You are on page 1of 222

MS Project 2010 Primavera P6

. ...

:
, ..

:
, ..
, ..

, 2012



MS Project 2010 Primavera P6


,
() , 2007-2013




, , Primavera
P6 Professional Project Management MS Project Professional 2010.
,
,


, .
,

,
. ,

, , ,
.
,
,
.

,

.
: , ,
, Primavera P6, MS Project 2010

ABSTRACT
The objective of this thesis is the comparative evaluation of the features and
capabilities of multi-project scheduling, performed by two widely used commercial
software applications, Primavera P6 Professional Project Management and MS
Project Professional 2010.
The thesis focuses on multi-project management, since it encounters more
difficulties to reconcile the requirements, constraints and relationships between
tasks and resources and reflects the needs of modern organizations in a more
realistic way, than managing projects as independent units.
The comparison was structured on a case study, which implemented the
management of three technical projects, performed partly in parallel and using
shared resources. The managing process is presented in phases, from the
introduction to the programs of enterprise and project data up to managing the
resources, defining, editing and updating the schedules and the cost. The
comparative assessment of the use of both software applications is primarily based
on literature and internet sources and is extended and concluded through the
personal experience in the exhaustive investigation of their characteristics.
The thesis describes the capabilities and weaknesses of software at each stage of
project management and evaluates the facility, speed and efficiency of their use by
organizations with different requirements and users with varying levels of
experience.

Keywords: Project Management, Multi-project scheduling, Software evaluation,


Primavera P6, MS Project 2010



MS Project 2010
Primavera P6
,
,
2011 - 2012.
.. . .
, .. . ,
...



. , ,

.
,

, Primavera P6 MS Project 2010,

.


.
MS Project

,

,
.
,

. ,

,
. ,
, MS Project 2010
Primavera P6 .

,
.


.

,
, .

,
.
,

. ,
,

.


Primavera MS Project
,
.
,
.

, . ,

. .
, 2012


1: ......................................................................................................... 1
1.1 .......................................................................... 1
1.2 PRIMAVERA P6 PROFESSIONAL PROJECT MANAGEMENT ........................................................ 4
1.3 MICROSOFT PROJECT 2010............................................................................................................ 8
2: .......................................................................... 11
3: ..................................................................... 13
3.1 ........................................................................................ 13
3.1.1 Primavera .................................................................................................................. 13
3.1.2 MS Project ................................................................................................................. 18
3.1.3 ................................................................................................................ 21
3.2 .............................................................................................. 22
3.2.1 Primavera .................................................................................................................. 23
3.2.2 MS Project ................................................................................................................. 29
3.2.3 ................................................................................................................ 34
4: ................................................................................ 37
4.1 ................................................................................ 37
4.1.1 Primavera .................................................................................................................. 37
4.1.1.1 (Enterprise Project Structure - PS).............. 37
4.1.1.2 (Organizational Breakdown Structure - OBS)... 39
4.1.1.3 (Resources) ................................................................. 41
4.1.1.4 (Roles) ..................................................................................................... 46
4.1.2 MS Project ................................................................................................................. 47
4.1.2.1 (Resource Sheet & Resource Pool) ..................... 48
4.1.3 ................................................................................................................ 50
4.2 (CALENDARS) .......................................................................... 52
4.2.1 Primavera .................................................................................................................. 52
4.2.2 MS Project ................................................................................................................. 54
4.2.3 ................................................................................................................ 55
4.3 ...................................................................................................................... 56
4.3.1 Primavera .................................................................................................................. 56
4.3.2 MS Project ................................................................................................................. 64
4.3.3 ................................................................................................................ 66
4.4 (WBS) ........................................................................................... 67
4.4.1 Primavera .................................................................................................................. 68
4.4.2 MS Project ................................................................................................................. 71
4.4.3 ................................................................................................................ 72

4.5 (ACTIVITIES)................................................................................ 73
4.5.1 Primavera .................................................................................................................. 75
4.5.1.1 ............................................................................... 75
4.5.1.2 .................................................................. 76
4.5.1.3 ................................................................... 85
4.5.1.4 (Relationships) ........................................................... 90
4.5.1.5 ...................................................... 94
4.5.2 MS Project ................................................................................................................. 95
4.5.2.1 ............................................................................... 95
4.5.2.2 ........................................................................................ 99
4.5.2.3 ............................................................ 100
4.5.2.4 ....................................................... 101
4.5.3 .............................................................................................................. 103
4.6 (RESOURCES & EXPENSES) ............................................. 105
4.6.1 Primavera ................................................................................................................ 105
4.6.1.1 ............................................................................. 105
4.6.1.2 (Expenses) ...................................................................... 110
4.6.2 MS Project ............................................................................................................... 111
4.6.3 .............................................................................................................. 115
5: .......................... 117
5.1 (SCHEDULE)................................................................. 117
5.1.1 Primavera ................................................................................................................ 117
5.1.2 MS Project ............................................................................................................... 121
5.1.3 .............................................................................................................. 125
5.2 (CRITICAL PATH) ..................................................................................... 126
5.2.1 Primavera ................................................................................................................ 126
5.2.2 MS Project ............................................................................................................... 130
5.2.3 .............................................................................................................. 133
5.3 (LEVELING) ........................................................................................ 133
5.3.1 Primavera ................................................................................................................ 133
5.3.1.1 ..................................................................... 133
5.3.1.2 ............................................................................ 136
5.3.1.3 ............................................................................ 138
5.3.2 MS Project ............................................................................................................... 144
5.3.2.1 ..................................................................... 144
5.3.2.2 ............................................................................ 146
5.3.3 .............................................................................................................. 151
6: ..................................................................... 155
6.1 (BASELINES)......................................................................... 155
6.1.1 Primavera ................................................................................................................ 156
6.1.1.1 (Baselines) ........................................................ 156
6.1.1.2 ............................................................... 158

6.1.2 MS Project ............................................................................................................... 160


6.1.3 .............................................................................................................. 162
6.2 (UPDATE PROJECTS) .................................................. 163
6.2.1 Primavera ................................................................................................................ 164
6.2.1.1 ........................................................................................... 165
6.2.1.2 ..................................................................................... 166
6.2.1.3 ................................................................................. 169
6.2.1.4 ............................................................................... 172
6.2.2 MS Project ............................................................................................................... 174
6.2.2.1 ........................................................................................... 174
6.2.2.2 ..................................................................................... 175
6.2.2.3 ................................................................................. 176
6.2.3 .............................................................................................................. 180
6.3 (EARNED VALUE ANALYSIS EVA)............................ 182
6.3.1 Primavera ................................................................................................................ 183
6.3.1.1 ........................................................................................... 183
6.3.1.2 EVA .......................................................................... 185
6.3.2 MS Project ............................................................................................................... 186
6.3.2.1 ........................................................................................... 186
6.3.2.2 EVA .......................................................................... 186
6.3.3 .............................................................................................................. 189
6.4 (COMPARE PROJECTS) .................................................................................. 190
6.4.1 Primavera ................................................................................................................ 190
6.4.2 MS Project ............................................................................................................... 192
6.4.3 .............................................................................................................. 193
7: PRIMAVERA .................................................. 195
7.1 (REFLECTIONS) .................................................... 195
7.2 (ISSUES & THRESHOLDS)....................... 196
7.3 (PROJECT RISKS) ................................................................................. 198
8: .................................................................................. 201
............................................................................................................. 204


