5S Is For Everyone
5S Is For Everyone
Producti vi ty
SUP ER
5S
g
n
i
d
a
e
Spr
e
d
i
w
d
l
Wor
IS FOR
EVER YO NE
Revised 1998 - 07
PART
Kaiz en
versu s
In no va ti
on
KAI ZE N
Kaizen
Innovation
Effect
Pace
Small steps
Big steps
Timeframe
Intermittent
Change
Approach
Group efforts
Involvement
Everybody
Selected few
Mode
Know-how
Conventional know-how
Technological breakthrough
Requirement
Little investment
Large investment
Orientation
People
Technology
Evaluation
KAIZ E
N INCREMENTAL BUT CONTINUOUS PROGRESS
IN NOVAT IO
N
DRAMATIC BUT
INTERMITTENT
PROGRESS
THE IDEAL
ACTU
A L ITY
KAIZ EN PL US
PROGRESS BY
INDESIRABLE
NOVATI
ON
COMBINATION OF TWO
OPPOSING APPROACHES
MAINTENANCE
DARD
AN
NEW ST
MAINTENANCE
IN NOV AT IO
N
KA IZ E
N
5S
KS S
QC C
QC Circle
TQ C
TP M
JI T
Just-In-Time Production
TPM
Overlapping Areas
between
Kaizen Programs
TQC
JIT
QCC
5
S
Toward Excellence
KS
S
PARTICIPATIVE MANAGEMENT
A Suggested Sequence of
Implementing Kaizen Programs
TQC
QCC
Start Here
TPM
KS
S
5S
JI T
What is 5S?
5S is the beginning of a healthy, comfortable and productive life for
everyone at work. This is fundamental to productivity improvement.
When implemented successfully in a company, 5S will bring about
amazing changes. For example, all unnecessary items are removed
from the workplace, only necessary items are conveniently located
near users, and machines and equipment become clean and shiny.
5S is an acronym for five Japanese words that are Seiri, Seiton,
Seiso, Seiketsu and Shitsuke.
The driving force for a 5S program comes from people. In this
respect, Shitsuke is critical to its success.
Shitsuke is to train people accordingly so that they will follow good
habit.
After the spirit and practice of a good 5S is installed as a platform, a
company can then develop and implement a Super 5S program which
requires a higher level of creativeness and Kaizen approaches.
Super 5S is for Everyone presents the know-how of 5S techniques
plus useful Kaizen illustrations. Therefore, I believe this textbook will
serve as a good manual for managers and Kaizen Engineers.
PART
2
Un der sta nd i
ng th e
Phi lo sop hy
and P owe
r ER
SUP
5
?
S
Super 5S is a Company-wide
Participation Program for Kaizen
Super 5S is a company-wide
participation program
involving everyone in the
organization.
It is a very effective approach
for motivating people, and
improving productivity and
the work environment .
5S?
5S?
5S?
5S?
5S?
5S is a set of five
Japanese words. Each
word starts with a sound
of se or shi.
They are Se-i-ri, Se-i-to-n,
Se-i-so, Se-i-ke-tsu, and
Shi-tsu-ke.
5S?
Seiton
Shitsuke
Seiketsu
Seiso
Seiton
Shitsuke
Seiketsu
Seiso
Seiton
Shitsuke
Seiketsu
Seiso
Seiton
Shitsuke
Seiketsu
Seiso
Seiton
Shitsuke
Seiketsu
Seiso
Shit suke
Sei ketsu
Sei so
PART
Step by Step
Im pl eme nta ti on
of a
Step 1: Preparations
Step 2: The CEOs Official Announcement
Step 3: Big Cleaning by All Colleagues
Step 4: Initial Seiri
Step 5: Daily Seiri, Seiton and Seiso
Step 6: Periodic 5S Audits
Preparations
* Understanding philosophy and benefits of Super 5S
by CEO
* CEOs visit to Super 5S model companies
* CEOs commitment to Super 5S implementation
* Organize Super 5S Working Committee
* Appoint Super 5S facilitators
* Train Super 5S facilitators and practitioners
CEOs Official Announcement
* CEO officially announces implementation of Super
5S for 2 years
* CEO explains objectives of Super 5S program to all
colleagues
* Publicize Super 5S organization and assignments by
area
*Big
Promote
Super
5SColleagues
with banners, posters and
Cleaning
by All
newsletters
* Organize a full-day of Big Cleaning Day twice a
* Organize basic Super 5S training programs for all
year
colleagues
* Organize small groups who are responsible for
assignments in divided areas of the companys
premises.
