FOR
(JUL 2009)
DESCRIPTION
PAGE
GENERAL PREAMBLES
1-3
4 - 15
1.
PILING
a)
Reinforced Concrete Piles
b)
Timber Piles
c)
Steel Sheet Piles
d)
Bakau Piles
16 - 18
2.
EXCAVATION
a)
Excavation
b)
Extra over excavation
c)
Timbering
d)
Backfilling
e)
Hardcore and Blinding
f)
Disposal
19 - 24
3.
CONCRETE WORK
a)
Concrete
b)
Reinforcement
c)
Formwork
24 - 27
4.
BRICKWORKS
a)
Brickwork
b)
Rubble Walls
27 - 28
5.
6.
WALL/FLOOR FINISHES
PAINTWORK
a)
Concrete and Plastered Surfaces
b)
Timber Surfaces
c)
Metal Surfaces
d)
Road Markings
28
28 - 31
32
32 - 37
DESCRIPTION
DRAINAGE WORKS
9.1 Sewers
a)
Blinding to Manhole base
b)
Type A Section Granular Material
c)
Type B Section Concrete (Without Piling Base)
d)
Type B Section Concrete (With Piling Base)
e)
Type C Section Concrete (Without Piling Base)
f)
Type C Section Concrete (With Piling Base)
g)
Type D Section Concrete (Without piling Base)
h)
Type D Section Concrete (With Piling Base)
i)
Vitrified Clay Pipes
j)
UPVC Pipes
k)
RC Pipes Class 'H'
l)
RC Pipes Class 'M'
m) Cast Iron Pipes
n)
Pipes in BackDrops/Tumbling Bays
o)
Concrete Rings and Surround to Manhole
p)
Concrete Cover Slabs & PC Unit for Manhole
q)
Manhole Cover and Frame, Ladder, Railings, etc
r)
Other Works
9.2
a)
b)
c)
d)
e)
10
38 - 56
Drains
Half Round and Composite Drain Channels and Block Drains
Drain Opening Cover slabs, Catch-Basin and Others
Sub-soil Pipes and Scupper Drains
Weepholes
Silt Traps, Water Trough & Vibration Access
PAGE
Pavings
Concrete Paving Slabs
BG Slabs
Aeration Slabs
Interlocking Concrete Paving Blocks
Expansion Joints
Kerbs, Dividers, etc.
Pipe Crossings
56 - 62
DESCRIPTION
PAGE
11
SIGNAGES
a)
Directional Signs
b)
Traffic Signs
c)
Signboards
63 - 70
12
71 - 72
13
72 - 75
14
76 - 79
15
DAYWORKS
a)
Labour (excluding profit and overheads)
b)
Construction Equipment (excluding profit and overheads)
80 - 83
Page 1 of 83
GENERAL PREAMBLES
1
Introduction
The clauses in the General Preambles shall apply to all work items contained in
the Standard Schedule of Rates.
The Particular Preambles to each Trade shall be read in conjunction with the
respective Trade in the Standard Schedule of Rates.
All rates contained in the Standard Schedule of Rates are exclusive of any
Goods and Services Tax. Any such Goods and Services Tax shall be borne by
the HDB as and when the same becomes due and payable.
All rates include the allowances for complying with the General and Particular
Preambles.
All rates contained in the Standard Schedule of Rates are fixed basic rates (in
Singapore Currency) and no amendment whatsoever shall be made to such
rates. The tenderers shall be deemed to have closely studied all rates contained
herein and duly noted their implications.
Unless otherwise stated, the term "as specified" means as specified in any of the
documents forming part of the Contract.
Where brand/trade names are given in the descriptions, they are solely intended
for fixing the rates of the items. The products and materials to be used in the
Contract shall be governed by the Specifications, Drawings and other documents
forming the Contract (and not this Schedule of Rates).
Principles of Measurement
Unless otherwise stated, all work shall be measured nett as fixed in its place.
10
Where minimum deductions of voids are dealt with in this document they shall
refer only to openings or voids which are within the boundaries of measured
area. Openings or voids which are at the boundaries of measured area shall
always be the subject of deductions irrespective of size.
11
12
Page 2 of 83
GENERAL PREAMBLES
13
Headings to groups of items shall be read as part of the descriptions of the items
to which the headings apply.
14
15
a)
b)
Materials and goods including materials required for lapping, jointing and
the like and all costs in connection therewith such as delivery, unloading,
storing, returning of packings, handling, hoisting and lowering.
c)
d)
e)
Waste of materials.
f)
g)
h)
i)
j)
Billing of Quantities
Where the unit of measurement is the linear metre, square metre and cubic
metre, quantities shall be billed to the nearest whole unit. Fractions of the unit
less than half shall be disregarded and all other fractions shall be regarded as a
whole unit.
16
17
Where the unit of measurement is the hour, fractions of the unit shall be billed to
the nearest next half hour.
18
Page 3 of 83
GENERAL PREAMBLES
19
20
Application of Rates
Where rates with descriptions pertain to the same purpose are listed in more
than one Standard Schedule of Rates incorporated in the Contract; the rate as
listed in the following schedules (in the stated order of precedence) shall prevail:
1st Precedence -
2nd Precedence -
3rd Precedence -
Units of Measurement
The following abbreviations are used for the units:
m
m2
m3
no
p/tree
job
kg
ton
pr
sht
ltr
hr
Linear metre
Square metre
Cubic metre
Number
Per Tree
Per Job
Kilogram
Tonne
Pair
Sheet
Litre
Hour
Page 4 of 83
PILING WORK
1.1
Generally
Piling work shall be executed in accordance with the relevant Specifications and
the instructions of Superintending Officer's Representative.
1.2
Rates
The rate of each type of piling work shall be deemed to include removal of
underground obstructions together with all work in connection therewith unless
specifically otherwise provided.
1.3
The rate of each type of piling work shall be deemed to include extending piles,
dollying and connections unless specifically otherwise provided.
