hw = 12 ft
Free height = 12 ft
O''
h = 20 ft
h1 = 8 ft
Pa
D = 8 ft Pw
Pp
Spacing of pile = 2 ft
Assuming D= 8.00 ft
Mo = 2 ≈ 0
If FS = 1.5
then D = 9.6 ft
O''
dia of pile = 18 in
As = 0.50% sq. in
hw = 12 ft
Free height = 12 ft
O'' 30 ft Ps
h = 27 ft
h1 = 15 ft
Pa
D = 15 ft Pw
Pp
Pp = 58 kip/ft of width
Assuming D= 15.22 ft
Mo = 1 ≈ 0
If FS = 1.5
then D = 18.264 ft
O''
dia of pile = 27 in
As = 0.50% sq. in
12 ft
O R hw = 12 ft
Free height = 26 ft
O''
30 ft
h = 36.5 ft
h1 = 25 ft
Pa
D = 11 ft Pw
Pp
Spacing of pile = 2 ft
Spacing of bracing = 8 ft
Factor of safety = 2
CALCULATION
Active earth pressure coeff = Ka = 0.295
Assuming D= 10.50 ft
Mo = 2 ≈ 0
If FS = 2
then D = 14.7 ft
R = 172.21 kip
12 ft
21.53 kip
9 kip
26 ft
14 ft 10.0 kip 14 ft
6.12 kip
O''
surcharge pressure
353.76 psf
DESIGN OF BRACED SHORE PILE (By free end method) (CONSIDERING SURCHARGE PRESSURE)
[Teng, Page 380]
12 ft
O R hw = 12 ft
D = 11 ft
D1 = 9 ft
Pp
soil pressure
= 3071.35 psf
For Granuar Soil
INPUT DATA
D1 = 9 ft , eqn = -24
Spacing of bracing = 20 ft
Factor of safety = 2
CALCULATION
Active soil pressure = Kba x yb' x h = 680.2 psf (below dredge line)
Mo = -24 ≈ 0
If FS = 2
Given length = 45 ft
(increase 30%)
Maximum moment
Ka = 0.295
13.63 kip 12 ft
Kba = 0.260
x= 19.5 ft 19.5 ft
7.5 579 psf 7.5 ft Kp = 3.852
yb' = 95 lb/ft3
Let us assume point of zero shear i.e. point of maximum moment at x below EGL
let x = 19.5 ft
equn = -0.6756
12 ft Ka = 0.295
13.63 kip
Kba = 0.260
Kp = 3.852
9.55 kip
27 ft y' = 100.770 lb/ft3
15 ft 10.8 kip 15 ft
7.02 kip yw = 62.400 lb/ft3
surcharge pressure
= 353.76 psf
DESIGN OF BRACED SHORE PILE (By free end method) (CONSIDERING SURCHARGE PRESSURE)
[Teng, Page 380]
4 ft
R 4 ft R 6 ft
O 12 ft
H = 26 ft
22 ft
22 ft 14 ft
h = 37.8 ft 30 ft
O''
Y = 2.66 ft
D 11.76 ft
D1= 9 ft
Spacing of bracing = 20 ft
CALCULATION
4 ft R 480 psf
120 x 12 = 1440 12 ft
x 0.33 = ### psf (dry)
125 x 14 = 1750
x
0.33 = ### psf (wet) 22 ft
3190 14 ft
x 0.27 = ### psf
### psf
pp'-pa' = y b' x (kp-ka') = 324.82 psf
pp'-pa' = 325 D1
surcharge pressure
= 400.00 psf
CALCULATION OF EMBEDMENT DEPTH
4 ft R 12 ft
2880 #
2880 x 4 = 11520 ft-lb 8 ft
Now,
Pp = 0.5 x 325 x D12
equ n
= Pp x X = 413424.89 D1 = 9 ft
By trial D1 = 9.101 ft
equn = 56 ≈ 0
For F.S. = 2
Pp = 13452.2 #
now
R= T/ 20 = 26834 - 13452.224 = 13381.4 #
(30% increment for bracing & wale design) 13381.4 x 1.3 = 17395.84 #
Reaction per bracing, T = 17.40 x 20 = 348 kip (Use for bracing & wale design)
Let the point of zero shear be at z below water level 4 ft R 480 psf
= 0.33 x 125 z 12 ft
= 41.7 z
Then equn is
z ft
13381.41 = 2880 + 480 z + 400.00 ( z + 6) + 0.5 x 41.7 z2 22 ft
14 ft
By trial z = 7.775 ft
### psf
equn = 0 ≈ 0
30 ft
charge pressure
6 ft
30 ft
12000 #
6 ft
30 ft
charge pressure
DESIGN OF BRACED SHORE PILE (By free end method) (WITH SURCHARGE PRESSURE)
[Teng, Page 380]
4 ft R1
O hw = 12 ft
12 ft
D = 12 ft
D1 = 9.4 ft
Pp
soil pressure
= 2924.55 psf
For Granuar Soil
INPUT DATA
D1 = 9.4 ft , eqn = -2
Spacing of bracing = 20 ft
CALCULATION
Active soil pressure = Kba x yb' x h = 680.2 psf (below dredge line)
Assuming D= 11.59 ft
Mo = -2 ≈ 0
If FS = 2
then D = 16.221 ft
R = 275.34 kip
(increase 30%)
4 ft
13.77 kip
x= 16.9 ft 16.9 ft
501 psf 12.9 ft
9.2 kip
26 ft
22 ft 10.0 kip 14 ft 804 psf 354 psf
6.12 kip
O''
Let us assume point of zero shear i.e. point of maximum moment at x below EGL
let x = 16.88 ft
equn = -1.115 kip
= ###
Ps
surcharge pressure
= 353.76 psf
Design of bracing
U channel size = 10 in
4 in
Length of bracing = 44 ft
Wt of U-channel = 30 lb/ft
212701.5 212836.8
-135.3346