SLOPE STABILIZATION

Modified Top
Down Method
Top-Down
Self Stabilized Structure
P
Presented
t d by:
b

Massoud Moghaddaspour
g
p
M.Sc Structural/Geotechnical Engineering
2013 (1392)

TOP
TOP-DOWN
DOWN CONSTRUCTION

1- Soldier Piles
()
2- Sheet Piles
()
3- Diaphragm Walls
()
4- Self Stabilized Structure ()

SOLDIER PILES
15

SHEET PILES
10

DIAPHRAGM WALLS
20

SELF STABILIZED STRUCTURE


6

Step 0: Initial Condition

Step 1: Drilling Wells Under Columns

Step 2: Reinforcing and First Stage Concreting of Piles

Step 3: Installing Main Columns and Second Stage Concreting of Piles

Step 4: Filling Wells with Gravel

Step 5: First Stage of Excavating

Step 6: First Stage of Composite Wall

Step 7: Second Stage of Excavating and Composite Wall

Step 8: Third Stage of Excavating and Composite Wall

Step 9: Installing Main Beams of Ground Floor

Step 10: Continuing Excavation and Composite Wall

Step 11: Continuing Excavation and Composite Wall

Step 12: Continuing Excavation and Composite Wall

Step 13: Installing First Basement Main Beams

Step 14: Continuing Procedure to Bottom of Foundation Level

Step 15: Constructing Foundation

Water Proofing Detail

Foundation Connection Detail

PLAXIS OUTPUT (DEFLECTION)

PLAXIS OUTPUT (DEFLECTION)

FACTOR OF SAFETY

SAP2000 MODEL

) (5

COLUMN INSIDE THE WELL

INSTALLING ALL OF COLUMNS

COMPOSITE WALLS AND EXCAVATION

CONTINUING
CONTINUING

COMPLETE CONSTRUCTION

MATERIAL TAKEOFF