1.4
1.5
b)
Cutting off surplus and heads of piles and preparing and integrating
reinforcement into pile caps where applicable, extra excavation, backfilling
and disposal of debris.
c)
1.6
The rate of each item of treated timber piles includes the application of wood
preservative to cut off surfaces of piles.
1.7
1.8
The rate of each item of pile tests includes provision of all anchors, platforms,
loading and unloading of materials, instruments and monitoring of the tests.
1.9
The rate for providing and assembling the equipment on the site and the
subsequent dismantling and removal shall be given separately as an item.
1.10
Movement of piling frames into position and about the site, any necessary
excavation or filling required to place the frames, raising or lowering the frames
and any staging, barges or the like required to support the frames, shall be
deemed to be included with the item of piling.
Page 5 of 83
1.11
Measurement
Payment for treated timber piles driven shall be the product of the relevant rate
per metre run and the penetration depth (measured from tip to cut-off level).
1.12
The pay length of each reinforced concrete pile after it is driven into the ground is
measured from the cut-off level of the pile to the end of pile shoe.
Notwithstanding the provisions of Billing of Quantities contained in the General
Preambles, the pay length of reinforced concrete piles shall be billed to the
accuracy of nearest of 10mm.
2.0
EXCAVATION
2.1
2.2
2.3
2.4
Generally
Excavation of ordinary ground includes spoil or rubbish of every description,
rubbish tip material etc, sand gravel, decomposed granite, red or white earth,
loamy or gravelly clay, gravelly laterite, mud, bog or any other formation by pick
and shovel or machinery and at any depth.
Rates
The rate of each item of excavation shall be deemed to include excavating
around foundation, piles and confined areas, getting out, removing of bakau
piles, trimming, levelling and compacting bottoms of excavations and keeping
sides plumb and planking and strutting (where stated).
Rates for each item shall be held to include for keeping all excavation free from
water and site dry, pumping or bailing and cable/services detection if required
and providing any temporary drains required.
Measurement
The measurement of all excavations and subsequent disposal shall be those
before excavating. The increase in bulk and any extra excavation required for
earthwork support, planking and strutting and formwork for concrete shall be
deemed to be included in the rates.
2.5
2.6
Filling shall be measured as equal to the void to be filled. Any thickness stated
shall be deemed to be after compacting.
Page 6 of 83
2.0
EXCAVATION (CONTD)
Timbering
2.7
Rates
The rate for each item of the timbering for the sewer trenches/manholes shall be
deemed to include the design of the timbering by a Professional Engineer when
the depth of the excavation/trenches exceeds 4.00 metres.
3.0
CONCRETE WORK
3.1
Generally
Unless otherwise stated, rates for concrete, reinforcement and formwork shall be
applicable to all work irrespective of locality, positions, shapes and height.
3.2
3.3
Rates
The rate for each item of concrete shall be held to include the following:
a)
Forming, cutting grooves, chases, mortices, holes and making good any
other sundry items of a like nature.
b)
c)
d)
e)
Measurement
No deduction shall be made in the measurement of concrete work for:
a)
b)
c)
Openings in walls, floor, roof slabs and the like of 0.10 square metre or
less.
Page 7 of 83
3.0
3.4
Reinforcement
3.4.1
Rates
The rate of each item of reinforcement shall be deemed to include:
3.4.2
a)
b)
All cleaning and wire-brushing bars to remove rust, dust, mill scale,
dirt, oil and other deleterious matters.
c)
d)
e)
Measurement
The conversion factor for the various steel reinforcement bars shall be as
follows:
6mm diameter
7mm diameter
8mm diameter
9mm diameter
10mm diameter
13mm diameter
16mm diameter
20mm diameter
22mm diameter
25mm diameter
28mm diameter
32mm diameter
3.5
3.5.1
3.5.2
0.222 kg/m
0.302 kg/m
0.394 kg/m
0.499 kg/m
0.616 kg/m
1.042 kg/m
1.579 kg/m
2.466 kg/m
2.984 kg/m
3.854 kg/m
4.834 kg/m
6.313 kg/m
Fabric Reinforcement
Rates
The rate for each item of fabric reinforcement shall be held to include for
extra material at laps, tying wires and all bending, cutting and notching
around obstruction.
Measurement
Only the nett area covered shall be measured and no deduction shall be
made for opening less than 1.00 square metre.
Page 8 of 83
3.6
Formwork
3.6.1
Rates
The rate of each item of formwork shall be deemed to include:
a)
b)
All splayed edges, notchings, allowance for overlaps and passings
at angles, battens, strutting, bolting, wedging, easing, striking and removal.
3.6.2
Measurement
Formwork shall be measured to the surface of work sloping more than 15
degree from the horizontal.
3.6.3
3.7
3.7.1
4.0
4.1
4.0
a)
b)
c)
Precast Work
Rates
The rate of each item of precast work shall be deemed to include concrete,
reinforcement, formwork including the formation and filling of pockets, holes,
chases and recesses for anchors, bolts and the like, grouting, pointing of
joints, surface finishes, delivery, unloading, hoisting, erecting, fixing including
all necessary temporary erection gear, bracing and working platforms.
BRICKWORK
Rates
The rate for each item of block, brickwork shall be held to include for all
special made blocks, bricks and in-situ concrete in lieu, all holdfasts and
bonding ties at abutments to concrete structures, all rough and fair cuttings,
oversailing and receding courses, rough relieving and discharging arches,
wedging and pining, raking out joints for and pointing flashings, bedding
plates, parging and coring flues, labour eaves filling, plumbing angles,
forming square and rebated reveals, cut squints or birdsmouths, notches,
forming, leaving or cutting chases, holes and mortices, cutting and pining
and making good and any other sundry items of a like nature.
BRICKWORK (CONTD)
Page 9 of 83
4.2
4.3
Rates (Contd)
Rates for blockwork and brickwork shall be applicable to all work irrespective
of positions, patterns, shapes and height.
Measurement
Deductions shall be measured the nett sizes of the openings and recesses,
including the extra width or rebated reveals. No deductions shall be made for
openings of 0.50 square metre or less.
4.4
Deductions shall be made for strings, sills, lintols and the like only when
exceeding 100mm in height.
