CLUSTER-E - MATERIAL SUBMITTAL LOG - CON

DISCIPLINE
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03

VOL #
ITEM
SUPPLIER /
SUBMITTAL REF. SUBMITTAL DESCRIPTION

&
MANUFACTURER
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

1 ELITE18-CON-CE-ARC-MSF-0001 Sika REP Sika ARC 6-Sep-22 7-Sep-22 B

2 ELITE18-CON-CE-CIV-MSF-0002 Walraven anchor epoxy (WPER500-S) Afko Global eng CIV 8-Sep-22 20-Sep-22 B

3 ELITE18-CON-CE-M&P-MSF-0003 Booster & transfer pumps Espa M&P 16-Sep-22 22-Sep-22 C 20-Oct-22 26-Oct-22 B

4 ELITE18-CON-CE-CIV-MSF-0004 Chemical anchor stud, M-16 & M-20 Afko Global eng CIV 1-Oct-22 6-Oct-22 B

5 ELITE18-CON-CE-CIV-MSF-0005 Laurence pur sand Local CIV 11-Oct-22 14-Oct-22 B

6 ELITE18-CON-CE-CIV-MSF-0006 Solid block & hollow block MS Spark Constructions CIV 11-Oct-22 13-Oct-22 C

7 ELITE18-CON-CE-CIV-MSF-0007 Walravon anchor throughbolt Afko Global eng CIV 18-Oct-22 18-Oct-22 C

Zoom Kingkrete
8 ELITE18-CON-CE-CIV-MSF-0008 King proof (100a) elastomeric acrylic waterproof
construction chemicals CIV 20-Oct-22 25-Oct-22 B
Inner mongolla baotou steel
9 ELITE18-CON-CE-CIV-MSF-0009 MS girder IPE-180,270 HEA-280 union co,ltd & ishtiaq steel CIV 22-Oct-22 25-Oct-22 C 26-Oct-22 27-Oct-22 A
industry
10 ELITE18-CON-CE-CIV-MSF-0010 Wall bracket light IP-65 Sunlight Pakistan ELE 22-Oct-22 29-Oct-22 B

11 ELITE18-CON-CE-CIV-MSF-0011 External wall multi lightup 2x5w Sunlight Pakistan ELE 22-Oct-22 29-Oct-22 B

External pargola down SMD light 24w (model SUN-CDN)


12 ELITE18-CON-CE-CIV-MSF-0012 (cex9101h-ks)
Sunlight Pakistan ELE 31-Oct-22 7-Nov-22 C

Capital Electro Eng Com


13 ELITE18-CON-CE-CIV-MSF-0013 Electric meter box 16 SWG
PVT.Ltd ELE 8-Nov-22 14-Nov-22 B

Zoom Kingkrete
14 ELITE18-CON-CE-CIV-MSF-0014 King seal (PU1)
construction chemicals CIV 1-Dec-22 9-Dec-22 B

15 ELITE18-CON-CE-M&P-MSF-0015 Acoustic sound lagging material K-FLEX M&P 9-Mar-23 UR

Water level controller relay complete with MS enclosure


16 ELITE18-CON-CE-M&P-MSF-0016 16swg
OMORON M&P 14-Mar-23 21-Mar-23 B

17 ELITE18-CON-CE-CIV-MSF-0017 Nilex tile bond Nilex tile bond CIV 3-Oct-23 4-Oct-23 C

18 ELITE18-CON-CE-CIV-MSF-0018 Champion tile bond Champion tile bond CIV 6-Oct-23 10-Oct-23 C

19 ELITE18-CON-CE-CIV-MSF-0019 HVAC condensate trox Local agent CIV 24-Oct-23 25-Oct-23 C

SUMMARY
Material Submittal
Final Status
Final Status
Decipline Total Submitted
(Total)
A B C UR

CIV 11 Err:504 Err:504 Err:504 Err:504 Err:504

ARC 1 Err:504 Err:504 Err:504 Err:504 Err:504

M&P 3 Err:504 Err:504 Err:504 Err:504 Err:504

ELE 4 Err:504 Err:504 Err:504 Err:504 Err:504

HSE 0 Err:504 Err:504 Err:504 Err:504 Err:504

Total 14 Err:504 Err:504 Err:504 Err:504 Err:504

Page 1 of 123
CLUSTER-E - DOCUMENT SUBMITTAL LOG - CON- January 30, 2024
PROMAG

DISCIPLINE
FILE CODE

DOC TYPE
Rev-00 Rev-01 Rev-02 Rev-03
VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

1 ELITE18-CON-CE-CIV-DS-0001 Method statement for retrofiting work DS CIVIL 31-Aug-22 3-Sep-22 B 3-Sep-22 UR UR

2 ELITE18-CON-CE-CIV-DS-0002 Bar bending schedule for retrofitting work DS CIVIL 7-Sep-22 20-Sep-22 A 5-May-23 22-Jun-23 A A

3 ELITE18-CON-CE-CIV-DS-0003 Bar bending schedule for micro pilling (company IVCC) DS CIVIL 24-Sep-22 1-Oct-22 A A

4 ELITE18-CON-CE-CIV-DS-0004 Weekly progress report # 104 DS CIVIL 29-Sep-22 26-Jul-23 B B

5 ELITE18-CON-CE-CIV-DS-0005 Monthly progress report #24 DS CIVIL 29-Sep-22 26-Jul-23 B B

6 ELITE18-CON-CE-CIV-DS-0006 Weekly progress report # 106 DS CIVIL 14-Nov-22 14-Dec-22 C C

7 ELITE18-CON-CE-CIV-DS-0007 Weekly progress report # 107 DS CIVIL 26-Nov-22 26-Jul-23 B B

8 ELITE18-CON-CE-CIV-DS-0008 Steel report DS CIVIL 15-Dec-22 UR UR

Handing over of door keys cluster E villa#143 type A


9 ELITE18-CON-CE-CIV-DS-0009
(Submit to consultant Approved)
DS CIVIL 29-Dec-22 29-Dec-22 A A

Handing over of door keys cluster E villa#144 type B


10 ELITE18-CON-CE-CIV-DS-0010
(Submit to consultant Approved)
DS CIVIL 29-Dec-22 29-Dec-22 A A

11 ELITE18-CON-CE-CIV-DS-0011 Tuff pavers report (gray & red) DS CIVIL 4-Jan-23 UR UR

Taking over certificate (doors,waerdrobe,venity,skirting,reducer,iron


12 ELITE18-CON-CE-CIV-DS-0012
mongries)
DS CIVIL 10-Jan-23 UR UR

13 ELITE18-CON-CE-CIV-DS-0013 Insident report DS HSE 28-Feb-23 20-Mar-23 B B

Handing over of door keys cluster E villa#142 type B


14 ELITE18-CON-CE-CIV-DS-0014
(Submit to consultant Approved)
DS CIVIL 2-Mar-23 2-Mar-23 A A

Handing over of remening kitchen exit & mumty door keys cluster E
15 ELITE18-CON-CE-CIV-DS-0015
villa 144 V (Submit to consultant Approved)
DS CIVIL 2-Mar-23 2-Mar-23 A A

Handing over of remening kitchen exit door keys & 01 AC remote


16 ELITE18-CON-CE-CIV-DS-0016
cover cluster E villa 143 V (Submit to consultant Approved)
DS CIVIL 2-Mar-23 2-Mar-23 A A

17 ELITE18-CON-CE-CIV-DS-0017 Insident report DS HSE 7-Mar-23 20-Mar-23 B B

Kitchan Appliance operating manuals & documents villa#142


18 ELITE18-CON-CE-CIV-DS-0018
(Submit to consultant Approved)
DS CIVIL 8-Mar-23 8-Mar-23 A A

Kitchan Appliance operating manuals & documents villa#141


19 ELITE18-CON-CE-CIV-DS-0019
(Submit to consultant Approved)
DS CIVIL 8-Mar-23 8-Mar-23 A A

20 ELITE18-CON-CE-CIV-DS-0020 HSE Plan DS HSE 22-Mar-23 6-Jul-23 B B

21 ELITE18-CON-CE-CIV-DS-0021 Tuff pavers report (gray & red) DS CIVIL 12-Apr-23 UR UR

22 ELITE18-CON-CE-CIV-DS-0022 HSE Monthly report DS HSE 8-May-23 UR UR

23 ELITE18-CON-CE-CIV-DS-0023 Bar bending schedule for retaing wall (BBS) DS CIVIL 12-May-23 16-May-23 C 18-May-23 25-May-23 B B

24 ELITE18-CON-CE-CIV-DS-0024 Tuff pavers test report (gray & red) DS CIVIL 7-Aug-23 8-Aug-23 A A

25 ELITE18-CON-CE-CIV-DS-0025 Kerb stone test report DS CIVIL 7-Aug-23 8-Aug-23 A A

Approvel required for dismentling of boundry wall villa 115 to 120


26 ELITE18-CON-CE-CIV-DS-0026
according to attached plan CVI
DS CIVIL 30-Aug-23 1-Sep-23 B B

27 ELITE18-CON-CE-CIV-DS-0027 Weekly progress report#158 DS CIVIL 13-Nov-23 UR UR

ELITE18-CON-CE-CIV-DS-0028 Bar bending shedule for boundary wall (115 to 120) DS CIVIL 19-Dec-23 21-Dec-23 C C

Page 2 of 123
CLUSTER-E - DOCUMENT SUBMITTAL LOG - CON- January 30, 2024
PROMAG

DISCIPLINE
FILE CODE

DOC TYPE
Rev-00 Rev-01 Rev-02 Rev-03
VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

LEGENDS
Total Submitted 28
Total Approved 19

A APPROVED 11
B APPROVED AS NOTED 8
C REVISED & RESUBMIT 2
D REJECTED 0
E FOR INFORMATION ONLY 0
UR UNDER REVIEW 7

Page 3 of 123
CLUSTER-E - SHOP DRAWINGS SUBMITTAL LOG - CON

DISCIPLINE
Rev-00 Rev-01 Rev-02 Rev-03
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Villa No. DRAWINGS NO STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

ELITE18-CON-CE-ELE-SHD-0001
1 ELITE18-CON-CE-ELE-SDS-0001 Light wiring layout plan for villa type A&B Type A&B ELITE18-CON-CE-ELE-SHD-0002 ELE 11-Nov-22 16-Nov-22 B B
ELITE18-CON-CE-ELE-SHD-0003

ELITE18-CON-CE-M&P-SHD-0003
ELITE18-CON-CE-M&PSHD-0004
2 ELITE18-CON-CE-M&P-SDS-0002 Water supply system layout plan for type A&B Type A&B
ELITE18-CON-CE-M&P-SHD-0005
M&P 17-Nov-22 19-Nov-22 C 4-Jan-23 25-Jan-23 B B
ELITE18-CON-CE-M&PSHD-0006

ELITE18-CON-CE-M&P-SHD-0003
ELITE18-CON-CE-M&PSHD-0004
3 ELITE18-CON-CE-M&P-SDS-0003 Drainage system layout plan for type A&B Type A&B
ELITE18-CON-CE-M&PSHD-0005
M&P 17-Nov-22 19-Nov-22 C 4-Jan-23 25-Jan-23 B B
ELITE18-CON-CE-M&PSHD-0006

ELITE18-CON-CE-M&P-SHD-0001
ELITE18-CON-CE-M&PSHD-0002
4 ELITE18-CON-CE-M&P-SDS-0004 HVAC layout plan for type A&B Type A&B
ELITE18-CON-CE-M&PSHD-0003
M&P 17-Nov-22 19-Nov-22 C 21-Jan-23 25-Jan-23 B B
ELITE18-CON-CE-M&PSHD-0006

ELITE18-CON-CE-ELE-SHD-0004
ELITE18-CON-CE-ELE-SHD-0005
5 ELITE18-CON-CE-ELE-SDS-0005 Data ELV & voice layout plan fr vilaa type a&b Type A&B ELITE18-CON-CE-ELE-SHD-0006 ELE 28-Nov-22 6-Dec-22 B B
ELITE18-CON-CE-ELE-SHD-0007
ELITE18-CON-CE-ELE-SHD-0008

ELITE18-CON-CE-M&P-SHD-0001
6 ELITE18-CON-CE-M&P-SDS-0006 Washroom layout plan for type a&b Type A&B ELITE18-CON-CE-M&PSHD-0002 M&P 7-Dec-22 15-Dec-22 B B
ELITE18-CON-CE-M&PSHD-0003

ELITE18-CON-CE-M&P-SHD-0001
HVAC layout of ground & first floor type A&B (All redy ELITE18-CON-CE-M&PSHD-0001
7 ELITE18-CON-CE-M&P-SDS-0007
aproved in SDS-04 no)
Type A&B
ELITE18-CON-CE-M&PSHD-0002
M&P 13-Dec-22 17-Dec-22 C 13-Dec-22 17-Dec-22 C 9-Jan-23 B B
ELITE18-CON-CE-M&PSHD-0002

ELITE18-CON-CE-CIV-SHD-0101
ELITE18-CON-CE-CIV-SHD-0101
8 ELITE18-CON-CE-CIV-SDS-0008 Dismantling for columns & beams ground & first floor Type A&B
ELITE18-CON-CE-CIV-SHD-0101
CIV 17-Dec-22 20-Dec-22 C 20-Dec-22 22-Dec-22 B B
ELITE18-CON-CE-CIV-SHD-0101

9 ELITE18-CON-CE--CIV-SDS-0009 External plaster patch work of villa 143,144 ELITE18-CON-CE-CIV-SHD-0102 CIV 17-Dec-22 21-Dec-22 B B

10 ELITE18-CON-CE-CIV-SDS-0010 External plaster patch work of villa 141,142 ELITE18-CON-CE-CIV-SHD-0103 CIV 17-Dec-22 21-Dec-22 B B

11 ELITE18-CON-CE--CIV-SDS-0011 External plaster patch work of villa 139,140 ELITE18-CON-CE-CIV-SHD-0104 CIV 17-Dec-22 22-Dec-22 B B

12 ELITE18-CON-CE-CIV-SDS-0012 Typical cross section for rc beam ELITE18-CON-CE-CIV-SHD-0105 CIV 19-Dec-22 UR UR

13 ELITE18-CON-CE--CIV-SDS-0013 MS girders for retrofitting of ground floor & first floor ELITE18-CON-CE-CIV-SHD-0100 CIV 22-Dec-22 22-Dec-22 B B

Slab on grade plan & sectional details walls footing


14 ELITE18-CON-CE--CIV-SDS-0014
section
ELITE18-CON-CE-CIV-SHD-0029 CIV 19-Dec-22 29-Dec-22 B B

15 ELITE18-CON-CE-CIV-SDS-0015 Internal plaster work for retrofiting of villa #143,144 ELITE18-CON-CE-CIV-SHD-0105 CIV 23-Jan-23 4-Feb-23 A A

16 ELITE18-CON-CE-CIV-SDS-0016 Internal plaster work on dismental wall of villa #143,144 ELITE18-CON-CE-CIV-SHD-0106 CIV 5-Jan-23 21-Jan-23 B B

17 ELITE18-CON-CE-CIV-SDS-0017 Internal plaster patch work of villa #143,144 ELITE18-CON-CE-CIV-SHD-0107 CIV 7-Jan-23 18-Jan-23 B B

18 ELITE18-CON-CE-M&P-SDS-0018 Gas supply ground first & top floor ELITE18-CON-CE-CIV-SHD-0010 M&P 21-Jan-23 25-Jan-23 B B

19 ELITE18-CON-CE-CIV-SDS-0019 Typical manhole cover & louvers of OHWT type A&B ELITE18-CON-CE-CIV-SHD-0109 CIV 26-Jan-23 26-Jan-23 A 20-Feb-23 23-Feb-23 A A

20 ELITE18-CON-CE-CIV-SDS-0020 Typical mumty roof gola & gravel section detail ELITE18-CON-CE-CIV-SHD-0110 CIV 26-Jan-23 26-Jan-23 B B

21 ELITE18-CON-CE-CIV-SDS-0021 Typical detail of bulk head cement board type A ELITE18-CON-CE-CIV-SHD-0111 CIV 26-Jan-23 26-Jan-23 A A

22 ELITE18-CON-CE-CIV-SDS-0022 Boundary wall front elevation of villa 143,144 ELITE18-CON-CE-CIV-SHD-0112 CIV 26-Jan-23 26-Jan-23 A A

Typical MS cover booster & transfer pump front & side


23 ELITE18-CON-CE-CIV-SDS-0023
elevation type A&B
ELITE18-CON-CE-CIV-SHD-0113 CIV 26-Jan-23 26-Jan-23 B B

Page 4 of 123
CLUSTER-E - SHOP DRAWINGS SUBMITTAL LOG - CON

DISCIPLINE
Rev-00 Rev-01 Rev-02 Rev-03
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Villa No. DRAWINGS NO STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

ELITE18-CON-CE-CIV-SHD-0013
24 ELITE18-CON-CE-CIV-SDS-0024 Stair & railing detail villa type A&B ELITE18-CON-CE-CIV-SHD-0014 CIV 26-Jan-23 26-Jan-23 A A
ELITE18-CON-CE-CIV-SHD-0014A

Washing machine on mumty floor PPRC & UPVC points


25 ELITE18-CON-CE-M&P-SDS-0025
type B
ELITE18-CON-CE-M&P-SHD-0113 M&P 26-Jan-23 1-Feb-23 B B

ELITE18-CON-CE-CIV-SHD-0015
26 ELITE18-CON-CE-CIV-SDS-0026 Block work for OHWT type A&B ELITE18-CON-CE-CIV-SHD-0015A CIV 31-Jan-23 4-Feb-23 A A

ELITE18-CON-CE-CIV-SHD-0016
27 ELITE18-CON-CE-CIV-SDS-0027 Plaster work for block work of OHWT type A&B ELITE18-CON-CE-CIV-SHD-0016A CIV 31-Jan-23 4-Feb-23 A A

Under plinth beam dismantling & block work for pile cap ELITE18-CON-CE-CIV-SHD-0017
28 ELITE18-CON-CE-CIV-SDS-0028
typeA&B
CIV 31-Jan-23 4-Feb-23 A A

ELITE18-CON-CE-CIV-SHD-0018
29 ELITE18-CON-CE-CIV-SDS-0029 External flooring plan & section type A&B ELITE18-CON-CE-CIV-SHD-0018A CIV 11-Feb-23 14-Feb-23 A A
ELITE18-CON-CE-CIV-SHD-0018B

30 ELITE18-CON-CE-CIV-SDS-0030 Internal plaster patch work of villa #136 ELITE18-CON-CE-CIV-SHD-00135 CIV 11-Mar-23 17-Mar-23 A A

ELITE18-CON-CE-CIV-SHD-0120
31 ELITE18-CON-CE-CIV-SDS-0031 Typical catch basin for type A&B CIV 15-Feb-23 A A

ELITE18-CON-CE-CIV-SHD-0121
32 ELITE18-CON-CE-CIV-SDS-0032 Internal plaster patch work of villa 137 type A CIV 24-Feb-23 A A

ELITE18-CON-CE-CIV-SHD-0122
33 ELITE18-CON-CE-CIV-SDS-0033 Internal plaster patch work of villa 138 type B CIV 24-Feb-23 A A

34 ELITE18-CON-CE-CIV-SDS-0034 Internal plaster patch work of villa #141,142 ELITE18-CON-CE-CIV-SHD-0114 CIV 18-Feb-23 23-Feb-23 A A

Column c-6 height extend 1st floor to skylight celing type


35 ELITE18-CON-CE-CIV-SDS-0035
B
ELITE18-CON-CE-CIV-SHD-0119 CIV 18-Feb-23 23-Feb-23 A A

Typical vanity base thickness for all bath powder type


36 ELITE18-CON-CE-CIV-SDS-0036
A&B
ELITE18-CON-CE-CIV-SHD-0123 CIV 22-Feb-23 23-Feb-23 A A

Typical block work for all walls ground,first & mumty


37 ELITE18-CON-CE-CIV-SDS-0037
floor type A&B
ELITE18-CON-CE-CIV-SHD-0124 CIV 23-Feb-23 6-Mar-23 B B

Typical access panel in ceiling ground & first floor type


38 ELITE18-CON-CE-CIV-SDS-0038
A&B
ELITE18-CON-CE-CIV-SHD-0125 CIV 23-Feb-23 9-Mar-23 B B

ELITE18-CON-CE-CIV-SHD-0126
Typical core cutting for manhole soil & waste pipe ELITE18-CON-CE-CIV-SHD-0126a
39 ELITE18-CON-CE-CIV-SDS-0039
ground first & mumty floor type A&B ELITE18-CON-CE-CIV-SHD-0126b
CIV 23-Feb-23 4-Mar-23 B B
ELITE18-CON-CE-CIV-SHD-0126c

ELITE18-CON-CE-CIV-SHD-0127
40 ELITE18-CON-CE-CIV-SDS-0040 Stair & railing detail type A&B ELITE18-CON-CE-CIV-SHD-0127A CIV 24-Feb-23 3-Mar-23 C 4-Mar-23 7-Mar-23 A A
ELITE18-CON-CE-CIV-SHD-0127B

41 ELITE18-CON-CE-CIV-SDS-0041 Internal plaster patch work of villa#139 ELITE18-CON-CE-CIV-SHD-0128 CIV 24-Feb-23 1-Mar-23 B B

42 ELITE18-CON-CE-CIV-SDS-0042 Internal plaster patch work of villa#140 ELITE18-CON-CE-CIV-SHD-0129 CIV 24-Feb-23 1-Mar-23 B B

Typical perlino marbal on column c-1 mumty floor ELITE18-CON-CE-CIV-SHD-0130


43 ELITE18-CON-CE-CIV-SDS-0043
elevation 4 ELITE18-CON-CE-CIV-SHD-0130A
CIV 2-Mar-23 7-Mar-23 A A

ELITE18-CON-CE-CIV-SHD-0131
ELITE18-CON-CE-CIV-SHD-0131A
44 ELITE18-CON-CE-CIV-SDS-0044 External plaster patch work of villa 137,138 A&B ELITE18-CON-CE-CIV-SHD-0131B CIV 4-Mar-23 8-Mar-23 B B
ELITE18-CON-CE-CIV-SHD-
0131C
ELITE18-CON-CE-CIV-SHD-0132
ELITE18-CON-CE-CIV-SHD-0132A
45 ELITE18-CON-CE-CIV-SDS-0045 External plaster patch work of villa 131,132 A&B ELITE18-CON-CE-CIV-SHD-0132B CIV 4-Mar-23 8-Mar-23 B B
ELITE18-CON-CE-CIV-SHD-
0132C
ELITE18-CON-CE-CIV-SHD-0133
ELITE18-CON-CE-CIV-SHD-0133A
46 ELITE18-CON-CE-CIV-SDS-0046 External plaster patch work of villa #129,130 A&B ELITE18-CON-CE-CIV-SHD-0133B CIV 6-Mar-23 8-Mar-23 B B
ELITE18-CON-CE-CIV-SHD-
0133C

47 ELITE18-CON-CE-CIV-SDS-0047 Internal plaster patch work of villa #135 ELITE18-CON-CE-CIV-SHD-0134 CIV 11-Mar-23 17-Mar-23 A A

ELITE18-CON-CE-CIV-SHD-0136
48 ELITE18-CON-CE-CIV-SDS-0048 Boundry wall detail type A&B villa#137,138
ELITE18-CON-CE-CIV-SHD-0137
CIV 1-Apr-23 4-Apr-23 A A

Page 5 of 123
CLUSTER-E - SHOP DRAWINGS SUBMITTAL LOG - CON

DISCIPLINE
Rev-00 Rev-01 Rev-02 Rev-03
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Villa No. DRAWINGS NO STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

49 ELITE18-CON-CE-CIV-SDS-0049 Typical shower area detail type A&B ELITE18-CON-CE-CIV-SHD-0138 CIV 1-Apr-23 4-Apr-23 B B

ELITE18-CON-CE-CIV-SHD-0139
ELITE18-CON-CE-CIV-SHD-0139A
50 ELITE18-CON-CE-CIV-SDS-0050 External plaster patch work of villa 133,134 A&B ELITE18-CON-CE-CIV-SHD-0139B CIV 6-Apr-23 14-Apr-23 C C
ELITE18-CON-CE-CIV-SHD-
0139C
ELITE18-CON-CE-CIV-SHD-0140
ELITE18-CON-CE-CIV-SHD-0140A
51 ELITE18-CON-CE-CIV-SDS-0051 External plaster patch work of villa 135,136 A&B ELITE18-CON-CE-CIV-SHD-0140B CIV 6-Apr-23 14-Apr-23 C C
ELITE18-CON-CE-CIV-SHD-
0140C
ELITE18-CON-CE-CIV-SHD-0141
ELITE18-CON-CE-CIV-SHD-0141A
52 ELITE18-CON-CE-CIV-SDS-0052 External plaster patch work of villa 127,128 A&B ELITE18-CON-CE-CIV-SHD-0141B CIV 6-Apr-23 10-Apr-23 B B
ELITE18-CON-CE-CIV-SHD-
0141C