PRIMAVERA
3.1: Primavera P6....................... 13
3.2: .................................................... 14
3.3: ............................. 15
3.4: ............................ 16
3.5: .................................... 16
3.6: ........................................ 17
3.7: ......................... 17
3.8: ................ 18
3.15: .................... 24
3.20: ........... 28
3.21: ... 28
3.22: ................ 29
4.1: ......................................... 38
4.2: ............................................. 40
4.3: OBS 40
4.4: ............................................. 42
4.5: ................. 42
4.6: ..................................... 43
4.7: , , /. ........... 43
4.8: / . 44
4.9: ........................................ 44
4.10: .......................... 45
4.11:
Timesheets .............................................................................................................................. 45
4.12: .................................................... 46
4.16: ................................ 52
4.17: . 53
4.18: ........................................ 53
4.19: ............ 54
4.20: ......................... 55
4.21: EPS ................................. 56
4.22: ................ 57

4.23: .............................................................. 58
4.24: ....... 58
4.25: 59
4.26: ................................... 60
4.27: , EVA 60
4.29: .................................................... 62
4.30: Gantt.............................. 62
4.31: ............................... 62
4.32: ................... 63
4.33: Primavera.................................... 64
4.36: WBS ...................... 68
4.37: WBS Gantt.......... 68
4.38: WBS ............................. 69
4.39: WBS .......................................................... 70
4.40: WBS
.................................................................................................................................... 70
4.41: EVA ... 71
4.43: WBS
...................................................................................................................... 75
4.44: ................... 76
4.45: ...................... 77
4.46: WBS ....................................... 79
4.47: Project A: ..................... 83
4.48: Project : ....................... 84
4.49: Project C: .. 85
4.50: . 86
4.51: Project A ............................. 89
4.52: Project B.............................. 89
4.53: Project C.............................. 90
4.54: .............. 91
4.55:
....................................................................................................................... 92
4.56: .... 94
4.64: .............................. 107
4.65: ........................... 107
4.66: .......................... 107

4.67:
....................................................................................................................... 108
4.68: .................. 109
4.69: ..................................... 109
4.70: Expenses.... 110
4.71: Expenses 111
5.1: ......................................... 118
5.2: .................................................. 118
5.3: Project A .............................................................. 119
5.4 Project B ............................................................... 120
5.5: Project C .............................................................. 120
5.6: .......................................................... 121
5.11: Project A........................................................... 128
5.12: Project ........................................................... 129
5.13: Project C ........................................................... 129
5.18: .............................................................. 134
5.19: ....................................................... 134
5.20: ......................................... 135
5.21: .................................. 136
5.22: ............................ 137
5.23: Primavera .. 139
5.24: ...................... 141
5.25: *.txt ...................................... 144
6.1: ............................................................ 157
6.2: ................................. 158
6.3:
............................................................................................................................................... 159
6.4: Gantt ............................... 159
6.8: ...................................................... 166
6.9: Auto Compute Actuals .................... 167
6.10: Auto Compute Actuals ............................. 168
6.11: Apply Actuals .................................................................... 168
6.12: Store Period Performance ................................................ 169
6.13: Duration ..... 171
6.14:
.................................................................................................................................... 171
6.15: Units % Cmp . 172

6.16: Physical ...... 172


6.17: 173
6.18: Current VS Baseline Schedule Analysis ............................. 174
6.25: ..................... 184
6.26: Earned Value for WBS and Activities .................................... 185
6.27: EVA ............................... 185
6.33: .................................. 191
6.34: HTML BL1 ............... 191
7.1: Reflection ....... 196
7.2: ................................................. 197
7.3: .................... 198
7.4: WBS ................................................... 199
7.5: .................... 199
7.6:
..................................................................................................................................... 200

MS PROJECT
3.9: File ................................. 19
3.10: Gantt Chart ..... 19
3.11: (Timeline) ............................. 20
3.12: , ............ 20
3.13: ................................................... 21
3.14: .............. 21
3.16: 25
3.17: ....................... 25
3.18: ................................................................ 26
3.19: Task Inspector ................... 28
3.23: ............................................... 30
3.24: 31
3.25: & 32
3.26: /
........................................................................................................................ 33
3.27:
EVA .................................................................................................... 34
4.13: Master Project ........................................................... 47
4.14: Master Project ............................................... 48

4.15: ........................................................... 50
4.34: .................................................................... 65
4.35: ........................................................................ 65
4.42: WBS Indent / Outdent Task .................... 72
4.57: Project A..................................................... 96
4.58: ............... 96
4.59: ... 97
4.60: Project A ................................................................. 100
4.61: Project ........................................... 101
4.62: Task Information (Predecessors) ...... 102
4.63: Project .......................................................... 102
4.72: ............................................. 112
4.73: ......... 113
4.74: Generic Budget 114
5.7: ...................................... 121
5.8: Project A .............................................................. 123
5.9: Project B .............................................................. 124
5.10: Project C ............................................................ 124
5.14: ............... 130
5.15: Project ........................................................... 131
5.16: Project ........................................................... 132
5.17: Project C ........................................................... 132
5.26: ................................................ 145
5.27: ................................ 145
5.28: ......................................... 146
5.29: .................................. 146
5.30: MS Project ......................... 149
5.31: Leveling Gantt .............. 150
5.32: Leveling Gantt
........................................................................................................................ 151
6.5: ................................................................. 160
6.6: ............................................................. 161
6.7: ......... 162
6.19: ..................................................... 175
6.20:
........................................................................................................................ 177

6.21: ....................... 177


6.22: ..... 178
6.23:
.................................................................................................................... 178
6.24:
................................................................................................................................. 179
6.28: EVA ........................................... 186
6.29: Project A (20% ) ...... 187
6.30: Project A (60% ) .... 187
6.31: EVA ................................... 188
6.32: EV Excel ................ 188
6.35: .................................. 192
6.36: ............................................................................ 193


3.1: ..............35
4.1: ........................................ 51
4.2: ..................................................................... 67
4.3: WBS ........................................................ 73
4.4: ..................................................... 74
4.5: , ,
........................................................................................................... 98
4.6: .................................... 104
4.7:
.................................................................................................................... 106
4.8: .......................... 116
5.1: ............................................. 126
5.2: Primavera .................. 139
5.3: Primavera ................... 142
5.4: MS Project .............................. 149
5.5: .................................................................. 153
6.1: ............................................................. 163
6.2: ...................................................... 181
6.3: ...................................... 190


MS Project 2010 Primavera P6

1.1

,
, . ,
,

,
.

. ,
,


.

.


.
,

,

.

|1

: & 2011-2012

( ,
, )

,
.

:

(CPM, PERT)


(Work Breakdown Structure WBS)




,
( )
()



( , )
( , , ..)
,

2|


MS Project 2010 Primavera P6

.
.
:
, ,




/
(client server architecture)



(open source), ,
,
GNU General Public Licence.
1 :
Clarizen
Tenrox Project Management
Daptiv PPM
Genius Project
EPM Live
Microsoft Project
Primavera Project Planner
Primavera Enterprise Project Portfolio Management
2 :
Collabtive

|3

: & 2011-2012

Redmine
Project Pier
Trac
KForge
dotProject
TaskJuggler

(webbased applications).
.

,
, Microsoft Project
Professional 2010 Primavera P6 Professional Project Management.


,
.

1.2 PRIMAVERA P6 PROFESSIONAL PROJECT MANAGEMENT


Primavera 1983
Primavera Systems Inc. 2008,
Oracle Corporation.
,
,
.
,

, ,
.

4|


MS Project 2010 Primavera P6

Windows,
/ (client/server architecture),
(Web-enabled technology)
(SQL Server Express),
(network-based, Oracle and Microsoft SQL
Server).
Primavera P6 Professional Project Management

Primavera Enterprise Project Portfolio Management.

