Project Name: Dubai Storm Water Tunnel (Detailed Design) Project No: A104435
Chamber and Box Culvert Uplift Check Designed By: PTGT
Date: 11/7/2022
1.0 Geometry
file:///conversion/tmp/activity_task_scratch/624352078.xlsx Page 1
Design Calculations
COWI COWI
Consulting Engineers
Project Name: Dubai Storm Water Tunnel (Detailed Design) Project No: A104435
Chamber and Box Culvert Uplift Check Designed By: PTGT
Date: 11/7/2022
file:///conversion/tmp/activity_task_scratch/624352078.xlsx Page 2
Design Calculations
COWI COWI
Consulting Engineers
Project Name: Dubai Storm Water Tunnel (Detailed Design) Project No: A104435
Chamber and Box Culvert Uplift Check Designed By: PTGT
Date: 11/7/2022
Bottom of Curved Base Slab for Box Culvert (BBS2) = -11.360 m (to be confirmed)
Cut-out dimensions
file:///conversion/tmp/activity_task_scratch/624352078.xlsx Page 3
Design Calculations
COWI COWI
Consulting Engineers
Project Name: Dubai Storm Water Tunnel (Detailed Design) Project No: A104435
Chamber and Box Culvert Uplift Check Designed By: PTGT
Date: 11/7/2022
This section presents the calculation of the loads applied on the robot model.
1) For chamber
Height H2 = 0.0 m
Height H1 = 15.6 m
TS Top slab
file:///conversion/tmp/activity_task_scratch/624352078.xlsx Page 4
Design Calculations
COWI COWI
Consulting Engineers
Project Name: Dubai Storm Water Tunnel (Detailed Design) Project No: A104435
Chamber and Box Culvert Uplift Check Designed By: PTGT
Date: 11/7/2022
No of sides = 2.000
Volume = 187 m³
No of sides = 1
No of sides = 2
Volume = 47 m³
1) For Chamber
No. of sides = 2
file:///conversion/tmp/activity_task_scratch/624352078.xlsx Page 5
Design Calculations
COWI COWI
Consulting Engineers
Project Name: Dubai Storm Water Tunnel (Detailed Design) Project No: A104435
Chamber and Box Culvert Uplift Check Designed By: PTGT
Date: 11/7/2022
Volume = 42 m³
No. of sides = 2
Volume = 31 m³
Volume = 89 m³
BS Base slab
1) For Chamber
file:///conversion/tmp/activity_task_scratch/624352078.xlsx Page 6
Design Calculations
COWI COWI
Consulting Engineers
Project Name: Dubai Storm Water Tunnel (Detailed Design) Project No: A104435
Chamber and Box Culvert Uplift Check Designed By: PTGT
Date: 11/7/2022
file:///conversion/tmp/activity_task_scratch/624352078.xlsx Page 7
Design Calculations
COWI COWI
Consulting Engineers
Project Name: Dubai Storm Water Tunnel (Detailed Design) Project No: A104435
Chamber and Box Culvert Uplift Check Designed By: PTGT
Date: 11/7/2022
The water pressure at the bottom of the base slab is calculated based on the design water
level. The design water level is the maximum of the following two values.
The water pressure at the bottom of the base slab is calculated based on the design water
level. The design water level is the maximum of the following two values.
Thus,
The calculation reveals that the destabilizing force is larger than the stabilizing force, i.e.
UNSAFE!
Since the structure is being uplifting under hydrostatic pressure we will consider soil backfill
2.50
The calculation reveals that the destabilizing force is larger than the stabilizing force, i.e.
Ok.
24.45
23.43
22.41
21.39
20.38
19.36
18.34
17.32
16.3
15.28
14.26
13.24
12.23
11.21
10.19
9.17
8.15
7.13
6.11
5.09
4.08
3.06
2.04
1.02
0 BASE