Client: M/s. Kitco Ltd.

Soil investigation for the proposed Stadium

PROJECT : SOIL INVESTIGATION WORK FOR THE PROPOSED MULTI PURPOSE SPORTS HALL AT KOTTAYAM
Bore Hole No

GEO FOUNDATIONS Type of Boring


& STRUCTURES
Termination Depth
PVT. LTD

: BH-01
: Rotary

Boring Started

: 14.11.2013

Boring Completed

: 16.11.2013

: 14.5 M

Ground Water Level

GRAPHICAL REPRESENTATION OF N VALUE


0

N- VALUE(BLOWS)
40
60

20

80

100

0.0

1.0
11

2.0

3.0

<1

4.0
1

DEPTH(M)

5.0

6.0

7.0
1

8.0

9.0

10.0
23

11.0

12.0

59

13.0
>100

14.0

15.0

BORE HOLE TERMINATED AT 14.50 M


FIG.2
Geo Foundations Structures Pvt. Ltd

: 1.00m

: 17 :
Client: M/s. Kitco Ltd.

Soil investigation for the proposed Stadium

PROJECT : SOIL INVESTIGATION WORK FOR THE PROPOSED MULTI PURPOSE SPORTS HALL AT KOTTAYAM
Bore Hole No

GEO FOUNDATIONS Type of Boring


& STRUCTURES
Termination Depth
PVT. LTD

: BH-02
: Rotary

Boring Started

: 19.11.2013

Boring Completed

: 21.11.2013

: 16.3 M

Ground Water Level

GRAPHICAL REPRESENTATION OF N VALUE


0

20

N- VALUE(BLOWS)
40
60

80

100

0.0

1.0
8

2.0

3.0

4.0
1

DEPTH(M)

5.0

6.0

<1

7.0
<1

8.0

9.0

10.0
1

11.0

12.0

13.0
4

14.0

15.0
7
>100

16.0

BORE HOLE TERMINATED AT 16.3 M


FIG.8
Geo Foundations Structures Pvt. Ltd

: 0.50m