.
100.000 .

Primavera P6 :
Primavera P6 Enterprise Project Portfolio Management:
, ,
,
.
Primavera Portfolio Management:

.
Primavera Risk Analysis:


.
Primavera Contract Management:
, ,
.

|5

: & 2011-2012

Primavera Earned Value Management:



.
Primavera P6
:
Project Management:
.


.
Primavera (PMDB)
(EPS)
, , , ,
(WBS), ,
.
Oracle SQL Server,
SQL Server
Express.
Methodology Management:

(MMDB). ,
,
.
(Project Management)
Project Architect Wizard,
. ,

.

6|


MS Project 2010 Primavera P6

Timesheets: Primavera

. Timesheets
,

.
Primavera's Web Application: Web Primavera

.
,

. ,
.
ProjectLink: ProjectLink
Microsoft Project (MSP) MSP,
Primavera Enterprise.
MSP
Primavera, MSP.
Primavera

MSP.

ProjectLink

MSP,

Primavera.
Primavera MS Project
Primavera Project Management
Primavera Enterprise Primavera Project Planner,
Excel.

|7

: & 2011-2012

1.3 MICROSOFT PROJECT 2010


Microsoft Project (MSP) ,
1984 Microsoft,
(project manager)
,

.
,
(file-based),

.
Microsoft Project Professional 2010
Microsoft Enterprise Project Management
(EPM) ,

,
.
Microsoft MS Project Server
2010, MS
Project Portfolio Server 2007. MS Project Server 2010
MSP
(SQL Server), .
,

.
Project Web App

. , Microsoft SharePoint Workspace
2010

8|


MS Project 2010 Primavera P6

|9

: & 2011-2012

10 |


MS Project 2010 Primavera P6


, Primavera P6 Professional Project Management
MS Project Professional 2010,
.

,
,
.

,
.
,
. ,

, .


.

,
.

|11

: & 2011-2012

,
,


.
:
1. (Project )
2. (Project B)
3. (Project C)

,

,
. .

MS Project 2010 :
.
.

MS Project 2010
(managing multiple projects).
.
Earned Value Analysis
.
Primavera P6


.

12 |


MS Project 2010 Primavera P6

3.1
3.1.1 Primavera
Primavera P6 Project Management

Microsoft,
.

.

3.1: Primavera P6


.
.

|13

: & 2011-2012

,

. , Edit Undo

. ,
, ,
, ,
, .
,
.
.1 ,
.

, .

3.2:

.2,
, .3

.

14 |


MS Project 2010 Primavera P6

3.3:

:
Primavera ,
. ,
(Display Layout),
Display/Layout
Columns.
( 3.4, 3.5).

|15

: & 2011-2012

3.4:

3.5:

, Primavera
, .
Display/Layout Filter By
Display/Layout Group and Sort By.

16 |


MS Project 2010 Primavera P6

Primavera
,
,
,
.

3.6:

3.7:

|17

: & 2011-2012

3.8:

3.1.2 MS Project
MS Project 2010 MS
Office 2010,
.

(Ribbon)
.
File ,
,
( 3.9).

3.10
Gantt.
, ,
,
Task View More Views.

18 |


MS Project 2010 Primavera P6

3.9: File

3.10: Gantt Chart

|19

: & 2011-2012

, MS Project 2010
(Timeline),

Copy Timeline ( 3.11).

3.11: (Timeline)

,
Add New Column
.
,
View Data Sort/ Highlight/
Filter/ Group by.

3.12: ,

20 |


MS Project 2010 Primavera P6

3.13:

3.14:

3.1.3
MS Project
,
MS Office
.

|21

: & 2011-2012


Undo Save MS Project,
Primavera,
,
.

,
.
,
Primavera
.
,
Primavera,

.
,

(,

, , , , ) Primavera,

.

3.2

,
.


.
, ,
,
22 |


MS Project 2010 Primavera P6


,
,
,
,
.

3.2.1 Primavera

Primavera,
.
Admin
Admin Preferences Edit User Preferences.


.

Admin Preferences

. ,

(Timesheets module), ,

. , (Data Limits, ID
Lengths), EPS, OBS WBS,

.

, , ,

|23

: & 2011-2012


.
Earned Value
(Earned Value Analysis EVA).
,
3.17,

(Performance percent complete),


.

, % ,
. ,
,
Use WBS milestones.
,
.

3.15:

24 |


MS Project 2010 Primavera P6

3.16:

3.17:

|25

: & 2011-2012

Admin Categories
Primavera
(project controls coordinator)

.

,
:


, WBS




3.18:

26 |


MS Project 2010 Primavera P6

User Preferences


Primavera.
Time Units
(Units) (Durations). ,
,
. ,
(Units/Time) h/d % . ( 3.20)
Resource
Analysis,
(Resource Usage
Profile). ( 3.21)
Calculations

, ,
/ .
,

.

.
MS Project
Task Inspector,

Units, Duration, Work, :
Work = Units x Duration

|27

: & 2011-2012

3.19: Task Inspector MS Project

3.20:

3.21:

28 |


MS Project 2010 Primavera P6

3.22:

3.2.2 MS Project
MS Project
,

,
File Options.


.
Display:
,
.

|29

: & 2011-2012

3.23:

Schedule: ,
,
( )
( ).
,
,
. ,
,
, ,
.

30 |


MS Project 2010 Primavera P6

,

,
,
,
,
.
08:00..
04:00.,
(Fixed Units)
(New tasks are effort driven).
3.24 3.25.

3.24:

|31

: & 2011-2012

3.25:

Advanced:
, ,
/
Gantt. ,

(EVA). ,
,
.

32 |


MS Project 2010 Primavera P6

3.26: /

|33

: & 2011-2012

3.27:
EVA

3.2.3

,
,
.

MS Project

34 |


MS Project 2010 Primavera P6

, Primavera
(EPS) .
Primavera
MS Project, EPS
EPS, , WBS

.
,
Primavera.

3.1:

Primavera
*1.
*2.
3. EPS
4.
5. WBS
6.

MS Project
*1.
2.

*
. ,
.

|35

: & 2011-2012

36 |


MS Project 2010 Primavera P6

4

4.1

,
,
.

4.1.1 Primavera
Primavera
,

, . ,

.

4.1.1.1 (Enterprise Project Structure - PS)


Primavera
,
.

.
, ,
(EPS).
EPS ,
. ,

|37

: & 2011-2012

4.1, ,
, ,
.
EPS.
File
Select Project Portfolio EPS
Enterprise Enterprise Project Structure.

.

Responsible Manager Browse.

4.1:


2012, ,
4.1.
, Industrial OBS,
, OBS.
38 |


MS Project 2010 Primavera P6

4.1.1.2 (Organizational Breakdown Structure - OBS)


.


OBS . OBS

,
.
OBS .
, OBS
EPS . OBS EPS
,
. , OBS
,
.
OBS Enterprise OBS.
Add
Del./Merge,
Users EPS
Responsibility.
,

Industrial
.

|39

: & 2011-2012

4.2:

4.3: OBS

40 |


MS Project 2010 Primavera P6

4.1.1.3 (Resources)

,
.
,
,

.
,
.
Primavera (Labor),
(Nonlabor) (Material).

,
. ,
,
.
,
- ,
.
Enterprise Resources,
Resources.
4.4.

|41

: & 2011-2012

4.4:

Display Details,
. , :
1. General :
, ID ,
ID
, ,
(Active ).

4.5:

42 |


MS Project 2010 Primavera P6

2. Codes :

,
.

4.6:

3. Details :
(Labor Nonlabor Material),
,
. ,
/
(. Default Units/Time = 8h/d ). ,


(Timesheets)
.