5.0
5.1
Description
The description of each item of carpentry work shall be deemed to include all
cutting, notching, boring, sinking, pelleting, fitting, trimming, mitring, halving,
morticing, tenoning, dovetailing, scarfing, wedging and all ends, splayed
edges, short lengths and temporary supports and any other sundry of a like
nature and also all labour in forming, drilling for bolts and fixing in position
complete with nails, screws or adhesives.
5.2
The description of each item of joinery work shall be deemed to include all
nailing, gluing, screwing, plugging, cutting, notching, holes, housing ends,
mitring ends and shaped ends, angles, junctions, heading joints, short
lengths, tongued angles, splayed or rounded edges, chamfers, rebates,
grooves and any other sundry items of a like nature including stops and
working cross-grain, fitting and hanging and the like.
6.0
6.1
Description
The description of each item of work shall be deemed to include:a)
b)
Page 10 of 83
6.2
6.3
d)
e)
f)
Deduction
No deduction shall be made for drillings, holes, notchings, splay cuts and
the like.
Measurement
Weights stated shall be net theoretical weights.
6.4
6.5
6.6
Page 11 of 83
7.1
7.2
7.3
WALL/FLOOR FINISHES
Rates
The rate for each item shall be deemed to include all temporary rules,
temporary grounds, temporary screeds and the like, cramps, dowels, ties,
special metal supporting brackets and the like, cutting holes, notching and
the like, masking, labour to internal angles other than coved angles, making
good around pipes and the like, work in narrow widths and small quantities,
joints between different types of work, joints between new and old work,
internal angles, fair edges, rounded or chamfered edges or angles, quirks,
grooves, V-joints, groin points and other intersections of curved surfaces,
rounded coves and external angles not exceeding 25mm radius, necessary
UPVC trimming pieces, mitres, stops and the like, and all making good and
any other sundry items of a like nature.
Rate for each item shall also be deemed to include protecting surfaces from
the weather or building operations.
Measurement
No deduction shall be made for openings of 0.50 square metre or less.
7.4
7.5
7.6
8.0
PAINTWORK
8.1
8.2
8.3
Rates
The rate for each item of painting shall be held to include for all necessary
preparation of surfaces including cleaning off, knotting, stopping and
sandpapering woodwork, wirebrushing metal and leaving all surfaces free
from dust, rust, grease and oil before painting, narrow widths, etc.
Measurement
No deduction shall be made for openings of 0.50 m2 or less.
Work shall be deemed to be executed when scaffolding has been provided
during the course of construction. Should scaffolding be required separately
just to execute the work, it would be paid as an extra item.
Page 12 of 83
9.0
DRAINAGE WORK
9.1
Measurement
Unless otherwise described, excavation, backfill and disposal of excavated
material shall be measured separately.
9.2
Piling, hardcore, lean concrete, sand bed and concrete haunching to drains,
sewers and culverts shall be measured separately.
9.3
The measurement of lengths of pipes shall be along their centre lines and
lengths of pipes in backdrops, tumbling bays, etc., shall be measured
separately.
9.4
9.5
9.6
9.7
Rates
The rate of each item of concrete haunching shall be deemed to include
moulds, formwork, reinforcement, forming holes, rebates, notchings,
mortices and recesses.
The rate of each item of pipes shall be deemed to include the following:
a)
b)
c)
10.0
10.1
Measurement
The thickness of materials used for road pavement shall be measured nett,
i.e. consolidated thickness after compaction.
10.2
10.3
10.4
Page 13 of 83
10.5
Rates (Contd)
The rate of each item of premix bituminous surfacing shall be deemed to
include the following:a)
b)
c)
d)
e)
10.6
The rate of each item of precast concrete kerbs, channels and drains shall
be deemed to include all necessary moulds, formwork, reinforcement and
joints and cutting, all angles, intersections, ends, outlets, etc.
10.7
The rate for each item of precast concrete kerbs shall include for laying in
alignment and finishing fair on all exposed surfaces.
11.0
SIGNAGES
11.1
Measurement
The rate of each item of work for directional/traffic signs shall be deemed to
include foundations, supporting posts, excavation, preparation of surfaces,
disposal of excavated material, upholding sides of excavation, backfilling,
concrete, formwork, reinforcement and joints, etc.
Page 14 of 83
12.1
Measurement
The measurement for lengths of fences shall exclude lengths occupied by
gates.
12.2
13.0
13.1
Rates
The rate for each item for fences shall be deemed to include the following:
a)
b)
c)
d)
13.2
Measurement
The measurement of girths of the trees shall be at a height of 1.0 metre
above ground.
13.3
Rates
The rate for cutting down trees shall be deemed to include for grubbing up
roots and filling of voids after removal of tree roots.
13.4
The rate of each item of turfing and planting shall be deemed to include for
watering, weeding, fertilizing, cutting, settlement, re-seeding and
maintenance during the Maintenance Period as specified.
Page 15 of 83
14.0
15.0
15.1
(b)
DAYWORKS
Rates
Rates shall be applicable in respect of all work executed on a daywork basis.
During the continuance of such work, the Contractor shall keep proper
records of the names, occupations and working hours of all workmen
employed for such work and the quantities and descriptions of all materials
and construction equipment employed. Such records, receipts or vouchers
must be verified by the Superintending Officer or the Superintending
Officer's Representative before payment can be effected.
Page 16 of 83
1.01
item
4,585.60
Q042
19.00
SB305
1.03
25.30
SB089
1.04
29.10
SB090
1.05
35.40
SB091
1.06
39.20
SB092
1.07
44.30
SB313
1,499.00
Q043
item
Page 17 of 83
1.09
100mm x 100mm.
