You are on page 1of 70

PROJECT

OWNER
LOCATION
DATE

SUMMARY OF BILL OF MATERIALS

Item Description
A. SITEWORKS

1. Clearing and Grubbing


1. Excavation
2. Soil (Fill)
4. Labor Cost (30%)
5. Indirect Cost (10%)
Total:
B. FOOTINGS / FOUNDATION

1. Sand
2. Coarse Aggregate
3. Portland Cement
4.16mm x 6 m RSB
4.10mm x 6 m RSB
5. #16 Tie Wire
6. Labor Cost (30%)
7. Indirect Cost (10%)
Total:
C.COLUMNS

1. Sand
2. Coarse Aggregate
3. Portland Cement
4.16mm x 7.5m RSB
5.16mm x 9 m RSB
6. 16 mm x 10.5m RSB
7.10mm x 6 m RSB
8.10mm x 7.5m RSB

9. 10mm x 10.5m RSB


10. #16 Tie Wire
11. Labor Cost (30%)
12. Indirect Cost (10%)
Total:

D. BEAMS AND GRADE BEAMS

1. Sand
2. Coarse Aggregate
3. Portland Cement
4.16mm x 6 m RSB
5.16mm x 7.5m RSB
6.16mm x 9 m RSB
7. 16 mm x 10.5m RSB
8. 16 mm x12m RSB
9.10mm x 6 m RSB
10.10mm x 7.5m RSB
11.10mm x 9 m RSB
12. 10mm x 10.5m RSB
13. #16 Tie Wire
14. Labor Cost (30%)
15. Indirect Cost (10%)
Total:
E. SLABS

1. Sand
2. Coarse Aggregate
3. Portland Cement
4.12mm x 6 m RSB
5.12mm x 7.5m RSB
6.12mm x 9 m RSB
7. 12mm x 10.5m RSB
8. 12 mm x12m RSB
9.10mm x 6 m RSB
10.10mm x 7.5m RSB
11.10mm x 9 m RSB
12. 10mm x12m RSB
13. #16 Tie Wire
14. Labor Cost (30%)
15. Indirect Cost (10%)
Total:

F. WALL

1. Sand
3. Portland Cement

4. CHB 4" thick


5.10mm x 6 m RSB
9. #16 Tie Wire
10Labor Cost (30%)
11. Indirect Cost (10%)
Total:
G. STAIRS

1. Sand
2. Coarse Aggregate
3. Portland Cement
4.12mm x 6 m RSB
5.12mm x 7.5m RSB
6.12mm x 9 m RSB
7. 12mm x 10.5m RSB
8. 12 mm x12m RSB
9. #16 Tie Wire
10Labor Cost (30%)
11. Indirect Cost (10%)
Total:

H. ROOF FRAME

1. 1.20mm x50 x100mm C-Purlins


2. 4.50 x50 x 50 mm Angle Bar
3. 10mm Sag Rod
4. 10 mm thick Double Sided Insulation
5. 3.50 x50 x 50 mm Angle Bar
6. 3/4" x12"x12" Hardi-Senepa
7. Welding Rod
8. Labor Cost (30%)
9. Indirect Cost (10%)
Total:
I. ROOF

1. Corrugated G.I. Sheets


2. Plain G.I. Sheets
3. Gutter
4. Rivets
5. Labor Cost (30%)
6. Indirect Cost (10%)
Total:

J. CEILING

1. Gypsum Board
2. 1 2 x 2 x 6 R/L METAL FURRING
3. Labor Cost (30%)
4. Indirect Cost (10%)
Total:
J. FORMWORKS

1. Marine Plywood
2. 2"x2"x12m Cocolumber
3. CWN
4. Labor Cost (30%)
5. Indirect Cost (10%)
Total:
K. SCAFFOLDING / STAGING

1. 2"x2"x12m Cocolumber
2. 2"x4"x12m Cocolumber
3. CWN
4. Labor Cost (30%)
5. Indirect Cost (10%)
Total:
L. TILE FLOORING
1. 20x20 cm Tile
2. 30x30 cm Tile
3. Grout
4. Cement
5. Tile Adhesive
5. Labor Cost (30%)
6. Indirect Cost (10%)
Total:

M. PAINT

1. Primer
2. Topcoat
3. Labor Cost (30%)
4. Indirect Cost (10%)
Total:
N. WINDOWS AND DOORS

1. D-1
2. D-2
3.D-3
4. D-4
5.D-5
6. D-6
7. W-1
8. W-2
9 W-3
10. W-4
11. W-5
12.Labor Cost (30%)
13. Indirect Cost (10%)
Total:
O. SEPTIC TANK