4.7: , , /.

|43

: & 2011-2012

4. Units & Prices :


,
.
(Max Units/Time) h/d, %,
Edit User Preferences Time Units.
8h/d, 16h/d 200% ,

. ,

(Add Effective Date).

4.8: /

5. Roles :
.

4.9:

44 |


MS Project 2010 Primavera P6

6. Notes :
. ,
.

4.10:

7. Timesheets :


.

4.11: Timesheets


,
MS Project
. ,
(Expense) . ,

|45

: & 2011-2012

Auto Compute Actuals,


,
.

4.1.1.4 (Roles)
Primavera
(Roles),
.
, ,

.
,
, ,
Enterprise Roles
,
.
,

.

4.12:

46 |


MS Project 2010 Primavera P6

4.1.2 MS Project

MS

Project


.
,
Microsoft
, Project Portfolio Management Sharepoint.
,

.

Master Project
. Master Project
EPS,
. Master
Project ,
Master Project , Project
Insert Subproject.

4.13: Master Project

|47

: & 2011-2012

4.1.2.1 (Resource Sheet & Resource Pool)


, MS Project
.
Resource Sheet

.


, Master Project
, .
.mpp,
,
(Task View Resource Sheet).
Master Project,
, Resource Resource Pool Share Resources.

4.14: Master Project

:
(resource name)
(type),
(work, material or cost)

48 |


MS Project 2010 Primavera P6

(material label)
(initials)
(group)
(max. units)
(std. rate)
(ovt. rate)
(cost/use)
(accrue at),
, , (start, prorated,
end)
(base calendar)
(code)
(Work)
.
, ( )
. , ,
.
(Material)
.
,
.
, (Cost)


.
.

, ,
.

|49

: & 2011-2012

4.15:

4.1.3
Primavera
MS Project,
,

.
, ,
,

. ,

.
, EPS OBS
MS
Project ,
50 |


MS Project 2010 Primavera P6

Primavera,

.
Primavera
MS Project. MS Project

Excel,
,
.mpp.
Master Project

.

,

. , Master Project
,
,
.
Primavera,

EPS.
4.1:

Primavera
1. EPS
2. OBS
3. /

MS Project
1.

2.
*3.

Master Project
* ,
.

|51

: & 2011-2012

4.2 (CALENDARS)


, .
,
.

4.2.1 Primavera
Primavera
(Global),
. Enterprise
Calendars
. Default,
.
Modify
(Work) (Nonwork),
(Workweek)
(Exception). ,
,
.

4.16:

52 |


MS Project 2010 Primavera P6

4.17:

4.18:

|53

: & 2011-2012

4.2.2 MS Project
MS Project
Project Properties Change Working Time.
Standard ,
(Night Shift) 24 (24 Hours),
Create New Calendar.
Exceptions Work
Weeks, ,
. ,

Exceptions Details, ..
.
,
,
,
.

4.19:

54 |


MS Project 2010 Primavera P6

4.20:

4.2.3
,
.
MS Project
Primavera.

(Template)
.
, Primavera

, - .

|55

: & 2011-2012

4.3


, ,
.
,
.

4.3.1 Primavera
,
Projects.
EPS .
Add .
,
(
4.22).

4.21: EPS

56 |


MS Project 2010 Primavera P6

4.22:


Display Show on
Bottom Project Details.
:
1. General : ID ,
,
.
, ,

|57

: & 2011-2012

- (Active, Inactive, Planned, What if).




EPS .
1 5, 1 5 . ,
1 ( ) 100
( ).
10.

4.23:

2. Dates :
(Planned Start),
(Data Date)
(Must Finish By). Finish

,
.

4.24:

58 |


MS Project 2010 Primavera P6

3. Notebook :
, .
4. Defaults :
,
. , ,
, ,

.
.

4.25:

5. Resources :
Timesheets. ,
Price/Unit
. Drive activity dates by default
,
Resources can be assigned to the same activity more than once
.

|59

: & 2011-2012

4.26:

6. Settings :
,
,
,
.

4.27: , EVA

7. Calculations :
. ,

Price/Unit

60 |


MS Project 2010 Primavera P6

( )
. ,

,
.
,
, Add Actual to Remaining
(At
Completion = Actual + Remaining).
. , Subtract Actual from At
Completion, At
Completion Actual. ,
,


,
.

4.28:

Projects
, , Gantt
. Layout Show on
Top Project Table/Gantt Chart/Chart View.

|61

: & 2011-2012

4.29:

4.30: Gantt

4.31:

62 |


MS Project 2010 Primavera P6

Primavera ,
,
( 4.32).
Copy Paste. ,
Primavera MS Project File
Import, File
Project Architect,
Methodology Management.

, .

4.32:

|63

: & 2011-2012

4.33: Primavera

4.3.2 MS Project
MS Project
. File New
(Template), ,
MS Excel SharePoint,
Microsoft.
,
, File Options.
(Start Date),
(Status Date), ,

Project Properties Project Information.

64 |


MS Project 2010 Primavera P6

4.34:

4.35:

|65

: & 2011-2012

4.3.3
,
Primavera , MS Project,

. , MS Project
. ,
,
Primavera ,
.

MS Project,
Project Information
. ,
Primavera

.
, ,

, ,
.

66 |


MS Project 2010 Primavera P6
4.2:

Primavera
MS Project
1.
1.
EPS
(Blank Project)
2.
*2.


*3.
3.


:
:
1. 1.

2.


**2.
3.
.
Microsoft
3.

Methodology
Management
*
,
** Import
MS Project

4.4 (WBS)
(Work Breakdown Structure - WBS)
,
(activities/tasks) .
WBS .
WBS ,
3 4, .

.
,
WBS,

.

|67

: & 2011-2012

4.4.1 Primavera
WBS Primavera.

,

.
WBS
Project WBS WBS .
WBS 4.37 ,
Gantt .
WBS,
WBS .

4.36: WBS

4.37: WBS Gantt

68 |


MS Project 2010 Primavera P6

4.38: WBS

Layout Show on Bottom WBS Details


WBS, ,
WBS ,
, , ()
.

|69

: & 2011-2012

4.39: WBS

Budget Log, Spending Plan, Budget Summary


WBS,

.
,
,
(WBS milestones),
WBS . ,
WBS
, Complete .
WBS

Admin Preferences Earned Value Use WBS milestones
Earned Value, .

4.40: WBS

70 |


MS Project 2010 Primavera P6

WBS
WPs & Docs,
. ,
Earned Value , ,
.

4.41: EVA

4.4.2 MS Project
MS Project WBS.
WBS
Task Schedule
Indent/Outdent, (Summary Tasks).
Format Show/Hide
Outline Number.
WBS

,
, . ,
,
(.. ).

|71

: & 2011-2012

4.42: WBS Indent / Outdent Task

4.4.3
, ,
Primavera,
.
. WBS
,

.
MS Project WBS,
Primavera,

.
, MS Project WBS
,
72 |


MS Project 2010 Primavera P6


.
4.3: WBS

Primavera
MS Project
1.
1.
2. WBS

WBS
2. WBS
3.
Indent/Outdent Task
WBS
3.
4.

EVA

,


**4.
*5.

:
1. 2



WBS
*
**. Primavera
WBS Summary

4.5 (ACTIVITIES)

WBS,
.


.
,
.

|73

: & 2011-2012

OBS & WBS

ID &



= x .

&

4.4:

74 |


MS Project 2010 Primavera P6


,
.

.
.

4.5.1 Primavera

Primavera

, .

4.5.1.1

Activities.
4.43 WBS
. , WBS
Add.