10.70
Q004
1.10
16.50
Q005
1.11
22.90
Q006
1.12
34.10
Q007
item
8,159.30
SA032
1.14
ton
171.30
SA028
1.15
ton
379.50
SA029
1.16
ton
253.00
SA030
1.17
ton
1,847.50
SA031
Page 18 of 83
1.18
item
980.40
Q045
no
4.40
Q031
1.20
no
7.50
Q032
1.21
no
15.30
Q033
1.22
no
19.40
Q034
no
5.20 CE01001
1.24
no
8.70 CE01002
1.25
no
16.90 CE01003
1.26
no
21.60 CE01004
1.27
1.60
Q030
2.30 CE01005
Page 19 of 83
2.01
1.50
SA001
2.02
2.80
SA002
2.03
8.70
SA003
2.04
Excavation only
ordinary ground.
1.20 CE02003
2.05
5.90
A094
2.06
10.10
SA007
2.07
18.90
A096
2.08
15.90
A095
Page 20 of 83
2.09
22.70
A097
2.10
28.10
A098
2.11
31.90
A099
21.50
SA008
2.13
24.10
SA009
2.14
27.90
SA010
2.15
29.60
A100
2.16
42.80
A101
2.17
44.10
A102
2.18
46.80
A103
2.19
52.20
A104
Page 21 of 83
2.20
8.60
A105
2.21
12.50
A106
2.22
9.80 CE02001
2.23
13.80 CE02002
54.60
A006
2.25
26.30
A007
2.26
50.90
A008
(c) Timbering
Open timbering for sewer trenches and manholes
measured as supporting faces of excavations using
type (I) timbering in stages of the following depths as
shown in Drawings (measured nett from Drawing):
2.27
9.70
A070
2.28
9.60
A071
2.29
10.50
A072
11.20
A073
2.30
Page 22 of 83
2.31
10.70
A074
2.32
11.70
A075
2.33
13.40
A076
2.34
12.50
A077
2.35
13.60
A078
19.20
A079
2.37
14.40
A080
2.38
15.70
A081
2.39
16.90
A082
2.40
18.20
A083
34.00
A084
2.42
19.30
A085
Page 23 of 83
2.43
20.90
A086
2.44
22.60
A087
2.45
24.30
A088
45.30
A089
2.47
27.20
A090
2.48
29.60
A091
2.49
32.00
A092
2.50
34.30
A093
2.51
297.00
A020
(d) Backfilling
Backfill excavated trench for service pipes, cable
crossings, etc including consolidation with:
2.52
Granular material.
44.90
A107
2.53
7.90
A110
2.54
Imported earth.
14.00
A109
Page 24 of 83
2.55
Hardcore.
22.00
I005
2.56
Granite dust.
55.90
A108
2.57
Granite chippings.
60.80
I008
2.58
26.70
SA020
7.90
SA016
137.30
(f) Disposal
2.59
3.01
I016
Grade 20.
151.20 CE03029
3.03
Grade 25.
153.10 CE03030
3.04
Grade 30.
155.10 CE03011
Grade 20.
139.30
I017
3.06
Grade 25.
141.20
I018
3.07
Grade 30.
143.20
I019
3.08
Grade 35.
145.20
I045
3.09
Grade 40.
147.10
I044
Page 25 of 83
3.10
6mm diameter.
kg
1.90
SB022
3.11
8mm diameter.
kg
1.90
SB154
3.12
10mm diameter.
kg
1.60
SB023
3.13
13mm diameter.
kg
1.60
SB024
3.14
16mm diameter.
kg
1.60
SB025
3.15
20mm diameter.
kg
1.50
SB026
3.16
22mm diameter.
kg
1.50
SB027
3.17
25mm diameter.
kg
1.50
SB028
3.18
28mm diameter.
kg
1.50
SB029
3.19
32mm diameter.
kg
1.50
SB030
10mm diameter.
kg
1.90 CE03016
3.21
13mm diameter.
kg
1.50 CE03017
3.22
16mm diameter.
kg
1.50 CE03018
3.23
20mm diameter.
kg
1.40 CE03019
3.24
22mm diameter.
kg
1.40 CE03020
3.25
25mm diameter.
kg
1.40 CE03021
3.26
28mm diameter.
kg
1.40 CE03022
3.27
32mm diameter.
kg
1.40 CE03023
kg
0.80
3.28
SB039
Page 26 of 83
3.29
A5
3.70
SB040
3.30
A6
4.40
SB041
3.31
A7
5.60
SB042
3.32
A8
7.10
SB043
3.33
A9
8.70 CE03001
3.34
A10
10.80
SB145
3.35
B5
6.60
SB146
3.36
B6
7.10
SB147
3.37
B7
8.00
SB148
3.38
B8
10.40
SB149
3.39
B9
12.20
SB229
3.40
B10
14.00
SB150
3.41
B11
16.40 CE03010
3.42
B12
18.50
3.43
B13
23.10 CE03002
3.44
D5
6.80 CE03006
3.45
D6
8.30
SB048
3.46
D7
10.60
SB049
3.47
D8
13.70
SB124
3.48
D9
17.10
SB230
3.49
D10
21.10
SB231
3.50
D11
25.30 CE03007
3.51
D12
30.10 CE03008
3.52
D13
35.30 CE03009
3.53
7.60 CE03028
SB151
Page 27 of 83
3.54
DA 10d/10.
29.50 CE03024
3.55
DA 13d/10.
45.30 CE03025
3.56
EA 10d/10.
22.00 CE03026
3.57
EA 13d/10.
32.70 CE03027
19.90
G005
(c) Formwork
3.58
4.01
205.40
L005
4.02
92.10
G011
4.03
61.40
G010
4.04
50.00
L006
4.05
26.00
L007
190mm thick.
46.70
SC015A
4.07
290mm thick.
