1 Precast Concrete Piling


To Buildings
To External Works
Sub-total
2 BUILDING WORKS INCLUDING M&E
Academic/Administration/Special Block
Dining Hall
Male & Female Hostel
Teachers House(4 Interm + 4 Corner units)
Total Gross Floor Area
Sub-total
3 M&E INFRASTRUCTURE WORKS
External Electrical Works
Fire Figthing Services
Cold Water Supply
P.A Sound Wiring Works
Auxiliary Building
Genset House
Genset
High Elevated Tank Pump House
Lighting for Covered Walkway
Water storage tank
Suction pumpset
River intake Pump house
Sewage Treatment Plant

Floor Area (m2)


1581
236.25
912
527
3256.25

Sub-total
A
B
C
D
E
F
G
H
I

A
B

A
B
C

4 EXTERNAL WORKS
Site Clearance and Earthworks
Road and Carparks
Surface Water Drainage
Foul Drainage
Water Reticulation
Sport Fascilities
Flag post
Fencing and Gates
Turfing
sub-total
5 MISCELLANEOUS
Site survey & soil investigation
Landscaping
Sub-total
6 CONTRIBUTION FEE TO LOCAL & UTILITY AUTHORITY
Water contribution
Sesco
Telekom
Subtotal
Total (Item 1- 6)
7 PRELIMINARIES
5%

A
B

8 TURNKEY ELEMENT
SUPERVISION
PROFESSIONAL FEES

Architect
Civil & Structural Engineering
M&E Engineer
Quantity Surveyor

Government Tax(5%)
Sub-total
Total Cost of Project

Amount
300 000.00
88 000.00
388 000.00
2 000 000.00
500 000.00
1000 000.00
700 000.00
4200 000.00
100 000.00
25 000.00
45 000.00
20 000.00
15 000.00
5 000.00
15 000.00
250 000.00
50 000.00
18 000.00
100 000.00
50,000.00
693,000.00
2 000 000.00
250 000.00
500 000.00
100 000.00
400 000.00
200 000.00
4 000.00
100 000.00
100 000.00
3 654 000.00
50 000.00
15 000.00
65 000.00
9000 000.00
377,500.00

1 100 000.00

1 100 000.00
10,477,500.00