4.43: WBS

|75

: & 2011-2012


(Edit User Preferences
Assistance Use New Activity Wizard),

.

4.44:

,
(Layout
Show on Bottom Activity Details).

4.5.1.2
General

, ,
Project Details Defaults.
ID, , ,
, ,
.
76 |


MS Project 2010 Primavera P6

4.45:

:
1. Task Dependent:
.
2. Resource Dependent:

.
3. Level of Effort (LOE):
/ .
LOE
.
,
, .
4. Start Milestone:
.
. ,
.
.

|77

: & 2011-2012

5. Finish Milestone:
.
. ,
.
.
6. WBS Summary:

WBS.

,

.
,
WBS,
WBS Summary,
.
WBS.

Primavera,

,
WBS Task
Dependent .

78 |


MS Project 2010 Primavera P6

4.46: WBS

: ,
.

.
:

() = / x
()
Remaining Units (resource) = Units/Time x Remaining Duration (activity)

Fixed Duration & Units/Time Fixed Duration & Units



. ,

|79

: & 2011-2012

.
task dependent .


.
Fixed Duration & Units/Time
/
.
:

= / x

Fixed Duration & Units


/
:

/ = /

Fixed Units/Time
.
/
.
resource dependent .
Fixed Units
( ) ,

. ,

/
.

80 |


MS Project 2010 Primavera P6

.
resource dependent .

/
(Fixed Units/Time),

8 .
Fixed Units MS Project.
Fixed Units Primavera,
MS Project,
Primavera
MS Project Fixed Work.
:
(Primavera MS Project)
Fixed Units Fixed Work
Fixed Units/Time Fixed Units

% :
(% Complete Type)
(Duration), (Units)
(Physical). :
Duration

.
Units

.
Physical

|81

: & 2011-2012

.

, .
Duration %
Complete,
.

82 |


MS Project 2010 Primavera P6

4.47: Project A:

|83

: & 2011-2012

4.48: Project :

84 |


MS Project 2010 Primavera P6

4.49: Project C:

4.5.1.3
(Status)

,
, , , .

|85

: & 2011-2012

,
.

.

4.50:

: :

Original Duration:
.

Actual Duration:
,
.

Remaining

Duration:

At Complete Duration:
(At Complete
Duration = Actual Duration + Remaining Duration).

Total Float:

.

Free Float:

.

86 |


MS Project 2010 Primavera P6


.
:
.

Started:
. ,

.

Finished:
. ,

.

Exp Finish:
.

:

.

.


.

.
: As late as possible, Finish on, Finish on or after, Finish on or before,
Mandatory start, Mantatory finish, Start on.
:
,

|87

: & 2011-2012


. ,
,
. :
Budgeted: /
.
Actual: /
.
Remaining: /

.
At Complete: /
.
,
,
Link Budget and At Completion for not started activities
(Project Details Calculations).
,
.

88 |


MS Project 2010 Primavera P6

4.51: Project A

4.52: Project B

|89

: & 2011-2012

4.53: Project C

4.5.1.4 (Relationships)


. ,
Gantt
,
(Tools Schedule
Options).
,

EPS.
( what-if
inactive )
.

90 |


MS Project 2010 Primavera P6

,
. (Activity Network)
,
Gantt (Gantt Chart) .
,

EPS.

4.54:

Gantt
,
.

.

|91

: & 2011-2012

4.55:

:
(Predecessors) (Successors),
, :
Finish to start:

.
Finish to finish:

.
Start to start:

.
Start to finish:

. .
, Lag

,
.

92 |


MS Project 2010 Primavera P6

Primavera
. ,

. ,
.
,
.
Primavera
.

Primavera
(Dissolve). ,
,
.
Primavera
.

, Tools Global Change.
(..
)
. 4.56
,
.

|93

: & 2011-2012

4.56:

4.5.1.5
,
:
:
.
:

.
:
.
.
:
.
94 |


MS Project 2010 Primavera P6

: .
,
.
:
Timesheets.
WPs

.
:
.
:
.

4.5.2 MS Project
MS Project
,
(Tasks - ) (Summary Tasks
).

4.5.2.1

(Task Sheet), Excel.


.


File Options
(Task Information). ,

|95

: & 2011-2012


, Ctrl.

4.57: Project A

4.58:

96 |


MS Project 2010 Primavera P6

4.59:

General ,
, , ,
. ID
.

Advanced

.
,
, ,
,
.
: (Task Type),
Primavera (Duration Type)
:
= x
Work = Units x Duration

|97

: & 2011-2012

, , (Fixed
Duration), (Fixed Work) (Fixed
Units) (Effort Driven),
.
(fixed)
MS Project,
.
.
, Effort Driven.
, ,
.
4.5: , ,

MS Project
Primavera,
.
, Mark Task as Milestone,
Scheduling ignores resource calendars,

.

98 |


MS Project 2010 Primavera P6

:
. MS Project
:
(% Complete):

.
.
(Physical % Complete):


. , 4 , 50%
, 25%
,
.

4.5.2.2
, (WBS)
.
-
. Schedule Indent
Task Task. ,
Indent
- .

Auto Scheduled.

|99

: & 2011-2012

4.60: Project A

4.5.2.3
duration
.
,
Auto Scheduled.
manual schedule
.
, - (milestones)
(0) .

, .

100 |


MS Project 2010 Primavera P6

4.61: Project

4.5.2.4
.
:
1. Information Properties Task (
)
Task Information ( 4.62).
2. Predecessors
Task name
.
3.
Finish-to-Start (FS), Start-to-Start (SS), Finish-to-Finish (FF), Start-toFinish (SF) Type.
4. (lead &
lag time) ,

, (FS, FF, SS). O
Lag.

|101

: & 2011-2012

5. ,

Gantt ( 4.63).

(FS)
Task Schedule Link Tasks

File Options Schedule Autolink inserted or moved tasks.

4.62: Task Information ( Predecessors)

4.63: Project

102 |


MS Project 2010 Primavera P6

4.5.3
,
,
, ,
.
, MS Project

,
Excel

WBS. ,
,
Excel, Ctrl
.
Primavera
(Global
Change).
,
, Primavera
,
.
,
.
MS Project
Mark Task as Milestone Scheduling ignores resource calendars

Indent task.
,

|103

: & 2011-2012

Primavera,

.
, Primavera
,
,

.
, Primavera
ID ,

. , ,

.
4.6:

1.
2.

3.
4.

Primavera

WBS




104 |

1.
2.
3.

4.
5.

MS Project


WBS
Indent/Outdent Task




MS Project 2010 Primavera P6

4.6 (RESOURCES & EXPENSES)




.
,
.

,
.
,
,
.


.

.

4.6.1 Primavera
4.6.1.1
Resources
Add Resource.
,
. ,
Add Role
Assign by Role.

/
Default Units/Time Details .

|105

: & 2011-2012


, , .. 16h/d
.
,
:

Budgeted Units = Budgeted Units/Time x Original Duration


Budgeted Cost = Price/Unit x Budgeted Units

,
,

.

Edit User Preferences Calculations.

.
4.7:

/
, ..

Fixed Units

Fixed
Duration &
Units

Fixed
Units/Time
Fixed
Duration &
Units/Time

106 |


MS Project 2010 Primavera P6

4.64:

4.65:

4.66:

(Add Role):

Add Role.
Assign by Role,
.

|107

: & 2011-2012

Calculations
.

4.67:

(Curves): Primavera
,
, .
,
.

.

,

Enterprise Resource Curves. 20
5%

.

108 |


MS Project 2010 Primavera P6


,
. ,
Fixed Duration & Units Fixed Duration & Units/Time.