65.70
SC044A
12.50
SD054
4.08
Page 28 of 83
4.09
105.60
L001
4.10
114.40
L002
932.30
N015
5.02
619.90
N016
5.03
789.40
N017
5.04
202.40
N018
5.05
258.80
N019
kg
4.20
SH018A
6.02
kg
3.80
SH019A
284.60 CE07007
Page 29 of 83
6.04
215.10 CE07008
6.05
139.20 CE07009
6.06
227.70 CE07010
6.07
38.00 CE07011
6.08
100.40
M046
6.09
88.50
M019
6.10
279.30
M020
80.40
M040
(c) Gratings
6.11
Page 30 of 83
6.12
299.80
M027
6.13
244.00
M045
6.14
657.40
M030
6.15
552.40
M031
6.16
383.00
M032
6.17
405.60
M050
Page 31 of 83
6.18
337.30 CE07005
6.19
no
175.60 CE07001
no
1,332.60 CE07002
(e) Bollards
6.21
no
95.60 CE07006
6.22
no
57.30
M039
6.23
no
54.90
M023
6.24
no
11.50 CE11025
6.25
2.50
M024
6.26
no
22.50
M052
Page 32 of 83
7.01
4.00 CE08001
7.02
0.90
SD002
7.03
12.70
L008
7.04
1.30
L009
7.05
9.20
G014
7.06
1.50
G065
7.07
8.00
SD019
7.08
1.60
SD020
O065
8. PAINTWORK
(a) Concrete and Plastered Surfaces
8.01
3.90
8.02
4.40 CE09020
8.03
0.90
O066
1.70
N025
8.05
Stop, knot with spirit knotting varnish, prime with one coat
wood primer and paint two coats of approved synthetic
enamel paint on woodwork.
5.30
N026
Page 33 of 83
8.06
4.60
N022
8.07
4.30
N023
8.08
4.20
N024
1.60
O014
8.10
2.20
O016
8.11
2.90
O017
8.12
3.80
O018
8.13
12.60
O019
Page 34 of 83
8.14
1.60
O020
8.15
2.20
O021
8.16
2.00 CE09008
8.17
3.00
O022
8.18
4.40
O023
8.19
6.10
O024
16.30 CE09002
8.21
29.60 CE09003
Page 35 of 83
8.22
3.80
O025
8.23
5.30
O026
8.24
no
36.80
O027
8.25
no
45.00
O028
8.26
no
55.20
O029
8.27
no
45.40 CE09007
8.28
no
33.90 CE09012
8.29
no
16.70 CE09014
8.30
no
14.40 CE09016
8.31
18.00
O032
Page 36 of 83
8.32
4.10
O033
8.33
5.70
O034
8.34
8.70
O035
8.35
no
40.30 CE09004
8.36
no
51.80 CE09005
8.37
no
63.30 CE09006
8.38
no
39.90 CE09021
8.39
no
33.90 CE09013
8.40
no
16.70 CE09015
8.41
no
14.40 CE09017
8.42
19.00
16.20 CE09001
8.43
O038
Page 37 of 83
8.44
7.30
O054
8.45
0.70
O055
8.46
1.10
O056
8.47
1.50
O057
8.48
2.20
O058
8.49
no
12.10 CE09023
8.50
no
16.10 CE09024
8.51
no
20.10 CE09025
8.52
no
13.80 CE09022
8.53
no
24.20 CE09009
8.54
no
13.80 CE09019
8.55
no
6.30 CE09010
8.56
no
2.50 CE09011
8.57
no
21.80
O070
8.58
per
centum
4.80%
O080
Page 38 of 83
9.01
2.80
A048
9.02
10.30
A068
5.50
B002
9.04
6.80
B003
9.05
7.60
B004
9.06
8.30
B005
9.07
9.70
B006
9.08
10.50
B007
9.09
12.20
B008
9.10
13.00
B009
9.11
14.70
B010
9.12
15.70
B011
9.13
25.70
B012
9.14
27.00
B013
9.15
29.10
B014
9.16
30.50
B015
9.17
45.20
B016
9.18
50.10
B017
Page 39 of 83
9.19
55.30
B018
9.20
60.60
B019
32.60
C002
9.22
42.10
C003
9.23
45.50
C004
9.24
48.80
C005
9.25
56.80
C006
9.26
60.40
C007
9.27
68.70
C008
9.28
72.70
C009
9.29
78.90
C010
9.30
83.20
C011
9.31
124.30
C012
9.32
129.70
C013
9.33
139.70
C014
9.34
145.40
C015
9.35
194.40
C016
9.36
220.60
C017
9.37
245.80
C018
9.38
271.70
C019
Page 40 of 83
9.39
57.60
C021
9.40
70.30
C022
9.41
75.20
C023
9.42
80.20
C024
9.43
91.30
C025
9.44
96.50
C026
9.45
108.00
C027
9.46
113.60
C028
9.47
121.50
C029
9.48
128.90
C030
9.49
176.40
C031
9.50
183.30
C032
9.51
196.60
C033
9.52
203.90
C034
9.53
262.50
C035
9.54
291.80
C036
9.55
322.00
C037
9.56
352.60
C038
Page 41 of 83
40.30
D002
9.58
56.40
D003
9.59
59.30
D004
9.60
62.00
D005
9.61
79.70
D006
9.62
82.20
D007
9.63
95.80
D008
9.64
97.90
D009
9.65
112.10
D010
9.66
113.90
D011
9.67
175.70
D012
9.68
178.90
D013
9.69
200.30
D014
9.70
203.20
D015
9.71
276.80
D016
9.72
314.10
D017
9.73
351.40
D018
9.74
389.90
D019
Page 42 of 83
9.75
65.60
D021
9.76
84.90
D022
9.77
89.40
D023
9.78
93.70
D024
9.79
114.70
D025
9.80
118.80
D026
9.81
135.60
D027
9.82
139.40
D028
9.83
155.20
D029
9.84
160.20
D030
9.85
228.50
D031
9.86
233.30
D032
9.87
258.00
D033
9.88
262.60
D034
9.89
345.80
D035
9.90
386.30
D036
9.91
428.60
D037
9.92
472.00
D038
Page 43 of 83
59.10
E002
9.94
77.00
E003
9.95
81.50
E004
9.96
85.80
E005
9.97
115.60
E006
9.98
120.30
E007
9.99
141.70
E008
9.100
146.40
E009
9.101
169.20
E010
9.102
173.60
E011
9.103
251.60
E012
9.104
257.70
E013
9.105
287.10
E014
9.106
293.30
E015
9.107
419.20
E016
9.108
463.70
E017
9.109
509.90
E018
9.110
557.30
E019
Page 44 of 83
9.111
84.40
E021
9.112
105.40
E022
9.113
109.90
E023
9.114
117.60
E024
9.115
150.60
E025
9.116
156.80
E026
9.117
181.50
E027
9.118
187.80
E028
9.119
212.30
E029
9.120
219.90
E030
9.121
304.40
E031
9.122
312.10
E032
9.123
344.80
E033
9.124
352.60
E034
9.125
486.70
E035
9.126
535.90
E036
9.127
587.10
E037
9.128
639.30
E038
Page 45 of 83
9.129
200mm diameter.