1. Sand
2. Coarse Aggregate
3. Portland Cement
4. CHB 4" thick
5.12mm x 6 m RSB
6.12mm x 7.5m RSB
7.10mm x 6 m RSB
8. Labor Cost (30%)
9. Indirect Cost (10%)
Total:
P. CATCH BASIN

1. Sand
2. Coarse Aggregate

3. Portland Cement
4. CHB 4" thick
5.10mm x 6 m RSB
6. Labor Cost (30%)
7. Indirect Cost (10%)
Total:

Q. ELECTRICAL

1. 3.5 mm sq.THHN Wire


3. 5.5 mm sq. THHN Wire
3. 30 mm sq. THHN Wire
4. 60 mm sq. THHN Wire
5. 20A Circuit Breaker
6. 30A Circuit Breaker
7. 40A Circuit Breaker
8. 100A Circuit Breaker
9. Panel Board
10. Kilowatt Hour Meter
11. Junction Box
12. 15 mm PVC Pipe 3 m
13. 20 mm PVC Pipe 3m
14. 30 mm Rigid Steel Conduit Pipe
15. Exhaust Fan
16. Pin Light Receptacle
17. Flourescent Lamp
18. Single Switch
19. Two Gang Switch
20. Three Gang Switch
21. Three- Way Switch
22. Convenience Outlet
23. Pin Light
24. Electric Tape large
25. Labor Cost (30%)
26. Indirect Cost (10%)
Total:

R. PLUMBLING

1.1/2 ELBOW
2. 3/4 Elbow
3. Tee
4. Tee R educer
5. Gate Valve
6. 1/2 Coupling
7. 3/4 Coupling
8. 20 mm PPRC Pipe 3 m
9. 32mm PPRC Pipe 3 m
10. 40mm PPRCPipe 3 m
11. 100 mm PVC Pipe 3 m
12. 50 mm PVC Pipe 3m
13. Reducer Tee 4"x2"
14. 4" Tee
15. 2" Elbow
16. 4" Elbow
17. PVC Solvent
18. Teflon Tape
19. Floor Drain 4"
20. P trap
21. 4" x 4" 45 degree Wye
22. Clean Out 4"
23. Hose Bib
24. Lavatory
25. Kitchen Sink
26. Water Closet
27. Shower
28. Labor Cost (30%)
29. Indirect Cost (10%)
Total:

: Two Storey Commercial Building


: Mr. Tiburcio M. Figueroa
: Sta. Ines, Bacolor, Pampanga
:

Quantity

Unit

3 Laborer
2 Laborer
4.05 m3

5.76 m3
11.52 m3
104 bags
60 pcs
25 pcs
6.5 kg

5.06 m3
10.12 m3
92 bags
2 pcs
84 pcs
2 pcs
15 pcs
2 pcs

10 pcs
24.5 kg

9.18 m3
18.36 m3
166 bags
94 pcs
79 pcs
19 pcs
63 pcs
4 pcs
220 pcs
32 pcs
189 pcs
36 pcs
83 kg

322 m3
17.85 m3
35.7 bags
94 pcs
79 pcs
19 pcs
63 pcs
4 pcs
64 pcs
98 pcs
46 pcs
56 pcs
52.25 kg

40.51 m3
1021 bags

11575 pcs
553 pcs
19 kg

1.65 m3
3.27 m3
31 bags
45 pcs
48 pcs
45 pcs
54 pcs
30 pcs
24.75 kg

85 pcs
9 pcs
9 pcs
671.55 sq. m
9 pcs
6 pcs
17.5 kg

175 pcs
10 pcs
15 pcs
37 kg

66 pcs
281 pcs

296 pcs
86 pcs
46.25 kg

151 pcs
108 pcs
8.5 kg

2631 pcs
3456 pcs
26 bag
20 bag
115 bag

66.25 gallon
49.14 gallon

5 set
7 set
10 set
1 set
1 set
1 set
2 set
1 set
2 set
8 set
1 set

2.09 m3
4.67 m3
22 bags
300 pcs
7 pcs
7 pcs
68 pcs

1.28 m3
1.46 m3

21 bags
160 pcs
23 pcs

470.47 m
132 m
58.85 m
40.04 m
13 pcs
16 pcs
7 pcs
4 pcs
4 pcs
4 pcs
38 pcs
189.1 m
96.1 m
6.5 m
10 m
24 pcs
34 set
1 pcs
16 pcs
9 pcs
6 pcs
64 pcs
24 pcs
23 pcs