4.68:

4.69:

|109

: & 2011-2012

4.6.1.2 (Expenses)

,
. ,
,
.
Expenses
Expenses .
,
, ,
.

:

Start of Activity:
.

End of Activity:
.

Uniform Over Activity:


.

,
.
,
.

4.70: Expenses

110 |


MS Project 2010 Primavera P6

4.71: Expenses

4.6.2 MS Project

,
.
, (Work,
Material, Cost) , ,

Resources ,
4.72
Resource Assignments Assign Resources. ,
Resources
,

100%.

|111

: & 2011-2012



, ,
/ .

4.72:

,

, /
, .


.
.
,
.

(Assignment Information)
:
112 |


MS Project 2010 Primavera P6

(Flat)
(Back Loaded)
(Front Loaded)
(Double Peak)
(Early Peak)
(Late Peak)
(Bell)

(Turtle)

4.73:

, MS Project
(Budget)
.
Budget
.
Budget
Cost (Resource Usage)
(Task Usage).

|113

: & 2011-2012

Primavera, MS Project
(Generic),
Project Professional Project Server.

Generic ,

.

4.74: Generic Budget

To MS Project
Primavera,
Cost.
.

114 |


MS Project 2010 Primavera P6

4.6.3
,
Primavera MS
Project, ,
.

,
. MS Project,
,
.
, ,

,

.
,
Primavera,


. ,
,
/
.
Primavera
MS
Project, ,

. ,

|115

: & 2011-2012

,
.
, ,
,
. (Work)
MS Project (Labor) - (Nonlabor)
Primavera, (Cost)
,

(Expenses).

Primavera

MS Project,
WBS .
4.8:

1.
2.
*3.
4.
5.
6.

*7.

Primavera











Expenses

WBS
*

116 |

1.
2.
3.

*4.
5.
6.

MS Project

Master Project


MS Project 2010 Primavera P6

5

5.1 (SCHEDULE)

(Critical Path Method CPM). CPM
.
"" .
" "
,
- ,
.
" "
,
,
.
.

5.1.1 Primavera
Primavera
.

. ,
Tools Schedule F9.

(Data Date)
( 5.1).

|117

: & 2011-2012


.
,
Schedule .

5.1:

Options
. :

5.2:

118 |


MS Project 2010 Primavera P6

5.3: Project A

|119

: & 2011-2012

5.4 Project B

5.5: Project C

120 |


MS Project 2010 Primavera P6

5.6:

5.1.2 MS Project
MS Project
,
,
.
.

.

(Auto Schedule)
(Manually Scheduled)
File
Options Schedule New tasks created.

5.7:

|121

: & 2011-2012


Schedule ,
.



.
.

,

. ,
,
, ,
.

122 |


MS Project 2010 Primavera P6

5.8: Project A

|123

: & 2011-2012

5.9: Project B

5.10: Project C

124 |


MS Project 2010 Primavera P6

5.1.3

,

.

,
..
,
Primavera .
, Primavera
,
. ,

,

.
,
Primavera
MS Project. ,
MS Project
,


.

|125

: & 2011-2012

5.1:

1.
2.
3.
4.

Primavera


Schedule

(Data Date)



Schedule F9

1.
2.
3.
4.

MS Project




(Status Date)


5.2 (CRITICAL PATH)





.

. (Total Float)


.

5.2.1 Primavera

Gantt
.
Bars Bars Chart Options. ,

126 |


MS Project 2010 Primavera P6


.

Tools
Schedule Options Define critical activities as Settings
.
,

.
5.11-13
, .

|127

: & 2011-2012

5.11: Project A

128 |


MS Project 2010 Primavera P6

5.12: Project

5.13: Project C

|129

: & 2011-2012

5.2.2 MS Project
Format Critical Tasks (
Bar Styles). ,
( ) . ,
.
MS Project
,

.
Advanced ( 5.14).

5.14:

Gantt
.

130 |


MS Project 2010 Primavera P6

5.15: Project

|131

: & 2011-2012

5.16: Project

5.17: Project C

132 |


MS Project 2010 Primavera P6

5.2.3

.

5.3 (LEVELING)
,

.
,
.
,

.
.

/
.

,
.

5.3.1 Primavera
5.3.1.1

.

(Resource Assignments)
Layout Show on Bottom

|133

: & 2011-2012

Resource Usage Spreadsheet ( 5.18). , ,

(Resource Usage Profile) ( 5.19).

5.18:

5.19:

134 |


MS Project 2010 Primavera P6


,
. ,
2012 EPS

.

.

(Display Show All Projects).

/ 1 (Timescale: Date Interval: Week/Day 1),
.
,
.

(Resource Usage Profile Options).

, .

5.20:

|135

: & 2011-2012

5.21:

5.3.1.2


.

.
Tools Level Resources
5.22.


.
,
(Schedule).
, ,

, .

136 |


MS Project 2010 Primavera P6

(Project Leveling Priority)


EPS, General .
,

.

5.22:



.
,


.

|137

: & 2011-2012

,
.


. ,

.

.
,

.

.
,
,
, ,
.

.
5.3.1.3

,

. 20


. ,

138 |


MS Project 2010 Primavera P6

.
.

Primavera P6 5.23
5.2.

5.23: Primavera

5.2: Primavera

Activity Leveling Priority

Project Leveling Priority



ID





ID



Activity ID

Planned Start

|139

: & 2011-2012

Planned Finish

Original Duration

Remaining Duration

Total Float

Free Float

Early Start

Early Finish

Late Start

Late Finish

140 |


MS Project 2010 Primavera P6


9
,
.
5.24
.
MS Project
,
. ,
MS Project,

. , ,
Fixed Units Effort
Driven,
. Primavera,


.

5.24:

7

.

|141

: & 2011-2012

5.3: Primavera

leveling
Activity Leveling
Priority
(Ascending)
Project Leveling Priority
(Ascending)
Original Duration
(Ascending)
Late Start
(Ascending)
Late Finish
(Ascending)
Total Float
(Ascending)
Free Float
(Ascending)

Project A

293d
501.001

Project B

327d
1.001.386

Project C

459d
1.405.708

2012

551d
2.908.095

457d
634.825

527d
1.188.586

601d
1.538.620

693d
3.362.031

Priority: 10
457d
634.825
324d
526.297
293d
501.001
293d
501.001
293d
501.001
317d
520.585

Priority: 5
744d
1.391.698
447d
1.113.706
634d
1.288.738
538d
1.198.882
385d
1.055.674
534d
1.195.138

Priority: 3
548d
1.489.012
791d
1.716.460
693d
1.624.732
612d
1.548.608
459d
1.405.708
608d
1.545.172

753d
3.515.535
883d
3.356.463
785d
3.414.471
704d
3.248.799
551d
2.962.383
700d
3.260.079

9
0

0
0
0
0
8
0

Primavera
5.22 ,

,
0.00d 0%.

, .

WBS (WBS Summary),
. ,


.

2012 EPS 5,
Late Finish.
142 |


MS Project 2010 Primavera P6

ID

ID
, Edit Replace.



Log to file.

|143

: & 2011-2012

5.25: *.txt

5.3.2 MS Project
5.3.2.1

.
Master Project ,

. , Master Project
( ).
.

.
( )
.
Master.mpp. View Other Views
Resource Graph ( Resource Views).
Resource Usage Resource Allocation.
5.28, 5.29 , ,
.