ELITE18-CON-CE-CIV-SHD-0156
ELITE18-CON-CE-CIV-SHD-0157
53 ELITE18-CON-CE-CIV-SDS-0053 Retrofitting detail for cluster E ELITE18-CON-CE-CIV-SHD-0158 CIV 5-May-23 UR 6-Jun-23 20-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0159
ELITE18-CON-CE-CIV-SHD-0160

ELITE18-CON-CE-CIV-SHD-0153
54 ELITE18-CON-CE-CIV-SDS-0054 Retaining wall deatail villa#93,94 & 107 to 114 ELITE18-CON-CE-CIV-SHD-0154 CIV 12-May-23 12-May-23 B B
ELITE18-CON-CE-CIV-SHD-0155

ELITE18-CON-CE-CIV-SHD-0161
55 ELITE18-CON-CE-CIV-SDS-0055 Boudry wall detail type A&B villa#135,136
ELITE18-CON-CE-CIV-SHD-0162
CIV 9-May-23 16-May-23 A A

ELITE18-CON-CE-CIV-SHD-0163
56 ELITE18-CON-CE-CIV-SDS-0056 Boudry wall detail type A&B villa#133,134
ELITE18-CON-CE-CIV-SHD-0164
CIV 9-May-23 16-May-23 A A

ELITE18-CON-CE-CIV-SHD-0165
57 ELITE18-CON-CE-CIV-SDS-0057 Boundry wall detail type A&B villa#139,140
ELITE18-CON-CE-CIV-SHD-0166
CIV 12-May-23 16-May-23 A A

ELITE18-CON-CE-CIV-SHD-0169
58 ELITE18-CON-CE-CIV-SDS-0058 Boundry wall deatail type A&B villa#141,142
ELITE18-CON-CE-CIV-SHD-0170
CIV 13-May-23 16-May-23 A A

59 ELITE18-CON-CE-CIV-SDS-0059 Paver deatil type A&B villa#139,140 ELITE18-CON-CE-CIV-SHD-0167 CIV 13-May-23 18-May-23 C C

ELITE18-CON-CE-CIV-SHD-0172
60 ELITE18-CON-CE-CIV-SDS-0060 Boundry wall details villa 143,144 type A&B
ELITE18-CON-CE-CIV-SHD-0173
CIV 25-May-23 1-Jun-23 A A

ELITE18-CON-CE-CIV-SHD-0174
61 ELITE18-CON-CE-CIV-SDS-0061 Internal plaster patch work of villa #134 ELITE18-CON-CE-CIV-SHD-0175 CIV 6-Jun-23 15-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0176
ELITE18-CON-CE-CIV-SHD-0177
62 ELITE18-CON-CE-CIV-SDS-0062 Internal plaster patch work of villa #133 ELITE18-CON-CE-CIV-SHD-0178 CIV 6-Jun-23 15-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0179

ELITE18-CON-CE-CIV-SHD-0180
63 ELITE18-CON-CE-CIV-SDS-0063 Internal plaster patch work of villa #132 ELITE18-CON-CE-CIV-SHD-0181 CIV 7-Jun-23 15-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0182

ELITE18-CON-CE-CIV-SHD-0183
64 ELITE18-CON-CE-CIV-SDS-0064 Internal plaster patch work of villa #131 ELITE18-CON-CE-CIV-SHD-0184 CIV 7-Jun-23 15-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0185

ELITE18-CON-CE-CIV-SHD-0186
65 ELITE18-CON-CE-CIV-SDS-0065 Internal plaster patch work of villa #130 ELITE18-CON-CE-CIV-SHD-0187 CIV 7-Jun-23 15-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0188

ELITE18-CON-CE-CIV-SHD-0189
66 ELITE18-CON-CE-CIV-SDS-0066 Internal plaster patch work of villa #129 ELITE18-CON-CE-CIV-SHD-0190 CIV 10-Jun-23 15-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0191

ELITE18-CON-CE-CIV-SHD-0192
67 ELITE18-CON-CE-CIV-SDS-0067 Internal plaster patch work of villa #128 ELITE18-CON-CE-CIV-SHD-0193 CIV 10-Jun-23 15-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0194

ELITE18-CON-CE-CIV-SHD-0195
68 ELITE18-CON-CE-CIV-SDS-0068 Internal plaster patch work of villa #127 ELITE18-CON-CE-CIV-SHD-0196 CIV 8-Jun-23 15-Jun-23 A A
ELITE18-CON-CE-CIV-SHD-0197

ELITE18-CON-CE-CIV-SHD-0198
69 ELITE18-CON-CE-CIV-SDS-0069 Boundary wall plaster patches villa#131
ELITE18-CON-CE-CIV-SHD-0199
CIV 10-Jun-23 15-Jun-23 A A

ELITE18-CON-CE-CIV-SHD-0200
70 ELITE18-CON-CE-CIV-SDS-0070 Boundary wall plaster patches villa#129,130 ELITE18-CON-CE-CIV-SHD-0201 CIV 10-Jun-23 15-Jun-23 B B
ELITE18-CON-CE-CIV-SHD-0202

Page 6 of 123
CLUSTER-E - SHOP DRAWINGS SUBMITTAL LOG - CON

DISCIPLINE
Rev-00 Rev-01 Rev-02 Rev-03
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Villa No. DRAWINGS NO STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

ELITE18-CON-CE-CIV-SHD-0203
71 ELITE18-CON-CE-CIV-SDS-0071 Boundary wall details villa#129,130
ELITE18-CON-CE-CIV-SHD-0204
CIV 19-Jun-23 6-Jul-23 A A

ELITE18-CON-CE-CIV-SHD-0205
ELITE18-CON-CE-CIV-SHD-0205a
72 ELITE18-CON-CE-CIV-SDS-0072 External plaster patch work of villa#122 & 123
ELITE18-CON-CE-CIV-SHD-0205b
CIV 17-Jul-23 20-Jul-23 A A
ELITE18-CON-CE-CIV-SHD-0205c

ELITE18-CON-CE-CIV-SHD-0206
73 ELITE18-CON-CE-M&P-SDS-0073 AC location & copper pipe of vilaa#122 to 126A ELITE18-CON-CE-CIV-SHD-0207 M&P 19-Jul-23 20-Jul-23 C 8-Aug-23 12-Aug-23 B B
ELITE18-CON-CE-CIV-SHD-0208

ELITE18-CON-CE-CIV-SHD-0209
ELITE18-CON-CE-CIV-SHD-0209a
74 ELITE18-CON-CE-CIV-SDS-0074 External plaster patch work of villa#124,125
ELITE18-CON-CE-CIV-SHD-0209b
CIV 19-Jul-23 25-Jul-23 A A
ELITE18-CON-CE-CIV-SHD-0209c

ELITE18-CON-CE-CIV-SHD-0210
ELITE18-CON-CE-CIV-SHD-0210a
75 ELITE18-CON-CE-CIV-SDS-0075 External plaster patch work of villa#126,126a
ELITE18-CON-CE-CIV-SHD-0210b
CIV 24-Jul-23 7-Aug-23 A A
ELITE18-CON-CE-CIV-SHD-0210c
ELITE18-CON-CE-CIV-SHD-0211
ELITE18-CON-CE-CIV-SHD-0212
ELITE18-CON-CE-CIV-SHD-0213
ELITE18-CON-CE-CIV-SHD-0214
76 ELITE18-CON-CE-CIV-SDS-0076 Architecture drawings of villa#126,126a ELITE18-CON-CE-CIV-SHD-0215 CIV 24-Jul-23 7-Aug-23 B B
ELITE18-CON-CE-CIV-SHD-0216
ELITE18-CON-CE-CIV-SHD-0217

ELITE18-CON-CE-CIV-SHD-0218
77 ELITE18-CON-CE-CIV-SDS-0077 Internal palster patch work of villa 126 ELITE18-CON-CE-CIV-SHD-0219 CIV 5-Aug-23 10-Aug-23 C 12-Aug-23 16-Aug-23 A A
ELITE18-CON-CE-CIV-SHD-0220

ELITE18-CON-CE-CIV-SHD-0233
78 ELITE18-CON-CE-CIV-SDS-0078 Internal palster patch work of villa 126a ELITE18-CON-CE-CIV-SHD-0234 CIV 5-Aug-23 11-Aug-23 C 12-Aug-23 16-Aug-23 A A
ELITE18-CON-CE-CIV-SHD-0235

ELITE18-CON-CE-CIV-SHD-0221
79 ELITE18-CON-CE-CIV-SDS-0079 Boundry wall details villa 127,128 type A&B
ELITE18-CON-CE-CIV-SHD-0222
CIV 3-Aug-23 9-Aug-23 A A

ELITE18-CON-CE-CIV-SHD-0223
Typical external retrofitting plaster patch work of villa ELITE18-CON-CE-CIV-SHD-0224
80 ELITE18-CON-CE-CIV-SDS-0080
101 to 120 ELITE18-CON-CE-CIV-SHD-0225
CIV 3-Aug-23 7-Aug-23 A A
ELITE18-CON-CE-CIV-SHD-0226

ELITE18-CON-CE-CIV-SHD-0227
81 ELITE18-CON-CE-CIV-SDS-0081 Internal palster patch work of villa 122,123 ELITE18-CON-CE-CIV-SHD-0228 CIV 5-Aug-23 8-Aug-23 A A
ELITE18-CON-CE-CIV-SHD-0229

ELITE18-CON-CE-CIV-SHD-0230
82 ELITE18-CON-CE-CIV-SDS-0082 Internal palster patch work of villa 124,125 ELITE18-CON-CE-CIV-SHD-0231 CIV 5-Aug-23 8-Aug-23 A A
ELITE18-CON-CE-CIV-SHD-0232

83 ELITE18-CON-CE-CIV-SDS-0083 Typical pergola cleats jointing type a&b ELITE18-CON-CE-CIV-SHD-0233 CIV 8-Aug-23 12-Aug-23 B B

ELITE18-CON-CE-CIV-SHD-0234
84 ELITE18-CON-CE-CIV-SDS-0084 Boundry wall details villa 126,126a type A&B
ELITE18-CON-CE-CIV-SHD-0235
CIV 10-Aug-23 19-Aug-23 A A

ELITE18-CON-CE-CIV-SHD-0236
85 ELITE18-CON-CE-CIV-SDS-0085 Removing plaster walls villa 114 B
ELITE18-CON-CE-CIV-SHD-0237
CIV 30-Aug-23 2-Sep-23 B B

ELITE18-CON-CE-CIV-SHD-0238
86 ELITE18-CON-CE-CIV-SDS-0086 Removing plaster old walls villa 111 A ELITE18-CON-CE-CIV-SHD-0239 CIV 30-Aug-23 2-Sep-23 A A
ELITE18-CON-CE-CIV-SHD-0240
ELITE18-CON-CE-CIV-SHD-0241
87 ELITE18-CON-CE-CIV-SDS-0087 Removing plaster old walls villa 112 B
ELITE18-CON-CE-CIV-SHD-0242
CIV 30-Aug-23 2-Sep-23 A A

ELITE18-CON-CE-CIV-SHD-0243
88 ELITE18-CON-CE-CIV-SDS-0088 Internal walls plaster villa 119 A Withdraw Withdraw ELITE18-CON-CE-CIV-SHD-0244 CIV 2-Sep-23
ELITE18-CON-CE-CIV-SHD-0245

ELITE18-CON-CE-CIV-SHD-0246
89 ELITE18-CON-CE-CIV-SDS-0089 Internal walls plaster villa 120 A Withdraw Withdraw ELITE18-CON-CE-CIV-SHD-0247 CIV 2-Sep-23
ELITE18-CON-CE-CIV-SHD-0248

ELITE18-CON-CE-CIV-SHD-0249
UPVC pipe measurement external & internal 110mm & ELITE18-CON-CE-CIV-SHD-0250
90 ELITE18-CON-CE-M&P-SDS-0090
160mm ELITE18-CON-CE-CIV-SHD-0251
M&P 30-Aug-23 1-Sep-23 B B
ELITE18-CON-CE-CIV-SHD-0252
ELITE18-CON-CE-CIV-SHD-0254
91 ELITE18-CON-CE-CIV-SDS-0091 Layout plan relocation boundry wall villa 122 A
ELITE18-CON-CE-CIV-SHD-0255
CIV 1-Sep-23 8-Sep-23 A A

Page 7 of 123
CLUSTER-E - SHOP DRAWINGS SUBMITTAL LOG - CON

DISCIPLINE
Rev-00 Rev-01 Rev-02 Rev-03
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Villa No. DRAWINGS NO STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

ELITE18-CON-CE-CIV-SHD-0256
92 ELITE18-CON-CE-M&P-SDS-0092 Typical kitchen layout & hood details type B WITHDRAW
ELITE18-CON-CE-CIV-SHD-0257
M&P 12-Sep-23 13-Sep-23

ELITE18-CON-CE-CIV-SHD-0258
93 ELITE18-CON-CE-M&P-SDS-0093 Typical kitchen layout & hood details type A WITHDRAW
ELITE18-CON-CE-CIV-SHD-0259
M&P 12-Sep-23 13-Sep-23

ELITE18-CON-CE-CIV-SHD-0260
RCC retaining wall excavation level detail villa#93,94, &
94 ELITE18-CON-CE-CIV-SDS-0094
107 to 114
ELITE18-CON-CE-CIV-SHD-0261 CIV 11-Sep-23 20-Sep-23 B B
ELITE18-CON-CE-CIV-SHD-0262
ELITE18-CON-CE-CIV-SHD-0263
95 ELITE18-CON-CE-CIV-SDS-0095 Boundry wall fence details villa#124,125
ELITE18-CON-CE-CIV-SHD-0264
CIV 14-Sep-23 UR UR

ELITE18-CON-CE-CIV-SHD-0265
96 ELITE18-CON-CE-CIV-SDS-0096 Boundry wall fence details villa#131,132
ELITE18-CON-CE-CIV-SHD-0266
CIV 14-Sep-23 18-Sep-23 A A

ELITE18-CON-CE-CIV-SHD-0267
97 ELITE18-CON-CE-CIV-SDS-0097 Boundry wall fence details villa#122,123
ELITE18-CON-CE-CIV-SHD-0268
CIV 14-Sep-23 18-Sep-23 A A

ELITE18-CON-CE-CIV-SHD-0269
98 ELITE18-CON-CE-M&P-SDS-0098 Typical HVAC detail villa 122 & 126a ELITE18-CON-CE-CIV-SHD-0270 M&P 20-Sep-23 27-Sep-23 B B
ELITE18-CON-CE-CIV-SHD-0271

ELITE18-CON-CE-CIV-SHD-0172
ELITE18-CON-CE-CIV-SHD-0173
99 ELITE18-CON-CE-CIV-SDS-0099 Retaining wall deatail villa#115 to 120
ELITE18-CON-CE-CIV-SHD-0174
CIV 24-Sep-23 25-Sep-23 C 27-Sep-23 4-Oct-23 B 24-Nov-23 28-Nov-23 C C
ELITE18-CON-CE-CIV-SHD-0175

ELITE18-CON-CE-CIV-SHD-0176
As built for paver skirting manhole & boundary wall
100 ELITE18-CON-CE-CIV-SDS-0100
villa# 127,128
127,128 ELITE18-CON-CE-CIV-SHD-0177 CIV 28-Sep-23 7-Oct-23 B B
ELITE18-CON-CE-CIV-SHD-0178
ELITE18-CON-CE-CIV-SHD-0179
As built for paver skirting manhole & boundary wall
101 ELITE18-CON-CE-CIV-SDS-0101
villa# 129,130
129,130 ELITE18-CON-CE-CIV-SHD-0180 CIV 14-Oct-23 25-Oct-23 C 6-Dec-23 8-Dec-23 C 13-Dec-23 14-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0181

ELITE18-CON-CE-CIV-SHD-0182
AS built for paver skirting manhole & boundary wall
102 ELITE18-CON-CE-CIV-SDS-0102
villa# 131,132
131,132 ELITE18-CON-CE-CIV-SHD-0183 CIV 9-Oct-23 11-Oct-23 C 14-Oct-23 25-Oct-23 C 6-Dec-23 8-Dec-23 C 13-Dec-23 14-Dec-23 B
ELITE18-CON-CE-CIV-SHD-0184

ELITE18-CON-CE-CIV-SHD-0185
AS built for paver skirting manhole & boundary wall
103 ELITE18-CON-CE-CIV-SDS-0103
villa# 133,134
133,134 ELITE18-CON-CE-CIV-SHD-0186 CIV 11-Oct-23 25-Oct-23 C 6-Dec-23 8-Dec-23 C 13-Dec-23 14-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0187
ELITE18-CON-CE-CIV-SHD-0188
AS built for paver skirting manhole & boundary wall
104 ELITE18-CON-CE-CIV-SDS-0104
villa# 135,136
135,136 ELITE18-CON-CE-CIV-SHD-0189 CIV 11-Oct-23 25-Oct-23 C 6-Dec-23 8-Dec-23 C 13-Dec-23 14-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0190
ELITE18-CON-CE-CIV-SHD-0191
AS built for paver skirting manhole & boundary wall
105 ELITE18-CON-CE-CIV-SDS-0105
villa# 137,138
137,138 ELITE18-CON-CE-CIV-SHD-0192 CIV 11-Oct-23 25-Oct-23 C 6-Dec-23 8-Dec-23 C 13-Dec-23 14-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0193
ELITE18-CON-CE-CIV-SHD-0194
AS built for paver skirting manhole & boundary wall
106 ELITE18-CON-CE-CIV-SDS-0106
villa# 139,140
139,140 ELITE18-CON-CE-CIV-SHD-0195 CIV 11-Oct-23 25-Oct-23 C 6-Dec-23 8-Dec-23 C 13-Dec-23 14-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0196
ELITE18-CON-CE-CIV-SHD-0197
107 ELITE18-CON-CE-CIV-SDS-0107 Boundary wall detail villa# 139,140 139,140 ELITE18-CON-CE-CIV-SHD-0197a CIV 10-Oct-23 13-Oct-23 C C
ELITE18-CON-CE-CIV-SHD-0198
ELITE18-CON-CE-CIV-SHD-0199
AS built for paver skirting manhole & boundary wall
108 ELITE18-CON-CE-CIV-SDS-0108
villa# 141,142
141,142 ELITE18-CON-CE-CIV-SHD-0200 CIV 14-Oct-23 25-Oct-23 C 6-Dec-23 8-Dec-23 C 13-Dec-23 14-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0201
ELITE18-CON-CE-CIV-SHD-0202
AS built for paver skirting manhole & boundary wall
109 ELITE18-CON-CE-CIV-SDS-0109
villa# 143,144
143,144 ELITE18-CON-CE-CIV-SHD-0203 CIV 14-Oct-23 25-Oct-23 C 6-Dec-23 8-Dec-23 C 13-Dec-23 14-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0204

ELITE18-CON-CE-CIV-SHD-0272
ELITE18-CON-CE-CIV-SHD-0273
110 ELITE18-CON-CE-CIV-SDS-0110 Core cutting deatails for villa# 119,120 119,120 ELITE18-CON-CE-CIV-SHD-0274 CIV 19-Oct-23 25-Oct-23 C 28-Oct-23 31-Oct-23 B B
ELITE18-CON-CE-CIV-SHD-0275
ELITE18-CON-CE-CIV-SHD-0276

ELITE18-CON-CE-CIV-SHD-0277
ELITE18-CON-CE-CIV-SHD-0278
111 ELITE18-CON-CE-CIV-SDS-0111 Core cutting deatails for villa# 111,112 111,112 ELITE18-CON-CE-CIV-SHD-0279 CIV 24-Oct-23 30-Oct-23 C 4-Nov-23 7-Nov-23 B B
ELITE18-CON-CE-CIV-SHD-0280
ELITE18-CON-CE-CIV-SHD-0281

ELITE18-CON-CE-CIV-SHD-0282
ELITE18-CON-CE-CIV-SHD-0283
112 ELITE18-CON-CE-CIV-SDS-0112 Core cutting deatails for villa# 113,114 113,114 ELITE18-CON-CE-CIV-SHD-0284 CIV 24-Oct-23 30-Oct-23 C 4-Nov-23 7-Nov-23 B B
ELITE18-CON-CE-CIV-SHD-0285
ELITE18-CON-CE-CIV-SHD-0286

Page 8 of 123
CLUSTER-E - SHOP DRAWINGS SUBMITTAL LOG - CON

DISCIPLINE
Rev-00 Rev-01 Rev-02 Rev-03
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Villa No. DRAWINGS NO STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

ELITE18-CON-CE-CIV-SHD-0287
ELITE18-CON-CE-CIV-SHD-0288
113 ELITE18-CON-CE-CIV-SDS-0113 Core cutting deatails for villa# 117,118 117,118 ELITE18-CON-CE-CIV-SHD-0289 CIV 24-Oct-23 30-Oct-23 C 4-Nov-23 7-Nov-23 B B
ELITE18-CON-CE-CIV-SHD-0290
ELITE18-CON-CE-CIV-SHD-0291

ELITE18-CON-CE-CIV-SHD-0292
114 ELITE18-CON-CE-CIV-SDS-0114 Boundry wall fence details villa# 119,120 119,120
ELITE18-CON-CE-CIV-SHD-0293
CIV 26-Oct-23 28-Oct-23 B B

ELITE18-CON-CE-CIV-SHD-0294
115 ELITE18-CON-CE-CIV-SDS-0115 Boundry wall fence details villa# 117,118 117,118
ELITE18-CON-CE-CIV-SHD-0295
CIV 26-Oct-23 28-Oct-23 B B

ELITE18-CON-CE-CIV-SHD-0296
116 ELITE18-CON-CE-CIV-SDS-0116 Boundry wall fence details villa# 113,114 113,134
ELITE18-CON-CE-CIV-SHD-0297
CIV 26-Oct-23 28-Oct-23 B B

ELITE18-CON-CE-CIV-SHD-0298
117 ELITE18-CON-CE-CIV-SDS-0117 Boundry wall fence details villa# 111,112 111,112
ELITE18-CON-CE-CIV-SHD-0299
CIV 28-Oct-23 1-Nov-23 A A

ELITE18-CON-CE-CIV-SHD-0300
118 ELITE18-CON-CE-CIV-SDS-0118 Retaining wall detail villa# 115 A back side 115
ELITE18-CON-CE-CIV-SHD-0301
CIV 28-Oct-23 5-Nov-23 A A

ELITE18-CON-CE-CIV-SHD-0302
119 ELITE18-CON-CE-CIV-SDS-0119 Boundry wall fence details villa# 109,110 109,110
ELITE18-CON-CE-CIV-SHD-0303
CIV 30-Oct-23 1-Nov-23 A A

ELITE18-CON-CE-CIV-SHD-0304
120 ELITE18-CON-CE-M&P-SDS-0120 Copper pipe measurement detail villa 119,120 119,120 ELITE18-CON-CE-CIV-SHD-0305 M&P 31-Oct-23 7-Nov-23 B B
ELITE18-CON-CE-CIV-SHD-0306

Typical diffuser & access panel location for ELITE18-CON-CE-CIV-SHD-0307


121 ELITE18-CON-CE-M&P-SDS-0121
villa#110,112,114,116,18,120 type B ELITE18-CON-CE-CIV-SHD-0307a
M&P 3-Nov-23 7-Nov-23 B B

ELITE18-CON-CE-CIV-SHD-0308
122 ELITE18-CON-CE-CIV-SDS-0122 New plaster work for GF FF villa 119,120
ELITE18-CON-CE-CIV-SHD-0309
CIV 11-Nov-23 24-Nov-23 B B

ELITE18-CON-CE-CIV-SHD-0310
123 ELITE18-CON-CE-CIV-SDS-0123 New plaster work for GF FF villa 117,118
ELITE18-CON-CE-CIV-SHD-0311
CIV 11-Nov-23 24-Nov-23 B B

ELITE18-CON-CE-CIV-SHD-0312
124 ELITE18-CON-CE-CIV-SDS-0124 New plaster work for GF FF villa 115,116
ELITE18-CON-CE-CIV-SHD-0313
CIV 11-Nov-23 24-Nov-23 B B

ELITE18-CON-CE-CIV-SHD-0314
125 ELITE18-CON-CE-CIV-SDS-0125 New plaster work for GF FF villa 113,114
ELITE18-CON-CE-CIV-SHD-0315
CIV 11-Nov-23 24-Nov-23 B B

ELITE18-CON-CE-CIV-SHD-0316
126 ELITE18-CON-CE-CIV-SDS-0126 New plaster work for GF FF villa 111,112
ELITE18-CON-CE-CIV-SHD-0317
CIV 11-Nov-23 24-Nov-23 B B

