5)
Design Load Computation
Interior Dimensions of Conduit
No of Cells = 1
Width = 1.5 m
Height = 1.5 m
Total Length of conduit= varies m
Unit Length of conduit= 1 m
Top Slab
Unit Weight of Soil = 18 KN / m3
Unit Weight of Concrete = 2400 Kg / m3 = 23.544 KN / m3
Depth of Fill above Top Slab = 1.50 m
Weight of Overlying Soil = 27.0 KN / m
Thickness of Slab = 300 mm
Total Width of Slab (at Top) = 2.3 m
Total Width of Slab (at bottom) = 2.3 m
Self Weight of Slab = 7.06 KN / m
Total Dead Load = 34.06 KN / m
Factor for Dead Load = 1.40
Factor for Live Load = 1.70
Side Walls
Thickness of Side Wall = 400 mm
Weight of Top Slab = 16.25 KN
Weight of Soil Over Top Slab = 62.10 KN
Height of Side Wall = 1.50 m
weight of Side wall = 14.13 KN
Total Reaction From Top Slab = 53.30 KN (Axially Compressing the Wall)
Lateral Earth Pressure on Side Wall
Earth Pressure at top of Wall = 27.00 KN / m2
Earth Pressure at Base of Wall = 64.80 KN / m2
Base Slab
Bearing Capacity of Soil = 287 KN / m2 (3 Tons per sft)
Self Weight of Box Culvert = 71.57 KN / m
Weight of Overlying Soil = 62.10 KN / m
Water Load = 22.07 KN / m *Assume Culvert Flowing at Full Depth
Bearing Pressure on Base Slab = 67.72 KN / m2 OK
Total Pressure On Base Slab = 67.72 KN / m2
Factored Total Pressure on Base Slab= 97.68 KN / m2
A 300mm B
1.5m 400mm
1.5m
D C
As road is to be provided at top of the Embsnkmrnt so Effect of Wheel Loads should also be
considered.
Factor for Live Load 1.70
Impact Factor for Slabs = 33%
Load Reduction Factor due to Fill = 0%
Wheel Load = 50.15 Kips = 223.16 KN
A B
MFAB = wl2/12+PL/8 = 64.59 KN-m
MFBA = wl2/12+PL/8 = -64.59 KN-m 52.1 52.1
MFBC = wl2/12 + wl2/30 = 11.06 KN-m
MFCB = wl2/12 +wl2/20 = -13.04 KN-m -17.9 -17.9
MFCD = wl2/12 = 27.47 KN-m
MFDC = wl2/12 = -27.47 KN-m
MFDA = wl2/12 + wl2/20 = 13.04 KN-m 19.8 19.8
Joint A B C D
Member AD AB BA BC CB CD DC DA
K 3555556 1500000 1500000 3555556 3555556 1500000 1500000 3555556
Cycle D.F. 0.7032967 0.2967033 0.2967033 0.703296703296703 0.7032967033 0.2967032967033 0.296703296703297 0.703296703296703
1 FEMs -11.06 64.59 -64.59 11.06 -13.04 27.47 -27.47 13.04
Bal -37.652 -15.884 15.884 37.652 -10.150 -4.282 4.282 10.150
2 CO 5.075 7.942 -7.942 -5.075 18.826 2.141 -2.141 -18.826
Bal -9.155 -3.862 3.862 9.155 -14.746 -6.221 6.221 14.746
3 CO 7.373 1.931 -1.931 -7.373 4.577 3.110 -3.110 -4.577
Bal -6.544 -2.761 2.761 6.544 -5.407 -2.281 2.281 5.407
4 CO 2.703 1.380 -1.380 -2.703 3.272 1.141 -1.141 -3.272
Bal -2.872 -1.212 1.212 2.872 -3.103 -1.309 1.309 3.103
5 CO 1.552 0.606 -0.606 -1.552 1.436 0.655 -0.655 -1.436
Bal -1.517 -0.640 0.640 1.517 -1.470 -0.620 0.620 1.470
6 CO 0.735 0.320 -0.320 -0.735 0.759 0.310 -0.310 -0.759