144 |


MS Project 2010 Primavera P6

5.26:

5.27:

|145

: & 2011-2012

5.28:

5.29:

5.3.2.2
(resource leveling)
,
.
,
.
H Resources Leveling Options
( Level).
146 |


MS Project 2010 Primavera P6

Resource Leveling Level all


.
,
,
,
. ,
Resource leveling
(manual) .

:
,
,

Gantt

),

,

.
5.30
:

.

.
.
,
.
,

.

|147

: & 2011-2012


.
,

.
.
(proposed)
(committed) Booking Type
,
.

.
(Leveling order: Standard, ID only,
Priority -Standard), ,
.
Standard
, ,
, ,
.
Priority - Standard

Standard.
0 1000, 1000
,
.
ID Only
ID .

.

148 |


MS Project 2010 Primavera P6

5.30: MS Project

7
.
5.4: MS Project

leveling
anual
anual - splits
anual - split - slack
anual - slack
Priorities - manual
Priorities manual splits
Priorities - manual split - slack

Project A

295d
516.272
459d
653.308
450d
645.304
447d
642.856
459d
653.308
467d
659.836
459d
652.648
459d
653.308

Project B

355d
1.027.594
637d
1.291.546
616d
1.271.890
542d
1.202.158
542d
1.202.626
512d
1.174.546
623d
1.278.442
542d
1.202.626

Project C

459d
1.405.708
583d
1.521.772
557d
1.496.968
459d
1.405.708
459d
1.405.708
571d
1.510.072
564d
1.503.520
459d
1.405.708

2012

551d
2.949.574
675d
3.466.626
649d
3.414.162
551d
3.250.722
551d
3.261.642
663d
3.344.454
656d
3.434.610
551d
3.261.642

9
0
0
5
7
0
0
7

|149

: & 2011-2012


5 (Priority
Standard, Manual),

.

.

MS Project,
.

Task View More Views
Leveling Gantt.
( 5.32).

5.31: Leveling Gantt

150 |


MS Project 2010 Primavera P6

5.32: Leveling Gantt

5.3.3


.
.
, MS Project,
,
,
. , Primavera,

, .
, Primavera
Undo ,

.
MS Project
.

|151

: & 2011-2012


, Primavera
MS Project,

(Split).
.
Primavera, ,
,
MS Project.

,

.

MS Project
. ,
Leveling Gantt
. Primavera
,
*.txt
.
,

Primavera

, MS Project

.

152 |


MS Project 2010 Primavera P6
5.5:

1.
2.
3.
4.
5.
6.

7.

Primavera




.txt



1.
2.

3.
4.
5.
6.
7.

MS Project

Master Project


Leveling Gantt


|153

: & 2011-2012

154 |


MS Project 2010 Primavera P6

6.1 (BASELINES)



.
,
/ (baseline),

( , , ).

,

,
.

,
,
,
.

|155

: & 2011-2012

6.1.1 Primavera
6.1.1.1 (Baselines)

(Baselines),
.
Data Limits
.

.

. Project
Maintain Baselines
( 6.1), , ,
.

.
- 1
. ,
. ,
, (Initial Plan)
,

(Mid-Project Status).

(Restore),
EPS
. ,
,

156 |


MS Project 2010 Primavera P6

Project Maintain Baselines Add Convert another project to a


new baseline of the current project.

6.1:

,
. ,

,
.
(Update),

, / .
,

,
( 6.2).

|157

: & 2011-2012

6.2:

6.1.1.2
(Project Assign Baselines)
,
(Project Baseline) ,
. Project Baseline
. Project Baseline

,
Settings .
,

Gantt.
(Bars)
,
( 6.4).

158 |


MS Project 2010 Primavera P6

6.3:

6.4: Gantt


,
.
BL . ,
, ,
,
.

|159

: & 2011-2012

6.1.2 MS Project
Primavera, MS Project

.

Project Set Baseline.
11 10 ,

.
. ,
,
,
Project Set Baseline Clear Baseline.

6.5:

160 |


MS Project 2010 Primavera P6

6.6:

,
.
, MS Project
, "Start"
"Finish" baseline, "Baseline Start" "Baseline
Finish",
. , 20
, .

(Baseline 0),
( ,
, ). Baseline 0
,
.

Advanced .

|161

: & 2011-2012

6.7:

6.1.3

.
Primavera
,
11 MS Project. ,
EPS
Restore .
, ,

Primavera (Project Baseline, Primary Baseline
), MS Project

.
162 |


MS Project 2010 Primavera P6
6.1:

Primavera
MS Project
1. 1.
(Data Date)
(Status Date)
2.
2.
(Initial Plan)
(Baseline 0)
*3.
*3.

4.
4.
Set Baseline
Maintain Baselines
5.
**5. Project Baseline
Tracking
Primary Baseline
Gantt
6.
Baseline
Gantt
* .
**
(Current Project).

6.2 (UPDATE PROJECTS)



,

.


,
.

.

,
. ,
,

|163

: & 2011-2012

,
.

:

.
.

outsourcing.
.

.

.


.

6.2.1 Primavera
Primavera ,
,
.

. ,
timesheets
.


(Data Date). ,
.
164 |


MS Project 2010 Primavera P6

,
.
.
6.2.1.1


,
, /
.

Earned Value
,
.
,
WBS Earned Value WBS.
, Calculations
,
.
, Details

.
, ,

,
,

.

|165

: & 2011-2012

6.2.1.2
Update Progress:
,
.
Tools Update Progress
, .
,
.
Update Progress,
.

,
.

6.8:

Auto Compute Actuals:



.
Auto Compute Actuals ,
, ,
166 |


MS Project 2010 Primavera P6


.
Auto Compute Actuals
.

.


.
,
Auto Compute Actuals

.

Tools Apply Actuals,
.
Tools Store Period Performance

.

6.9: Auto Compute Actuals


|167

: & 2011-2012

6.10: Auto Compute Actuals

6.11: Apply Actuals

168 |


MS Project 2010 Primavera P6

6.12: Store Period Performance

6.2.1.3
.
,
,
.

.
,

,
.
: General
,
,
.

. :

|169

: & 2011-2012

Physical Percent Complete,



, Status
.
Duration,

.
:

Duration% Cmp = [(Original Duration Rem Duration) / Original Duration] x 100

Units,
.

:

Units % Cmp = [Actual Units / At Completion Units] x 100

:
.
Status
Started Finished
.
Duration:
Status
,
. ,



.

170 |


MS Project 2010 Primavera P6

,

/ .

6.13: Duration

Units:

Resource Dependent
Fixed Units/Time.
.
,

Status .

Resources .

6.14:

|171

: & 2011-2012

6.15: Units % Cmp

Physical:

.
Schedule Apply
Actuals,
Resources.

6.16: Physical

,
Auto Compute Actuals,

.
6.2.1.4

,
.

172 |


MS Project 2010 Primavera P6



.

.

Gantt
.


.


MS Project.
,
,

.

6.17:

|173

: & 2011-2012

6.18: Current VS Baseline Schedule Analysis

6.2.2 MS Project
MS Project
.
6.2.2.1


Schedule Advanced.
Schedule

Advanced

174 |


MS Project 2010 Primavera P6


.
,
.

6.2.2.2


,
.
Project Status Update Project
6.19,

:
(Set 0% - 100% Complete), 0%
(Set 0% or 100% Complete Only).

6.19:

|175

: & 2011-2012

6.2.2.3

.
:

( )

,
,
.

Updating task status updates resources status Schedule
.
:

Advanced
(% Complete)
(Physical % Complete). ,
Advanced
.
Physical % Complete ,
, .
(0%, 25%, 50%, 75% 100%)

(Schedule) Task
( 6.20).

176 |


MS Project 2010 Primavera P6

Task Mark on Track


Update Tasks. ,
% Complete, 6.21.