ELITE18-CON-CE-CIV-SHD-0318
127 ELITE18-CON-CE-CIV-SDS-0127 New plaster work for GF FF villa 109,110
ELITE18-CON-CE-CIV-SHD-0319
CIV 13-Nov-23 24-Nov-23 B B

ELITE18-CON-CE-CIV-SHD-0320
128 ELITE18-CON-CE-CIV-SDS-0128 New plaster work for GF,FF Villa# 107,108 107,108
ELITE18-CON-CE-CIV-SHD-0321
CIV 28-Nov-23 5-Dec-23 A A

ELITE18-CON-CE-CIV-SHD-0322
129 ELITE18-CON-CE-CIV-SDS-0129 New plaster work for GF,FF Villa# 105,106 105,106
ELITE18-CON-CE-CIV-SHD-0323
CIV 28-Nov-23 5-Dec-23 A A

ELITE18-CON-CE-CIV-SHD-0324
130 ELITE18-CON-CE-CIV-SDS-0130 New plaster work for GF,FF Villa# 103,104 130,104
ELITE18-CON-CE-CIV-SHD-0325
CIV 28-Nov-23 5-Dec-23 A A

ELITE18-CON-CE-CIV-SHD-0326
131 ELITE18-CON-CE-CIV-SDS-0131 Boundry wall detail villa# 107,108 A&B
ELITE18-CON-CE-CIV-SHD-0327
CIV 2-Dec-23 7-Dec-23 B B

ELITE18-CON-CE-CIV-SHD-0328
132 ELITE18-CON-CE-CIV-SDS-0132 Boundry wall detail villa# 120 120 ELITE18-CON-CE-CIV-SHD-0329 CIV 4-Dec-23 20-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0330

ELITE18-CON-CE-CIV-SHD-0331
ELITE18-CON-CE-CIV-SHD-0332
133 ELITE18-CON-CE-CIV-SDS-0133 Typical stairs marble & skirting detail for type A&B A&B
ELITE18-CON-CE-CIV-SHD-0333
CIV 2-Dec-23 7-Dec-23 B B
ELITE18-CON-CE-CIV-SHD-0334

ELITE18-CON-CE-CIV-SHD-0335
134 ELITE18-CON-CE-CIV-SDS-0134 Boundry wall fence details villa# 105,106 A&B
ELITE18-CON-CE-CIV-SHD-0336
CIV 4-Dec-23 7-Dec-23 B B

ELITE18-CON-CE-CIV-SHD-0337
Typical glass partition in bath shower area detail for 10 ELITE18-CON-CE-CIV-SHD-0338
135 ELITE18-CON-CE-CIV-SDS-0135
M
A&B
ELITE18-CON-CE-CIV-SHD-0339
CIV 6-Dec-23 11-Dec-23 A A
ELITE18-CON-CE-CIV-SHD-0340

Page 9 of 123
CLUSTER-E - SHOP DRAWINGS SUBMITTAL LOG - CON

DISCIPLINE
Rev-00 Rev-01 Rev-02 Rev-03
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Villa No. DRAWINGS NO STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

ELITE18-CON-CE-M&P-SHD-0341
Copper pipe measurment detail villa #101 to 110 ,
136 ELITE18-CON-CE-CIV-SDS-0136
115,116
A&B ELITE18-CON-CE-M&PSHD-0342 M&P 15-Dec-23 20-Dec-23 B B
ELITE18-CON-CE-M&P-SHD-0343

ELITE18-CON-CE-CIV-SHD-0344
137 ELITE18-CON-CE-CIV-SDS-0137 Detail for boundary wall partition wall villa # 107,108 A&B ELITE18-CON-CE-CIV-SHD-0345 CIV 20-Dec-23 UR UR
ELITE18-CON-CE-CIV-SHD-0346

ELITE18-CON-CE-CIV-SHD-0347
138 ELITE18-CON-CE-CIV-SDS-0138 Area detail for paver skirting manhole & boundry wall 122,123 ELITE18-CON-CE-CIV-SHD-0348 CIV 26-Dec-23 UR UR
ELITE18-CON-CE-CIV-SHD-0349

ELITE18-CON-CE-CIV-SHD-0350
139 ELITE18-CON-CE-CIV-SDS-0139 Area detail for paver skirting manhole & boundry wall 124,125 ELITE18-CON-CE-CIV-SHD-0351 CIV 26-Dec-23 UR UR
ELITE18-CON-CE-CIV-SHD-0352

ELITE18-CON-CE-CIV-SHD-0353
140 ELITE18-CON-CE-CIV-SDS-0140 Area detail for paver skirting manhole & boundry wall 126,126a ELITE18-CON-CE-CIV-SHD-0354 CIV 26-Dec-23 UR UR
ELITE18-CON-CE-CIV-SHD-0355

ELITE18-CON-CE-CIV-SHD-0356
141 ELITE18-CON-CE-CIV-SDS-0141 Area detail for paver skirting manhole & boundry wall 119,120 ELITE18-CON-CE-CIV-SHD-0357 CIV 26-Dec-23 UR UR
ELITE18-CON-CE-CIV-SHD-0358

ELITE18-CON-CE-CIV-SHD-0359
142 ELITE18-CON-CE-CIV-SDS-0142 Area detail for paver skirting manhole & boundry wall 113,114 ELITE18-CON-CE-CIV-SHD-0360 CIV 27-Dec-23 UR UR
ELITE18-CON-CE-CIV-SHD-0361

ELITE18-CON-CE-M&P-SHD-0362
ELITE18-CON-CE-M&P-SHD-0363
Catch basin & RWP deatail
ELITE18-CON-CE-M&P-SDS-0143
117,118,107,108,,103,104,105,106,
A&B ELITE18-CON-CE-M&P-SHD-0364 M&P 28-Dec-23 UR UR
ELITE18-CON-CE-M&P-SHD-
0365

SUMMARY
Decipline Total Qty.
CIV 125
ARC 0
M&P 16
ELE 2
Total
143
Submitted
LEGENDS
Total submitted 139
Total Approved 125

A APPROVED 58
B APPROVED AS NOTED 67
C REVISED & RESUBMIT 5
D REJECTED 0
E FOR INFORMATION ONLY 0
UR UNDER REVIEW 9

Page 10 of 123
CLUSTER-E - SUB-CONTRACTOR / SUPPLIERS APPROVAL LOG - CON January 30, 2024

DISCIPLINE
FILE CODE

Rev-00 Rev-01 Rev-02 Rev-03


VOL #
ITEM

SUB-CONTRACTOR / FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

SUPPLIER NAME STATUS


Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status
Submission Reply Days
Status

LEGENDS
Total submitted 0
Total Approved 0

A APPROVED 0
B APPROVED AS NOTED 0
C REVISED & RESUBMIT 0
D REJECTED 0
E FOR INFORMATION ONLY 0
UR UNDER REVIEW 0

Page 11 of 123
CLUSTER-E - REQUEST FOR INFORMATION LOG - CON January 30, 2024

DISCIPLINE
FILE CODE

Rev-00 Rev-01 Rev-02


VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status

1 ELITE18-CON-CE-CIV-RFI-0001 Clashing of sewerage system with pilling work CIV 8-Sep-22 10-Sep-22 CLOSED CLOSED

2 ELITE18-CON-CE-CIV-RFI-0002 Structural cracks CIV 17-Sep-22 21-Sep-22 CLOSED CLOSED

3 ELITE18-CON-CE-CIV-RFI-0003 Retrofitting detail CIV 26-Sep-22 27-Sep-22 CLOSED CLOSED

4 ELITE18-CON-CE-CIV-RFI-0004 Bath floor tile type A bath-04 (Withdraw) CIV 23-Jan-23 10-Jun-23

5 ELITE18-CON-CE-CIV-RFI-0005 Window size increase CVI CIV 26-Jan-23 9-Feb-23 CLOSED CLOSED

6 ELITE18-CON-CE-ELE-RFI-0006 Spare conduit for solar system from MDB for mumty laevel ELE 8-Feb-23 14-Feb-23 CLOSED CLOSED

7 ELITE18-CON-CE-CIV-RFI-0007 Approvel requird for kitchen cabinet wall complete primer+putty CIV 11-Feb-23 14-Feb-23 CLOSED CLOSED

8 ELITE18-CON-CE-ELE-RFI-0008 Approvel requird for changing top roof tile villa 143 back side CIV 11-Feb-23 14-Feb-23 CLOSED CLOSED

9 ELITE18-CON-CE-ARC-RFI-0009 Flooring detail requird for villa-134 ARC 10-Mar-23 13-Mar-23 CLOSED CLOSED

10 ELITE18-CON-CE-M&P-RFI-0010 Proposed route for catch basin to infra manhole M&P 21-Mar-23 3-May-23 CLOSED 3-May-23 24-May-23 CLOSED CLOSED

11 ELITE18-CON-CE-M&P-RFI-0011 Proposed rain water drain & slope M&P 30-Mar-23 6-May-23 CLOSED CLOSED

12 ELITE18-CON-CE-M&P-RFI-0012 Water proofing re-work in UGWT M&P 11-Apr-23 14-Apr-23 CLOSED CLOSED

13 ELITE18-CON-CE-M&P-RFI-0013 Wall removed villa 134 M&P 6-May-23 9-May-23 CLOSED CLOSED

14 ELITE18-CON-CE-M&P-RFI-0014 Villa 101 to 132 M&P 6-May-23 9-May-23 CLOSED CLOSED

15 ELITE18-CON-CE-M&P-RFI-0015 Catch basin detail vila #101 to 132 M&P 23-May-23 2-Jun-23 CLOSED CLOSED

16 ELITE18-CON-CE-M&P-RFI-0016 Construction of retaining wall at backside of villa cle 105 cle 114 M&P 29-May-23 8-Jun-23 CLOSED CLOSED

17 ELITE18-CON-CE-M&P-RFI-0017 Addition of 83mm UPVC pipe M&P 9-Jun-23 19-Jun-23 CLOSED CLOSED

18 ELITE18-CON-CE-CIV-RFI-0018 Cracks on villa (elevation 4) CIV 8-Jul-23 10-Jul-23 CLOSED CLOSED

19 ELITE18-CON-CE-CIV-RFI-0019 Roof HVAC pedestal re-location CIV 17-Aug-23 1-Sep-23 CLOSED CLOSED

20 ELITE18-CON-CE-CIV-RFI-0020 Boundry wall re-location CIV 18-Aug-23 29-Aug-23 CLOSED CLOSED

21 ELITE18-CON-CE-ELE-RFI-0021 Electrical conduiting 25mm ELE 19-Aug-23 1-Sep-23 CLOSED CLOSED

22 ELITE18-CON-CE-M&P-RFI-0022 Rain water ppe proposal for villa 115 to 120 M&P 26-Aug-23 29-Aug-23 CLOSED CLOSED

Page 12 of 123
CLUSTER-E - REQUEST FOR INFORMATION LOG - CON January 30, 2024

DISCIPLINE
FILE CODE

Rev-00 Rev-01 Rev-02


VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status

23 ELITE18-CON-CE-M&P-RFI-0023 Gate valve in kitchen along with access panal in type A M&P 26-Aug-23 29-Aug-23 CLOSED CLOSED

24 ELITE18-CON-CE-CIV-RFI-0024 Doubal layer protection of bath floors CIV 26-Aug-23 29-Aug-23 CLOSED CLOSED

25 ELITE18-CON-CE-CIV-RFI-0025 3rd coat paint of internal paint CIV 26-Aug-23 29-Aug-23 CLOSED 11-Sep-23 OPEN OPEN

26 ELITE18-CON-CE-CIV-RFI-0026 Existing cores in bath CIV 26-Aug-23 29-Aug-23 CLOSED CLOSED

27 ELITE18-CON-CE-CIV-RFI-0027 Dismentlling of boundry wall vilaa 115 CIV 26-Aug-23 1-Sep-23 CLOSED CLOSED

28 ELITE18-CON-CE-CIV-RFI-0028 3rd weather shield coat on mumty parapet wall & boundry wall CIV 26-Aug-23 29-Aug-23 CLOSED CLOSED

29 ELITE18-CON-CE-MEP-RFI-0029 Issuances of MEP ERI M&P 11-Sep-23 21-Sep-23 CLOSED CLOSED

30 ELITE18-CON-CE-M&P-RFI-0030 Measurement verify (Kitchen hood pipe) M&P 13-Sep-23 21-Sep-23 CLOSED CLOSED

31 ELITE18-CON-CE-MEP-RFI-0031 Measurement verify (copper pipe) M&P 15-Sep-23 OPEN OPEN

32 ELITE18-CON-CE-CIV-RFI-0032 Boundry wall column extention 93 to 114 (Withdraw) CIV 25-Sep-23 25-Sep-23

33 ELITE18-CON-CE-M&P-RFI-0033 New catch basin & rain water pipes proposal for villa# 101,120 M&P 9-Oct-23 11-Oct-23 CLOSED CLOSED

34 ELITE18-CON-CE-CIV-RFI-0034 Roof tile color variation CIV 17-Oct-23 25-Oct-23 CLOSED CLOSED

35 ELITE18-CON-CE-CIV-RFI-0035 Level Issue CIV 25-Oct-23 OPEN OPEN

36 ELITE18-CON-CE-M&P-RFI-0036 Muslim shower 107 & 109 M&P 31-Oct-23 3-Nov-23 CLOSED CLOSED

37 ELITE18-CON-CE-M&P-RFI-0037 Unavailability of muller copper pipe M&P 3-Nov-23 11-Nov-23 CLOSED CLOSED

38 ELITE18-CON-CE-M&P-RFI-0038 Propose kreeba cistern tanks M&P 3-Nov-23 11-Nov-23 CLOSED CLOSED

39 ELITE18-CON-CE-CIV-RFI-0039 Issue for ERI CIV 3-Nov-23 OPEN OPEN

40 ELITE18-CON-CE-M&P-RFI-0040 Hight increase of boundry wall CIV 11-Nov-23 15-Nov-23 CLOSED CLOSED

41 ELITE18-CON-CE-M&P-RFI-0041 Change location of boundary wall M&P 23-Nov-23 29-Nov-23 CLOSED CLOSED

42 ELITE18-CON-CE-M&P-RFI-0042 Additional rain water manhole villa#107,108 M&P 9-Dec-23 13-Dec-23 CLOSED CLOSED

43 ELITE18-CON-CE-M&P-RFI-0043 Transfer pimp location shifting villa#120 M&P 9-Dec-23 22-Dec-23 CLOSED CLOSED

44 ELITE18-CON-CE-M&P-RFI-0044 Rubber line strip clamps M&P 28-Dec-23 OPEN OPEN

Page 13 of 123
CLUSTER-E - REQUEST FOR INFORMATION LOG - CON January 30, 2024

DISCIPLINE
FILE CODE

Rev-00 Rev-01 Rev-02


VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status

1 ELITE18-CON-CE-CIV-CVI-0001 Approval requird for 4'' core (CVI) CIV 24-Jan-23 OPEN OPEN

SUMMARY
Decipline Total
CIV 21
ARC 1
M&P 21
ELE 2
Total
45
Submitted

LEGENDS
TOTAL 43
CLOSED 37
OPEN 6

Page 14 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

1 ELITE18-CON-CE-CIV-MIR-0001 Bestway Cement CIV 17-Sep-22 20-Sep-22 B B

2 ELITE18-CON-CE-CIV-MIR-0002 MS pargola pipes strips & beams CIV 24-Sep-22 26-Sep-22 A A

Larancepur sand (865 cft) DC


3 ELITE18-CON-CE-CIV-MIR-0003
no = 08 Local 6-Oct-22 12-Oct-22 B B

Water proofing 4mm bituminous membrain total


4 ELITE18-CON-CE-CIV-MIR-0004 no,s of rool =50 DC Roof Grip 6-Oct-22 14-Oct-22 B B
no=2376

Solid Block size ( 4"x8"x12")


5 ELITE18-CON-CE-CIV-MIR-0005 1000= nos Local 6-Oct-22 12-Oct-22 B B
DC#1708,1709

Solid Block size ( 6"x8"x12")


6 ELITE18-CON-CE-CIV-MIR-0006 1600= nos Local 6-Oct-22 12-Oct-22 B B
DC#1711,1712,1713,1714

Solid Block size ( 6"x8"x12")


7 ELITE18-CON-CE-CIV-MIR-0007 400= nos Local 6-Oct-22 12-Oct-22 B B
DC#1715

Deformed Steel bars (200mm)


8 ELITE18-CON-CE-CIV-MIR-0008
DC=1170 Pak Steel 7-Oct-22 8-Oct-22 B B

Solid Block size ( 6"x8"x12") Hollow


block size ( 6"x8"x16") 400= nos
9 ELITE18-CON-CE-CIV-MIR-0009
400= nos Local 10-Oct-22 12-Oct-22 B B
DC#1718,1719

Larancepur sand (886,875,888 cft)


10 ELITE18-CON-CE-CIV-MIR-0010
DC no = 324,340,341 Local 10-Oct-22 12-Oct-22 B B

Solid Block size ( 4"x8"x12")


11 ELITE18-CON-CE-CIV-MIR-0011 2000= nos Local 11-Oct-22 13-Oct-22 B B
DC#1820,1721,1722,1723

Larancepur sand (898 cft) DC


12 ELITE18-CON-CE-CIV-MIR-0012
no = 339 Local 11-Oct-22 13-Oct-22 B B

MS pargola pipes strips & beams


13 ELITE18-CON-CE-CIV-MIR-0013
DC=0037/HRZ/1022 N/A 13-Oct-22 25-Oct-22 B B

Larancepur sand (876 cft) DC


14 ELITE18-CON-CE-CIV-MIR-0014
no = 352
14-Oct-22 15-Oct-22 B B

Solid Block size ( 4"x8"x12")


15 ELITE18-CON-CE-CIV-MIR-0015 600= nos 14-Oct-22 15-Oct-22 B B
DC#1724,1725

Larancepur sand (814,998 cft)


16 ELITE18-CON-CE-CIV-MIR-0016
DC no = 337,338 Local 15-Oct-22 18-Oct-22 B B

Page 15 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

Larancepur sand (890,948,886,867,866 cft)


17 ELITE18-CON-CE-CIV-MIR-0017
DC no = 29,30,32,344,353 Local 17-Oct-22 18-Oct-22 B B

Larancepur sand (888,888,886,886 cft)


18 ELITE18-CON-CE-CIV-MIR-0018
DC no = 35,357,374,375 Local 20-Oct-22 25-Oct-22 B B

Anchor throughbolt (888,888,886,886 cft) DC AFKO GE


19 ELITE18-CON-CE-CIV-MIR-0019
no=35,357,374,375
20-Oct-22 25-Oct-22 B B
PVT.ltd
Water proofing 4mm bituminous membrain & primer
total no,s of rool =25 total no,s of drum=3
20 ELITE18-CON-CE-CIV-MIR-0020
DC no=2090,2401,28
Roof Grip 20-Oct-22 2-Mar-23 B B
(Resubmit=24-2-23)
Wper 500-s chemical anchor 585 ml total
AFKO GE
21 ELITE18-CON-CE-CIV-MIR-0021 no,s of pcs =50 DC 20-Oct-22 25-Oct-22 B B
no=1009,2022 PVT.ltd
Deformed Steel bars (12mm)
22 ELITE18-CON-CE-CIV-MIR-0022
Total-44.970
CPI Pak Steel 24-Oct-22 25-Oct-22 B B

Larancepur sand (877,886 cft)


23 ELITE18-CON-CE-CIV-MIR-0023
DC no = 49,377 Local 25-Oct-22 27-Oct-22 A A

Hollow block size (6"x8|"x16")


24 ELITE18-CON-CE-CIV-MIR-0024 Total Nos=1600 Local 25-Oct-22 27-Oct-22 A A
DC no=1729

Kingkure 100a
Zoom
25 ELITE18-CON-CE-CIV-MIR-0025 Total Nos of pcs=420 25-Oct-22 27-Oct-22 A A
DC no=1402 Kingkrete CC

Solid Block size ( 4"x8"x12")


26 ELITE18-CON-CE-CIV-MIR-0026 500= nos Local 25-Oct-22 27-Oct-22 B B
DC#1730

AFKO GE
27 ELITE18-CON-CE-CIV-MIR-0027 Wper500-s chemical anchor 585ml 25-Oct-22 27-Oct-22 B B
PVT.ltd
Solid Block size ( 4"x8"x12")
28 ELITE18-CON-CE-CIV-MIR-0028 2000= nos Local 26-Oct-22 31-Oct-22 B B
DC#1732,1733,1734,1735
Larancepur sand (865,924,912,947,924,889 cft)
29 ELITE18-CON-CE-CIV-MIR-0029
DC no = 28,69,76,85,349 Local 26-Oct-22 31-Oct-22 B B

Solid Block size ( 4"x8"x12")


30 ELITE18-CON-CE-CIV-MIR-0030 1000= nos Local 27-Oct-22 29-Oct-22 B B
DC#1736,1737
IKAN ENG
MS girder = 3 set cmplete
31 ELITE18-CON-CE-CIV-MIR-0031
DC#7664,7672 SER 27-Oct-22 29-Oct-22 B B
PVT.LTD
IKAN ENG
MS girder = 3 set cmplete
32 ELITE18-CON-CE-CIV-MIR-0032
DC#7713 SER 29-Oct-22 1-Nov-22 B B
PVT.LTD
Larancepur sand (936,890,1005,901 cft)
33 ELITE18-CON-CE-CIV-MIR-0033
DC no = 201,220,222,347 Local 31-Oct-22 1-Nov-22 B B

34 ELITE18-CON-CE-CIV-MIR-0034 External tile cladding j(ii) stone cladding black granite Local 31-Oct-22 3-Nov-22 A A
IKAN ENG
MS girder = 3 set cmplete
35 ELITE18-CON-CE-CIV-MIR-0035
DC#7717 SER 1-Nov-22 3-Nov-22 B B
PVT.LTD

Page 16 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

Wper500-s chemical anchor 585ml


AFKO GE
36 ELITE18-CON-CE-CIV-MIR-0036 Total no,s of pcs=200 1-Nov-22 3-Nov-22 B B
DC#3110,2022 PVT.ltd

Anchor throughbolt (M20x160) & chemicla threaded bolt


AFKO GE
37 ELITE18-CON-CE-CIV-MIR-0037 ( M16x190 & 20x190) 1-Nov-22 3-Nov-22 C C
DC no=1-c 341/22 PVT.ltd

Solid Block size ( 4"x8"x12")


38 ELITE18-CON-CE-CIV-MIR-0038 2500= nos Local 2-Nov-22 5-Nov-22 B B
DC#1739,1740,1741,1742,1743

Solid Block size ( 4"x8"x12") Solid Block size ( 4"x8"x12")


2500= nos
39 ELITE18-CON-CE-CIV-MIR-0039
300=nos Local 5-Nov-22 11-Nov-22 B B
DC#1744,1745,1746,1747
Larancepur sand (901,922,888,898 cft)
40 ELITE18-CON-CE-CIV-MIR-0040
DC no = 112,118,120,379 Local 5-Nov-22 11-Nov-22 B B

External tile cladding BOQ j(iv) stone cladding composite stone


41 ELITE18-CON-CE-CIV-MIR-0041 composit stone (2|"x9")=2100 sft (18400 nos Local 5-Nov-22 7-Nov-22 A A
DC# 001
Finishes BOQ #B (i-ii) external finishes BOQ (i) & block filler external
42 ELITE18-CON-CE-CIV-MIR-0042 wall Total CPI Jotun 7-Nov-22 8-Nov-22 A A
nos of block filler packs=125

Larancepur sand (898cft) Chanab


43 ELITE18-CON-CE-CIV-MIR-0043
sand (931 cft) Local 7-Nov-22 8-Nov-22 B B

Solid Block size ( 4"x8"x12")


44 ELITE18-CON-CE-CIV-MIR-0044 1200= nos Local 7-Nov-22 8-Nov-22 B B
DC#1748,1749,1750

Solid Block size ( 6"x8"x12")


45 ELITE18-CON-CE-CIV-MIR-0045 2800= nos Local 10-Nov-22 16-Nov-22 B B
DC#1751,1752,1753,1754,1755,1756,1757

46 ELITE18-CON-CE-CIV-MIR-0046 Water proofing 4mm bituminous membrain Roof Grip 12-Nov-22 16-Nov-22 B B

Larancepur sand (945,953,901,955 cft)


47 ELITE18-CON-CE-CIV-MIR-0047
DC no = 305,316,108,115 Local 12-Nov-22 16-Nov-22 B B

Bestway Cement 600=bag Bestway


48 ELITE18-CON-CE-CIV-MIR-0048
DC#9975
12-Nov-22 16-Nov-22 B B
Cement

Pan Crush ( 965 cft)


49 ELITE18-CON-CE-CIV-MIR-0049
DC#113 Local 12-Nov-22 16-Nov-22 B B

Crush 3/8 (854 cft)


50 ELITE18-CON-CE-CIV-MIR-0050
DC#119 Local 12-Nov-22 16-Nov-22 B B

Page 17 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

MS pargola beams
51 ELITE18-CON-CE-CIV-MIR-0051
DC# 0040/HRZ/1122 N/A 17-Nov-22 17-Nov-22 A A

MS girder = Ground Floor 6 set cmplete & First Floor 3 Set Complete IKAN ENG
52 ELITE18-CON-CE-CIV-MIR-0052 SER 22-Nov-22 24-Nov-22 B B
DC#7746 PVT.LTD
MS girder = Ground Floor 7 set cmplete & First Floor 3 Set Complete IKAN ENG
53 ELITE18-CON-CE-CIV-MIR-0053 SER 22-Nov-22 24-Nov-22 B B
DC#7759 PVT.LTD
Tuff Paver 60mm Grey=1000Sft+1250 Sft+1250Sf=3500Sft
54 ELITE18-CON-CE-CIV-MIR-0054 Tuff Paver 60mm Red=1000Sft+1250 Sft+1250Sft=3500Sft Local 22-Nov-22 24-Nov-22 C 4-Jan-23 7-Jan-23 B B
(DC # 130, 134 & 135)

Anchor Throughbolt(M12x140) & Chemical Threaded Bolt (M16x190) AFKO


With Nut & Washer GLOBAL
55 ELITE18-CON-CE-CIV-MIR-0055
Nut M16 & Washer M16
24-Nov-22 25-Nov-22 B B
ENGINEERIN
DC # (1611-2022) G(Pvt) Ltd.