53.20 CE10032
9.130
225mm diameter.
58.20
F002
9.131
300mm diameter.
100.50
F003
250mm diameter.
39.60 CE10028
300mm diameter.
115.60
F005
9.134
375mm diameter.
136.50
F007
9.135
450mm diameter.
168.90
F009
9.136
525mm diameter.
192.80
F011
9.137
600mm diameter.
234.20
F013
9.138
675mm diameter.
241.80
F015
9.139
750mm diameter.
318.80
F017
9.140
825mm diameter.
324.60
F019
900mm diameter.
458.90
F021
9.142
975mm diameter.
418.10
F023
9.143
1.050m diameter.
461.80
F025
9.144
1.125m diameter.
555.80
F027
Page 46 of 83
9.145
1.200m diameter.
551.60
F029
9.146
1.350m diameter.
698.50
F031
9.147
1.500m diameter.
690.30
F033
9.148
1.725m diameter.
981.50
F035
9.149
1.800m diameter.
1,086.30
F037
375mm diameter.
133.60
F006
9.151
450mm diameter.
150.60
F008
9.152
525mm diameter.
172.90
F010
9.153
600mm diameter.
218.60
F012
9.154
675mm diameter.
246.60
F014
9.155
750mm diameter.
288.90
F016
9.156
825mm diameter.
309.40
F018
225mm diameter.
88.00
G047
9.158
300mm diameter.
102.50
G048
39.70
G049
9.159
Page 47 of 83
9.160
200mm diameter
38.20 CE10033
9.161
225mm diameter.
66.60
F042
9.162
300mm diameter.
113.70
F045
Bend.
no
180.20 CE10034
9.164
Junction.
no
309.40 CE10035
Bend.
no
64.90
F043
9.166
Junction.
no
192.20
F044
Bend.
no
57.40
F046
9.168
Junction.
no
269.30
F047
1.050m diameter.
560.80
G054
9.170
1.200m diameter.
657.60
G055
Page 48 of 83
9.171
1.350m diameter.
731.90
G056
9.172
1.500m diameter.
832.30
G057
9.173
1.800m diameter.
1,096.60
G058
no
318.70
G026
9.175
no
396.10
G027
1.050m diameter.
no
598.40
G028
9.177
1.200m diameter.
no
846.60
G029
9.178
1.350m diameter.
no
1,101.80
G030
9.179
1.500m diameter.
no
1,331.60
G031
9.180
1.800m diameter.
no
1,706.90
G032
1.500 m diameter.
no
1,452.90
G033
9.182
1.800m diameter.
no
1,706.90
G034
Page 49 of 83
9.183
100mm high.
no
57.50 CE10020
9.184
200mm high.
no
76.50 CE10021
no
169.40
G035
9.186
no
87.90
G036
9.187
59.90
G038
9.188
set
55.70
G039
9.189
81.50
G040
9.190
no
22.90
G041
set
140.20
G042
9.192
set
152.30
G043
9.193
set
164.40
G044
Page 50 of 83
9.194
set
25.30 CE10005
9.195
set
25.70 CE10006
9.196
set
26.00 CE10007
kg
17.30
G045
9.197
no
297.70
M033
9.199
no
430.70
M034
9.200
no
170.80
M035
9.201
no
215.50
M036
9.202
no
1.70 CE10025
no
21.70 CE10036
9.204
no
26.10 CE10037
Page 51 of 83
9.205
no
344.70
G053
9.206
no
13.50
G059
740.60
H002
225mm diameter.
Tunnel with proper timber strutting, supply, lay and
join Class "M" concrete pipe with spigot and socket
rubber ring joint and concrete surround all as
specified:
9.208
300mm diameter.
908.30
H003
9.209
450mm diameter.
1,066.20
H004
9.210
600mm diameter.
1,269.90
H005
200mm diameter.
442.80 CE10011
9.212
225mm diameter.
488.80 CE10027
9.213
250mm diameter.
534.80 CE10012
9.214
300mm diameter.
603.80 CE10013
9.215
400mm diameter.
649.80 CE10014
225mm diameter.
580.80
H011
9.217
300mm diameter.
615.30
H012
9.218
375mm diameter.
644.00
H015
9.219
450mm diameter.
672.80
H013
9.220
525mm diameter.
701.50
H016
9.221
600mm diameter.
730.30
H014
Page 52 of 83
9.222
7.50
J001
9.223
8.30
J002
9.224
9.90
J003
9.225
10.60
J004
9.226
12.40
J005
9.227
13.50
J006
24.20
J008
9.229
28.90
J070
9.230
28.10
J072
9.231
32.60
J009
9.232
55.40
J010
Page 53 of 83
9.233
26.20
J016
9.234
30.70
J017
9.235
63.20
J018
no
57.00 CE10029
9.237
no
13.50 CE10030
9.238
no
1.00 CE10031
9.239
no
154.30
J074
9.240
no
24.70
J062
80mm diameter.
5.70 CE10002
9.242
100mm diameter.
7.60
K052
9.243
150mm diameter.
11.30
K053
Page 54 of 83
9.244
DN 80 (80mm diameter).
