COAL & ASH CALCULATION

1
2
3

Plant Capacity (MW)


Coal usage
Coal Analysis

:
:
:

350
100% Indian coal
Performance coal

GCV Kcal/kg

Ash %

3280
4
5
6
7
8

TG cycle heat rate


Boiler efficiency
Station heat rate
Plant load factor
Coal requirement

:
:
:
:
:

42.3
1900
87
2184
85

S.No.

Area requirement for coal storage - M2 :

S.No.

Note:

Density of coal
Height of pile
Plant load factor
10 (a) Distribution of total ash produced for
design of Ash Pond system
i) Bed Ash
ii) Fly Ash
(b) Height of Ash Pond
Ash generation and area requirement

0.7 TM3
8 Mt.
100%

:
:
:
:

20%
80%
15 mtrs

i) Plant load factor

ii) Ash density

TPD

7 days/T 10 days/T 15 days/T

10 days

Per year/MTY
85%
100%

1.74
1.96

2.04
2.31

15 days

Ash Generation - MT
1st Yr
5th Yr
9th Yr

Perf. Coal - Bed


- Fly
Worst Coal - Bed
- Fly
Note:

44

6991.17 9987.384 14981.1


7907.25 11296.08 16944.1

:
:
:

S.No.

Ash %

233.04 5592.935 39150.5


55929 83894.029
263.6 6325.803 44280.6 63258.03 94887.039
7 days

Performance coal
Worst coal

GCV
Kcal/kg
2900

Kcal/Kw/hr
%
Kcal/Kw/hr
%
TPH

Performance coal
Worst coal

Worst coal

0.15
0.59
0.17
0.69

85%
0.7 Ton/M3

0.73
2.94
0.88
3.53

1.31
5.46
1.55
6.22

Area Requirement - M2
1st Yr
5th Yr
9th Yr

13980.82 69904.1
55923.28 279616.4
16448.29 84044.011
65793.17
336176

125061.3
520349.6
148034.6
592138.5

5 years/MT
85%
100%

8.68
10.03

10.21
11.54

9 years/MT
85%
100%

15.52
17.66

18.37
20.78

COAL & ASH CALCULATION


1
2
3

4
5
6
7
8

Plant Capacity (MW)


Coal usage
Coal Analysis

TG cycle heat rate


Boiler efficiency
Station heat rate
Plant load factor
Coal requirement

:
135
: 100% Imported coal
Performance coal
:

:
:
:
:
:

GCV Kcal/kg

Ash %

5830

1.3
2032
85
2391
85

S.No.

Performance coal
Worst coal
9

Area requirement for coal storage - M2 :

S.No.

Density of coal
Height of pile
Plant load factor
10 (a) Distribution of total ash produced for
design of Ash Pond system
i) Bed Ash
ii) Fly Ash
(b) Height of Ash Pond
Ash generation and area requirement

TPH

TPD

55.36
63.3

1328.56
1518.727

:
:
:

0.7 TM3
8 Mt.
100%

:
:
:
:

15%
85%
15 mtrs

i) Plant load factor

ii) Ash density

10 days

1660.7 2372.429
1898.41 2712.012

S.No.

Ash Generation - MT
1st Yr
5th Yr

Perf. Coal - Bed


- Fly
Worst Coal - Bed
- Fly
Note:

GCV
Kcal/kg
5100

Kcal/Kw/hr
%
Kcal/Kw/hr
%

7 days

Performance coal
Worst coal
Note:

Worst coal

0.0008
0.0046
0.0059
0.0332

85%
0.7 Ton/M3

0.0040
0.0228
0.0300
0.1699

L & ASH CALCULATION

Worst coal

Ash %
8.3

7 days/T 10 days/T 15 days/T

Per year/MTY
85%
100%

9299.92
13286 19928.403
10631.1 15187.27 22780.9

0.41
0.47

0.48
0.55

15 days

3558.64
4068.02

Generation - MT
9th Yr

0.0072
0.2601
0.0528
0.2992

Area Requirement - M2
1st Yr
5th Yr
9th Yr

76.5
433.8
558.7
3165.9

382.7
2168.9
2854.7
16176.5

684.7
24773.7
5028.2
28493.2

5 years/MT
85%
100%

2.06
2.41

2.42
2.77

9 years/MT
85%
100%

3.69
4.24

4.36
4.99