Bal -0.742 -0.313 0.313 0.742 -0.752 -0.317 0.317 0.752
7 CO 0.376 0.157 -0.157 -0.376 0.371 0.159 -0.159 -0.371
Bal -0.374 -0.158 0.158 0.374 -0.372 -0.157 0.157 0.372
8 CO 0.186 0.079 -0.079 -0.186 0.187 0.079 -0.079 -0.187
Bal -0.187 -0.079 0.079 0.187 -0.187 -0.079 0.079 0.187
9 CO 0.093 0.039 -0.039 -0.093 0.093 0.039 -0.039 -0.093
Bal -0.093 -0.039 0.039 0.093 -0.093 -0.039 0.039 0.093
10 CO 0.047 0.020 -0.020 -0.047 0.047 0.020 -0.020 -0.047
Bal -0.047 -0.020 0.020 0.047 -0.047 -0.020 0.020 0.047
11 CO 0.023 0.010 -0.010 -0.023 0.023 0.010 -0.010 -0.023
Bal -0.023 -0.010 0.010 0.023 -0.023 -0.010 0.010 0.023
12 CO 0.012 0.005 -0.005 -0.012 0.012 0.005 -0.005 -0.012
Bal -0.012 -0.005 0.005 0.012 -0.012 -0.005 0.005 0.012
13 CO 0.006 0.002 -0.002 -0.006 0.006 0.002 -0.002 -0.006
Bal -0.006 -0.002 0.002 0.006 -0.006 -0.002 0.002 0.006
14 CO 0.003 0.001 -0.001 -0.003 0.003 0.001 -0.001 -0.003
Bal -0.003 -0.001 0.001 0.003 -0.003 -0.001 0.001 0.003
15 CO 0.001 0.001 -0.001 -0.001 0.001 0.001 -0.001 -0.001
Bal -0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
Total -52.10 52.10 -52.10 52.10 -19.80 19.80 -19.80 19.80
Top Slab
(Bottom Steel)
Mu = 108.94 KN-m
b= 1000 mm
d = 300-40-19/2 250.5 mm
ρmin = 0.002
ρmax = 0.013216
ρ = 0.005007
ρ>ρmin So Use ρ Use Bar Size 19
Ast = 1254.162 mm /m 2
Spacing = 225.96 mm (Required)
Provide 19 @ 200 mm C/C Provide Spacing = 200 mm
(Top Steel)
Mu = 52.10 KN-m
b= 1000 mm
d = 300-40-12.5/2 253.75 mm
ρmin = 0.002
ρmax = 0.013216
ρ = 0.002254
ρ>ρmin So Use ρ Use Bar Size 12.5
Ast = 600 mm /m 2
Spacing = 204.43 mm (Required)
Provide 12.5 @ 200 mm C/C Provide Spacing = 200 mm
Base Slab
(Bottom Steel)
Mu = 19.80 KN-m
b= 1000 mm
d = 300-40-12.5/2 253.75 mm
ρmin = 0.002
ρmax = 0.013216
ρ = 0.000842
ρmin>ρ So Use ρmin Use Bar Size 12.5
Ast = 600 mm2/m Spacing = 204.43 mm (Required)
Provide 12.5 @ 200 mm C/C Provide Spacing = 200 mm
(Top Steel)
Mu = 141.24 KN-m
b= 1000 mm
d = 300-40-19/2 250.5 mm
ρmin = 0.002
ρmax = 0.013216
ρ = 0.006629
ρ>ρmin So Use ρ Use Bar Size 19
Ast = 1660.559 mm2/m Spacing = 170.66 mm (Required)
Designed by: Engr. Taha Jalal
Provide 19 @ 150 mm C/C Provide Spacing = 150 mm
ρmin = 0.002
ρmax = 0.013216
ρ= 0 N/A
ρmin>ρ So Use ρmin Use Bar Size 12.5
Ast = 800 mm2/m Spacing = 153.32 mm (Required)
Provide 12.5 @ 150 mm C/C Provide Spacing = 150 mm
(Outer Steel)
Mu = 52.10 KN-m
b= 1000 mm
d = 300-40-12.5/2 353.75 mm
ρmin = 0.002
ρmax = 0.013216
ρ = 0.001144
ρmin>ρ So Use ρmin Use Bar Size 12.5
Ast = 800 mm2/m Spacing = 153.32 mm (Required)
Provide 12.5 @ 150 mm C/C Provide Spacing = 150 mm
Distribution Steel
ρmin = 0.002 Use Bar Size 12.5
Ast = 800 mm2/m Spacing = 153.32 mm (Required)
Provide 12.5 @ 150 mm C/C Provide Spacing = 150 mm