Total Nos of Threshold Pieces =14 Nos


56 ELITE18-CON-CE-CIV-MIR-0056 Total Nos of Stair Pieces =40 Nos Mahad 23-Nov-22 26-Nov-22 A A
DC # (338), DC # (341)

Total Nos of Black Granite Window Sill Pieces =18 Nos


57 ELITE18-CON-CE-CIV-MIR-0057
DC # (325) Mahad 23-Nov-22 26-Nov-22 A A

Total Nos of Crema Mo Pieces =100+70 =170 Nos


58 ELITE18-CON-CE-CIV-MIR-0058 DC # (344&345) Mahad 24-Nov-22 26-Nov-22 A A

Total Nos of Vanity Latak & Top Pieces =4+32 =36 Nos
59 ELITE18-CON-CE-CIV-MIR-0059
DC # (347&348) Mahad 24-Nov-22 26-Nov-22 A A

Chemical threaded bolt (M16x190) with nut & washer


AFKO GE
60 ELITE18-CON-CE-CIV-MIR-0060 Chemical threaded bolt (M20x190) with nut & washer DC # 26-Nov-22 1-Dec-22 B B
(2411-2022) PVT.ltd

Bestway cement 500=bag Bestway


61 ELITE18-CON-CE-CIV-MIR-0061
DC#9977
26-Nov-22 1-Dec-22 B B
Cement

Mahad
62 ELITE18-CON-CE-CIV-MIR-0062 Finishes VO-1 #5A(i) perlino marbal (threshold & stair tread riser) 2-Dec-22 7-Dec-22 A A
Marbal

IKAN ENG
MS girder Nos of complete set=7
63 ELITE18-CON-CE-CIV-MIR-0063
DC#7774 SER 2-Dec-22 7-Dec-22 B B
PVT.LTD

AFKO GE
64 ELITE18-CON-CE-CIV-MIR-0064 Anchor throughbolt (M12x140) & (M20x160) 5-Dec-22 7-Dec-22 B B
PVT.ltd

Page 18 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

Deformed steel bars (3,4,6)


65 ELITE18-CON-CE-CIV-MIR-0065 Total=39.985 MT Pak Steel 7-Dec-22 7-Dec-22 B B
DC#4172,4200

Deformed steel bars (20mm)


66 ELITE18-CON-CE-CIV-MIR-0066 Total=53.050 MT CPI Pak Steel 9-Dec-22 B B
GRN#734

67 ELITE18-CON-CE-CIV-MIR-0067 Deformed Steel bars 12mm CPI Pak Steel 14-Dec-22 17-Dec-22 B B

AFKO GE
68 ELITE18-CON-CE-CIV-MIR-0068 Anchor through bolt M16x140 14-Dec-22 17-Dec-22 B B
PVT.ltd

Mahad
69 ELITE18-CON-CE-CIV-MIR-0069 Finshes vo-01#5a(i) perlin marbal (floor,skirting,vanity & stair riser 14-Dec-22 17-Dec-22 B B
Marbales

Cladding crema mo Total Nos=540 Mahad


70 ELITE18-CON-CE-CIV-MIR-0070
DC=370,384,392
14-Dec-22 17-Dec-22 B B
Marbales

Black granite window sill & shower cubical


Window sill pieces Total Nos=56 Mahad
71 ELITE18-CON-CE-CIV-MIR-0071
Shower cubical pieces Total Nos=19
14-Dec-22 17-Dec-22 B B
Marbales
DC=365,366,383

Bestway cement (yeh promag sy wapas a gai thi)


Besway
72 ELITE18-CON-CE-CIV-MIR-0072 600=bag 14-Dec-22
DC#802 Factory

73 ELITE18-CON-CE-CIV-MIR-0073 Deformes steel bars 10mm CPI Pak Steel 14-Dec-22 29-Dec-22 B B

Wper 500-s chemical anchor 585 ml


AFKO GE
74 ELITE18-CON-CE-CIV-MIR-0074 Total no,s of pcs=200 17-Dec-22 20-Dec-22 B B
DC=1612,2022 PVT.ltd

Anchor throughbolt(M12x140)=500 pcs (M16x140) =300 pcs AFKO GE


75 ELITE18-CON-CE-CIV-MIR-0075
DC # (1912-2022)
20-Dec-22 23-Dec-22 B B
PVT.ltd

Finishes vo-1 #5A(i) perlino marbal (floor,skirting & copping) Mahad


76 ELITE18-CON-CE-CIV-MIR-0076
DC#351,404,408
20-Dec-22 10-Jan-23 B B
Marbles

Black granite marbale =1 nos Mahad


77 ELITE18-CON-CE-CIV-MIR-0077
DC#358
20-Dec-22 10-Jan-23 B B
Marbles

Finishes vo-1 #5A(i) perlino marbal (floor,skirting & ledge wall &
Mahad
78 ELITE18-CON-CE-CIV-MIR-0078 threshold) 28-Dec-22 2-Jan-23 B B
DC#411,413,414,415,416,417,418,420,421,423,424 Marbles

Finishes vo-1 #5A(i) perlino marbal (stair & landing Mahad


79 ELITE18-CON-CE-CIV-MIR-0079
DC#385,426,430,431,432
4-Jan-23 7-Jan-23 B B
Marbles

Page 19 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

Mahad
80 ELITE18-CON-CE-CIV-MIR-0080 Black granite marble sills 4-Jan-23 7-Jan-23 B B
Marbles

Finishes vo-1 #5A(i) perlino marbal (floor stair threshold)


Mahad
81 ELITE18-CON-CE-CIV-MIR-0081 12-Jan-23 14-Jan-23 B B
DC#425,43,438,439,440,442,443,444,445,447,449,452,453,456,457,458 Marbles

Black granite marbal sills & jams


Mahad
82 ELITE18-CON-CE-CIV-MIR-0082 Total Nos=103 12-Jan-23 14-Jan-23 B B
DC=324,389,390,391,396,446 Marbles

Cladding crema mo Total Mahad


83 ELITE18-CON-CE-CIV-MIR-0083
Nos=95 DC=331
12-Jan-23 14-Jan-23 B B
Marbles

Finishes vo-1 #5A(i) perlino marbal (floor stair skirting & threshold riser)
Mahad
84 ELITE18-CON-CE-CIV-MIR-0084 16-Jan-23 18-Jan-23 B B
DC#433,437,463,454,459 Marbles

Finishes vo-1 #5A(i) perlino marbal (floor stair skirting vanity & riser)
Mahad
85 ELITE18-CON-CE-CIV-MIR-0085 17-Jan-23 18-Jan-23 B B
DC#372,373,394,401,449,452,453,456,457,458 Marbles

86 ELITE18-CON-CE-CIV-MIR-0086 Doors james & architrave CPI SPIRIT 19-Jan-23 23-Jan-23 A A

Finishes vo-1 #5A(i) perlino marbal (floor stair skirting vanity & riser) Mahad
87 ELITE18-CON-CE-CIV-MIR-0087
DC#465
21-Jan-23 26-Jan-23 B B
Marbles

Finishes vo-1 #5A(i) perlino marbal (floor & cooping) Mahad


88 ELITE18-CON-CE-CIV-MIR-0088
DC#470,460
31-Jan-23 4-Feb-23 A A
Marbles

89 ELITE18-CON-CE-CIV-MIR-0089 Deformed steel bars 20mm CPI Pak Steel 8-Feb-23 21-Feb-23 A A

AFKO GE
90 ELITE18-CON-CE-CIV-MIR-0090 Anchor throughbolt M16x150 8-Feb-23 10-Feb-23 C C
PVT.ltd

Finishes vo-1 #5A(i) perlino marbal (cooping,skirting & vanity)


Mahad
91 ELITE18-CON-CE-CIV-MIR-0091 8-Feb-23 14-Feb-23 A A
DC#467,468,469,471,474 Marbles

Finishes vo-1 #5A(i) perlino marbal (skirting) Mahad


92 ELITE18-CON-CE-CIV-MIR-0092
DC# 483,484
11-Feb-23 14-Feb-23 A A
Marbles

Finishes vo-1 #5A(i) perlino marbal (flooring,skirting,threhold,vanity)


Mahad
93 ELITE18-CON-CE-CIV-MIR-0093 DC# 14-Feb-23 21-Feb-23 A A
475,476,477,478,479,481,486,487,488,489,491 Marbles

Kitchen cabnatory 13 sets of 0.5 kanal villas of cluster-E in MS eighteen


94 ELITE18-CON-CE-CIV-MIR-0094
warehouse lahore
CPI Linoadocor 18-Feb-23 UR UR

95 ELITE18-CON-CE-CIV-MIR-0095 Wooden vanites CPI SPIRIT 15-Feb-23 23-Feb-23 A A

Page 20 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

Finishes vo-1 #5A(i) perlino marbal (window sills) Mahad


96 ELITE18-CON-CE-CIV-MIR-0096
DC#494,495,496
18-Feb-23 21-Feb-23 A A
Marbles

Finishes vo-1 #5A(i) perlino marbal (vanity,s & skirting) Mahad


97 ELITE18-CON-CE-CIV-MIR-0097
DC# 497,498,500,506,508
24-Feb-23 2-Mar-23 A A
Marbles

Finishes vo-1 #5A(i) perlino marbal (Stair) Mahad


98 ELITE18-CON-CE-CIV-MIR-0098
DC# 509
25-Feb-23 1-Mar-23 A A
Marbles

Finishes vo-1 #5A(i) perlino marbal (floor) Mahad


99 ELITE18-CON-CE-CIV-MIR-0099
DC# 518
4-Mar-23 7-Mar-23 A A
Marbles

Black granite marbal for shower cubical Mahad


100 ELITE18-CON-CE-CIV-MIR-0100
DC# 517
4-Mar-23 7-Mar-23 A A
Marbles

Black granite marbal for windowdills DC# Mahad


101 ELITE18-CON-CE-CIV-MIR-0101
490
14-Mar-23 20-Mar-23 A A
Marbles

Finishes vo-1 #5A(i) perlino marbal (floring,Stair,ledgewall & entrence


Mahad
102 ELITE18-CON-CE-CIV-MIR-0102 step) 14-Mar-23 20-Mar-23 A A
DC# 492,499,505,554,555,557,558,559,560 Marbles

Finishes vo-1 #5A(i) perlino marbal (Stair) Mahad


103 ELITE18-CON-CE-CIV-MIR-0103
DC# 563
16-Mar-23 20-Mar-23 A A
Marbles

Finishes vo-1 #5A(i) perlino marbal (Stair,skirting & threshold)


Mahad
104 ELITE18-CON-CE-CIV-MIR-0104 DC# 24-Mar-23 28-Mar-23 A A
547,548,549,563,571,575,577 Marbles

Black granite marbal for window jambs,shower cubical & windosills


Mahad
105 ELITE18-CON-CE-CIV-MIR-0105 DC# 24-Mar-23 28-Mar-23 A A
551,568,570,572 Marbles

Tuff paver 60mm grey & red


106 ELITE18-CON-CE-CIV-MIR-0106
DC# 066,073,074,251,252,2800
24-Mar-23 2-May-23 B B

107 ELITE18-CON-CE-CIV-MIR-0107 Wooden vanites CPI SPIRIT 29-Mar-23 3-Apr-23 B B

Finishes vo-1 #5A(i) perlino marbal (legdewall,vanities,Stair,skirting &


Mahad
108 ELITE18-CON-CE-CIV-MIR-0108 floor ) 29-Mar-23 3-Apr-23 A A
DC# 578,579,580,586,594,601,603 Marbles

Mahad
109 ELITE18-CON-CE-CIV-MIR-0109 Black granite marbal for window jambs & sill 29-Mar-23 3-Apr-23 A A
Marbles

Mahad
110 ELITE18-CON-CE-CIV-MIR-0110 Cladding crema mo 29-Mar-23 3-Apr-23 A A
Marbles
Finishes vo-1 #5A(i) perlino marbal
(legdewall,threshold,vanities,Stair,skirting & floor ) Mahad
111 ELITE18-CON-CE-CIV-MIR-0111
DC#
1-Apr-23 3-Apr-23 A A
Marbles
585,604,606,607,608,611,613,616,617,618,619,620
Black granite marbal for window jambs & sills Mahad
112 ELITE18-CON-CE-CIV-MIR-0112
DC#614
1-Apr-23 3-Apr-23 A A
Marbles

Page 21 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

Finishes vo-1 #5A(i) perlino marbal


(Copping,legdewall,threshold,vanities,Stair,skirting & floor )
DC# Mahad
113 ELITE18-CON-CE-CIV-MIR-0113
521,522,523,525,526,531,532,536,537,538,539,540,543,544,550,552,561,
11-Apr-23 14-Apr-23 B B
Marbles
566,576,596,621,623,624,625,625,626,628,633,637,646,647,648,650,651,
654
Black granite marbal for window sills & shower cubical Mahad
114 ELITE18-CON-CE-CIV-MIR-0114
DC#631,640
11-Apr-23 14-Apr-23 A A
Marbles

Finishes vo-1 #5A(i) perlino marbal (Stair, stair skirting & floor skirting )
Mahad
115 ELITE18-CON-CE-CIV-MIR-0115 DC# 11-Apr-23 14-Apr-23 A A
553,583,584,590 Marbles

HDF skirting Pak Carpet &


116 ELITE18-CON-CE-CIV-MIR-0116
DC#PCI 17,18
CPI 3-May-23 8-May-23 B B
Interiors
Lever flush bolts type A&B 457 mm
117 ELITE18-CON-CE-CIV-MIR-0117
Dust socket type A&B
CPI SPIRIT 10-May-23 31-May-23 A A

118 ELITE18-CON-CE-CIV-MIR-0118

Cladding crema mo Total


Mahad
119 ELITE18-CON-CE-CIV-MIR-0119 Nos=188 17-Jun-23 6-Jul-23 B B
DC=742,758 Marbal

Black granite marbal for window sill jams external cladding & shower
cubical Mahad
120 ELITE18-CON-CE-CIV-MIR-0120
Total Nos=13,30,27,24,
17-Jun-23 6-Jul-23 B B
Marbal
DC=734,735,743,744,754,759,760,761,789,790

Finishes vo-1 #5A(i) perlino marbal (Stair, stair skirting & floor threshold
entrence step vanites & floor skirting )
Mahad
121 ELITE18-CON-CE-CIV-MIR-0121 DC# 17-Jun-23 6-Jul-23 B B
779,780,793,794,802,827,823,820,804,813,739,745,753,773,795,762,763, Marbal
764,750,751,755,756,784,785,786,787,800,801,806,810,826,828

122 ELITE18-CON-CE-CIV-MIR-0122 Wooden bath vanites CPI SPIRIT 6-Jul-23 14-Jul-23 B B

123 ELITE18-CON-CE-CIV-MIR-0123 Tuff paver 60mm gray & red 5-Aug-23 9-Aug-23 B B

Window frame window glass DG collar GSL -04 aluminium shutter pally
124 ELITE18-CON-CE-CIV-MIR-0124 rubber 15# aluminium jali,new self lock,DG stoper,screws rawal CPI CHAWALA 14-Sep-23 16-Sep-23 B B
plug,water cap, silicon white bottles,DG guider

HDF skirting,transition strip,architrave,door jam frame,door


125 ELITE18-CON-CE-CIV-MIR-0125
stoper,wardrobe
CPI SPIRIT 15-Oct-23 18-Oct-23 B B

126 ELITE18-CON-CE-CIV-MIR-0126 Architrave window jam frame CPI SPIRIT 20-Nov-23 27-Nov-23 B B

Page 22 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ARC - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

CPI FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

ITM STATUS
Submission No. of Date of Date of No. of Date of Date of No. of
Date
Response Date
Days
Status Submission Reply Days
Status
Submission Reply Days
Status

Window frame window glass single glazed and double glazed aluminium
127 ELITE18-CON-CE-CIV-MIR-0127
shutter pally HD-7,HD-8
CPI CHAWALA 30-Nov-23 5-Dec-23 C C

Tuff paver 60mm grey & red


128 ELITE18-CON-CE-CIV-MIR-0128
DC# 7222, 7224, 7225, 7230
13-Dec-23 15-Dec-23 B B

Tuff paver 60mm grey & red


129 ELITE18-CON-CE-CIV-MIR-0129
DC# 7273,7379,7279,7285,7286
28-Dec-23 29-Dec-23 B B

LEGENDS
Total submitted 127
Total Approved 123

A APPROVED 38
B APPROVED AS NOTED 85
C REVISED & RESUBMIT 3
D REJECTED 0
E FOR INFORMATION ONLY 0
UR UNDER REVIEW 1

Page 23 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - ELECTRICAL - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status

Gate Way
1 ELITE18-CON-CE-ELE-MIR-0001 3M 24 port patch panel 1-Nov-22 7-Nov-22 A A
Technologies
2 ELITE18-CON-CE-ELE-MIR-0002 Earthing system Mega Plus 30-Nov-22 2-Dec-22 A A
Capital
3 ELITE18-CON-CE-ELE-MIR-0003 Electric meter box 16 SWG Eelctro ENG 3-Dec-22 7-Dec-22 A A
PVT.Ltd
4 ELITE18-CON-CE-ELE-MIR-0004 Sunlight 2*5 watt led wall up & dowan light fixture model 1018-5704 Sunlight 14-Dec-22 15-Dec-22 A A

5 ELITE18-CON-CE-ELE-MIR-0005 IT data rack 4u wall mounted NET COM 4-Mar-23 6-Mar-23 C C

6 ELITE18-CON-CE-ELE-MIR-0006 Electrical conduits & fittings PLASCO 4-Mar-23 9-Mar-23 A A

7 ELITE18-CON-CE-ELE-MIR-0007 Electrical conduits & fittings PLASCO 15-Mar-23 20-Mar-23 A A

8 ELITE18-CON-CE-ELE-MIR-0008 Electrical cabal Fast Cabal 26-Jul-23 23-Aug-23 A A

22
44

LEGENDS
Total submitted 8
Total Approved 7

A APPROVED 7
B APPROVED AS NOTED 0
C REVISED & RESUBMIT 1
D REJECTED 0
E FOR INFORMATION ONLY 0
UR UNDER REVIEW 0

Page 24 of 123
CLUSTER-E - MATERIAL INSPECTION REQUEST LOG - M&P - CON January 30, 2024
FILE CODE

SUPPLIER
Rev-00 Rev-01 Rev-02
VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of
Date Date Days
Status Submission Reply Days
Status
Submission Reply Days
Status

1 ELITE18-CON-CE-M&P-MIR-0001 EWHT (Electric & gas geyser) (no,s-44) NASGAS 28-Sep-22 5-Oct-22 B B

CAPITAL
2 ELITE18-CON-CE-M&P-MIR-0002 Cabal tray with cover 17-Oct-22 27-Oct-22 B B
ELE
Transfer pumps & booster pump (Pressure & booster pump ESPA
3 ELITE18-CON-CE-M&P-MIR-0003 19-Oct-22 25-Oct-22 A 22-Nov-22 UR UR
accessories ) (Sgheer & co)
Zeta E PVT
4 ELITE18-CON-CE-M&P-MIR-0004 Aluminium cladding sheet 15-Dec-22 C C
Ltd
MM Steel
5 ELITE18-CON-CE-M&P-MIR-0005 Aerofoam insulation tube 17-Dec-22 B B
corp
6 ELITE18-CON-CE-M&P-MIR-0006 Level controller relay complete with MS enclosure box OMORON 14-Mar-23 21-Mar-23 A A

7 ELITE18-CON-CE-M&P-MIR-0007 ISO sound insulation acoustic & ISO glue ISO 14-Mar-23 31-Mar-23 C C

8 ELITE18-CON-CE-M&P-MIR-0008 Euro ceramic counter top basin 60 & bottle trap 1 1/4" (CPI) Grohe 11-Apr-23 2-May-23 B B

9 ELITE18-CON-CE-M&P-MIR-0009 Transfer & booster pump Sagheer & co 13-Apr-23 14-Apr-23 A A

Hair Pak
10 ELITE18-CON-CE-M&P-MIR-0010 Wall mounted type inverter unit hair AC 5-Jun-23 14-Jun-23 B B
PVT.LTD
11 ELITE18-CON-CE-M&P-MIR-0011 Plasco UPVC pipe & fitting Plasco 14-Jul-23 17-Jul-23 B B

12 ELITE18-CON-CE-M&P-MIR-0012 General items for MEP work Plasco 9-Aug-23 10-Aug-23 A A

13 ELITE18-CON-CE-M&P-MIR-0013 Level controller relay complete with MS enclosure box Multi Eng 20-Oct-23 21-Oct-23 B B

LEGENDS
Total submitted 13
Total Approved 10

A APPROVED 3
B APPROVED AS NOTED 7
C REVISED & RESUBMIT 2
D REJECTED 0
E FOR INFORMATION ONLY 0
UR UNDER REVIEW 1

Page 25 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
349 349 ELITE18-CON-CE-CIV-IR-0349 Formwork & RCC concrete (4000 si) with bonding agent of column 137,138 GF,FF 25-Oct-22 29-Oct-22 B B

350 350 ELITE18-CON-CE-CIV-IR-0350 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) slab thickness increase 141,142 FF 25-Oct-22 29-Oct-22 A A

351 351 ELITE18-CON-CE-CIV-IR-0351 Formwork & RCC concrete (4000 si) with bonding agent of column 135,136 FF 25-Oct-22 29-Oct-22 A A

352 352 ELITE18-CON-CE-CIV-IR-0352 RCC top level for slab thickness increase 139,140 FF 25-Oct-22 31-Oct-22 B B

353 353 ELITE18-CON-CE-CIV-IR-0353 RCC top level for slab thickness increase 143,144 FF 25-Oct-22 29-Oct-22 B B

354 354 ELITE18-CON-CE-CIV-IR-0354 RCC top level for slab thickness increase 141,142 FF 25-Oct-22 31-Oct-22 B B

355 355 ELITE18-CON-CE-CIV-IR-0355 RCC top level for slab thickness increase 143,144 TR 25-Oct-22 29-Oct-22 B B

356 356 ELITE18-CON-CE-CIV-IR-0356 RCC top level for slab thickness increase 141,142 TR 25-Oct-22 31-Oct-22 B B

357 357 ELITE18-CON-CE-CIV-IR-0357 RCC top level for slab thickness increase 139,140 TR 25-Oct-22 31-Oct-22 B B

358 358 ELITE18-CON-CE-CIV-IR-0358 RCC top level for slab thickness increase 137,138 FF 25-Oct-22 29-Oct-22 B B

359 359 ELITE18-CON-CE-CIV-IR-0359 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 143,144 25-Oct-22 29-Oct-22 B B

360 360 ELITE18-CON-CE-CIV-IR-0360 Dismentlling celling with all respect for retrofitting work 115 to 126A GF,FF,MR 25-Oct-22 29-Oct-22 B B

361 361 ELITE18-CON-CE-CIV-IR-0361 Dismentlling celling with all respect for retrofitting work 103 to 114 GF,FF,MR 25-Oct-22 29-Oct-22 B B