Gantt (Gantt Chart),
(Task Usage), (Task Form), %
Complete (Tracking),
(Tables) (Data) (View).

6.20:

6.21:


,

Task Mark on Track Update Tasks.
,
Gantt (Gantt Chart),

|177

: & 2011-2012

(Task Usage), (Task Form),


(Tracking), View
Data Tables Tracking
(Act. Start) (Actual Finish).

6.22:

:
Update Tasks
, (Actual dur) (Remaining
dur).

6.23:


Tracking, Actual Duration
/ Remaining Duration.
178 |


MS Project 2010 Primavera P6

, MS Project
,
.
MS Project,
, :
+ =

:
,
,
, MS Project
, .

,
.
:
(Updating task status updates resource status)
MS Project (Actual costs are
always calculated by Project), Schedule .

6.24:

|179

: & 2011-2012

6.2.3




.



. Primavera
, MS Project
. ,


. ,

.
, Primavera
Units % Complete,
. MS Project

Work % Complete,
.
Primavera MS Project

. ,
,
.

180 |


MS Project 2010 Primavera P6

, Primavera

, , ,
. , ,
Primavera
,

.
6.2:

1.
2.
3.
4.
5.
6.

7.
8.

9.

Primavera


(Data Date)

(Initial Plan)
Update
Progress Schedule

Apply Actuals



Maintain Baselines




.

* 4:
1. Auto
Compute Actuals
2.

MS Project
1.
2.
(Status Date)
3.
(Baseline 0)
4. Update
Project
5.


6.
Set Baseline
7.


* 4:
1.

*
3

|181

: & 2011-2012

6.3 (EARNED VALUE ANALYSIS EVA)




.


(Earned Value Analysis - EVA).

,
, . , Budgeted Cost
for Work Performed (CWP),
.
EVA
.
,
,
Earned Schedule (
) EV
.
,

Performance Measurement Baseline (PMB). ,

(control accounts).
, ,

(Performance Measurement Baseline).
,

182 |


MS Project 2010 Primavera P6

(PMB)
,

.
(EV),
3 :
(Budgeted
Cost of Work Scheduled - BCWS), (Planned Value PV) ( )
.
,
, .
(Actual Cost of Work
Performed - ACWP) (Actual Cost - AC),
(
)
.
(Budgeted Cost of
Work Performed - BCWP) (Earned Value - EV). To
BCWP,
( )
), .

6.3.1 Primavera
6.3.1.1
,


Earned Value . , ,

|183

: & 2011-2012



. ,

. , BL
BL
.

6.25.

6.25:


WBS, Earned Value WBS. ,
Settings
EVA Project Baseline Users Primary Baseline.
184 |


MS Project 2010 Primavera P6

6.3.1.2 EVA
EVA
(Reports) Primavera
(Tracking) Earned Value.

.

6.26: Earned Value for WBS and Activities

6.27: EVA

|185

: & 2011-2012

6.3.2 MS Project
6.3.2.1
MS Project
Advanced
,
.
,
Advanced
.

6.3.2.2 EVA
EVA
EVA 6.28,
, View Data
Tables More Tables. ,

MS Excel MS Visio,
Project Reports Reports/Visual Reports.

6.28: EVA

186 |


MS Project 2010 Primavera P6

6.29: Project A ( 20% )

6.30: Project A ( 60% )

|187

: & 2011-2012

6.31: EVA

6.32: Excel

188 |


MS Project 2010 Primavera P6

6.3.3

Primavera

. , Primavera

,
.
, ,
,
,

.

,
.



.
EVA,
, MS Project
Primavera, MS
Excel MS Visio ,
Microsoft. ,
Primavera
,
.

|189

: & 2011-2012

6.3:

1.
2.
3.
4.

5.

6.
7.

Primavera
EVA

Baseline

EVA
Project Details Settings


Tracking Earned Value

Reports Earned Value
EVA

1.
2.
3.
4.

5.

6.
7.

8.

MS Project
EVA

Baseline

EVA
File Options Advanced


View More Tables Earned Value

Project Reports Costs EV

Project Visual Reports EV


EVA

6.4 (COMPARE PROJECTS)


6.4.1 Primavera
Primavera
EPS.
HTML File, CSV File ASCII Text File
.
Tools
Claim Digger
Advanced. 6.34 HTML

1,
.

190 |


MS Project 2010 Primavera P6

6.33:

6.34: HTML BL1


|191

: & 2011-2012

6.4.2 MS Project
MS Project
Project Reports Compare
Projects.
,
( 6.35).

,

( 6.36).

6.35:

192 |


MS Project 2010 Primavera P6

6.36:

6.4.3

MS Project
Primavera,
,
. , Primavera
,
,
.
, , Compare Projects

, Primavera.

|193

: & 2011-2012

194 |


MS Project 2010 Primavera P6

7
PRIMAVERA

Primavera
, MS
Project, ,
.
.

7.1 (REFLECTIONS)
, Primavera
,
.
,
.

,
EPS Copy Paste
,
.
EPS What-if,
.

Create Reflection.

. ,

, Merge Reflection.

|195

: & 2011-2012



EPS
.
,
.

7.1: Reflection

7.2 (ISSUES & THRESHOLDS)


Primavera
, (Issues)

.
,

(Thresholds).

196 |


MS Project 2010 Primavera P6

,
5
Start Date Variance (days) 5.00d
Thresholds. ,
,
(Monitor)
. (Issues)
.
Notify
e-mail .

,
.

7.2:

|197

: & 2011-2012

7.3:

7.3 (PROJECT RISKS)


Primavera, ,

.
,
(WBS)
.
,

Primavera Risk Analysis ( PertMaster)
.



.

198 |


MS Project 2010 Primavera P6

(Risks)
, WBS ,

.
Calculate Impact
( 7.6).

7.4: WBS

7.5:

|199

: & 2011-2012

7.6:

200 |


MS Project 2010 Primavera P6

. Primavera P6
1.

Primavera,



. MS Project

,
MS Project Server.

2.

Primavera
MS Project,
,

. ,
, Primavera
,
, MS Project , ,
.

3.

Primavera


. , ,
,
,
.

|201

: & 2011-2012

4.

Primavera
, ,
,
.

. MS Project 2010
1.

MS Project
,


,
.

2.

MS
Project

. Primavera
,
,
.
:

.

.

3.

Primavera,
( EPS,
OBS, WBS, )

.
,

202 |


MS Project 2010 Primavera P6

,

.
.
1.


, Primavera Web App
Primavera SharePoint MS Project. Primavera

, MS Project
Sharepoint.

2.


. MS Project
Excel
.
Primavera ,
MS Project,
.

,

,
.

|203

: & 2011-2012

1. CDP, Inc., (2008), The University of North Carolina Primavera Project Manager for
the Enterprise, Version 6.1, Custom Training Manual, [pdf], Available through:
< http://www.northcarolina.edu>
2. Chatfield, C. Johnson D., T., (2010), Microsoft Project 2010 Step by Step, Microsoft
Press, Washington
3. Oracle USA, Inc., (2009), Primavera P6 Project Management, Reference Manual,
Version 6.2.1, [pdf], Available through: <http://docs.oracle.com>
4. , ., (2011), ,
, ,
5. , ., (2011),
Primavera,
, ,
6. , ., (2007),
: MS Project Primavera,
, ,


1. Microsoft Products, Microsoft Corporation, <http://www.microsoft.com>
2. Office Products, Microsoft Corporation, <http://office.microsoft.com>
3. Oracle Products, Oracle USA, Inc., <http://www.oracle.com>

204 |

You might also like