You are on page 1of 1

2011_MCG Cost Code List_REV-27-12-2011 (Masterlist) overall code

Descriptions (blank) Design Works Gen Requirements/Temp Facilities Mobilization & Demobilization Site Works GRP Trenching Ductile Trenching Excavation Earth Works Backfill Shaft works Shaft-Finishes Drainage Backdrops Micro Tunneling Piling Works Pile Installation Pile Load Test Asphalt Works Septic tank Demolition Pavements & Walkways Boundary Wall Gravel Surfacing Road Work Fencing Works (blank) Play Ground Water Works Road Traffic Marking Planting Landscaping / Hardscaping Civil Works Cast-in-place Concrete Manhole Concrete Finishes & Coating Pre-cast Concrete Minor Works/Structures Pipe Connection Masonry Works Glass Block Works Ext Wall Cladding Structural Steel & Metal Works Design & Inspection Structural Steel Fabrication & Paint Machining Erection/Installation Metal Works Wood & Plastic Works Architectural Wood Works Wood Works Fabrication & Finishing Decorative Panels Thermal & Moisture Protection
C:\Users\Safraz\Desktop\work files\Jezan\Cost code\2011_MCG Cost Code List_REV-27-12-2011 - overall code 14-04-13

1-6

You might also like