362 362 ELITE18-CON-CE-CIV-IR-0362 Dismentlling external sill (black granite) for retrofitting work 127 to 132 GF,FF,MR 25-Oct-22 29-Oct-22 B B

363 363 ELITE18-CON-CE-CIV-IR-0363 Sand removal internal side for pilling work 106,107,109,110 25-Oct-22 29-Oct-22 B B

364 364 ELITE18-CON-CE-CIV-IR-0364 Sand removal for pilling work 127,132 25-Oct-22 29-Oct-22 B B

365 365 ELITE18-CON-CE-CIV-IR-0365 FDT test 3rd layer sand filling for external side 143,144 25-Oct-22 29-Oct-22 B B

366 366 ELITE18-CON-CE-CIV-IR-0366 Installation suspension & framming system for celling work 143,144 GF,FF,MR 1-Nov-22 3-Nov-22 C 7-Nov-22 8-Nov-22 B B

367 367 ELITE18-CON-CE-CIV-IR-0367 Laying & Fixing of MS Pergola ### 25-Oct-22 29-Oct-22 B B

368 368 ELITE18-CON-CE-CIV-IR-0368 PCC (1:2:4) for pergola columns 108,109,110,111 25-Oct-22 29-Oct-22 B B

369 369 ELITE18-CON-CE-CIV-IR-0369 Steel fixing & anchor epoxy for column jackting 133,134 GF,FF 26-Oct-22 29-Oct-22 A A

370 370 ELITE18-CON-CE-CIV-IR-0370 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) slab thickness increase 143,144 TR 26-Oct-22 29-Oct-22 A A

371 371 ELITE18-CON-CE-CIV-IR-0371 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) slab thickness increase 139,140 FF 26-Oct-22 29-Oct-22 A A

372 372 ELITE18-CON-CE-CIV-IR-0372 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) slab thickness increase 143,144 FF 26-Oct-22 29-Oct-22 A A

373 373 ELITE18-CON-CE-CIV-IR-0373 Dismentlling split stone for retrofitting work 141,142,143 26-Oct-22 29-Oct-22 B B

374 374 ELITE18-CON-CE-CIV-IR-0374 Dismentlling plaster cleaning & debris remove for parapet wall 143,144 MT 26-Oct-22 29-Oct-22 B B

375 375 ELITE18-CON-CE-CIV-IR-0375 FDT test 1st layer sand filling for under the floating slab 137,138 26-Oct-22 5-Nov-22 B B

376 376 ELITE18-CON-CE-CIV-IR-0376 FDT test 2nd layer sand filling for under the floating slab 137,138 26-Oct-22 5-Nov-22 B B

377 377 ELITE18-CON-CE-CIV-IR-0377 Block masonory & lintels for walls 143,144 GF,FF 26-Oct-22 8-Nov-22 B B
101 to 108 & 122
378 378 ELITE18-CON-CE-CIV-IR-0378 Dismentlling bath wall tile for retrofitting work to 125 GFB,FFB,MB 27-Oct-22 29-Oct-22 B B

379 379 ELITE18-CON-CE-CIV-IR-0379 Dismentlling bath floor tile for retrofitting work 141 to 144 27-Oct-22 31-Oct-22 B B

380 380 ELITE18-CON-CE-CIV-IR-0380 07 Days Cylinder Concrete Test R.C.C Concrete (3000 psi) floating slab 142 Type,B 27-Oct-22 1-Nov-22 B B

381 381 ELITE18-CON-CE-CIV-IR-0381 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) slab thickness increase 139,140 Type,A&B 27-Oct-22 1-Nov-22 B B

382 382 ELITE18-CON-CE-CIV-IR-0382 Layout share links for slab thickness increase 127 to 138 FF 27-Oct-22 29-Oct-22 B B

383 383 ELITE18-CON-CE-CIV-IR-0383 Layout share links for slab thickness increase 137 to 144 TR 27-Oct-22 29-Oct-22 B B

384 384 ELITE18-CON-CE-CIV-IR-0384 Plaster for parapet wall 143,144 MT 27-Oct-22 29-Oct-22 B B

385 385 ELITE18-CON-CE-CIV-IR-0385 Dismentlling block masonory walls for due to axcessive cracks 141,142 Type,A&B 27-Oct-22 29-Oct-22 B B

386 386 ELITE18-CON-CE-CIV-IR-0386 RCC concrete (1:2:4) for floatting slab 139 Type,A 28-Oct-22 1-Nov-22 B B

387 387 ELITE18-CON-CE-CIV-IR-0387 07 Days Cylinder Concrete Test P.C.C (1:4:8) under floating slab 139,140 Type,A&B 28-Oct-22 5-Nov-22 B B

388 388 ELITE18-CON-CE-CIV-IR-0388 07 Days Cylinder Concrete Test R.C.C Concrete (3000 psi) floating slab 141 Type,A 28-Oct-22 5-Nov-22 B B

389 389 ELITE18-CON-CE-CIV-IR-0389 Dismentlling block work uner the plinth beam for pile cap 127,132 Type,A&B 29-Oct-22 3-Nov-22 B B

390 390 ELITE18-CON-CE-CIV-IR-0390 Block masonory for under the plinth beam & entrance lobby wall 135,136 Type,A&B 29-Oct-22 3-Nov-22 B B

391 391 ELITE18-CON-CE-CIV-IR-0391 Block masonory for under the plinth beam & entrance lobby wall 133,134 Type,A&B 29-Oct-22 3-Nov-22 C 7-Nov-22 12-Nov-22 B B

392 392 ELITE18-CON-CE-CIV-IR-0392 Primer coat for pile cape (internal & external side) 139,140 Type,A&B 29-Oct-22 3-Nov-22 B B

393 393 ELITE18-CON-CE-CIV-IR-0393 Primer Coat & membranes (bituminous) sheet for external side 139,140 Type,A&B 29-Oct-22 3-Nov-22 C 19-Nov-22 23-Nov-22 C 5-Dec-22 9-Dec-22 A A

394 394 ELITE18-CON-CE-CIV-IR-0394 Primer coat for pile cape (internal & external side) 137,138 Type,A&B 29-Oct-22 5-Nov-22 A A

395 395 ELITE18-CON-CE-CIV-IR-0395 Primer Coat & membranes (bituminous) sheet for external side 137,138 Type,A&B 29-Oct-22 3-Nov-22 C 19-Nov-22 23-Nov-22 C 5-Dec-22 9-Dec-22 C 14-Dec-22 20-Dec-22 C 21-Jan-23 24-Jan-23 C A

396 396 ELITE18-CON-CE-CIV-IR-0396 Primer coat for pile cape (internal & external side) 135,136 Type,A&B 29-Oct-22 3-Nov-22 B B

397 397 ELITE18-CON-CE-CIV-IR-0397 Primer coat for pile cape (internal & external side) 133,134 Type,A&B 29-Oct-22 3-Nov-22 B B

398 398 ELITE18-CON-CE-CIV-IR-0398 FDT test 3rd layer sand filling for under the floating slab 137,138 Type,A&B 29-Oct-22 12-Nov-22 B B

399 399 ELITE18-CON-CE-CIV-IR-0399 Dismentlling plaster cleaning & debris remove for parapet wall 137 to 142 MT 31-Oct-22 3-Nov-22 C 4-Nov-22 8-Nov-22 B B

400 400 ELITE18-CON-CE-CIV-IR-0400 Plaster for parapet wall 141,142 MT 31-Oct-22 1-Nov-22 B B

401 401 ELITE18-CON-CE-CIV-IR-0401 Primer Coat & membranes (bituminous) sheet for top roof 143,144 Type,A&B 31-Oct-22 3-Nov-22 B B

402 402 ELITE18-CON-CE-CIV-IR-0402 Plaster for parapet wall 139,140 MT 31-Oct-22 1-Nov-22 B B

403 403 ELITE18-CON-CE-CIV-IR-0403 Plaster for parapet wall 137,138 MT 31-Oct-22 1-Nov-22 B B

Page 26 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
404 404 ELITE18-CON-CE-CIV-IR-0404 Polythene sheet (1000 micron) under the PCC floating slab 137,138 Type,A&B 31-Oct-22 5-Nov-22 A A

405 405 ELITE18-CON-CE-CIV-IR-0405 PCC (1:4:8) under the floating slab 137,138 Type,A&B 31-Oct-22 5-Nov-22 A A

406 406 ELITE18-CON-CE-CIV-IR-0406 28 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) retrofitting columns 143,144 Type,A&B 31-Oct-22 5-Nov-22 B B

407 407 ELITE18-CON-CE-CIV-IR-0407 07 Days Cylinder Concrete Test R.C.C Concrete (3000 psi) floating slab 140 Type,B 31-Oct-22 5-Nov-22 B B

408 408 ELITE18-CON-CE-CIV-IR-0408 07 Days Cylinder Concrete Test R.C.C Concrete (3000 psi) slab thickness increase 141,142 Type,A&B 31-Oct-22 5-Nov-22 B B

409 409 ELITE18-CON-CE-CIV-IR-0409 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) slab thickness increase 137,138 Type,A&B 31-Oct-22 5-Nov-22 B B

410 410 ELITE18-CON-CE-CIV-IR-0410 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) retrofitting beams 141,142 Type,A&B 31-Oct-22 5-Nov-22 B B

411 411 ELITE18-CON-CE-CIV-IR-0411 07 Days Cylinder Concrete Test R.C.C Concrete (3000 psi) pergola column 108 to 111 Type,A&B 31-Oct-22 5-Nov-22 B B

412 412 ELITE18-CON-CE-CIV-IR-0412 Formwork & RCC concrete (4000 psi) with bonding agent of beam 141,142 FF 31-Oct-22 5-Nov-22 B B

413 413 ELITE18-CON-CE-CIV-IR-0413 Steel & anchor epoxy for slab thickness increase 135,136 TR 31-Oct-22 5-Nov-22 B B

414 414 ELITE18-CON-CE-CIV-IR-0414 RCC concrete (4000 psi) for slab thikness incease (top roof) 135,136 Type,A&B 31-Oct-22 5-Nov-22 B B

415 415 ELITE18-CON-CE-CIV-IR-0415 Steel & anchor epoxy for slab thickness increase 137,138 TR 31-Oct-22 3-Nov-22 C 31-Oct-22 8-Nov-22 B B

416 416 ELITE18-CON-CE-CIV-IR-0416 RCC concrete (4000 psi) for slab thikness incease (top roof) 137,138 Type,A&B 31-Oct-22 3-Nov-22 B B

417 417 ELITE18-CON-CE-CIV-IR-0417 Steel & anchor epoxy for slab thickness increase 133,134 FF,TR 31-Oct-22 3-Nov-22 B B

418 418 ELITE18-CON-CE-CIV-IR-0418 RCC concrete (4000 psi) for slab thikness incease (first floor,top roof) 133,134 FF,TR 31-Oct-22 3-Nov-22 B B

419 419 ELITE18-CON-CE-CIV-IR-0419 Surface clearence & side gola for top roof 143,144 Type,A&B 31-Oct-22 1-Nov-22 B B

420 420 ELITE18-CON-CE-CIV-IR-0420 Layout MS girder & RCC beams drilling 135 to 144 GF,FF 1-Nov-22 7-Nov-22 A A

421 421 ELITE18-CON-CE-CIV-IR-0421 Layout for block masonory 141,142 GF 1-Nov-22 3-Nov-22 A A

422 422 ELITE18-CON-CE-CIV-IR-0422 Layout for block masonory 139,140 GF 1-Nov-22 3-Nov-22 B B

423 423 ELITE18-CON-CE-CIV-IR-0423 Formwork & RCC concrete (4000 psi) with bonding agent of column 135,136 GF,FF 1-Nov-22 3-Nov-22 B B
RCC beam & MS beam area dismentlling block masonory & plaster & debris
424 424 ELITE18-CON-CE-CIV-IR-0424 137 to 142 GF,FF 1-Nov-22 3-Nov-22 B B
remove for retrofitting work
425 425 ELITE18-CON-CE-CIV-IR-0425 Fixing MS beam anchoring mechnical & chemical boulting apoxy with all respect 143,144 GF,FF 1-Nov-22 3-Nov-22 B 10-Nov-22 12-Nov-22 A A

426 426 ELITE18-CON-CE-CIV-IR-0426 Fixing MS beam anchoring mechnical & chemical boulting apoxy with all respect 141,142 GF,FF 1-Nov-22 3-Nov-22 B 10-Nov-22 12-Nov-22 B B

427 427 ELITE18-CON-CE-CIV-IR-0427 Fixing MS beam anchoring mechnical & chemical boulting apoxy with all respect 139,140 GF,FF 1-Nov-22 3-Nov-22 B 21-Nov-22 23-Nov-22 B B

428 428 ELITE18-CON-CE-CIV-IR-0428 Layout share links for slab thickness increase 127 to 132 FF 1-Nov-22 7-Nov-22 A A

429 429 ELITE18-CON-CE-CIV-IR-0429 Layout share links for slab thickness increase 131 to 136 TR 1-Nov-22 7-Nov-22 A A

430 430 ELITE18-CON-CE-CIV-IR-0430 Sand top level for sand filling under the floatting slab PCC 137 to 142 Type A&B 1-Nov-22 3-Nov-22 A A

431 431 ELITE18-CON-CE-CIV-IR-0431 PCC top level for under the floating slab 137 to 142 Type A&B 1-Nov-22 3-Nov-22 A A

432 432 ELITE18-CON-CE-CIV-IR-0432 RCC top level for floatting slab 137 to 142 Type A&B 1-Nov-22 7-Nov-22 B B

433 433 ELITE18-CON-CE-CIV-IR-0433 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) retrofitting columns 137,138 GF,FF 1-Nov-22 5-Nov-22 B B

434 434 ELITE18-CON-CE-CIV-IR-0434 Plaster work for external side (elevation 1 & elevation 3) 143,144 Type A&B 1-Nov-22 3-Nov-22 B B

435 435 ELITE18-CON-CE-CIV-IR-0435 Installation black granite with filling for partition wall 143,144 Type A&B 1-Nov-22 3-Nov-22 B B

436 436 ELITE18-CON-CE-CIV-IR-0436 Block masonry for external side duct (elevation 1) 143,144 Type A&B 1-Nov-22 3-Nov-22 A A

437 437 ELITE18-CON-CE-CIV-IR-0437 FDT test 1st layer sand filling for under the floating slab 135,136 Type A&B 1-Nov-22 3-Nov-22 C 1-Nov-22 12-Nov-22 B B

438 438 ELITE18-CON-CE-CIV-IR-0438 FDT test 2nd layer sand filling for under the floating slab 135,136 Type A&B 1-Nov-22 3-Nov-22 C 1-Nov-22 12-Nov-22 B B

439 439 ELITE18-CON-CE-CIV-IR-0439 Fixing MS beam anchoring mechnical & chemical boulting apoxy with all respect 137,138 GF,FF 1-Nov-22 3-Nov-22 C 22-Nov-22 24-Nov-22 C 3-Dec-22 9-Dec-22 C 14-Dec-22 15-Dec-22 B B

440 440 ELITE18-CON-CE-CIV-IR-0440 Inspection request against IR (01,12,47,48,69,360,361) 103 to 144 Type A&B 2-Nov-22 UR UR

441 441 ELITE18-CON-CE-CIV-IR-0441 Installation split stone for external side (elevation 1,3) 144 Type B 2-Nov-22 7-Nov-22 B B

442 442 ELITE18-CON-CE-CIV-IR-0442 Steel & anchor epoxy for slab thickness increase 129,130,131,132 TR 2-Nov-22 5-Nov-22 B B

443 443 ELITE18-CON-CE-CIV-IR-0443 RCC concrete (4000 psi) for slab thickness increase 129,130,131,132 TR 2-Nov-22 5-Nov-22 B B

444 444 ELITE18-CON-CE-CIV-IR-0444 Block masonory & lintels for walls 141,142 GF,FF 2-Nov-22 8-Nov-22 B B

445 445 ELITE18-CON-CE-CIV-IR-0445 FDT test 3rd layer sand filling for under the floating slab 135,136 Type A&B 2-Nov-22 12-Nov-22 B B

446 446 ELITE18-CON-CE-CIV-IR-0446 Installation OHWT cover & concrete uper side 143,144 Type A&B 2-Nov-22 8-Nov-22 C 19-Nov-22 23-Nov-22 C 3-Dec-22 4-Feb-23 C 8-Feb-23 8-Feb-23 A A

447 447 ELITE18-CON-CE-CIV-IR-0447 Block masonory for OHWT 143,144 Type A&B 2-Nov-22 8-Nov-22 B B

448 448 ELITE18-CON-CE-CIV-IR-0448 Installation gypsum bord for celling work dry area 144 GF,FF 2-Nov-22 8-Nov-22 C 10-Nov-22 24-Nov-22 C 3-Dec-22 9-Dec-22 B B

449 449 ELITE18-CON-CE-CIV-IR-0449 07 Days Cylinder Concrete Test R.C.C Concrete (4000 psi) retrofitting columns 139,140 FF 2-Nov-22 12-Nov-22 B B

450 450 ELITE18-CON-CE-CIV-IR-0450 Pond test for top roof 143,144 Type A&B 2-Nov-22 8-Nov-22 B B

451 451 ELITE18-CON-CE-CIV-IR-0451 Jumbolon XPS bord 50mm * polythene sheet laying for top roof 143,144 TR 2-Nov-22 8-Nov-22 B B

452 452 ELITE18-CON-CE-CIV-IR-0452 Surface clearence & side gola for top roof 141,142 TR 2-Nov-22 8-Nov-22 B B

453 453 ELITE18-CON-CE-CIV-IR-0453 07 Days Cylinder Concrete Test P.C.C (1:4:8) under floating slab 143 Type A 2-Nov-22 12-Nov-22 B B

454 454 ELITE18-CON-CE-CIV-IR-0454 FDT test 1st layer sand filling for under the floating slab 133,134 Type A&B 2-Nov-22 12-Nov-22 B B

455 455 ELITE18-CON-CE-CIV-IR-0455 FDT test 2nd layer sand filling for under the floating slab 133,134 Type A&B 2-Nov-22 12-Nov-22 B B

456 456 ELITE18-CON-CE-CIV-IR-0456 Steel & filler board for floatting slab 137,138 Type A&B 2-Nov-22 8-Nov-22 B B

457 457 ELITE18-CON-CE-CIV-IR-0457 RCC concrete (1:2:4) for floatting slab 137,138 Type A&B 2-Nov-22 8-Nov-22 B B

458 458 ELITE18-CON-CE-CIV-IR-0458 Sand laying for under top roof tile 143,144 Type A&B 2-Nov-22 UR UR

Page 27 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
459 459 ELITE18-CON-CE-CIV-IR-0459 28 days cylinder concrete test PCC (1:4:8) under floating slab 144 Type B 4-Nov-22 12-Nov-22 B B

460 460 ELITE18-CON-CE-CIV-IR-0460 28 days cylinder concrete test RCC concrete (4000 psi) retrofitting columns 143,144 Type A&B 4-Nov-22 12-Nov-22 B B

461 461 ELITE18-CON-CE-CIV-IR-0461 7 days cylinder concrete test RCC concrete (3000 psi) flating slab 139 Type A 4-Nov-22 12-Nov-22 B B

462 462 ELITE18-CON-CE-CIV-IR-0462 Block masonory for internal side duct 144 GF,FF,TR 4-Nov-22 8-Nov-22 B B

463 463 ELITE18-CON-CE-CIV-IR-0463 Drilling for share links 127 to 130 TR 4-Nov-22 8-Nov-22 C 10-Nov-22 12-Nov-22 C 14-Nov-22 18-Nov-22 B B

464 464 ELITE18-CON-CE-CIV-IR-0464 RCC top level for slab thickness increase 137,138 TR 4-Nov-22 8-Nov-22 A A

465 465 ELITE18-CON-CE-CIV-IR-0465 RCC top level for slab thickness increase 135,136 FF,TR 4-Nov-22 8-Nov-22 A A

466 466 ELITE18-CON-CE-CIV-IR-0466 RCC top level for slab thickness increase 133,134 FF,TR 4-Nov-22 8-Nov-22 A A

467 467 ELITE18-CON-CE-CIV-IR-0467 RCC top level for slab thickness increase 131,132 FF,TR 4-Nov-22 8-Nov-22 A A

468 468 ELITE18-CON-CE-CIV-IR-0468 Steel fixing & anchor epoxy for column jackting 131,132 GF,FF 4-Nov-22 8-Nov-22 B B

469 469 ELITE18-CON-CE-CIV-IR-0469 28 days cylinder concrete test RCC concrete (4000 psi) retrofitting columns 141,142 GF 5-Nov-22 12-Nov-22 B B

470 470 ELITE18-CON-CE-CIV-IR-0470 Plaster work with all respect for internal side duct 144 GF,FF,TR 5-Nov-22 8-Nov-22 C 19-Nov-22 23-Nov-22 B B

471 471 ELITE18-CON-CE-CIV-IR-0471 Installation split stone for external side (elevation 1,4) 143 Type A 5-Nov-22 8-Nov-22 B B

472 472 ELITE18-CON-CE-CIV-IR-0472 Block masonory for WC mechnical wall 144 GF,FF 5-Nov-22 8-Nov-22 B B

473 473 ELITE18-CON-CE-CIV-IR-0473 Block masonory & lintels for walls 139,140 Type A&B 5-Nov-22 8-Nov-22 C 19-Nov-22 23-Nov-22 B B

474 474 ELITE18-CON-CE-CIV-IR-0474 Installation corner bits for all corners 143,144 Type A&B 5-Nov-22 12-Nov-22 C 19-Nov-22 23-Nov-22 C 24-Nov-22 29-Nov-22 A A

475 475 ELITE18-CON-CE-CIV-IR-0475 Polythene sheet (1000 micron) under the PCC floating slab 135,136 Type A&B 7-Nov-22 10-Nov-22 B B

476 476 ELITE18-CON-CE-CIV-IR-0476 PCC (1:4:8) under the floating slab 135,136 Type A&B 7-Nov-22 10-Nov-22 B B

477 477 ELITE18-CON-CE-CIV-IR-0477 Plaster work with all respect for internal walls 144 Type B 7-Nov-22 12-Nov-22 C 19-Nov-22 23-Nov-22 C 29-Nov-22 2-Jan-23 B B

478 478 ELITE18-CON-CE-CIV-IR-0478 Block masonory work for internal side 143,144 Type A&B 7-Nov-22 12-Nov-22 B B

479 479 ELITE18-CON-CE-CIV-IR-0479 28 days cylinder concrete test RCC concrete (3000 psi) floating slab 143 Type A 7-Nov-22 12-Nov-22 B B

480 480 ELITE18-CON-CE-CIV-IR-0480 Steel fixing & anchor epoxy for beam jackting 137,138 GF,FF 7-Nov-22 12-Nov-22 B B

481 481 ELITE18-CON-CE-CIV-IR-0481 Formwork & RCC concrete (4000 psi) with bonding agent of beam 137,138 GF,FF 7-Nov-22 12-Nov-22 B B

482 482 ELITE18-CON-CE-CIV-IR-0482 Polythene sheet (1000 micron) under the PCC floating slab 134 Type B 7-Nov-22 12-Nov-22 B B

483 483 ELITE18-CON-CE-CIV-IR-0483 PCC (1:4:8) under the floating slab 134 Type B 7-Nov-22 12-Nov-22 B B

484 484 ELITE18-CON-CE-CIV-IR-0484 NSL & layout for manhole gully trap electrical handhole & electrical chamber 139 to 144 Type A&B 7-Nov-22 8-Nov-22 C 10-Nov-22 12-Nov-22 A A

485 485 ELITE18-CON-CE-CIV-IR-0485 PCC (1:4:8) for manhole gully trap electrical handhole & electrical chamber 139 to 144 Type A&B 7-Nov-22 12-Nov-22 C 14-Nov-22 17-Nov-22 B B

486 486 ELITE18-CON-CE-CIV-IR-0486 PCC (1:3:6) for manhole gully trap electrical handhole & electrical chamber 139 to 144 Type A&B 7-Nov-22 12-Nov-22 B B
Excavation & PCC top level for manhole gully trap electrical handhole & electrical
487 487 ELITE18-CON-CE-CIV-IR-0487 139 to 144 Type A&B 7-Nov-22 8-Nov-22 C 10-Nov-22 12-Nov-22 A A
chamber
488 488 ELITE18-CON-CE-CIV-IR-0488 Wall tile for bath & powder room 144 GF,FF 8-Nov-22 12-Nov-22 C 19-Nov-22 24-Nov-22 B 3-Dec-22 9-Dec-22 B B