10 pcs
9 pcs
29 pcs
29 pcs
6 pcs
8 pcs
9 pcs
34.2 m
39.5 m
3.4 m
48.15 m
11.2 m
5 pcs
17 pcs
6 pcs
11 pcs
12 pcs
40 roll
10 pcs
10 pcs
2 pcs
8 pcs
6 set
4 set
6 set
10 set
6 set

Unit Cost (Pesos)

Total Cost

350
350
209

1050
700
846.45
253.935
285.0385
3135.4235

209
680
220
345
136
63

1203.84
7833.6
22880
20700
3400
409.5
10718.082
3572.694
50017.716

209
680
220
432
518
605
136
167

1057.54
6881.6
20240
864
43512
1210
2040
334

236
63

2360
1543.5
24012.792
8004.264
112059.696

209
680
220
345
432
518
605
692
136
167
202
236
63

1918.62
12484.8
36520
32430
34128
9842
38115
2768
29920
5344
38178
8496
5229
76612.026
25537.342
357522.788

209
680
220
195
243
292
341
389
136
167
202
270
63

67298
12138
7854
18330
19197
5548
21483
1556
8704
16366
9292
15120
3291.75
61853.325
20617.775
288648.85

209
220

8466.59
224620

9
136
63

104175
75208
1197
124099.977
41246.959
579013.526

209
680
220
195
243
292
341
389
63

344.85
2223.6
6820
8775
11664
13140
18414
11670
1559.25
22383.21
7461.07
104454.98

540
676
420
75
690
385
105

45900
6084
3780
50366.25
6210
2310
1837.5
34946.325
11648.775
163082.85

320
680
347
75

56000
6800
5205
2775
21234
7078
99092

270
129

17820
36249
16220.7
3624.9
73914.6

380
108
70

112480
9288
3237.5
37501.65
12500.55
175007.7

108
144
70

16308
15552
595
9736.5
3245.5
45437

25
30
75
220
464

65775
103680
1950
4400
53360
68749.5
22916.5
320831

495
510

32793.75
25061.4
17356.545
5785.515
80997.21

8736
2856
1322
12150
10164
19080
2074
1383
2765
4160
5530

43680
19992
13220
12150
10164
19080
4148
1383
5530
33280
5530
50447.1
16815.7
235419.8

209
680
220
9
195
243
136

436.81
3175.6
4840
2700
1365
1701
9248
7039.923
2880.5333
33386.8663

209
680

267.52
992.8

220
9
136

4620
1440
3128
3134.496
1044.832
14627.648

36
25
65
105
285
285
285
420
1500
3000
25
29
38
128
1700
150
250
126
170
162
95
162
32
35

16936.92
3300
3825.25
4204.2
3705
4560
1995
1680
6000
12000
950
5483.9
3651.8
832
17000
3600
8500
126
2720
1458
570
10368
768
805
34511.721
11503.907
161054.698

35
40
40
40
250
40
40

189
94
80
80
75
80
100
30
100
90
200
80
150
7000
3000
4500
750

TOTAL COST:

350
360
1160
1160
1500
320
360
0
0
0
9100.35
1052.8
400
1360
450
880
1200
1200
1000
900
400
640
900
28000
18000
45000
4500
36057.945
12019.315
169170.41

2677419.5363

PRICE LIST
MATERIALS
Gravel
Portland cement
Sand
16mm x 6m. Rebars
16mm x 7.5m. Rebars
16mm x 9m. Rebars
16mm x10.5m. Rebars
16mm x 12m. Rebars
12mm x 6m. Rebars
12mm x 7.5m. Rebars
12mm x 9m. Rebars
12mm x 10.5m. Rebars
12mm x 12m. Rebars
10mm x 6m. Rebars
10mm x 7.5m. Rebars
10mm x 9m. Rebars
10mm x 10.5m. Rebars
10mm x 12m. Rebars
# 16 GI Wire
PCS of .15x.20 x .40 CHB
PCS of .10 x.20 x .40 CHB
Panel Door
Flush Type Solid Core Door
Flush Hallow Core Door
Roll up Door
Roll up Door
Roll up Door
Steel Window
Steel Window
Steel Window
Steel Window
Steel Window
1.20mm x50 x100mm C-Purlins
4.50 x50 x 50 mm Angle Bar
10mm Sag Rod
10 mm thick Double Sided Insulation
3.50 x50 x 50 mm Angle Bar
3/4" x12"x12" Hardi-Senepa
Welding Rod
Corrugated G.I. Sheets
Plain G.I. Sheets
Gutter
Rivets
Gypsum Board