6.80 CE10016
9.245
7.60 CE10017
9.246
13.60 CE10018
9.247
26.70 CE10019
66.90
K066
9.248
9.249
no
2.00
K044
9.250
no
3.20
K045
9.251
23.70 CE10026
9.252
no
3.90 CE10004
9.253
no
19.70 CE11041
9.254
no
128.10
K057
Page 55 of 83
9.255
no
57.60
K067
9.256
no
12.60
K058
9.257
no
16.40 CE10024
9.258
13.40
L003
9.259
3.20
L020
(d) Weepholes
UPVC pipe to SS213:1979 as weephole not exceeding
300mm long:
9.260
50mm diameter.
no
1.50
M009
9.261
65mm diameter.
no
1.60
M042
9.262
80mm diameter.
no
2.50
M010
9.263
100mm diameter.
no
3.80
M011
9.264
no
1.00 CE10003
9.265
3.50
L004
9.266
1.90
L021
Page 56 of 83
9.267
no
1,402.60 CE10008
9.268
no
3,839.70 CE10009
9.269
no
5,133.80 CE10022
9.270
no
1,132.50 CE10023
Class 'A'
formation.
synthetic
geotextile
membrane
on
road
2.10 CE11018
10.02
2.50
J054
10.03
67.30
J073
Page 57 of 83
10.04
1.50
J059
10.05
48.60
J060
10.06
60.70 CE11017
21.30 CE11004
10.08
25.00 CE11005
10.09
33.40 CE11006
10.10
6.90 CE11007
10.11
10.50 CE11008
10.12
6.90 CE11009
10.13
14.10 CE11010
10.14
47.60 CE11011
10.15
133.60 CE11012
10.16
177.40 CE11027
Page 58 of 83
10.17
item
621.00 CE15036
10.18
item
2,484.00 CE15037
10.19
item
517.50 CE15038
10.20
item
621.00 CE15039
10.21
item
621.00 CE15040
10.22
item
621.00 CE15041
10.2 PAVINGS
(a) Concrete Paving Slabs
Concrete paving slab including 50mm granite fines or
unwashed sand bed and jointing in cement mortar
(1:3):
10.23
50mm thick.
25.70
K012
10.24
75mm thick.
43.30
K011
10.25
46.70
K078
10.26
65.70
K079
Page 59 of 83
10.27
no
11.50
K015
no
17.50
K019
10.29
no
2.30
B020
45.10 CE11033
10.31
42.00 CE11034
10.32
38.80 CE11043
10.33
7.90 CE11036
Page 60 of 83
10.34
9.40 CE11037
10.35
no
48.60 CE11035
26.60
SD077
10.37
29.00
SD078
10.38
8.30 CE11024
10.39
6.40 CE11001
2.70
K024
10.41
16.50
K074
10.42
1.80
K026
10.43
3.70
K070
10.44
10.80
K076
Page 61 of 83
10.45
10.60 CE11044
10.46
18.40 CE11045
8.40
K036
10.48
12.30
K032
10.49
9.70 CE11042
14.00 CE11014
10.51
no
12.60 CE11038
10.52
19.80 CE11031
10.53
7.70 CE11032
10.54
8.60 CE11039
Page 62 of 83
7.70 CE11040
300mm x 150mm.
19.80
K037
10.57
380mm x 200mm.
26.50
K038
10.58
19.60
K073
10.59
13.60
K072
10.60
no
27.80 CE11046
10.61
no
84.30 CE11016
80mm diameter.
3.90 CE11019
10.63
100mm diameter.
5.10 CE11020
10.64
150mm diameter.
9.60 CE11021
80mm diameter.
11.70 CE11022
10.66
100mm diameter.
17.20 CE11023
Page 63 of 83
11.01
no
108.80
O067
pair
464.00
O068
11.03
pair
594.10
O081
11.04
pair
666.60
O082
no
1,409.30 CE12042
11.06
Multi-storey carpark.
no
1,409.30 CE12009
Page 64 of 83
11.07
no
272.30 CE12044
11.08
no
389.90 CE12053
no
225.30 CE12054
11.10
no
197.10 CE12055
11.11
no
460.40 CE12056
no
415.10 CE12011
11.12
Page 65 of 83
11.13
no
1,155.50 CE12045
11.14
no
873.40 CE12046
m2
689.40 CE12051
11.16
m2
815.90 CE12052
no
278.60
O079
Page 66 of 83
11.18
no
285.70 CE12027
11.19
no
285.70 CE12026
11.20
no
13.10 CE12006
84.20
no
11.22
no
162.60 CE12001
11.23
no
178.30
P031
11.24
no
225.30
P032
11.25
no
319.40 CE12002
P030
Page 67 of 83
11.26
no
413.40 CE12003
11.27
no
507.50 CE12008
11.28
no
460.40 CE12031
11.29
no
460.40 CE12032
11.30
no
883.70 CE12033
11.31
no
601.50 CE12034
11.32
no
75.60 CE12015
11.33
no
154.00 CE12016
11.34
no
169.70 CE12017
11.35
no
216.70 CE12018
11.36
no
310.70 CE12019
11.37
no
430.70 CE12020
11.38
no
579.20 CE12021
11.39
no
477.70 CE12035
11.40
no
451.80 CE12037
11.41
no
900.90 CE12038
11.42
no
404.80 CE12036
11.43
no
592.90 CE12039
Page 68 of 83
11.44
no
225.30 CE12047
11.45
no
234.50 CE12048
11.46
no
413.40 CE12049
11.47
no
422.60 CE12050
11.48
no
216.70 CE12022
11.49
no
212.50 CE12023
11.50
no
430.70 CE12024
11.51
no
422.30 CE12025
no
413.50 CE12013
11.52
Page 69 of 83
11.53
no
350.70 CE12029
11.54
no
385.30 CE12030
11.55
no
143.00 CE12043
11.56
no
134.40 CE12057
no
280.10 CE12005
11.58
no
280.10 CE12005
Page 70 of 83
no
50.80 CE12007
(c) Signboards
11.60
no
40.00
Q021
11.61
no
78.00
Q049
11.62
no
93.70 CE12041
11.63
no
763.10
11.64
no
281.50 CE12012
O074
Page 71 of 83
12.01
50.90
N001
12.02
125.90
N002
1.20m high.
32.70
N003
12.04
1.50m high.
37.50
N004
12.05
1.80m high.
42.70
N005
12.06
2.10m high.
53.50
N006
12.07
2.40m high.