489 489 ELITE18-CON-CE-CIV-IR-0489 Cementitious coat for bath & powder room water proofing 144 GF 8-Nov-22 12-Nov-22 B B
Dismantling manhole gully trap electrical handhole & electrical chamber on
490 490 ELITE18-CON-CE-CIV-IR-0490 122 to 126a Type A&B 7-Nov-22 12-Nov-22 B B
external side for pilling & debris remove
491 491 ELITE18-CON-CE-CIV-IR-0491 Steel & filler board for floatting slab 135 Type A 7-Nov-22 12-Nov-22 C 19-Nov-22 23-Nov-22 B B

492 492 ELITE18-CON-CE-CIV-IR-0492 RCC concrete (1:2:4) for floatting slab 135 Type B 7-Nov-22 12-Nov-22 B B

493 493 ELITE18-CON-CE-CIV-IR-0493 Wall tile for maid bath 143,144 Type A&B 8-Nov-22 12-Nov-22 C 23-Nov-22 26-Nov-22 B B

494 494 ELITE18-CON-CE-CIV-IR-0494 Block masonory partition wall for external side 141,142 Type A&B 8-Nov-22 12-Nov-22 B B

495 495 ELITE18-CON-CE-CIV-IR-0495 Plaster wprk partition walls for external side 141,142 Type A&B 8-Nov-22 12-Nov-22 B B

496 496 ELITE18-CON-CE-CIV-IR-0496 Block masonory partition wall for external side (elevation 2) 143,144 Type A&B 8-Nov-22 12-Nov-22 B B

497 497 ELITE18-CON-CE-CIV-IR-0497 Plaster wprk partition walls for external side (elevation 2) 143,144 Type A&B 8-Nov-22 12-Nov-22 B B

498 498 ELITE18-CON-CE-CIV-IR-0498 7 days cylinder concrete test RCC concrete (4000 psi) retrofitting columns 135,136 Type A&B 8-Nov-22 12-Nov-22 B B

499 499 ELITE18-CON-CE-CIV-IR-0499 28 days cylinder concrete test RCC concrete (3000 psi) floating slab 144 Type B 8-Nov-22 12-Nov-22 B B

500 500 ELITE18-CON-CE-CIV-IR-0500 7 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 137,138 TR 8-Nov-22 12-Nov-22 B B

501 501 ELITE18-CON-CE-CIV-IR-0501 7 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 133,134 TR 8-Nov-22 12-Nov-22 B B

502 502 ELITE18-CON-CE-CIV-IR-0502 7 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 131,132 TR 8-Nov-22 12-Nov-22 B B

503 503 ELITE18-CON-CE-CIV-IR-0503 7 days cylinder concrete test RCC concrete (4000 psi) retrofitting beams 139,140 GF,FF 8-Nov-22 12-Nov-22 B B

504 504 ELITE18-CON-CE-CIV-IR-0504 Steel fixing & anchor epoxy for beam jackting 135,136 GF,FF 8-Nov-22 12-Nov-22 B B

505 505 ELITE18-CON-CE-CIV-IR-0505 FDT test 1st layer sand filling for under the floating slab 131,132 Type A&B 8-Nov-22 13-Dec-22 B B

506 506 ELITE18-CON-CE-CIV-IR-0506 FDT test 2nd layer sand filling for under the floating slab 131,132 Type A&B 8-Nov-22 13-Dec-22 B B

507 507 ELITE18-CON-CE-CIV-IR-0507 Perlino marble for floor with filling 144 Type B 10-Nov-22 12-Nov-22 B 19-Nov-22 23-Nov-22 B B

508 508 ELITE18-CON-CE-CIV-IR-0508 Black granite for external side partition wall 141,142 Type A&B 10-Nov-22 12-Nov-22 B B

509 509 ELITE18-CON-CE-CIV-IR-0509 Black granite for external side partition wall & debris remove 122 to 126a Type A&B 10-Nov-22 12-Nov-22 B B

510 510 ELITE18-CON-CE-CIV-IR-0510 Dismentling black Granite For external side & Derbis Remove 139,141,143 Type A 19-Nov-22 23-Nov-22 B B

511 511 ELITE18-CON-CE-CIV-IR-0511 Dismentling crma mo for external side (elevation 1) & Derbis Remove 139,141,143 Type A 19-Nov-22 24-Nov-22 B B

512 512 ELITE18-CON-CE-CIV-IR-0512 125 mm core cutting & grout fill for MEP work 143,144 Type A&B 11-Feb-23 14-Feb-23 A A

513 513 ELITE18-CON-CE-CIV-IR-0513 Wall tile for kitchen 143,144 Type A&B 10-Nov-22 24-Nov-22 B 3-Feb-23 7-Feb-23 A 11-Feb-23 14-Feb-23 A A

Page 28 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
514 514 ELITE18-CON-CE-CIV-IR-0514 Cementitious coat for kitchenwall water proofing 143,144 Type A&B 10-Nov-22 12-Nov-22 B B

515 515 ELITE18-CON-CE-CIV-IR-0515 7 days cylinder concrete test PCC (1:4:8)) under floating slab 137,138 Type A&B 10-Nov-22 12-Nov-22 A A

516 516 ELITE18-CON-CE-CIV-IR-0516 7 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 135,136 TR 10-Nov-22 12-Nov-22 A A

517 517 ELITE18-CON-CE-CIV-IR-0517 28 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 143,144 FF 10-Nov-22 12-Nov-22 A A

518 518 ELITE18-CON-CE-CIV-IR-0518 7 days cylinder concrete test RCC concrete (4000 psi) retrofitting beams 141,142 FF 10-Nov-22 12-Nov-22 B B

519 519 ELITE18-CON-CE-CIV-IR-0519 Slab thickness increase drilling for share links 131 to 144 FF,TR 10-Nov-22 12-Nov-22 C 18-Nov-22 13-Dec-22 B B

520 520 ELITE18-CON-CE-CIV-IR-0520 Drilling for RCC beam 133 to 144 GF,FF 10-Nov-22 12-Nov-22 C 18-Nov-22 13-Dec-22 B B

521 521 ELITE18-CON-CE-CIV-IR-0521 28 days cylinder concrete test RCC concrete (4000 psi) retrofitting columns 141,142 FF 10-Nov-22 13-Dec-22 B B

522 522 ELITE18-CON-CE-CIV-IR-0522 28 days cylinder concrete test RCC concrete (4000 psi) retrofitting columns 139,140 GF 10-Nov-22 13-Dec-22 B B

523 523 ELITE18-CON-CE-CIV-IR-0523 Layout for AC outdoor pedestal & exhaust fan pad 139 to 144 Type A&B 10-Nov-22 12-Nov-22 B B

524 524 ELITE18-CON-CE-CIV-IR-0524 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 139 to 142 Type A&B 10-Nov-22 12-Nov-22 C 14-Nov-22 17-Nov-22 C 4-Jan-23 7-Jan-23 B B

525 525 ELITE18-CON-CE-CIV-IR-0525 Layout for block masonory 137,138 GF 10-Nov-22 12-Nov-22 A A

526 526 ELITE18-CON-CE-CIV-IR-0526 Sand top level for sand filling under the floatting slab PCC 131 to 136 Type A&B 10-Nov-22 12-Nov-22 A A

527 527 ELITE18-CON-CE-CIV-IR-0527 PCC top level for under the floating slab 131 to 136 Type A&B 10-Nov-22 12-Nov-22 B B

528 528 ELITE18-CON-CE-CIV-IR-0528 Cementitious coat for bath & powder room water proofing 143 GF 10-Nov-22 12-Nov-22 B B

529 529 ELITE18-CON-CE-CIV-IR-0529 Polythene sheet (1000 micron) under the PCC floating slab 133 Type A 12-Nov-22 16-Nov-22 A A

530 530 ELITE18-CON-CE-CIV-IR-0530 PCC (1:4:8) under the floating slab 133 Type A 12-Nov-22 16-Nov-22 B B

531 531 ELITE18-CON-CE-CIV-IR-0531 7 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 135,136 FF 12-Nov-22 16-Nov-22 B B

532 532 ELITE18-CON-CE-CIV-IR-0532 28 days cylinder concrete test PCC (1:4:8) under floating slab 141,142 Type A&B 12-Nov-22 16-Nov-22 A A

533 533 ELITE18-CON-CE-CIV-IR-0533 7 days cylinder concrete test RCC concrete (3000 psi) floating slab 137,138 Type A&B 12-Nov-22 16-Nov-22 A A

534 534 ELITE18-CON-CE-CIV-IR-0534 Drilling for share links 129,130 Type A&B 14-Nov-22 18-Nov-22 B B

535 535 ELITE18-CON-CE-CIV-IR-0535 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 141,142 Type A&B 14-Nov-22 17-Nov-22 C 21-Nov-22 23-Nov-22 C 6-Dec-22 9-Dec-22 B B

536 536 ELITE18-CON-CE-CIV-IR-0536 PCC (1:4:8) for manhole gully trap electrical handhole & electrical chamber 141,142 Type A&B 14-Nov-22 17-Nov-22 B B

537 537 ELITE18-CON-CE-CIV-IR-0537 PCC (1:4:8) for manhole gully trap electrical handhole & electrical chamber 143,144 Type A&B 14-Nov-22 17-Nov-22 B B

538 538 ELITE18-CON-CE-CIV-IR-0538 Steel fixing & filler board floating slab 136 Type B 18-Nov-22 23-Nov-22 B B

539 539 ELITE18-CON-CE-CIV-IR-0539 Rcc concrete (1:2:4) floating slab 136 Type B 18-Nov-22 23-Nov-22 B B

540 540 ELITE18-CON-CE-CIV-IR-0540 Steel fixing & filler board floating slab 133,134 Type A&B 18-Nov-22 23-Nov-22 B B

541 541 ELITE18-CON-CE-CIV-IR-0541 Rcc concrete (1:2:4) floating slab 133,134 Type A&B 18-Nov-22 23-Nov-22 B B

542 542 ELITE18-CON-CE-CIV-IR-0542 7 days cylinder concrete test PCC (1:4:8) under floating slab 135,136 Type A&B 17-Nov-22 23-Nov-22 A A

543 543 ELITE18-CON-CE-CIV-IR-0543 7 days cylinder concrete test PCC (1:4:8) under floating slab 134 Type B 17-Nov-22 23-Nov-22 A A

544 544 ELITE18-CON-CE-CIV-IR-0544 28 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 143,144 TR 17-Nov-22 23-Nov-22 A A

545 545 ELITE18-CON-CE-CIV-IR-0545 28 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 139,140 FF 17-Nov-22 23-Nov-22 A A

546 546 ELITE18-CON-CE-CIV-IR-0546 28 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 139,140 TR 17-Nov-22 23-Nov-22 A A

547 547 ELITE18-CON-CE-CIV-IR-0547 28 days cylinder concrete test RCC concrete (4000 psi) retrofitting beams 143,144 GF,FF 17-Nov-22 23-Nov-22 A A

548 548 ELITE18-CON-CE-CIV-IR-0548 7 days cylinder concrete test RCC concrete (4000 psi) retrofitting beams 137,138 GF,FF 17-Nov-22 23-Nov-22 A A

549 549 ELITE18-CON-CE-CIV-IR-0549 28 days cylinder concrete test RCC concrete (3000 psi) floating slab 142 Type B 17-Nov-22 23-Nov-22 A A

550 550 ELITE18-CON-CE-CIV-IR-0550 Formwork and RCC Concrete (4000Psi) & SBR with Bonding Agent of Column 133,134 GF.FF 17-Nov-22 15-Dec-22 B B

551 551 ELITE18-CON-CE-CIV-IR-0551 Polythene Sheet (1000 Micron) Under the PCC Floating Slab 131,132 Type A&B 17-Nov-22 13-Dec-22 B B

552 552 ELITE18-CON-CE-CIV-IR-0552 PCC (1:4:8) Under the Floating Slab 131,132 Type A&B 17-Nov-22 23-Nov-22 B B

553 553 ELITE18-CON-CE-CIV-IR-0553 7 days cylinder concrete test RCC concrete (3000 psi) floating slab 135 Type A 17-Nov-22 23-Nov-22 A A

554 554 ELITE18-CON-CE-CIV-IR-0554 Primer Coat & membranes (bituminous) sheet for Top Roof 141,142 TR 17-Nov-22 23-Nov-22 C 29-Nov-22 2-Dec-22 B B

555 555 ELITE18-CON-CE-CIV-IR-0555 Primer Coat & membranes (bituminous) sheet for Top Roof 139,140 TR 19-Nov-22 23-Nov-22 C 29-Nov-22 2-Dec-22 C 14-Dec-22 20-Dec-22 C 22-Dec-22 29-Dec-22 B B

556 556 ELITE18-CON-CE-CIV-IR-0556 Pond Test For Top Roof 141,142 TR 18-Nov-22 26-Nov-22 C 29-Nov-22 2-Dec-22 B B

557 557 ELITE18-CON-CE-CIV-IR-0557 Pond Test For Top Roof 139,140 TR 19-Nov-22 23-Nov-22 C 23-Dec-22 29-Dec-22 B B

558 558 ELITE18-CON-CE-CIV-IR-0558 Formwork and RCC Concrete (4000Psi) & SBR with Bonding Agent of Column 131,132 GF.FF 19-Nov-22 23-Nov-22 B B
Columns Horizontal Drilling 12mm (1550 Nos) & Vertical Drilling 25mm (1526
559 559 ELITE18-CON-CE-CIV-IR-0559 141,142 GF.FF 19-Nov-22 23-Nov-22 B B
Nos) For Share Links
Columns Horizontal Drilling 12mm (1550 Nos) & Vertical Drilling 25mm (1526
560 560 ELITE18-CON-CE-CIV-IR-0560 139,140 GF.FF 19-Nov-22 23-Nov-22 B B
Nos) For Share Links
Columns Horizontal Drilling 12mm (1550 Nos) & Vertical Drilling 25mm (1526
561 561 ELITE18-CON-CE-CIV-IR-0561 137,138 GF.FF 19-Nov-22 23-Nov-22 B B
Nos) For Share Links
Columns Horizontal Drilling 12mm (1550 Nos) & Vertical Drilling 25mm (1526
562 562 ELITE18-CON-CE-CIV-IR-0562 135,136 GF.FF 19-Nov-22 23-Nov-22 B B
Nos) For Share Links
Columns Horizontal Drilling 12mm (1550 Nos) & Vertical Drilling 25mm (1526
563 563 ELITE18-CON-CE-CIV-IR-0563 133,134 GF.FF 19-Nov-22 23-Nov-22 B B
Nos) For Share Links
Columns Horizontal Drilling 12mm (1550 Nos) & Vertical Drilling 25mm (1526
564 564 ELITE18-CON-CE-CIV-IR-0564 131,132 GF.FF 19-Nov-22 23-Nov-22 B B
Nos) For Share Links
Columns Horizontal Drilling 12mm (1550 Nos) & Vertical Drilling 25mm (1526
565 565 ELITE18-CON-CE-CIV-IR-0565 129,130 GF.FF 19-Nov-22 23-Nov-22 B B
Nos) For Share Links
Columns Horizontal Drilling 12mm (1550 Nos) & Vertical Drilling 25mm (1526
566 566 ELITE18-CON-CE-CIV-IR-0566 127,128 GF.FF 19-Nov-22 23-Nov-22 B B
Nos) For Share Links
Slab Thickness Increase Drilling 12mm(3625 Nos), 14mm(605 Nos) & 24mm(65 Nos) For Share
567 567 ELITE18-CON-CE-CIV-IR-0567 Links
141,142 FF,TR 19-Nov-22 23-Nov-22 B B
Slab Thickness Increase Drilling 12mm(3625 Nos), 14mm(605 Nos) & 24mm(65 Nos) For Share
568 568 ELITE18-CON-CE-CIV-IR-0568 Links
139,140 FF,TR 19-Nov-22 23-Nov-22 B B

Page 29 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
Slab Thickness Increase Drilling 12mm(3625 Nos), 14mm(605 Nos) & 24mm(65 Nos) For Share
569 569 ELITE18-CON-CE-CIV-IR-0569 Links
137,138 FF,TR 19-Nov-22 23-Nov-22 B B
Slab Thickness Increase Drilling 12mm(3625 Nos), 14mm(605 Nos) & 24mm(65 Nos) For Share
570 570 ELITE18-CON-CE-CIV-IR-0570 Links
135,136 FF,TR 19-Nov-22 23-Nov-22 B B
Slab Thickness Increase Drilling 12mm(3625 Nos), 14mm(605 Nos) & 24mm(65 Nos) For Share
571 571 ELITE18-CON-CE-CIV-IR-0571 Links
133,134 FF,TR 18-Nov-22 13-Dec-22 B B

572 572 ELITE18-CON-CE-CIV-IR-0572 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 141,142 GF.FF 18-Nov-22 13-Dec-22 B B

573 573 ELITE18-CON-CE-CIV-IR-0573 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 139,140 GF.FF 18-Nov-22 13-Dec-22 B B

574 574 ELITE18-CON-CE-CIV-IR-0574 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 137,138 GF.FF 18-Nov-22 13-Dec-22 B B

575 575 ELITE18-CON-CE-CIV-IR-0575 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 135,136 GF.FF 18-Nov-22 13-Dec-22 B B

576 576 ELITE18-CON-CE-CIV-IR-0576 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 133,134 GF.FF 18-Nov-22 13-Dec-22 B B
Slab Thickness Increase Drilling 12mm(3625 Nos), 14mm(605 Nos) & 24mm(65 Nos) For Share
577 577 ELITE18-CON-CE-CIV-IR-0577 Links
131,132 FF,TR 18-Nov-22 13-Dec-22 B B

578 578 ELITE18-CON-CE-CIV-IR-0578 Steel & Anchor Epoxy For Slab Thickness Increase 129,130 TF 18-Nov-22 13-Dec-22 B B

579 579 ELITE18-CON-CE-CIV-IR-0579 RCC Concrete (4000 PSi) & SBR For Slab Thikness Increase 129,130 TF 18-Nov-22 13-Dec-22 B B

580 580 ELITE18-CON-CE-CIV-IR-0580 Steel & Anchor Epoxy For Slab Thickness Increase 127,128 TF 18-Nov-22 13-Dec-22 B B

581 581 ELITE18-CON-CE-CIV-IR-0581 RCC Concrete (4000 PSi) & SBR For Slab Thikness Increase ,127,128 TF 18-Nov-22 23-Nov-22 B B

582 582 ELITE18-CON-CE-CIV-IR-0582 Steel & Anchor Epoxy For Slab Thickness Increase ,127,128 FF 19-Nov-22 23-Nov-22 B B

583 583 ELITE18-CON-CE-CIV-IR-0583 RCC Concrete (4000 PSi) & SBR For Slab Thikness Increase ,127,128 FF 19-Nov-22 23-Nov-22 B B

584 584 ELITE18-CON-CE-CIV-IR-0584 Steel & Anchor Epoxy For Slab Thickness Increase 129,130 FF 19-Nov-22 13-Dec-22 B B

585 585 ELITE18-CON-CE-CIV-IR-0585 RCC Concrete (4000 PSi) & SBR For Slab Thikness Increase 129,130 FF 19-Nov-22 13-Dec-22 B B

586 586 ELITE18-CON-CE-CIV-IR-0586 Steel & Anchor Epoxy For Slab Thickness Increase 131,132 FF 19-Nov-22 13-Dec-22 B B

587 587 ELITE18-CON-CE-CIV-IR-0587 RCC Concrete (4000 PSi) & SBR For Slab Thikness Increase 131,132 FF 19-Nov-22 13-Dec-22 B B

588 588 ELITE18-CON-CE-CIV-IR-0588 Steel & Anchor Epoxy For Slab Thickness Increase 133,134 FF 19-Nov-22 13-Dec-22 B B

589 589 ELITE18-CON-CE-CIV-IR-0589 RCC Concrete (4000 PSi) & SBR For Slab Thikness Increase 133,134 FF 19-Nov-22 13-Dec-22 B B

590 590 ELITE18-CON-CE-CIV-IR-0590 Steel Fixing & Anchor Epoxy for Beam Jackting 135,136 GF.FF 19-Nov-22 23-Nov-22 B B

591 591 ELITE18-CON-CE-CIV-IR-0591 Formwork and RCC Concrete (4000Psi) & SBR with Bonding Agent of Beam 135,136 GF.FF 19-Nov-22 23-Nov-22 B B

592 592 ELITE18-CON-CE-CIV-IR-0592 Steel Fixing & Anchor Epoxy for Beam Jackting 133,134 GF.FF 19-Nov-22 23-Nov-22 B B

593 593 ELITE18-CON-CE-CIV-IR-0593 Steel Fixing & Anchor Epoxy for Beam Jackting 131,132 GF.FF 19-Nov-22 23-Nov-22 B B

594 594 ELITE18-CON-CE-CIV-IR-0594 FDT Test 1st Layer Sand Filling For Under the Floating Slab 129,130 TypeA&B 19-Nov-22 25-Nov-22 B B

595 595 ELITE18-CON-CE-CIV-IR-0595 FDT Test 2nd Layer Sand Filling For Under the Floating Slab 129,130 TypeA&B 19-Nov-22 25-Nov-22 B B

596 596 ELITE18-CON-CE-CIV-IR-0596 FDT Test 1st Layer Sand Filling For Under the Floating Slab 127,128 TypeA&B 19-Nov-22 29-Nov-22 C 9-Dec-22 14-Dec-22 B B

597 597 ELITE18-CON-CE-CIV-IR-0597 FDT Test 2nd Layer Sand Filling For Under the Floating Slab 127,128 TypeA&B 19-Nov-22 29-Nov-22 C 9-Dec-22 14-Dec-22 B B

598 598 ELITE18-CON-CE-CIV-IR-0598 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 133,134 GF.FF 19-Nov-22 23-Nov-22 B B

599 599 ELITE18-CON-CE-CIV-IR-0599 Dismentlling Plaster For Black Granite External Side (Elevation 1) 139,141,143 EXT 19-Nov-22 23-Nov-22 B B

600 600 ELITE18-CON-CE-CIV-IR-0600 Dismentlling Plaster For Crema Mo External Side (Elevation 1) 139,141,143 EXT 19-Nov-22 23-Nov-22 B B

601 601 ELITE18-CON-CE-CIV-IR-0601 Plaster Black Granite For External Side (Elevation 1) 139,141,143 EXT 19-Nov-22 24-Nov-22 B B

602 602 ELITE18-CON-CE-CIV-IR-0602 Plaster Crema Mo For External Side (Elevation 1) 139,141,143 EXT 19-Nov-22 24-Nov-22 B B

603 603 ELITE18-CON-CE-CIV-IR-0603 Installation Crema Mo For External Side (Elevation 1) 139,141,143 EXT 19-Nov-22 24-Nov-22 B B

604 604 ELITE18-CON-CE-CIV-IR-0604 Installation Black Granite For External Side (Elevation 1) 139,141,143 EXT 19-Nov-22 24-Nov-22 B B

605 605 ELITE18-CON-CE-CIV-IR-0605 Installation Moisture Risitence Board For Ceiling Work Wet Area 144 GF.FF 18-Nov-22 26-Nov-22 B 3-Dec-22 9-Dec-22 B B

606 606 ELITE18-CON-CE-CIV-IR-0606 Sand Removal for Piling Work 122,123 EXT 19-Nov-22 23-Nov-22 B B

607 607 ELITE18-CON-CE-CIV-IR-0607 Sand Removal for Piling Work 124,125 EXT 19-Nov-22 23-Nov-22 B B

608 608 ELITE18-CON-CE-CIV-IR-0608 Sand Removal for Piling Work 126126A EXT 19-Nov-22 23-Nov-22 B B

609 609 ELITE18-CON-CE-CIV-IR-0609 Sand Removal for Piling Work 119,120 EXT 19-Nov-22 23-Nov-22 B B

610 610 ELITE18-CON-CE-CIV-IR-0610 Sand Removal for Piling Work 117,118 EXT 19-Nov-22 23-Nov-22 B B

611 611 ELITE18-CON-CE-CIV-IR-0611 Sand Removal for Piling Work 115,116 EXT 19-Nov-22 23-Nov-22 B B

612 612 ELITE18-CON-CE-CIV-IR-0612 Sand Removal for Piling Work 113,114 EXT 19-Nov-22 13-Dec-22 B B

613 613 ELITE18-CON-CE-CIV-IR-0613 Sand Removal for Piling Work 111,112 EXT 19-Nov-22 13-Dec-22 B B

614 614 ELITE18-CON-CE-CIV-IR-0614 Sand Removal for Piling Work 109,110 EXT 19-Nov-22 13-Dec-22 B B

615 615 ELITE18-CON-CE-CIV-IR-0615 Sand Removal for Piling Work 107,108 EXT 19-Nov-22 13-Dec-22 B B

616 616 ELITE18-CON-CE-CIV-IR-0616 Sand Removal for Piling Work 105,106 EXT 19-Nov-22 13-Dec-22 B B