UNITS
cu. m
bag
cu. m
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
kg
pcs
pcs
set
set
set
set
set
set
set
set
set
set
set
pcs
pcs
pcs
sq. m
pcs
pcs
kg
pcs
pcs
pcs
kg
pcs

1 2 x 2 x 6 R/L METAL FURRING


Marine Plywood
2"x2"x12m Cocolumber
2. 2"x4"x12m Cocolumber
CWN

pcs
pcs
pcs
pcs
kg

20x20 cm Tile
30x30 cm Tile
Grout
Cement
Tile Adhesive
Paint Primer
Paint Topcoat
3.5 mm sq.THHN Wire
5.5 mm sq. THHN Wire
30 mm sq. THHN Wire
60 mm sq. THHN Wire
20A Circuit Breaker
30A Circuit Breaker
40A Circuit Breaker
100A Circuit Breaker
Panel Board
Kilowatt Hour Meter
Junction Box
15 mm PVC Pipe 3 m
20 mm PVC Pipe 3m
30 mm Rigid Steel Conduit Pipe
Exhaust Fan
Pin Light Receptacle
Flourescent Lamp
Single Switch
Two Gang Switch
Three Gang Switch
Three- Way Switch
Convenience Outlet
Pin Light
Electric Tape large
1/2 ELBOW
3/4 Elbow
Tee
Tee Reducer
Gate Valve
1/2 Coupling
3/4 Coupling
20 mm PPRC Pipe 3 m
32mm PPRC Pipe 3 m
100 mm PVC Pipe 3 m
11. 50 mm PVC Pipe 3m
Reducer Tee 4"x2"
4" Tee
2" Elbow
4" Elbow
PVC Solvent
Teflon Tape

pcs
pcs
bag
bag
bag
gallon
gallon
m
m
m
m
pcs
pcs
pcs
pcs
pcs
pcs
pcs
m
m
m
m
pcs
set
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
m
m
m
m
pcs
pcs
pcs
pcs
pcs
roll

Floor Drain 4"


P trap
4" x 4" 45 degree Wye
Clean Out 4"
Hose Bib
Lavatory
Kitchen Sink
Water Closet
Shower

pcs
pcs
pcs
pcs
set
set
set
set
set

UNIT COST
680
220
209
345
432
518
605
692
195
243
292
341
389
136
167
202
236
270
63
12
9
8736
3213
801
12150
10164
19080
2074
1383
2765
4160
5530
540
676
420
75
690
385
105
320
680
347
75
270

129
380
108
144
70

25
30
75
220
464
495
510
36
25
65
105
285
285
285
420
1500
3000
25
29
38
128
1700
150
250
126
170
162
95
162
32
35
35
40
40
40
250
40
40

189
94
80
80
75
80
100
30

100
90
200
80
150
7000
3000
4500
750

PROJECT
OWNER
LOCATION
DATE

: Two Storey Commercial Building


: Mr. Tiburcio M. Figueroa
: Sta. Ines, Bacolor, Pampanga
:

SUMMARY OF BILL OF QUANTITIES


Item

Description

PRELIMINARIES

SUBSTRUCTURES
EARTHWORKS
Clearing and grubbing

Excavation Works

Backfilling Works

CONCRETE WORKS
RC Footing

Grade Beams

Slab-onGrade

REINFORCEMENT
RC Footing

Grade Beams

Slab-onGrade

SUPERSTRUCTURE
GROUND FLOOR
Concrete Works

Masonry Works

Reinforcement

Formworks and Staging

SECOND FLOOR
Concrete Works

Masonry Works

Reinforcement

Formworks and Staging

ROOF
Concrete Works

Masonry Works

Reinforcement

Formworks and Staging

ARCHITECTURAL
DOORS AND WINDOWS

FINISHES

PAINTING AND DECORATING

MECHANICAL

ELECTRICAL

PLUMBING
Concrete Works

Masonry Works

Reinforcement

PLUMBING

TOTAL DIRECT COST


TOTAL INDIRECT COST (TAXES)
TOTAL PROJECT COST

Site Safety Fence


Safety Signs
Engineer Site Inspection
Builders Site Sign
Soil Test
Land Surveyor Subdivision
Quantity Surveyor

