Professional Documents
Culture Documents
XKM 3 Control System Operation Training Protocol: Time/place Program Performed by
XKM 3 Control System Operation Training Protocol: Time/place Program Performed by
Program
Performed by
yellow,
red,
blue,
green
used)
7. Command
operation
Initialization/Confirmation/Execution
or
Cancellation
Time/place
Program
1.
2.
In
control
3.
room
4.
(The Engineer
5.
Station will be
6.
used)
7.
letter_THXP_HCN_SWE_0525-attachment 10
Event List
Alarms management
Trend display / Curve
Reports Process Value, Energy
Security
Archiving
Timing
Performed by
ANDRITZ
HYDRO
1/3
Time/place
In
XKM3
control room
(The
Engineer
Station will
be used)
XKM3 Training_Outline
Program
1.
2.
3.
4.
5.
6.
Performed by
ANDRITZ
HYDRO
2/3
Herewith it is confirmed that the instructors of ANDRITZ Hydro have sufficiently trained the
operating and maintenance personal of the power plant THXP in the below listed points.
All Participants have passed the training with success.
No.
Content of training
subjects
Name of
instructor
Date
ANDRITZ
HYDRO
Control System
Operation
Zhang Yi
Ma Yongkuan
XKM3 Training_Outline