617 617 ELITE18-CON-CE-CIV-IR-0617 Sand Removal for Piling Work 103,104 EXT 19-Nov-22 13-Dec-22 B B

618 618 ELITE18-CON-CE-CIV-IR-0618 Sand Removal for Piling Work 101,102 EXT 19-Nov-22 13-Dec-22 B B

619 619 ELITE18-CON-CE-CIV-IR-0619 Dismentling Block Work Under the Plinth Beam for Pile Cap 131,132 GF 18-Nov-22 13-Dec-22 B B

620 620 ELITE18-CON-CE-CIV-IR-0620 Dismentling Block Work Under the Plinth Beam for Pile Cap 129,130 GF 18-Nov-22 13-Dec-22 B B

621 621 ELITE18-CON-CE-CIV-IR-0621 Dismentling Block Work Under the Plinth Beam for Pile Cap 127,128 GF 18-Nov-22 13-Dec-22 B B

622 622 ELITE18-CON-CE-CIV-IR-0622 Dismentling Block Work Under the Plinth Beam for Pile Cap 122,123 GF 18-Nov-22 23-Nov-22 B B

623 623 ELITE18-CON-CE-CIV-IR-0623 Dismentling Block Work Under the Plinth Beam for Pile Cap 124,125 GF 18-Nov-22 23-Nov-22 B B

Page 30 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
624 624 ELITE18-CON-CE-CIV-IR-0624 Dismentling Block Work Under the Plinth Beam for Pile Cap 126,126A GF 18-Nov-22 23-Nov-22 B B

625 625 ELITE18-CON-CE-CIV-IR-0625 28 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 141,142 FF 18-Nov-22 29-Nov-22 B B

626 626 ELITE18-CON-CE-CIV-IR-0626 Dismentling External PCC for Pilling Work 122,123 EXT 18-Nov-22 23-Nov-22 B B

627 627 ELITE18-CON-CE-CIV-IR-0627 Dismentling External PCC for Pilling Work 124,125 EXT 18-Nov-22 13-Dec-22 B B

628 628 ELITE18-CON-CE-CIV-IR-0628 Dismentling External PCC for Pilling Work 126,126A EXT 18-Nov-22 13-Dec-22 B B

629 629 ELITE18-CON-CE-CIV-IR-0629 Cementitious Coat For Baths & Powder Room Water Proofing 144 GF,FF 18-Nov-22 23-Nov-22 C 29-Nov-22 7-Feb-23 A 4-Feb-23 UR A

630 630 ELITE18-CON-CE-CIV-IR-0630 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of column 129,130 GF 26-Nov-22 2-Dec-22 C 5-Dec-22 9-Dec-22 B B

631 631 ELITE18-CON-CE-CIV-IR-0631 Floor Tile For Baths & Powder Room 144 GF,FF 18-Nov-22 24-Nov-22 B B

632 632 ELITE18-CON-CE-CIV-IR-0632 Cementitious Coat For Kitchen Water Proofing 143,144 GF 18-Nov-22 23-Nov-22 B B

633 633 ELITE18-CON-CE-CIV-IR-0633 Block masonory & lintels for walls 135,136 A&B 26-Nov-22 1-Dec-22 C 9-Dec-22 13-Dec-22 C 20-Dec-22 29-Dec-22 B B

634 634 ELITE18-CON-CE-CIV-IR-0634 Floor Tile For Kitchen 143,144 GF 19-Nov-22 24-Nov-22 B B

635 635 ELITE18-CON-CE-CIV-IR-0635 Dismentling Floor Tile For Maid Room & Debris Remove 144 MR 19-Nov-22 24-Nov-22 B B

636 636 ELITE18-CON-CE-CIV-IR-0636 Dismentling Black Granite For Partition Wall & Derbis Remove 109,110 EXT 19-Nov-22 23-Nov-22 C 9-Dec-22 14-Dec-22 B B

637 637 ELITE18-CON-CE-CIV-IR-0637 Dismentling Black Granite For Partition Wall & Derbis Remove 111,112 EXT 19-Nov-22 23-Nov-22 B B

638 638 ELITE18-CON-CE-CIV-IR-0638 Dismentling Black Granite For Partition Wall & Derbis Remove 113,114 EXT 19-Nov-22 23-Nov-22 B B

639 639 ELITE18-CON-CE-CIV-IR-0639 Dismentling Black Granite For Partition Wall & Derbis Remove 115,116 EXT 19-Nov-22 23-Nov-22 B B

640 640 ELITE18-CON-CE-CIV-IR-0640 Dismentling Black Granite For Partition Wall & Derbis Remove 117,118 EXT 19-Nov-22 23-Nov-22 B B

641 641 ELITE18-CON-CE-CIV-IR-0641 Dismentling Black Granite For Partition Wall & Derbis Remove 119,120 EXT 19-Nov-22 23-Nov-22 B B

642 642 ELITE18-CON-CE-CIV-IR-0642 Installation Floor Tile For Maid Room With Filling 144 MR 19-Nov-22 24-Nov-22 B B

643 643 ELITE18-CON-CE-CIV-IR-0643 Dismentling Block Masonory For Partition Wall & Derbis Remove 122,123 EXT 19-Nov-22 23-Nov-22 B B

644 644 ELITE18-CON-CE-CIV-IR-0644 Dismentling Block Masonory For Partition Wall & Derbis Remove 124,125 EXT 19-Nov-22 23-Nov-22 B B

645 645 ELITE18-CON-CE-CIV-IR-0645 Dismentling Block Masonory For Partition Wall & Derbis Remove 126,126A EXT 19-Nov-22 23-Nov-22 B B

646 646 ELITE18-CON-CE-CIV-IR-0646 Dismentling Block Masonory For Partition Wall & Derbis Remove 119,120 EXT 19-Nov-22 23-Nov-22 B B

647 647 ELITE18-CON-CE-CIV-IR-0647 Dismentling Block Masonory For Partition Wall & Derbis Remove 117,118 EXT 19-Nov-22 23-Nov-22 B B

648 648 ELITE18-CON-CE-CIV-IR-0648 Dismentling Block Masonory For Partition Wall & Derbis Remove 115,116 EXT 19-Nov-22 23-Nov-22 A A

649 649 ELITE18-CON-CE-CIV-IR-0649 Dismentling Block Masonory For Partition Wall & Derbis Remove 113,114 EXT 19-Nov-22 23-Nov-22 B B

650 650 ELITE18-CON-CE-CIV-IR-0650 Dismentling Block Masonory For Partition Wall & Derbis Remove 111,112 EXT 19-Nov-22 23-Nov-22 B B

651 651 ELITE18-CON-CE-CIV-IR-0651 Dismentling Block Masonory For Partition Wall & Derbis Remove 109,110 EXT 19-Nov-22 23-Nov-22 B B

652 652 ELITE18-CON-CE-CIV-IR-0652 Installation Black Granite Window Sill 144 Type B 19-Nov-22 24-Nov-22 B B

653 653 ELITE18-CON-CE-CIV-IR-0653 Surface Clearence & Primer Coat For Internal Paint 144 GF,FF,MR 19-Nov-22 24-Nov-22 C 29-Dec-22 2-Jan-23 B B

654 654 ELITE18-CON-CE-CIV-IR-0654 Plaster Work & Wall Mounted Cement Board For Cistern Flushing Tank 144 GF,FF 19-Nov-22 23-Nov-22 B B

655 655 ELITE18-CON-CE-CIV-IR-0655 Block Masonory For Manhole, Gully Trap, Electrical Chamber & Electrical Handhole 143,144 Type A&B 19-Nov-22 24-Nov-22 B B

656 656 ELITE18-CON-CE-CIV-IR-0656 Block Masonory For Manhole, Gully Trap, Electrical Chamber & Electrical Handhole 141,142 Type A&B 19-Nov-22 24-Nov-22 B B

657 657 ELITE18-CON-CE-CIV-IR-0657 Block Masonory For Manhole, Gully Trap, Electrical Chamber & Electrical Handhole 139,140 Type A&B 19-Nov-22 24-Nov-22 B B

658 658 ELITE18-CON-CE-CIV-IR-0658 Pudlo Plaster & Benching For Manhole, Gully Trap, Electrical Chamber & Electrical Handhole 143,144 Type A&B 19-Nov-22 24-Nov-22 B B

659 659 ELITE18-CON-CE-CIV-IR-0659 28 days cylinder concrete test PCC (1:4:8) under floating slab 139,140 Type A&B 19-Nov-22 23-Nov-22 A A

660 660 ELITE18-CON-CE-CIV-IR-0660 28 days cylinder concrete test RCC concrete (3000 psi) floating slab 141 Type A 19-Nov-22 23-Nov-22 A A

661 661 ELITE18-CON-CE-CIV-IR-0661 Pudlo Plaster & Benching For Manhole, Gully Trap, Electrical Chamber & Electrical Handhole 141,142 Type A&B 19-Nov-22 24-Nov-22 B B

662 662 ELITE18-CON-CE-CIV-IR-0662 Installation Perlino Marble For Floor With Filling 143 GF 19-Nov-22 24-Nov-22 B B

663 663 ELITE18-CON-CE-CIV-IR-0663 Dismentling Perlino Marble For Floor & Debris Remove 144 FF 19-Nov-22 23-Nov-22 B B

664 664 ELITE18-CON-CE-CIV-IR-0664 Installation Perlino Marble For Floor With Filling 144 FF 19-Nov-22 24-Nov-22 C 24-Nov-22 29-Dec-22 B 23-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A A

665 665 ELITE18-CON-CE-CIV-IR-0665 Block Masonory Work For Internal Side 141,142 GF,FF 19-Nov-22 23-Nov-22 B B

666 666 ELITE18-CON-CE-CIV-IR-0666 Block Masonory Work For Internal Side 139,140 GF,FF 19-Nov-22 23-Nov-22 C 29-Nov-22 1-Dec-22 B B

667 667 ELITE18-CON-CE-CIV-IR-0667 Block Masonory Partition Walls For External Side 139,140 EXT 19-Nov-22 23-Nov-22 C 29-Nov-22 1-Dec-22 B B

668 668 ELITE18-CON-CE-CIV-IR-0668 Plaster Work Partition Walls For External Side 139,140 EXT 19-Nov-22 23-Nov-22 B B

669 669 ELITE18-CON-CE-CIV-IR-0669 Block Masonory Partition Walls For External Side 137,138 EXT 19-Nov-22 23-Nov-22 B B

670 670 ELITE18-CON-CE-CIV-IR-0670 Plaster Work Partition Walls For External Side 137,138 EXT 19-Nov-22 23-Nov-22 B B

671 671 ELITE18-CON-CE-CIV-IR-0671 Block Masonory Partition Walls For External Side 135,136 EXT 19-Nov-22 23-Nov-22 B B

672 672 ELITE18-CON-CE-CIV-IR-0672 Plaster Work Partition Walls For External Side 135,136 EXT 19-Nov-22 23-Nov-22 B B

673 673 ELITE18-CON-CE-CIV-IR-0673 Dismentlling Concrete & Side Gola for slab thickness increase 113,114 TR 19-Nov-22 23-Nov-22 B B

674 674 ELITE18-CON-CE-CIV-IR-0674 Dismentlling Jumbolon Sheet & Membrane (Bituminous) Sheet for slab thickness increase 113,114 TR 19-Nov-22 23-Nov-22 B B

675 675 ELITE18-CON-CE-CIV-IR-0675 Dismentlling Concrete & Side Gola for slab thickness increase 111,112 TR 19-Nov-22 23-Nov-22 C 9-Dec-22 14-Dec-22 B B

676 676 ELITE18-CON-CE-CIV-IR-0676 Dismentlling Jumbolon Sheet & Membrane (Bituminous) Sheet for slab thickness increase 111,112 TR 19-Nov-22 23-Nov-22 B B

677 677 ELITE18-CON-CE-CIV-IR-0677 Dismentlling Concrete & Side Gola for slab thickness increase 109,110 TR 19-Nov-22 23-Nov-22 C 9-Dec-22 14-Dec-22 B B

678 678 ELITE18-CON-CE-CIV-IR-0678 Dismentlling Jumbolon Sheet & Membrane (Bituminous) Sheet for slab thickness increase 109,110 TR 19-Nov-22 23-Nov-22 B B

Page 31 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
679 679 ELITE18-CON-CE-CIV-IR-0679 Dismentlling Concrete & Side Gola for slab thickness increase 107,108 TR 19-Nov-22 23-Nov-22 C 9-Dec-22 13-Dec-22 B B

680 680 ELITE18-CON-CE-CIV-IR-0680 Dismentlling Jumbolon Sheet & Membrane (Bituminous) Sheet for slab thickness increase 107,108 TR 19-Nov-22 23-Nov-22 B B

681 681 ELITE18-CON-CE-CIV-IR-0681 Dismentlling Concrete & Side Gola for slab thickness increase 105,106 TR 19-Nov-22 23-Nov-22 C 9-Dec-22 13-Dec-22 B B

682 682 ELITE18-CON-CE-CIV-IR-0682 Dismentlling Jumbolon Sheet & Membrane (Bituminous) Sheet for slab thickness increase 105,106 TR 19-Nov-22 23-Nov-22 B B

683 683 ELITE18-CON-CE-CIV-IR-0683 Dismentlling Concrete & Side Gola for slab thickness increase 103,104 TR 19-Nov-22 23-Nov-22 C 9-Dec-22 13-Dec-22 B B

684 684 ELITE18-CON-CE-CIV-IR-0684 Dismentlling Jumbolon Sheet & Membrane (Bituminous) Sheet for slab thickness increase 103,104 TR 19-Nov-22 23-Nov-22 B B

685 685 ELITE18-CON-CE-CIV-IR-0685 7 days cylinder concrete test PCC (1:4:8) under floating slab 133 Type A 19-Nov-22 23-Nov-22 B B

686 686 ELITE18-CON-CE-CIV-IR-0686 Block Masonory & Lintels For Walls 137,138 GF 19-Nov-22 23-Nov-22 C 29-Nov-22 2-Dec-22 B B

687 687 ELITE18-CON-CE-CIV-IR-0687 Block Masonory For Internal Side Duct 143 GF,FF,TR 19-Nov-22 23-Nov-22 B B

688 688 ELITE18-CON-CE-CIV-IR-0688 Plaster Work With All Respect For Internal Side Duct 143 GF,FF,TR 19-Nov-22 23-Nov-22 C 29-Nov-22 2-Jan-23 A A

689 689 ELITE18-CON-CE-CIV-IR-0689 Plaster Work With All Respect For Internal Walls 143 GF,FF,TR 19-Nov-22 24-Nov-22 C 29-Nov-22 2-Jan-23 A A

690 690 ELITE18-CON-CE-CIV-IR-0690 Polythene Sheet (1000 Micron) For External Side 144 EXT 19-Nov-22 23-Nov-22 B B

691 691 ELITE18-CON-CE-CIV-IR-0691 PCC (1:3:6) For External Side 144 EXT 19-Nov-22 23-Nov-22 B B

692 692 ELITE18-CON-CE-CIV-IR-0692 Block Masonory For Under the Plinth Beam & Entrance Lobby Wall 131,132 Type A&B 19-Nov-22 23-Nov-22 B B

693 693 ELITE18-CON-CE-CIV-IR-0693 Block Masonory For Under the Plinth Beam & Entrance Lobby Wall 129,130 Type A&B 19-Nov-22 23-Nov-22 B B

694 694 ELITE18-CON-CE-CIV-IR-0694 Block Masonory For Under the Plinth Beam & Entrance Lobby Wall 127,128 Type A&B 19-Nov-22 23-Nov-22 B B

695 695 ELITE18-CON-CE-CIV-IR-0695 Dismentling Plaster (Chiping) For External Side (Elevation 1,2,3 & 4) 143,144 EXT 21-Nov-22 24-Nov-22 C 22-Dec-22 29-Dec-22 B B

696 696 ELITE18-CON-CE-CIV-IR-0696 Cracks Repair With Sika REP For External Side (Elevation 1,2,3 & 4) 143,144 EXT 21-Nov-22 23-Nov-22 C 22-Dec-22 29-Dec-22 B B

697 697 ELITE18-CON-CE-CIV-IR-0697 Dismentling Plaster (Chiping) For Boundry Wall (Elevation 2,3 & 4) 143,144 EXT 21-Nov-22 23-Nov-22 C 29-Dec-22 2-Jan-23 B B

698 698 ELITE18-CON-CE-CIV-IR-0698 Cracks Repair With Sika REP For Boundry Wall (Elevation 2,3 & 4) 143,144 EXT 21-Nov-22 23-Nov-22 C 29-Dec-22 2-Jan-23 A A

699 699 ELITE18-CON-CE-CIV-IR-0699 Dismentling Block Masonory For Boundry Wall 143,144 EXT 21-Nov-22 23-Nov-22 B B

700 700 ELITE18-CON-CE-CIV-IR-0700 Block Masonory For Boundry Wall 143,144 EXT 21-Nov-22 23-Nov-22 B B

701 701 ELITE18-CON-CE-CIV-IR-0701 28 days cylinder concrete test RCC concrete (3000 psi) floating slab 140 Type B 21-Nov-22 1-Dec-22 C 13-Dec-22 20-Dec-22 B B

702 702 ELITE18-CON-CE-CIV-IR-0702 28 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 137,138 FF 21-Nov-22 25-Nov-22 B B

703 703 ELITE18-CON-CE-CIV-IR-0703 28 days cylinder concrete test RCC concrete (4000 psi) slab thickness increase 141,142 TR 21-Nov-22 29-Nov-22 B B

704 704 ELITE18-CON-CE-CIV-IR-0704 28 days cylinder concrete test RCC concrete (4000 psi) retrofitting beams 141,142 GF 21-Nov-22 25-Nov-22 B B

705 705 ELITE18-CON-CE-CIV-IR-0705 28 days cylinder concrete test RCC concrete (3000 psi) Peragola Column 108,109,110,111 Type A&B 21-Nov-22 1-Dec-22 C 13-Dec-22 20-Dec-22 B B

706 706 ELITE18-CON-CE-CIV-IR-0706 Pond Test For Manhole & Gully Trap 143,144 Type A&B 21-Nov-22 24-Nov-22 B B
RCC Beam & MS Beam Area Dismentling Block Masonory, Plaster & Debris Remove for
707 707 ELITE18-CON-CE-CIV-IR-0707 Retrofitting Work
135,136 GF,FF 21-Nov-22 23-Nov-22 B B
RCC Beam & MS Beam Area Dismentling Block Masonory, Plaster & Debris Remove for
708 708 ELITE18-CON-CE-CIV-IR-0708 Retrofitting Work
133,134 GF,FF 21-Nov-22 23-Nov-22 B B
RCC Beam & MS Beam Area Dismentling Block Masonory, Plaster & Debris Remove for
709 709 ELITE18-CON-CE-CIV-IR-0709 Retrofitting Work
131,132 GF,FF 21-Nov-22 23-Nov-22 B B
RCC Beam & MS Beam Area Dismentling Block Masonory, Plaster & Debris Remove for
710 710 ELITE18-CON-CE-CIV-IR-0710 Retrofitting Work
129,130 GF,FF 21-Nov-22 23-Nov-22 B B
RCC Beam & MS Beam Area Dismentling Block Masonory, Plaster & Debris Remove for
711 711 ELITE18-CON-CE-CIV-IR-0711 Retrofitting Work
127,128 GF,FF 21-Nov-22 23-Nov-22 B B
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
712 712 ELITE18-CON-CE-CIV-IR-0712 Retrofitting Work
105,106 GF,FF 21-Nov-22 23-Nov-22 C 12-Jan-23 17-Jan-23 B B
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
713 713 ELITE18-CON-CE-CIV-IR-0713 Retrofitting Work
104 GF,FF 21-Nov-22 23-Nov-22 B B
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
714 714 ELITE18-CON-CE-CIV-IR-0714 Retrofitting Work
107,108 GF,FF 21-Nov-22 23-Nov-22 B B
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
715 715 ELITE18-CON-CE-CIV-IR-0715 Retrofitting Work
109,110 GF,FF 21-Nov-22 23-Nov-22 B B
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
716 716 ELITE18-CON-CE-CIV-IR-0716 Retrofitting Work
111,112 GF,FF 21-Nov-22 23-Nov-22 B B
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
717 717 ELITE18-CON-CE-CIV-IR-0717 Retrofitting Work
113,114 GF,FF 21-Nov-22 23-Nov-22 B B
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
718 718 ELITE18-CON-CE-CIV-IR-0718 Retrofitting Work
115,116 GF,FF 21-Nov-22 23-Nov-22 C 7-Apr-23 11-Apr-23 C 23-Aug-23 26-Aug-23 A A
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
719 719 ELITE18-CON-CE-CIV-IR-0719 Retrofitting Work
117,118 GF,FF 21-Nov-22 23-Nov-22 B B
Dismentling Block Masonory Walls, Stair Area & Duct Area (G.F&F.F) & Debris Remove for
720 720 ELITE18-CON-CE-CIV-IR-0720 Retrofitting Work
119 GF,FF 21-Nov-22 23-Nov-22 B B

721 721 ELITE18-CON-CE-CIV-IR-0721 1st Coat Putty (After Primer) For Internal Paint 143,144 GF,FF,MR 21-Nov-22 24-Nov-22 C 29-Dec-22 2-Jan-23 B B

722 722 ELITE18-CON-CE-CIV-IR-0722 2nd Coat Putty (After Putty 1st Coat) For Internal Paint 143,144 GF,FF,MR 21-Nov-22 24-Nov-22 C 29-Nov-22 2-Jan-23 B B

723 723 ELITE18-CON-CE-CIV-IR-0723 Primer Coat For Celing Paint 143,144 GF,FF,MR 21-Nov-22 24-Nov-22 C 3-Dec-22 9-Dec-22 B B

724 724 ELITE18-CON-CE-CIV-IR-0724 Surface Clearence & Primer Coat For Internal Paint 143 GF,FF,MR 21-Nov-22 24-Nov-22 C 29-Dec-22 2-Jan-23 B B

725 725 ELITE18-CON-CE-CIV-IR-0725 RCC Top Level For Floatting Slab 135,136 Type A&B 21-Nov-22 23-Nov-22 A A

726 726 ELITE18-CON-CE-CIV-IR-0726 RCC Top Level For Floatting Slab 133,134 Type A&B 21-Nov-22 23-Nov-22 A A

727 727 ELITE18-CON-CE-CIV-IR-0727 RCC Top Level For Slab Thickness Increase 129,130 FF,TR 21-Nov-22 23-Nov-22 A A

728 728 ELITE18-CON-CE-CIV-IR-0728 RCC Top Level For Slab Thickness Increase 127,128 FF,TR 21-Nov-22 23-Nov-22 A A

729 729 ELITE18-CON-CE-CIV-IR-0729 PCC Top Level For Under the Floatting Slab 131,132 Type A&B 21-Nov-22 23-Nov-22 A A

730 730 ELITE18-CON-CE-CIV-IR-0730 Layout For Block Masonory 133,134 GF 21-Nov-22 23-Nov-22 A A

731 731 ELITE18-CON-CE-CIV-IR-0731 Layout For Block Masonory 135,136 GF 21-Nov-22 23-Nov-22 A A

732 732 ELITE18-CON-CE-CIV-IR-0732 Steel Fixing & Anchor Epoxy for Column Jackting 129,130 GF,FF 22-Nov-22 25-Nov-22 B B

733 733 ELITE18-CON-CE-CIV-IR-0733 Top Slab & Plaster For Duct 143,144 TR 22-Nov-22 24-Nov-22 B B

Page 32 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
734 734 ELITE18-CON-CE-CIV-IR-0734 Plaster With All Respect For Internal Side 141,142 GF,FF,MR 22-Nov-22 24-Nov-22 C 1-Dec-22 3-Dec-22 C 14-Dec-22 15-Dec-22 C 20-Dec-22 29-Dec-22 B B

735 735 ELITE18-CON-CE-CIV-IR-0735 Corner Bits For All Corners 141,142 GF,FF 22-Nov-22 24-Nov-22 C 1-Dec-22 3-Dec-22 C 4-Jan-23 7-Jan-23 C C

736 736 ELITE18-CON-CE-CIV-IR-0736 Plaster & Roof Tile For Top Roof Floor 143,144 TR 22-Nov-22 26-Nov-22 B B

737 737 ELITE18-CON-CE-CIV-IR-0737 Polythene Sheet (1000 Micron) For External Side 143 EXT 22-Nov-22 24-Nov-22 B B

738 738 ELITE18-CON-CE-CIV-IR-0738 PCC (1:3:6) For External Side 143 EXT 22-Nov-22 24-Nov-22 B B

739 739 ELITE18-CON-CE-CIV-IR-0739 28 days cylinder concrete test RCC concrete (4000 psi) retrofitting columns 137,138 GF,FF 22-Nov-22 25-Nov-22 B B

