Introduction:
###
wall will be installed at the perimeter of excavation area to support and retain soil during excavation. After the construction of permanent structures
the space between constructed structures and secant pile wall will be backfilled and the secant pile wall will be left buried inside soil. The ground
water table is considered at surface level in the design. Before starting excavation, the ground water table is to be lowered inside the excavation
area to at least 1.0m below the excavation level and shall be maintained untill the backfilling is done. The secant pile wall is considered to be made
of 800mm diameter Primary Piles (to be drilled first) in M35 grade and 800mm diameter Secondary Piles (to be drilled as touch piles) in M35 grade.
Reduced Levels:
Ground Level = 0.0 m (Top 1.0m to be excavated on passive side before wall construction)
Ground Water Table = -40.0 m
Final Excavation Level = #REF! m
Toe level of Secant Pile Wall = #REF! m
Soil/Rock Properties:
The soil & rock properties are obtained from sub soil exploration report. The soil parameters used in Wallap analysis
are as below -
Layer-1-Fill Up: Top level of soil layer = 0.0 m (top 3m to be excavated before wall const.)
Bottom level of soil layer = -2.0 m
Cohesive / Cohesionless = Cohesionless soil
Consolidation State = Normally-Consolidated OCR = -
Soil bulk unit weight (dry), gdry = 15 kN/m 3
601014127.xlsx
Design of Secant Pile Wall
Drained Young's Modulus, E' = 10000 kN/m2 ( SPT value = 10 ) E' = 1000 x (N60) KPa
Rate of increase of modulus with depth = - kN/m 2
/m
Poisson's Ratio = 0.30
601014127.xlsx
Design of Secant Pile Wall
601014127.xlsx
Design of Secant Pile Wall
Concrete Properties:
(a) M35 Grade for Secondary Piles:
Young's Modulus, Ec = 5000 x √fck N/mm2 As per IS:456-2000, clause 6.2.3.1
Grade of concrete M35, fck = 35 N/mm 2
Creep Factor for Long Term, q = 1.1 As per IS:456-2000, clause 6.2.3.1
Considered for design calculation = 1.1
Young's modulus Ec' = Ec / (1 + q) kN/m3 (Long Term)
Young's modulus Ec' = 12598815.77 kN/m3 (Long Term)
Say, Ec' = 1.26E+07 kN/m3 (Long Term)
Creep Factor for Long Term, q = 1.1 As per IS:456-2000, clause 6.2.3.1
Considered for design calculation = 1.1
Young's modulus Ec' = Ec / (1 + q) kN/m3 (Long Term)
Young's modulus Ec' = 12598815.77 kN/m3 (Long Term)
Say, Ec' = 12598815.77 kN/m3 (Long Term)
601014127.xlsx
Design of Secant Pile Wall
Primary Piles in M 35
Spacing of Piles, S = 0.8 m
Moment of Inertia of Primary Piles, I1 = (pi * d^4) / 64 = 0.0296 m4 Ignore these in case of Touch-Piles
Modulus of elasticity of Primary Piles, Ec1 (M35 Grade) = 26457513 kN/m 2
#REF! °
601014127.xlsx
Design of Secant Pile Wall
Introduction:
###
wall will be installed at the perimeter of excavation area to support and retain soil during excavation. After the construction of permanent structures
the space between constructed structures and secant pile wall will be backfilled and the secant pile wall will be left buried inside soil. The ground
water table is considered at surface level in the design. Before starting excavation, the ground water table is to be lowered inside the excavation
area to at least 1.0m below the excavation level and shall be maintained untill the backfilling is done. The secant pile wall is considered to be made
of 800mm diameter Primary Piles (to be drilled first) in M35 grade and 800mm diameter Secondary Piles (to be drilled as touch piles) in M35 grade.
Reduced Levels:
Ground Level = 0.0 m (Top 1.0m to be excavated on passive side before wall construction)
Ground Water Table = -40.0 m
Final Excavation Level = #REF! m
Toe level of Secant Pile Wall = #REF! m
Soil/Rock Properties:
The soil & rock properties are obtained from sub soil exploration report. The soil parameters used in Wallap analysis
are as below -
Layer-1-Fill Up: Top level of soil layer = 0.0 m (top 3m to be excavated before wall const.)
