XKM 3 Control System

Operation Training Protocol


The training is intended for the participants from the client in 3
days, but the time can be shortened as the trainees understand the
equipment fast.
Engineer Station will be utilized in the time of training.
1st day of the training
Time/place

Program

Performed by

1. Scada Servercommunication with LCUs


,data processing, and data storage
2. Scada Client human machine interface of
the whole control system
3. Overview Display Structure
In
control
4. Status Indication, value Indication.
room
5. Symbol Circuit breaker, Disconnect switch, ANDRITZ
(The Engineer
HYDRO
Earthling
Switch, Motor Pump, Valve
station will be
6.
LED

yellow,
red,
blue,
green
used)
7. Command
operation
Initialization/Confirmation/Execution
or
Cancellation

2nd day of the training

Time/place

Program

1.
2.
In
control
3.
room
4.
(The Engineer
5.
Station will be
6.
used)
7.

letter_THXP_HCN_SWE_0525-attachment 10

Event List
Alarms management
Trend display / Curve
Reports Process Value, Energy
Security
Archiving
Timing

Performed by

ANDRITZ
HYDRO

1/3

3rd day of the training

Time/place
In
XKM3
control room
(The
Engineer
Station will
be used)

XKM3 Training_Outline

Program
1.
2.
3.
4.
5.
6.

Unit start/stop sequencing


Trip matrix
Interlocking logic
Restart of Engineer Station
Use of touch panel
Manual operation at LCU panel

Performed by

ANDRITZ
HYDRO

2/3

Herewith it is confirmed that the instructors of ANDRITZ Hydro have sufficiently trained the
operating and maintenance personal of the power plant THXP in the below listed points.
All Participants have passed the training with success.
No.

Content of training
subjects

Name of trained persons from


XKM 3

Name of
instructor

Date

ANDRITZ
HYDRO
Control System
Operation
Zhang Yi
Ma Yongkuan

XKM3 Training_Outline

3/3