RMQC: Data Collection (Work Process)

START

Material
received?

YES

Retrieve COAs from


shipping

Input specs into


Analysis
Spreadsheet

Warning
received?

YES

Collect OPS/PMCE
charts (if applicable) and
consult warnings tab of
Analysis Spreadsheet

NO

Wait for material


arrival

Raw Materials Quality Analysis:


1. Choose raw material tab
that matches COA
2. Input appropriate data

NO

Alert Tech Advisor (give


advisor all relevant info)

Record Retention:
Files must be
shredded every 3
years

File COAs

END

RMQC: Order Trigger Process


Raw Materials
Ordered
Argon, Nitrogen,
and Hydrogen
are vendor
managed

Order Alerts

Critical and
Reorder
Material
Levels
Reached
KOH level reaches 100
gal

NaOH level reaches 30"

MTS level reaches 18


or after 4 SiC Runs
Gerald Orders Raw
Materials

RMQC Triggers Order


CO2 reaches 16000 lbs

Watch production
schedule for Zinc and
Selenium (3 months in
advance)
(Watch pressure levels)
1 H2S tonner is left