Isolated Footings
Grade Beams
Septic Tank
Catch Basin
Mat Foundation
Isolated Footings
Grade Beams

Sand
Sand
Sand

Isolated Footings

Cement
Sand
Gravel

Wall Footings

Cement
Sand
Gravel

Footing Tie Beams

Cement
Sand
Gravel
Cement
Sand
Gravel

Isolated Footings

16mm x 6 m RSB
#16 Tie Wire

Wall Footing

10mm x 6 m RSB
#16 Tie Wire

Footing Tie Beams

16mm x 6 m RSB
16mm x 7.5m RSB
16mm x 9 m RSB
16 mm x 10.5m RSB
16 mm x12m RSB
10mm x 6 m RSB
#16 Tie Wire

10mm x 6m. Rebars


10mm x 7.5m. Rebars
10mm x 9m. Rebars
10mm x 10.5m. Rebars
10mm x 12m. Rebars
# 16 GI Wire

Columns

Cement
Sand
Gravel

Stairs

Cement
Sand
Gravel

Walls

Cement
Sand
CHB 4"

Columns

16mm x 7.5m RSB


16mm x 9 m RSB
16 mm x 10.5m RSB
10mm x 6 m RSB
10mm x 7.5m RSB
10mm x 10.5m RSB
#16 Tie Wire

Walls

10mm x 6 m RSB
#16 Tie Wire

Stairs

12mm x 6m. Rebars


12mm x 7.5m. Rebars
12mm x 9m. Rebars
12mm x 10.5m. Rebars
12mm x 12m. Rebars
#16 Tie Wire

Columns

4'x8' Marine Plywood


2"x4"x12
2x2x12
CWN

Stairway

4'x8' Marine Plywood


2"x4"x12
2x2x12
CWN

Columns

Cement
Sand
Gravel

Beams

Cement
Sand
Gravel

Slabs

Cement
Sand
Gravel

Walls

Cement
Sand
CHB 4"

Columns

16mm x 7.5m RSB


16mm x 9 m RSB
16 mm x 10.5m RSB
10mm x 6 m RSB
10mm x 7.5m RSB
10mm x 10.5m RSB
#16 Tie Wire

Walls

10mm x 6 m RSB
#16 Tie Wire

Beams

16mm x 6 m RSB
16mm x 7.5m RSB
16mm x 9 m RSB
16 mm x 10.5m RSB
16 mm x12m RSB
10mm x 6 m RSB
10mm x 7.5m RSB
10mm x 9 m RSB
10mm x 10.5m RSB
#16 Tie Wire

Slab

12mm x 6m. Rebars


12mm x 7.5m. Rebars
12mm x 9m. Rebars
12mm x 10.5m. Rebars
12mm x 12m. Rebars
10mm x 6 m RSB
10mm x 7.5m RSB
10mm x 9 m RSB
10mm x 10.5m RSB
#16 Tie Wire

Columns

4'x8' Marine Plywood


2"x4"x12
2x2x12
CWN

Beams

4'x8' Marine Plywood


2"x4"x12

2x2x12
CWN
Slab

4'x8' Marine Plywood


2"x4"x12
2x2x12
CWN

Beams

Cement
Sand
Gravel

Walls

Cement
Sand
CHB 4"

Roof Beams

16mm x 6 m RSB
16mm x 7.5m RSB
16mm x 9 m RSB
16 mm x 10.5m RSB
16 mm x12m RSB
10mm x 6 m RSB
10mm x 7.5m RSB
10mm x 9 m RSB
10mm x 10.5m RSB
#16 Tie Wire

Walls

10mm x 6 m RSB
#16 Tie Wire

Beams

4'x8' Marine Plywood


2"x4"x12
2x2x12
CWN

Structural Steel Works

Doors
D-1
D-2
D-3

D-4
D-5
D-6
Windows
W-1
W-2
W-3
W-4
W-5

Tile works
20x20 cm Tile
30x30 cm Tile
Grout
Cement
Tile Adhesive

Ceiling Works
Gypsum Board
1 2 x 2 x 6 R/L METAL FURRING

Painting Works
Paint Primer
Paint Topcoat

Aircon Ducts
Ventillation Works
Wiring-Ins
3.5 mm sq. THHN Wire
5.5 mm sq. THHN Wire
30 mm sq. THHN Wire
60 mm sq. THHN Wire
20A Circuit Breaker
30A Circuit Breaker
40A Circuit Breaker
100A Circuit Breaker
Panel Board
Kilowatt Hour Meter