* Provide enough cleaning tools and materials
* Implement a company-wide big cleaning for one day
* Big cleaning includes the elimination of unnecessary
Initial
items Seiri
and wastes
* Establish a Disposal Standard for unnecessary items
* Organize a full-day of Seiri activity twice a year
* Everyone concentrates to identify and stratify
unnecessary items for elimination
* Unnecessary items that cost a lot should be
evaluated so as to prevent the occurrence of such
waste
Daily Seiri, Seiton and Seiso
* Seiri: Throw away things that are not needed and
not being used
* Seiton: Improve locations and methods for storing
things so that searching time is minimized
* Seiso: Set up a daily cleaning schedule for the
creation of a healthy and comfortable workplace
* Motivate colleagues to come up with creative
improvements
Periodic Audits on Super 5S
* Establish a Super 5S evaluation and incentive plan
* Conduct a Super 5S audit regularly by auditors
* Organize a Super 5S inter-departmental competition
for upgrading
* Award groups and individuals for their contributions
* Organize study tours to other companies doing
Super 5S
* Organize Super 5S inter-company competition to
1
12
10
11
12
10
11
MASTER PLAN
STEP 1: PREPARATION
MASTER PLAN
5S Steering Committee
5S Working Committee
5S Audit Committee
Purchasing Manager
5S Activist/Trainer
Purchasing Group
Production Manager
5S Activist/Trainer
Machine Group 1
Machine Group 2
Machine Group 3
Painting Group
Assembly &
Packing Group
5S Facilitator(s)
Sales Manager
5S Activist/Trainer
Sales Group
Administrative Manager
5S Activist/Trainer
Administrative Group
Material
Storage
Machining 1
Machining 2
Assembly
and
Packing
Sales
Machining 3
Administration
Painting
1F
Material
Storage
Machining 1
Machining 2
Painting
Assembly
and
Packing
Sales
Machining 3
Administration
1F
5S TOOL BOX
Promotion Tools
Implementation Tools
5S Newsletters
What is Seiton?
Here is
a need for
SEIRI
5S Study Tours
Seiri
5S Guidance Stickers
5S DAY
Seiton is arranging
necessary items in good
order so they can easily
be selected for use
5S Posters
Evaluation Tools
Here is
a need for
SEITON
Shitsuke
Seiso
5S Banners
5S Checklists
5S Inter-Department Competition
Congratulations!
We all Practice 5S
5S Badges
SUPER
5S
Department A
Department B
Department C
Department D
SEISO
Seiton
Seiketsu
Here is
a need for
He re i s a n
Ex ce lle nt
5S
Ex ample of
Pra ctic e
Seiri
Sort out
unnecessary items
in the workplace
and
discard them
Sei ketsu
Maintain ones
workplace so that
it is productive
and comfortable
by repeating SeiriSeiton-Seiso
5S
Sei ton
Shi tsuke
IS FUN DAME NT AL TO
PRO DUCTIVIT Y
Arrange necessary
items in good order
so they can easily
be selected
for use
Sei so
Clean your
workplace completely
so that there is
no dust on floors,
machines or
equipment
MASTER PLAN
MASTER PLAN
Which
???
