SUMMARISED OUTPUT DATA FOR KRUPP SURFACE MINER (KSM)


Basic data:
a) Coal density - 1.10 te/cu.m (loose) b) Swell factor - 1.36 c) Effective annual loading time - 4470 hrs. d) Life of machine - 20 years e) Interest rate - 15% f) Annual interest & depreciation factor - 15.98% Dumper combination Production/hour g) KSM's nominal digging rate: 1) for coal - 1800 bcm/hour 2) for OB - 1400 bcm/hour h) Uniaxial Compressive Strength 1) for OB - 400 kg/sq.cm (40 MPa) 2) for coal - 250 kg/sq.cm (25 MPa) Production/day Annual production i) Working shifts/day - 3 j) Working hours/day - 21 k) Annual operating hours - 4470

O/O cost for coal ( Rs.per te )

O/O cost for OB ( Rs.per bcm )

Cost for conventional mining (drilling,blasting,shovelling & crushing) For coal For OB Rs.73/ per te Rs.63/ per cu.m

For coal with 110 te dumper For coal with 85 te dumper For OB with 110 te dumper For OB with 85 te dumper

1,760 te/hour 1,675 te/hour 1,340 lcu.m/hour 1,285 lcu.m/hour

36,960 te 35,165 te 28,145 lcu.m 27,000 lcu.m

7.87 million te 7.47 million te 5.99 million cu.m 5.74 million cu.m

20.46 21.59 -

37.92 39.08

NOTES: 1) Comparative study has been made as above, since, Krupp Surface Miner shall delete the job of drilling, blasting, shovelling and primary crushing for coal. 2) For conventional mining, cost of primary crushing has been considered only for coal. 3) O/O cost is estimated owning and operating cost of the machine. LEGENDS: lcu.m = loose cu.m; lcu.m/h = loose cu.m per hour; bcm = bank cu.m; te = tonne; t/h = tonne per hour; OB = overburden; MPa = Mega Pascal.