57.10
N007
8.40
N009
Page 72 of 83
12.09
6.60
N010
12.10
10.00
N027
12.11
8.80
N011
12.12
1.10
N012
12.13
33.50
N013
13. SITE
PLANTING
CLEARANCE,
TURFING
AND
TREE-
ton
96.20
L010
13.02
3.60
L011
no
161.90 CE14001
13.04
no
194.20
L012
13.05
no
252.30
L013
Page 73 of 83
13.06
no
377.10
L014
13.07
no
472.90
L015
13.08
no
615.30
L016
13.09
no
754.30
L017
13.10
no
947.90
L018
13.11
no
1,122.00
L019
(b) Turfing
13.12
1.20
M002
13.13
5.30
SM002
13.14
8.50
SM004
10.50
SM009
13.16
10.10
SM011
13.17
11.90 CE14002
13.18
11.40 CE14003
13.19
0.20
M038
Page 74 of 83
0.10
M053
p/tree
3.80 CE14004
13.22
p/tree
9.60 CE14005
13.23
p/tree
27.30 CE14006
13.24
p/tree
37.40 CE14007
13.25
p/tree
56.30 CE14008
13.26
p/tree
87.80 CE14009
13.27
p/tree
120.60 CE14010
34.70
SM018
no
86.50
SM078
13.30
no
38.40
SM077
13.31
no
5.50
SM079
Page 75 of 83
13.32
no
2.30
SM080
13.33
no
3.00
SM081
13.34
no
1.90
SM082
13.35
no
1.50
SM083
13.36
no
1.10
SM084
13.37
no
0.60
SM085
13.38
28.80
Q016
13.39
no
18.50
SM041
Single layer.
m2
1.20
SM043
13.41
Double layer.
m2
2.30
SM044
13.42
39.70
Q018
13.43
53.60
Q019
13.44
no
9.30
Q020
Page 76 of 83
14.01
36.20
J065
14.02
Reinforced concrete.
109.30
J066
14.03
Mass concrete.
85.60
J067
14.04
57.20
J068
3.50
J047
14.05
14.06
49.90 CE15042
14.07
140.30 CE15043
14.08
161.90 CE15044
3.70
J069
14.10
4.40
J063
14.11
5.70
J064
14.12
17.00
A011
14.13
Add to (or deduct) from last item for each size over or
below 0.01 m2 cross sectional area of kerb.
3.20
A012
14.14
5.20
J012
Page 77 of 83
14.15
5.10
J013
14.16
7.50
A009
14.17
4.90
K021
14.18
3.60 CE15028
14.19
14.20
4.20 CE15029
14.21
6.30
K023
14.22
17.40
A010
14.23
8.70
J014
20.60
K022
Page 78 of 83
14.24
8.40
14.25
4.30 CE15046
14.26
3.90 CE15047
14.27
no
76.80 CE15048
J015
15.60
M048
14.29
15.90
M025
14.30
16.60
M049
Page 79 of 83
14.31
1.40
O039
14.32
1.30 CE15033
14.33
2.50 CE15034
14.34
2.00
O040
14.35
3.00
O041
14.36
4.70
O042
14.37
10.90 CE15035
14.38
no
36.20
O043
14.39
no
42.60
O044
14.40
no
50.70
O045
no
26.50 CE15030
14.42
no
17.80 CE15053
14.43
no
7.50 CE15031
14.44
no
5.20 CE15032
14.45
14.40
O048
Page 80 of 83
15.01
Bricklayer.
hr
6.20
SN001
15.02
Carpenter.
hr
7.40
SN003
15.03
Concretor.
hr
6.90
SN004
15.04
Drainlayer.
hr
6.70
SN006
15.05
Fitter.
hr
7.00
SN008
15.06
Labourer.
hr
4.70
SN012
15.07
Mason.
hr
6.20
SN014
15.08
Painter.
hr
5.60
SN016
15.09
Pavior.
hr
6.60
SN017
15.10
Roller Driver.
hr
13.50
SN022
15.11
hr
7.20
SN025
15.12
Watchman.
hr
4.60
SN029
15.13
Welder.
hr
7.60
SN030
Page 81 of 83
15.14
hr
60.85
SN082
15.15
hr
22.70
SN032
15.16
hr
14.00
SN033
15.17
hr
20.30
SN034
15.18
hr
106.00
SN050
15.19
hr
80.60
SN063
15.20
hr
85.55
SN079
15.21
hr
29.90
SN061
15.22
hr
25.20
SN058
15.23
hr
13.15
SN036
15.24
hr
107.70
SN056
15.25
hr
144.40
SN057
15.26
hr
28.90
SN067
15.27
hr
52.20
SN068
15.28
hr
77.10
SN069
15.29
hr
14.85
SN080
15.30
hr
78.80
SN060
Page 82 of 83
15.31
hr
29.70
SN062
15.32
hr
43.30
SN078
15.33
hr
73.90
SN051
15.34
hr
83.20
SN070
15.35
hr
97.25
SN071
15.36
hr
101.65
SN072
15.37
hr
15.30
SN053
15.38
hr
26.95
SN039
15.39
hr
32.35
SN040
15.40
hr
51.40
SN052
15.41
hr
41.25
SN081
15.42
hr
13.90
SN041
15.43
hr
20.65
SN042
15.44
hr
21.60
SN054
15.45
hr
24.40
SN055
15.46
hr
64.80
SN065
15.47
hr
83.20
SN066
15.48
hr
32.35
SN045
15.49
hr
33.55
SN083
15.50
hr
16.00
SN059
Page 83 of 83
15.51
Per day
450.00
SN084
15.52
hr
78.80
SN073
15.53
hr
105.50
SN074
15.54
hr
113.00
SN075
15.55
hr
155.00
SN076
15.56
hr
171.60
SN077
15.57
hr
70.40
SN046
15.58
hr
81.70
SN047
15.59
hr
100.65
SN048
15.60
hr
141.90
SN064
15.61
hr
25.00
SN085
15.62
hr
36.00
SN086
15.63
hr
43.00
SN087
15.64
hr
70.10
SN049