Stratification
Required Action
Items having
some value for sale
Items
Necessary
For
SEITON
Items
Not Necessary
SEIRI
Why
How to
Seiri
MASTER PLAN
Seiri: Throw away things that are not needed and not
being used. Use space more economically (space is
money).
Seiton: Improve locations and methods of storing
things so that searching and retrieval time is
minimized (time is money).
Seiso: Continue daily cleaning schedule for the
creation of a healthy and comfortable workplace.
Motivate colleagues to come up with creative
improvements for the workplace.
Required Action
SEITON
Items
frequently used
Items
Necessary
Items
sometimes used
Can be placed
farther away
Items
not used at all
but must be kept
Must be stored
separately with
clear identification
SEIRI
How to
Seiton
SEITON
SUPER
FIFO
LIFO
Random Access
SEITON
SUPER
Before 5S activity
Reserved seats
Matching names
SEITON
SUPER
A1
A2
A3
A4
A5
A6
A7
A1
A2
A3
A4
A5
A6
A7
B1
B2
B3
B4
B5
B6
B7
B1
B2
B3
B4
B5
B6
B7
C1
C2
C3
C4
C5
C6
C7
C1
C2
C3
C4
C5
C6
C7
Reserved seats
Matching names
SEITON
SUPER
PD20
PD21
PD22
PD20
PD21
PD22
PD30
PD31
PD32
PD30
PD31
PD32
SEITON
Transparent / no cover
Stock level indicators
SUPER
B10-100
B12-100
B10-150
B12-150
SEITON
SUPER
1 2 3 4 5 6 7 8 9 101112
Seiri wastes
No horizontal piling
Nothing on floor
SEITON
SUPER
Quick retrieval
No horizontal piling
Vertical holders
B20S
B25S
B30S
B35S
B40S
B50S
SEITON
SUPER
10
11
12
10 11
12
10 11 12
SEITON
SUPER
Matching labels
Color identification
Matching labels
Open/Close separation
SEITON
SUPER
CLOSED
OPEN
1
*
2
2*
3
*
4
*
5
5
*
1
1*
2
*
3
3*
4
4*
5
*
6
6*
7
*
8
8*
9
*
10
*
6
*
7
7
*
8
*
9
9
*
10
10
*
11
*
11
12
12
*
13
*
14
*
15
*
15
11
*
12
*
13
13
*
14
14
*
15
*
16
*
17
*
18
18
*
19
*
20
20
*
16
*
16
17
*
17
18
*
19
19
*
20
*
Matching labels
Color identification
SEITON
SUPER
OFF
OFF
OFF
OFF
SEITON
SUPER
CL15-20
CL20-20
BL20-50
BL20-20
BL30-20
BLH20-40
BLH20-20
BLH25-20
Cast Materials
CL10-40
SEITON
SUPER
CL15-20
CL20-20
BL20-50
Kanban
Parking place
Safety sign
BL20-20
BL30-20
BLH20-40
BLH20-20
Cart No. 5
BLH25-20
Cart No. 5
Safety First
SEITON
SUPER
Before 5S - unsafe
No height control
SEITON
SUPER
No lifting by hands
Sliding or rolling
SEITON
SUPER
POTABLE
WATER
0
Kg
75
Color labeling for invisible
substances
Indication of flow direction
25
50
SEITON
SUPER
COLD
HOT
COLD
HOT
Clean
me !
How to
Seiso
SEISO
SUPER
5S
How to
Seiketsu
How to
Shitsuke
JANUARY
STEP 2
5S IMPROVEMENT RECORDS
WORKPLACE
LOCATION NO.
STEP 1
DATE
01/04/95
COMMENTS
STEP 2
DATE
COMMENTS
Very messy.
RATING
RATING
88
10/04/95
STEP 3
DATE
STEP 4
COMMENTS
COMMENTS
RATING
RATING
DATE
5S IMPROVEMENT RECORDS
WORKPLACE
STEP 1
LOCATION NO.
