You are on page 1of 1

Name: ______________________________________

Date: ________________________

Subject: TLE ICT CHS 9


PERFORMANCE TEST
Direction: follow and perform the given procedures on Activity A, B, and C. Safety precautions must be
observed when working. You will be rated in accordance with the rubrics provided after each activity.
RUBRICS FOR PERFORMANCE TEST
PC DISASSEMBY
Criteria

Percentage

Accuracy

50 %

Adherence to the procedure

20 %

Workmanship (applied safety precautions)

20 %

Speed

10 %

Grade

Performance Rating

PC ASSEMBY
Criteria

Percentage

Accuracy

50 %

Adherence to the procedure

20 %

Workmanship (applied safety precautions)

20 %

Speed

10 %

Grade

Performance Rating

CONNECTING PC PHERIPHERALS
Criteria

Percentage

Accuracy

50 %

Adherence to the procedure

20 %

Workmanship (applied safety precautions)

20 %

Speed

10 %
Performance Rating

Grade

You might also like