This document provides a schematic and details for a drilling assembly for a subsea well called the "Training Subsea Well" as part of the "Training Project" project. The schematic shows the bottom hole assembly for the well, which will be drilled to a total depth of 25,000 feet.
This document provides a schematic and details for a drilling assembly for a subsea well called the "Training Subsea Well" as part of the "Training Project" project. The schematic shows the bottom hole assembly for the well, which will be drilled to a total depth of 25,000 feet.
This document provides a schematic and details for a drilling assembly for a subsea well called the "Training Subsea Well" as part of the "Training Project" project. The schematic shows the bottom hole assembly for the well, which will be drilled to a total depth of 25,000 feet.
With Annual Contracts You Are Locked Into Your Rates Even As Rig Counts and Activity Decrease With A Pay-As-You-Go Model, Your Monthly Costs Go Down As Your Activity Decreases