Junction Box
15 mm PVC Pipe 3 m
20 mm PVC Pipe 3m
30 mm Rigid Steel Conduit Pipe
Electric Tape large

Electrical Fixtures
Exhaust Fan
Pin Light Receptacle
Flourescent Lamp
Single Switch
Two Gang Switch
Three Gang Switch
Three- Way Switch
Convenience Outlet
Pin Light

Septic Tank

Cement
Sand
Gravel

Catch Basin

Cement
Sand
Gravel

Septic Tank

Cement
Sand
CHB 4"

Catch Basin

Cement
Sand
CHB 4"

Septic Tank

16mm x 7.5m RSB


16mm x 9 m RSB
16 mm x 10.5m RSB
10mm x 6 m RSB
10mm x 7.5m RSB
10mm x 10.5m RSB
#16 Tie Wire

Catch Basin

10mm x 6 m RSB

#16 Tie Wire

Plumbing-Ins
1/2 ELBOW
3/4 Elbow
Tee
Tee Reducer
Gate Valve
1/2 Coupling
3/4 Coupling
20 mm PPRC Pipe 3 m
40mm PPRC Pipe 3 m
32mm PPRC Pipe 3 m
100 mm PVC Pipe 3 m
50 mm PVC Pipe 3m
Reducer Tee 4"x2"
4" Tee
2" Elbow
4" Elbow
PVC Solvent
Teflon Tape
P trap
4" x 4" 45 degree Wye
Clean Out 4"
Hose Bib
Plumbing Fixtures
Lavatory
Kitchen Sink
Water Closet
Shower
Floor Drain 4"

Quantity

Unit

1 lm
1 ea
1 ea
1 ea
1 ea
1 item
1 quote

sq. m

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

bag
cu.m
cu.m

Material Cost

bag
cu.m
cu.m
bag
cu.m
cu.m
bag
cu.m
cu.m

kg
kg
kg
kg

kg
kg
kg
kg
kg
kg
kg

kg
kg
kg
kg
kg
kg

cu.m
bag
cu.m
cu.m
bag
cu.m
cu.m
sq. m

220
209
680
220
209
680
680

bag
cu.m
pcs

220
209
680

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

pcs
bd.ft.
bd.ft.
kg
pcs
bd.ft.
bd.ft.
kg

bag
cu.m
cu.m

220
209
680

bag
cu.m
cu.m

220
209
680

bag
cu.m
cu.m

220
209
680

bag
cu.m
pcs

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

pcs
bd.ft.
bd.ft.
kg
pcs
bd.ft.

bd.ft.
kg
pcs
bd.ft.
bd.ft.
kg

bag
cu.m
cu.m

220
209
680

bag
cu.m
pcs

220
209
680

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

pcs
bd.ft.
bd.ft.
kg
kg

5 set
7 set
10 set

8736
3213
801

1 set
1 set
1 set

12150
10164
19080

2 set
1 set
2 set
8 set
1 set

2074
1383
2765
4160
5530

sq. m
pcs
pcs
bag
bag
bag

sq. m
pcs
pcs

sq. m
gal
gal

470.47 m
132 m
58.85 m
40.04 m
13 pcs
16 pcs
7 pcs
4 pcs
4 pcs
4 pcs

36
25
65
105
285
285
285
420
1500
3000

38 pcs
189.1 m
96.1 m
6.5 m
35 pcs

25
29
38
128

10 pcs
24 pcs
34 pcs
1 pcs
16 pcs
9 pcs
6 pcs
64 pcs
24 pcs

1700
150
250
126
170
162
95
162
32

bag
cu.m
cu.m
bag
cu.m
cu.m

bag
cu.m
pcs
bag
cu.m
pcs

kg
kg
kg
kg
kg
kg
kg
kg

kg

10 pcs
9 pcs
29 pcs
29 pcs
6 pcs
8 pcs
9 pcs
34.2 m
39.5 m
3.4 m
48.15 m
11.2 m
5 pcs
17 pcs
6 pcs
11 pcs
12 pcs
40 pcs
10 pcs
2 pcs
8 pcs
6 pcs

4 set
6 set
10 set
6 set
10 pcs

7000
3000
4500
750
100

Unit Cost

Labor Cost (30%) Total Cost

168157

0
0
0
.