Bottom level of soil layer = -2.0 m
Cohesive / Cohesionless = Cohesionless soil
Consolidation State = Normally-Consolidated OCR = -
Soil bulk unit weight (dry), gdry = 15 kN/m 3
601014127.xlsx
Design of Secant Pile Wall
Drained Young's Modulus, E' = 10000 kN/m2 ( SPT value = 10 ) E' = 1000 x (N60) Kpa
Rate of increase of modulus with depth = - kN/m 2
/m
Poisson's Ratio = 0.30
601014127.xlsx
Design of Secant Pile Wall
601014127.xlsx
Design of Secant Pile Wall
Concrete Properties:
(a) M35 Grade for Secondary Piles:
Young's Modulus, Ec = 5000 x √fck N/mm2 As per IS:456-2000, clause 6.2.3.1
Grade of concrete M35, fck = 35 N/mm 2
Creep Factor for Long Term, q = 1.1 As per IS:456-2000, clause 6.2.3.1
Considered for design calculation = 1.1
Young's modulus Ec' = Ec / (1 + q) kN/m3 (Long Term)
Young's modulus Ec' = 12598815.77 kN/m3 (Long Term)
Say, Ec' = 1.26E+07 kN/m3 (Long Term)
Creep Factor for Long Term, q = 1.1 As per IS:456-2000, clause 6.2.3.1
Considered for design calculation = 1.1
Young's modulus Ec' = Ec / (1 + q) kN/m3 (Long Term)
Young's modulus Ec' = 12598815.77 kN/m3 (Long Term)
Say, Ec' = 12598815.77 kN/m3 (Long Term)
601014127.xlsx
Design of Secant Pile Wall
Primary Piles in M 35
Spacing of Piles, S = 0.8 m
Moment of Inertia of Primary Piles, I1 = (pi * d^4) / 64 = 0.0296 m4 Ignore these in case of Touch-Piles
Modulus of elasticity of Primary Piles, Ec1 (M35 Grade) = 26457513 kN/m 2
#REF! °
601014127.xlsx
Wallap Input Parameters
Thickness of structure
D-wall = 1000 mm
Roof slab = 1000 mm
concourse = 750 mm
Base slab = 1000 mm
1.56m Backfill
122.54 (TOC)
1000mm Roof slab level= 122.04
121.54
120.59
115.54 (TOC)
750mm Concourse slab level 115.165
114.79
114.74
108.125
1000mm Base slab level= 107.625
107.125 (BOC)
` 107.05
4.50m Embedment
106.365
W.T
Note:
1) Dash line represents Excavation level below soffit/bottom of slab level
2) Top-Down approach has been adopted
3) 50mm PCC have been considered below soffit level of Roof/ Concourse slab and 75mm PCC has been considered below base slab bottom level
Ground Level 124.1 m
Base Level 107.125 m
Width of Excavation 22.2 m
Depth of Excavation 16.975 m
D-Wall Height, H 21.475 m
D-Wall Toe Elevation 102.625 m
D-Wall Thickness, B 1m
D-Wall Embedment, D 4.5 m \
Moment Load
919.64 954.80 130.24
(kNm/m)
Cut out
Moment Restraint
621900 405200 1131500
(kNm/m/rad)
Moment Load
919.64 354.23 130.24
(kNm/m)
No Cut out
Moment Restraint
621900 297500 1131500
(kNm/m/rad)
2-D FEM
No
Yes
21.475
100 Take large value for 2-D Plain Strain
0.5
22.2
32.21
11.1 Symmetric
91.89
Rough
Rough
Smooth Symmetric
Rough Full adhesion between soil & wall
Unfactored BM and SF to be considered in Structural Design:
(Touch Piles)
Pile Spacing, S = 0.6 m Secondary pile (reinforced pile) in every 0.6 m length of wall
From wallap analysis maximum unfactored UDL on waler beam = 132 kN/m
3400 mm c/c
Ground Anchor Location
PLAN VIEW
Project:
AIRPORT METRO EXPRESS LINE AMEL C1
X X
Y Depth = 150 mm
Try Section - ISA 150x150x10 Flange thickness = 10 mm
Sectional Area, A = 29.03 cm 2
Radius of gyration, rx = 4.63 cm
Centre of gravity, Cx = 4.06 cm Radius of gyration, ry = 4.63 cm
Centre of gravity, Cy = 4.06 cm Section modulus, Zx = 58 cm3
Moment of inertia, Ix = 622.4 cm4 Section modulus, Zy = 58 cm3
Moment of inertia, Iy = 622.4 cm4
Effective length of beam about X-X Axis Lex = 0.9 * #REF! (Effective length = 0.85 x L - as per IS:800)
= #REF! mm
= #REF! MPa
Y = 26.5 * 105
l2
Y = #REF! MPa
fcbx = X
= #REF! MPa
= #REF! MPa
Calculation of Actual Bending Stress sbc,act.