DATE
STEP 2
DATE
STEP 3
DATE
STEP 4
COMMENTS
COMMENTS
COMMENTS
COMMENTS
RATING
RATING
RATING
RATING
WORKPLACE
STEP 1
DATE
LOCATION NO.
DATE
STEP 2
DATE
STEP 3
DATE
STEP 4
COMMENTS
COMMENTS
COMMENTS
COMMENTS
RATING
RATING
RATING
RATING
DATE
MASTER PLAN
PART
5S
5S
1. Objectives
Proposed competitions are aimed at improving the organizations total
productivity through everyones participation in the Super 5S program.
Qualification for Participation
Any department which is implementing 5S on a certain level is eligible
for participation.
3. Competition Period
Each competition will be organized for a period of 6 months, two times
a year on a continuing basis.
4. Auditing Team
An auditing team appointed by the Super 5S Steering Committee will
visit each competing department and evaluate its Super 5S activities
at the end of each competition period.
5. Super 5S Evaluation Forms
One of the following Super 5S Evaluation Forms will be used by the
auditors according to the function of the participating departments:
7. Awarding
With better results and psychological effects in mind, the
implementing organization should work out an awarding method that
can encourage, but not discourage, the participating colleagues and
departments toward intended objectives.
1
2
3
4
5
6
7
8
9
1
0
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
ITEM
materials / parts
work-in-process
finished products
defective / rejects
machines / equipment
wiring / piping
dies / tools / jigs
spare parts / lubricants
containers / pallets
racks / shelves / cabinets
carts / wagons / forklifts
lifts / conveyers / cranes
desks / tables / chairs
forms / files / records
floors
/ passages /
stairways
walls / windows / ceiling
lighting / ventilation
working wears / shoes
safety devices
fire
exitsextinguishers / fire
FOCUS
are
they conveniently located and labeled for easy
retrieval?
are they conveniently located for easy handling?
are
they conveniently located and labeled for easy
retrieval?
are
they dust-free, tidy and conveniently labeled for items
stored?
are
they well-maintained and placed at designated
locations?
are they clean, tidy, safe and well-maintained?
are they clean and organized inside and outside?
are
they up-to-date, easy to retrieve and at convenient
locations?
are they dust-free, tidy, safe and well-maintained?
are they dust-free, tidy, safe and well-maintained?
are they adequate for efficient operation?
are they clean and do they present a good image?
are
they conveniently located for use and wellmaintained?
are they
are they
cleaning
tools
/
waste
baskets
NO. OF ITEMS EVALUATED (b): are they
canteens / toilets / lockers
are
they
image?
external areas / gardens
are
they
security guards / car parks
image?
2
3
2
SUPER
5S PRACTICE IDENTIFIED:
4
AUDITOR:
DEPARTMENT:
DATE:
SCORE
10
4 28 6
10
4 28 6
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
6
6
6
6
6
6
6
6
6
6
6
6
10
4 28
10
4 28
10
4 28
28
10
4 28
10
4 28
10
4
10
4
20
10
40
10
4
10
4
6
6
28 6
28 6
15 10 5
28 6
28 6
6
6
ITEM
desks / tables / chairs
cabinets / shelves
documents / files
forms / office supplies
telephones
facsimiles
typewriters
processors / word-
1
2
3
4
5
6
7
8 computers / monitors
9 printers
1
0 copying machines
electric wiring
1
1
lighting / ventilation
1
2 floors / walls / windows /
ceiling
1
3 fire extinguishers
1
4 emergency exits
safety devices
1
5 working clothes / shoes
1
6 waste baskets
1
7
DEPARTMENT:
FOCUS
are they tidy and conveniently organized?
are
they clean and labeled for the easy retrieval of things
needed?
are they clean and systematically organized?
are they tidy and conveniently stored for retrieval?
are they clean and well-maintained?
are they clean and well-maintained?
are they clean and well-maintained?
are they clean and well-maintained?
are they clean and well-maintained?
are they clean and well-maintained?
