x d b = 564.493 kN
Project
Job Ref.
The Pearl
Q09077
Section
Sheet no./rev.
DAR GROUP
QQ
Calc. by
Date
Eng.TK
09-Mar-08
Chk'd by
Date
App'd by
Eng.IC
Date
Dr.AE
Perimeter (@d/2);
b o = 2 (b c + d b + a c + d b ) = 3983.8 mm
Perimeter (@face);
b s = 2 (a c + b c) = 2000.0 mm
Concrete strength;
fc = 40.000 N/mm 2
Punching shear;