Is it tidy, safe and conveniently laid out for operation?
are they adequate for efficient operation?
are they dust-free and well-maintained?
are they adequate and well-maintained?
are
they adequate and clear of obstacles in case of
emergencies?
are they adequate and well-maintained?
are they clean and do they present a good image?
are clean and well-maintained?
1
8
1
9
2
0
2
1
2
2
2
3
2
SUPER
5S PRACTICE IDENTIFIED:
4
AUDITOR:
DATE:
SCORE
10
4 28 6
10
4 28 6
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
10
4 28
6
6
6
6
6
6
6
6
6
6
6
6
10
4 28
10
4 28
10
4 28
28
10
4 28
10
4 28
10
4
10
4
20
10
40
10
4
10
4
6
6
28 6
28 6
15 10 5
28 6
28 6
6
6
SUPER
DATE: 5S EVALUATION SUMMARY
DEPARTMENT
ORGANIZATION:
DATE OF AUDIT
ADJUSTED PT.
SUPER 5S PT.
TOTAL PT.
RANKIN
G
AUDITOR
SEIRI
SEITON
SEITON
SEISO
SEIRI
SEITON
SEITON
SEISO
SEIRI
SEITON
SEITON
SEISO
SEIRI
SEITON
SEITON
SEISO
SEIRI
SEITON
SEITON
SEISO
He re is a n
Exc elle nt
5S
Exam ple of
Pra ctice
He re is a n
Exc elle nt
5S
Exam ple of
Pra ctice
He re is a n
Exc elle nt
5S
Exam ple of
Pra ctice
He re is a n
Ex cellen t
5S
Exam ple of
Pra ct ice
He re is a n
Ex cellen t
5S
Exam ple of
Pra ct ice
He re is a n
Ex cellen t
5S
Exam ple of
Pra ct ice
Her e is an
Excellen t
5S
Exam ple of
Pra ct ice
Her e is an
Excellen t
5S
Exam ple of
Pra ct ice
Her e is an
Excellen t
5S
Exam ple of
Pra ct ice
T
A
R
G
E
T
S
A
C
TI
O
N
S
STEP 1
STEP 2
STEP 3
STEP 4
Seiri 1
Seiri 2
Seiri 3
Seiri 4
Seiton 1
Seiton 2
Seiton 3
Seiton 4
Seiso 1
Seiso 2
Seiso 3
Seiso 4
Seiketsu 1
Seiketsu 2
Seiketsu 3
Seiketsu 4
Shitsuke 1
Shitsuke 2
Shitsuke 3
Shitsuke 4
Keep only
necessary
items
Do not put
anything on
the floor
Assign items
a place
.
Make needed
items
accessible
Reduce
searching
time
Reduce
walking
distances
In each
section clean
one machine
well
Increase the
number of
clean
machines
Increase the
number of
clean
machines
Create a
clean
workplace
Create a
comfortable
workplace
Create a
healthy and
safe
workplace
Create a
highly
productive
workplace
Discard
unnecessary
items more
often
Use wagons
to transport
items
-
Draw lines to
separate
passageways
for people
Reduce
excess
inventory
-
Arrange
items by type
and size
-
Remove
obstacles
around
needed items
Use labels to
simplify
retrieval
-
Place
frequently
used items
close by
Select a
machine and
clean it
completely
Use more
convenient
cleaning
tools
Prevent
machines
from getting
dirty
Combine
cleaning
with
inspection
Set up a
cleaning
schedule
Eliminate
hazards
Introduce
creative
thinking
Clean ones
workplace
daily
PASSPORT TO SUCCESSFUL 5S
What is 5S?
Seiri:
Seiton:
Seiso:
checkpoints
The 5S Activity Bulletin Board is wellorganized and data are updated
score
score
10
Tackled - 3
Not Tackled - 1
10
Tackled - 3
Not Tackled - 1
PART
A Col lection
of
Photogr aphs
Il lustrating
SUP ER
5S
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
43
45
47
49
51
53
55
57
59
61
63
65
67
69
71
73
75
77
79
81
83
85
87
89
The End
of the
Presenta ti
on
Thank Yo u V ery
Much
for Your
T
A
R
G
E
T
S
A
C
TI
O
N
S
STEP 1
STEP 2
STEP 3
STEP 4
Seiri 1
Seiri 2
Seiri 3
Seiri 4
Seiton 1
Seiton 2
Seiton 3
Seiton 4
Seiso 1
Seiso 2
Seiso 3
Seiso 4
Seiketsu 1
Seiketsu 2
Seiketsu 3
Seiketsu 4
Shitsuke 1
Shitsuke 2
Shitsuke 3
Shitsuke 4
Keep only
necessary
items
Do not put
anything on
the floor
Assign items
a place
.
Make needed
items
accessible
Reduce
searching
time
Reduce
walking
distances
In each
section clean
one machine
well
Increase the
number of
clean
machines
Increase the
number of
clean
machines
Create a
clean
workplace
Create a
comfortable
workplace
Create a
healthy and
safe
workplace
Create a
highly
productive
workplace
Discard
unnecessary
items more
often
Use wagons
to transport
items
-
Draw lines to
separate
passageways
for people
Reduce
excess
inventory
-
Arrange
items by type
and size
-
Remove
obstacles
around
needed items
Use labels to
simplify
retrieval
-
Place
frequently
used items
close by
Select a
machine and
clean it
completely
Use more
convenient
cleaning
tools
Prevent
machines
from getting
dirty
Combine
cleaning
with
inspection
Set up a
cleaning
schedule
Eliminate
hazards
Introduce
creative
thinking
Clean ones
workplace
daily
PASSPORT TO SUCCESSFUL 5S
What is 5S?
Seiri:
Seiton:
Seiso:
checkpoints
The 5S Activity Bulletin Board is wellorganized and data are updated
score
score
10
Tackled - 3
Not Tackled - 1
10
Tackled - 3
Not Tackled - 1
Preparations
* Understanding philosophy and benefits of Super 5S
by CEO
* CEOs visit to Super 5S model companies
* CEOs commitment to Super 5S implementation
* Organize Super 5S Working Committee
* Appoint Super 5S facilitators
* Train Super 5S facilitators and practitioners
CEOs Official Announcement
* CEO officially announces implementation of Super
5S for 2 years
* CEO explains objectives of Super 5S program to all
colleagues
* Publicize Super 5S organization and assignments by
area
*Big
Promote
Super
5SColleagues
with banners, posters and
Cleaning
by All
newsletters
* Organize a full-day of Big Cleaning Day twice a
* Organize basic Super 5S training programs for all
year
colleagues
* Organize small groups who are responsible for
assignments in divided areas of the companys
premises.
* Provide enough cleaning tools and materials
* Implement a company-wide big cleaning for one day
* Big cleaning includes the elimination of unnecessary
Initial
items Seiri
and wastes
* Establish a Disposal Standard for unnecessary items
* Organize a full-day of Seiri activity twice a year
* Everyone concentrates to identify and stratify
unnecessary items for elimination
* Unnecessary items that cost a lot should be
evaluated so as to prevent the occurrence of such
waste
Daily Seiri, Seiton and Seiso
* Seiri: Throw away things that are not needed and
not being used
* Seiton: Improve locations and methods for storing
things so that searching time is minimized
* Seiso: Set up a daily cleaning schedule for the
creation of a healthy and comfortable workplace
* Motivate colleagues to come up with creative
improvements
Periodic Audits on Super 5S
* Establish a Super 5S evaluation and incentive plan
* Conduct a Super 5S audit regularly by auditors
* Organize a Super 5S inter-departmental competition
for upgrading
* Award groups and individuals for their contributions
* Organize study tours to other companies doing
Super 5S
* Organize Super 5S inter-company competition to
TO