740 740 ELITE18-CON-CE-CIV-IR-0740 28 days cylinder concrete test RCC concrete (4000 psi) retrofitting columns 139,140 FF 23-Nov-22 29-Nov-22 B B

741 741 ELITE18-CON-CE-CIV-IR-0741 Plaster For Under the OHWT 143,144 TR 23-Nov-22 25-Nov-22 B B

742 742 ELITE18-CON-CE-CIV-IR-0742 MS Louvers For Under the OHWT 143,144 TR 23-Nov-22 26-Nov-22 B B

743 743 ELITE18-CON-CE-CIV-IR-0743 MS Vanity Frame For Baths & Powder Room 143,144 GF,FF 23-Nov-22 1-Dec-22 B B

744 744 ELITE18-CON-CE-CIV-IR-0744 Cementitious Coat For Bath & Powder Room Water Proofing 143 GF,FF 23-Nov-22 26-Nov-22 B B

745 745 ELITE18-CON-CE-CIV-IR-0745 Wall Tile For Bath & Powder Room 143 GF,FF 23-Nov-22 26-Nov-22 B 3-Dec-22 9-Dec-22 B B

746 746 ELITE18-CON-CE-CIV-IR-0746 Floor Tile For Maid Bath 143,144 MR 23-Nov-22 26-Nov-22 B B

747 747 ELITE18-CON-CE-CIV-IR-0747 Block Masonory For Under the OHWT 141,142 TR 23-Nov-22 25-Nov-22 B B

748 748 ELITE18-CON-CE-CIV-IR-0748 Layout MS Girder & RCC Beams Drilling 133,134 GF,FF 23-Nov-22 24-Nov-22 A A

749 749 ELITE18-CON-CE-CIV-IR-0749 Layout MS Girder & RCC Beams Drilling 131,132 GF,FF 23-Nov-22 26-Nov-22 C 5-Dec-22 7-Dec-22 A A

750 750 ELITE18-CON-CE-CIV-IR-0750 Layout MS Girder & RCC Beams Drilling 129,130 GF,FF 23-Nov-22 24-Nov-22 A A

751 751 ELITE18-CON-CE-CIV-IR-0751 Layout MS Girder & RCC Beams Drilling 127,128 GF,FF 23-Nov-22 24-Nov-22 A A

752 752 ELITE18-CON-CE-CIV-IR-0752 Layout For AC Outdoor Pedestal, PPRC Pipe Supporting Pads & Exhaust Fan Pad 137,138 TR 23-Nov-22 24-Nov-22 A A

753 753 ELITE18-CON-CE-CIV-IR-0753 Layout For AC Outdoor Pedestal, PPRC Pipe Supporting Pads & Exhaust Fan Pad 135,136 TR 23-Nov-22 24-Nov-22 A A

754 754 ELITE18-CON-CE-CIV-IR-0754 Layout For AC Outdoor Pedestal, PPRC Pipe Supporting Pads & Exhaust Fan Pad 133,134 TR 23-Nov-22 24-Nov-22 A A

755 755 ELITE18-CON-CE-CIV-IR-0755 Layout For AC Outdoor Pedestal, PPRC Pipe Supporting Pads & Exhaust Fan Pad 131,132 TR 23-Nov-22 24-Nov-22 A A

756 756 ELITE18-CON-CE-CIV-IR-0756 Layout For AC Outdoor Pedestal, PPRC Pipe Supporting Pads & Exhaust Fan Pad 129,130 TR 23-Nov-22 24-Nov-22 A A

757 757 ELITE18-CON-CE-CIV-IR-0757 Layout For AC Outdoor Pedestal, PPRC Pipe Supporting Pads & Exhaust Fan Pad 127,128 TR 23-Nov-22 24-Nov-22 A A

758 758 ELITE18-CON-CE-CIV-IR-0758 Polythene Sheet (1000 Micron) Under the PCC Floating Slab 129,130 GF 23-Nov-22 29-Nov-22 B B

759 759 ELITE18-CON-CE-CIV-IR-0759 PCC (1:4:8) Under the Floating Slab 129,130 GF 23-Nov-22 29-Nov-22 B B

760 760 ELITE18-CON-CE-CIV-IR-0760 Surface Clearence & Side Gola For Top Roof 139,140 TR 23-Nov-22 25-Nov-22 B B

761 761 ELITE18-CON-CE-CIV-IR-0761 Surface Clearence & Side Gola For Top Roof 137,138 TR 23-Nov-22 26-Nov-22 B B

762 762 ELITE18-CON-CE-CIV-IR-0762 Surface Clearence & Side Gola For Top Roof 135,136 TR 23-Nov-22 26-Nov-22 B B

763 763 ELITE18-CON-CE-CIV-IR-0763 Primer Coat & Membranes (Bituminous) Sheet For Top Roof 137,138 TR 23-Nov-22 26-Nov-22 C 14-Dec-22 20-Dec-22 C 22-Dec-22 29-Dec-22 B B

764 764 ELITE18-CON-CE-CIV-IR-0764 Primer Coat & Membranes (Bituminous) Sheet For Top Roof 135,136 TR 23-Nov-22 26-Nov-22 C 22-Dec-22 29-Dec-22 B B

765 765 ELITE18-CON-CE-CIV-IR-0765 Steel Fixing & Anchor Epoxy for Column Jackting 127,128 GF,FF 23-Nov-22 29-Nov-22 B B

766 766 ELITE18-CON-CE-CIV-IR-0766 Surface Clearence & Primer Coat For Paint (Mumty, OHWT & Parapet Wall) 143,144 TR 23-Nov-22 1-Dec-22 B B

767 767 ELITE18-CON-CE-CIV-IR-0767 Block Filler (After Primer Coat) For Paint (Mumty, OHWT & Parapet Wall) 143,144 TR 23-Nov-22 1-Dec-22 B B

768 768 ELITE18-CON-CE-CIV-IR-0768 Weather Sheet (After Block Filler) For Paint (Mumty, OHWT & Parapet Wall) 143,144 TR 23-Nov-22 1-Dec-22 B B

769 769 ELITE18-CON-CE-CIV-IR-0769 Steel & Filler Board For Floatting Slab 132 GF 24-Nov-22 26-Nov-22 B B

770 770 ELITE18-CON-CE-CIV-IR-0770 RCC Concrete (1:2:4) For Floatting Slab 132 GF 24-Nov-22 30-Nov-22 B B

771 771 ELITE18-CON-CE-CIV-IR-0771 Primer Coat For Pile Cape (Internal & External Side) 131,132 INT&EXT 24-Nov-22 26-Nov-22 B B

772 772 ELITE18-CON-CE-CIV-IR-0772 Primer Coat For Pile Cape (Internal & External Side) 129,130 INT&EXT 24-Nov-22 26-Nov-22 B B

773 773 ELITE18-CON-CE-CIV-IR-0773 Primer Coat For Pile Cape (Internal & External Side) 127,128 INT&EXT 24-Nov-22 26-Nov-22 B B

774 774 ELITE18-CON-CE-CIV-IR-0774 Primer Coat For Pile Cape (Internal & External Side) 122,123 INT&EXT 24-Nov-22 26-Nov-22 B B

775 775 ELITE18-CON-CE-CIV-IR-0775 Primer Coat For Pile Cape (Internal & External Side) 124,125 INT&EXT 24-Nov-22 26-Nov-22 B B

776 776 ELITE18-CON-CE-CIV-IR-0776 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 131,132 GF,FF 24-Nov-22 26-Nov-22 B B

777 777 ELITE18-CON-CE-CIV-IR-0777 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 129,130 GF,FF 24-Nov-22 26-Nov-22 B B

778 778 ELITE18-CON-CE-CIV-IR-0778 Drilling 12mm(230 Nos) & 24mm(74 Nos) For RCC Beam 127,128 GF,FF 24-Nov-22 30-Nov-22 B B

779 779 ELITE18-CON-CE-CIV-IR-0779 Steel Fixing & Anchor Epoxy for Beam Jackting 129,130 GF,FF 24-Nov-22 26-Nov-22 B B

780 780 ELITE18-CON-CE-CIV-IR-0780 Steel Fixing & Anchor Epoxy for Beam Jackting 127,128 GF,FF 24-Nov-22 30-Nov-22 B B

781 781 ELITE18-CON-CE-CIV-IR-0781 FDT Test 1st Layer Sand Filling For Under the Floating Slab 122,123 GF 24-Nov-22 29-Nov-22 C 13-Dec-22 20-Dec-22 C 7-Jan-23 12-Jan-23 B B

782 782 ELITE18-CON-CE-CIV-IR-0782 FDT Test 2nd Layer Sand Filling For Under the Floating Slab 122,123 GF 24-Nov-22 29-Nov-22 C 7-Jan-23 12-Jan-23 B B

783 783 ELITE18-CON-CE-CIV-IR-0783 28 days cylinder concrete test RCC (3000 psi) floating slab 139 Type A 30-Nov-22 1-Dec-22 B B

784 784 ELITE18-CON-CE-CIV-IR-0784 7 days cylinder concrete test PCC (1:4:8) under floating slab 131,132 Type A&B 26-Nov-22 1-Dec-22 B B

785 785 ELITE18-CON-CE-CIV-IR-0785 7 days cylinder concrete test RCC (4000 PSI) retrofiting columns 131,132 Type A&B 26-Nov-22 1-Dec-22 B B

786 786 ELITE18-CON-CE-CIV-IR-0786 7 days cylinder concrete test RCC (4000 PSI) slab thickness increase 127,128 FF,TR 26-Nov-22 1-Dec-22 B B

787 787 ELITE18-CON-CE-CIV-IR-0787 7 days cylinder concrete test RCC (4000 PSI) retrofiting beams 135,136 GF,FF 26-Nov-22 1-Dec-22 B B

788 788 ELITE18-CON-CE-CIV-IR-0788 7 days cylinder concrete test PCC (1:3:6) external side 144 Type B 26-Nov-22 3-Dec-22 B B

Page 33 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
789 789 ELITE18-CON-CE-CIV-IR-0789 Core cutting & grout fill for MEP work (125mm =16nos) 141,142 Type A&B 26-Nov-22 1-Dec-22 C 9-Dec-22 15-Dec-22 B B

790 790 ELITE18-CON-CE-CIV-IR-0790 Core cutting & grout fill for MEP work (125mm =16nos) 139,140 Type A&B 26-Nov-22 1-Dec-22 C C

791 791 ELITE18-CON-CE-CIV-IR-0791 Primer Coat For Pile Cape (Internal & External Side) 126,126a Type A&B 26-Nov-22 1-Dec-22 B B

792 792 ELITE18-CON-CE-CIV-IR-0792 Side gola for top roof 133,134 Type A&B 26-Nov-22 1-Dec-22 B B

793 793 ELITE18-CON-CE-CIV-IR-0793 Side gola for top roof 131,132 Type A&B 26-Nov-22 1-Dec-22 C 5-Dec-22 UR UR

794 794 ELITE18-CON-CE-CIV-IR-0794 Side gola for top roof 129,130 Type A&B 26-Nov-22 1-Dec-22 C C

795 795 ELITE18-CON-CE-CIV-IR-0795 Side gola for top roof 127,128 Type A&B 26-Nov-22 1-Dec-22 C 5-Dec-22 UR UR

796 796 ELITE18-CON-CE-CIV-IR-0796 7 days cylinder concrete test RCC (3000 psi) floating slab 136 Type B 28-Nov-22 1-Dec-22 B B

797 797 ELITE18-CON-CE-CIV-IR-0797 7 days cylinder concrete test RCC (3000 psi) floating slab 133,134 Type A&B 28-Nov-22 1-Dec-22 B B

798 798 ELITE18-CON-CE-CIV-IR-0798 Steel fixing & anchor epoxy for beam jackting 133,134 GF,FF 28-Nov-22 30-Nov-22 B B

799 799 ELITE18-CON-CE-CIV-IR-0799 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of beam 133,134 GF,FF 28-Nov-22 2-Dec-22 C 5-Dec-22 9-Dec-22 B B

800 800 ELITE18-CON-CE-CIV-IR-0800 Floor tile for baths & powder room 143 GF,FF 28-Nov-22 1-Dec-22 B B
Installation Moisture Risitence Board For Ceiling Work Wet Area (Resubmit IR
801 801 ELITE18-CON-CE-CIV-IR-0801 143 GF,FF 28-Nov-22 29-Dec-22 B B
24-12-22)
802 802 ELITE18-CON-CE-CIV-IR-0802 Installation threshold 143,144 GF,FF,MR 28-Nov-22 1-Dec-22 B B

803 803 ELITE18-CON-CE-CIV-IR-0803 Installation black granite window sill 143 Type A 28-Nov-22 1-Dec-22 B B

804 804 ELITE18-CON-CE-CIV-IR-0804 Black granite vertical window sill(Resubmit IR 24-12-22) 143,144 Type A&B 28-Nov-22 29-Dec-22 A A

805 805 ELITE18-CON-CE-CIV-IR-0805 Gypsum board for celling work dry area (Resubmit IR 24-12-22) 143 GF,FF 28-Nov-22 29-Dec-22 B B

806 806 ELITE18-CON-CE-CIV-IR-0806 Ledge wall top 143,144 Type A&B 28-Nov-22 1-Dec-22 B B

807 807 ELITE18-CON-CE-CIV-IR-0807 28 days cylinder concrete test RCC (4000 psi) retrofiting coulmns 135,136 GF,FF 29-Nov-22 3-Dec-22 B B

808 808 ELITE18-CON-CE-CIV-IR-0808 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 137,138 TR 29-Nov-22 3-Dec-22 B B

809 809 ELITE18-CON-CE-CIV-IR-0809 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 133,134 TR 29-Nov-22 3-Dec-22 B B

810 810 ELITE18-CON-CE-CIV-IR-0810 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 131,132 TR 29-Nov-22 3-Dec-22 B B

811 811 ELITE18-CON-CE-CIV-IR-0811 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 139,140 GF,FF 29-Nov-22 3-Dec-22 B B
Dismantling manhole gully trap electrical handhole & electrical chamber on
812 812 ELITE18-CON-CE-CIV-IR-0812 119,120 Type A&B 29-Nov-22 1-Dec-22 B B
external side for pilling & debris remove
Dismantling manhole gully trap electrical handhole & electrical chamber on
813 813 ELITE18-CON-CE-CIV-IR-0813 117,118 Type A&B 29-Nov-22 1-Dec-22 B B
external side for pilling & debris remove
Dismantling manhole gully trap electrical handhole & electrical chamber on
814 814 ELITE18-CON-CE-CIV-IR-0814 103,104 Type A&B 29-Nov-22 1-Dec-22 B B
external side for pilling & debris remove
Dismantling manhole gully trap electrical handhole & electrical chamber on
815 815 ELITE18-CON-CE-CIV-IR-0815 105,106 Type A&B 29-Nov-22 1-Dec-22 B B
external side for pilling & debris remove
816 816 ELITE18-CON-CE-CIV-IR-0816 Layout columns drilling top & buttom for retrofitting work 127 to 132 GF,FF 29-Nov-22 1-Dec-22 A A

817 817 ELITE18-CON-CE-CIV-IR-0817 Layout columns formwork for retrofitting work 127 to 132 GF,FF 29-Nov-22 2-Dec-22 A A

818 818 ELITE18-CON-CE-CIV-IR-0818 Pond test for bath 143,144 FF,MB 29-Nov-22 2-Dec-22 B B

819 819 ELITE18-CON-CE-CIV-IR-0819 Pond test for bath 141,142 FF,MB 29-Nov-22 2-Dec-22 C 5-Dec-22 9-Dec-22 B B

820 820 ELITE18-CON-CE-CIV-IR-0820 Pond test for bath 139,140 FF,MB 29-Nov-22 2-Dec-22 C 5-Dec-22 9-Dec-22 C 15-May-23 22-May-23 B B

821 821 ELITE18-CON-CE-CIV-IR-0821 FDT test sand filling 1st layer for external side 141,142 Type A&B 30-Nov-22 3-Dec-22 B B

822 822 ELITE18-CON-CE-CIV-IR-0822 Steel & filler board for floatting salb 131 Type A 30-Nov-22 7-Dec-22 B B

823 823 ELITE18-CON-CE-CIV-IR-0823 RCC concrete (1:2:4) for floatting slab 130 Type B 30-Nov-22 7-Dec-22 B B

824 824 ELITE18-CON-CE-CIV-IR-0824 Steel & filler board for floatting slab 130 Type B 30-Nov-22 7-Dec-22 B B

825 825 ELITE18-CON-CE-CIV-IR-0825 RCC concrete (1:2:4) for floatting slab 131 Type A 30-Nov-22 7-Dec-22 B B

826 826 ELITE18-CON-CE-CIV-IR-0826 FDT test sand filling 2nd layer for external side 141,142 Type A&B 30-Nov-22 3-Dec-22 B B

827 827 ELITE18-CON-CE-CIV-IR-0827 Block masonory partition wall for external siide 133,134 Type A&B 30-Nov-22 2-Dec-22 B B

828 828 ELITE18-CON-CE-CIV-IR-0828 Block masonory partition wall for external siide 131,132 Type A&B 30-Nov-22 2-Dec-22 B B

829 829 ELITE18-CON-CE-CIV-IR-0829 Block masonory partition wall for external siide 129,130 Type A&B 30-Nov-22 2-Dec-22 B B

830 830 ELITE18-CON-CE-CIV-IR-0830 Block masonory partition wall for external siide 127,128 Type A&B 30-Nov-22 2-Dec-22 B B

831 831 ELITE18-CON-CE-CIV-IR-0831 28 days cylinder concrete test PCC (1:4:8) under floating slab 137,138 Type A&B 30-Nov-22 3-Dec-22 B B

832 832 ELITE18-CON-CE-CIV-IR-0832 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 135,136 TR 30-Nov-22 3-Dec-22 B B

833 833 ELITE18-CON-CE-CIV-IR-0833 28 days cylinder concrete test RCC (4000 psi) retrofitting beams 141,142 FF 30-Nov-22 3-Dec-22 B B

834 834 ELITE18-CON-CE-CIV-IR-0834 07 days cylinder concrete test PCC (1:3:6) external side 143 Type A 30-Nov-22 3-Dec-22 B B

835 835 ELITE18-CON-CE-CIV-IR-0835 FDT test sand filling 3rd layer for external side 141,142 Type A&B 1-Dec-22 7-Dec-22 B B

836 836 ELITE18-CON-CE-CIV-IR-0836 Pond Test For Manhole & Gully Trap 141,142 Type A&B 1-Dec-22 7-Dec-22 B B

837 837 ELITE18-CON-CE-CIV-IR-0837 Wardrobes GF,FF 133 to 144 GF,FF 19-Sep-22 A A

838 838 ELITE18-CON-CE-CIV-IR-0838 Doors GF,FF 133,143,144 GF,FF 19-Sep-22 A A

839 839 ELITE18-CON-CE-CIV-IR-0839 Dismentlling screed FF & top roof sidpose/of from site 101 to 144 A&B 25-Feb-23 15-Mar-23 A A

840 840 ELITE18-CON-CE-CIV-IR-0840 Dismentlling SOG & block masonry GF dispose/off from site 101 to 144 A&B 25-Feb-23 15-Mar-23 B B

841 841 ELITE18-CON-CE-CIV-IR-0841 Excavates soil dispose/of from site ### A&B 25-Feb-23 20-Mar-23 C C

842 842 ELITE18-CON-CE-CIV-IR-0842 FDT test for retaining wall (soil) 107 to 114 A&B 17-May-23 22-May-23 B B

843 843 ELITE18-CON-CE-CIV-IR-0843 FDT tesrt for retaining wall (sand) 107 to 114 A&B 22-May-23 25-May-23 B B

Page 34 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
844 844 ELITE18-CON-CE-CIV-IR-0844 07 days cylinder concrete test PCC (1:4:8) retaining wall 109 to 114 31-May-23 7-Jun-23 A A

845 845 ELITE18-CON-CE-CIV-IR-0845 Installation of glass alongwith silicon gass kit & necessary hardware 101 to 144 A&B 6-Jun-23 8-Jun-23 B B

846 846 ELITE18-CON-CE-CIV-IR-0846 PCC (1:4:8) for retaining wall 107 to 114 A&B 6-Jun-23 8-Jun-23 B B

847 847 ELITE18-CON-CE-CIV-IR-0847 RCC concrete (1:2:4) for retaining wall 107 to 114 A&B 6-Jun-23 8-Jun-23 B B

848 848 ELITE18-CON-CE-CIV-IR-0848 Steel for retaining wall 107 to 114 A&B 6-Jun-23 8-Jun-23 B B

849 849 ELITE18-CON-CE-CIV-IR-0849 Sand top level for under the floatting slab 101 to 126a A&B 10-Jun-23 17-Jun-23 A A

850 850 ELITE18-CON-CE-CIV-IR-0850 PCC top level for under the floatting slab 101 to 126a A&B 10-Jun-23 17-Jun-23 A A

851 851 ELITE18-CON-CE-CIV-IR-0851 RCC top level for floatting slab 101 to 126a A&B 10-Jun-23 17-Jun-23 A A

852 852 ELITE18-CON-CE-CIV-IR-0852 07 days cylinder concrete test PCC (1:2:4) retaining wall bed 107 to 114 A&B 10-Jun-23 14-Jun-23 A A

853 853 ELITE18-CON-CE-CIV-IR-0853 28 days cylinder concrete test PCC (1:4:8) retaining wall 107 to 114 A&B 19-Jun-23 20-Jun-23 A A

854 854 ELITE18-CON-CE-CIV-IR-0854 RCC top level for slab thickness increase 103 to 123 FF 19-Jun-23 22-Jun-23 A A

855 855 ELITE18-CON-CE-CIV-IR-0855 RCC top level for slab thickness increase top roof 103 to 114 TR 19-Jun-23 22-Jun-23 C 23-Jun-23 24-Jun-23 A A

856 856 ELITE18-CON-CE-CIV-IR-0856 07 days cylinder concrete test PCC (1:2:4) retaining wall concrete 112 to 114 A&B 7-Jul-23 13-Jul-23 B B

857 857 ELITE18-CON-CE-CIV-IR-0857 07 days cylinder concrete test PCC (1:2:4) retaining concrete 108 to 111 A&B 7-Jul-23 13-Jul-23 B B

858 858 ELITE18-CON-CE-CIV-IR-0858 07 days cylinder concrete test PCC (1:2:4) retaining wall bed 107 to 114 A&B 7-Jul-23 13-Jul-23 B B

859 859 ELITE18-CON-CE-CIV-IR-0859 RCC concrete (1:2:4) for retaining wall 108 to 114 A&B 13-Jul-23 17-Jul-23 B B

860 860 ELITE18-CON-CE-CIV-IR-0860 Steel for retaining wall 108 to 114 A&B 13-Jul-23 17-Jul-23 B B

861 861 ELITE18-CON-CE-CIV-IR-0861 28 days cylinder concrete test PCC (1:4:8) retaining wall concrete 112 to 114 A&B 17-Jul-23 20-Jul-23 A A

862 862 ELITE18-CON-CE-CIV-IR-0862 28 days cylinder concrete test RCC (1:2:4) retaining wall concrete 108 to 111 A&B 21-Jul-23 24-Jul-23 A A

863 863 ELITE18-CON-CE-CIV-IR-0863 NSL layout & excavation for retaining wall 93 to 114 A&B 24-Jul-23 26-Aug-23 B B

864 864 ELITE18-CON-CE-CIV-IR-0864 FDT test sand for retaining wall 93 to 94 A&B 24-Jul-23 25-Jul-23 B B

865 865 ELITE18-CON-CE-CIV-IR-0865 07 days cylinder concrete test RCC (1:2:4) retaining wall bed concrete 93 to 107 A&B 27-Jul-23 4-Aug-23 A A

866 866 ELITE18-CON-CE-CIV-IR-0866 RCC concrete (1:2:4) for retaining wall 107 to 108 A&B 21-Aug-23 23-Aug-23 B B

867 867 ELITE18-CON-CE-CIV-IR-0867 Farm work for retaining wall 107 to 114 A&B 21-Aug-23 23-Aug-23 A A

868 868 ELITE18-CON-CE-CIV-IR-0868 Weep hole PVC pipe at retaning wall 107 to 114 A&B 21-Aug-23 23-Aug-23 A A

869 869 ELITE18-CON-CE-CIV-IR-0869 Cold applied bitumen at retaning wall 108 to 114 A&B 21-Aug-23 23-Aug-23 A A

870 870 ELITE18-CON-CE-CIV-IR-0870 28 days cylinder concrete test RCC (1:2:4) retaining wall bed concrete 94 to 107 A&B 22-Aug-23 26-Aug-23 A A
137,138,140,141,
871 871 ELITE18-CON-CE-CIV-IR-0871 Re installation skirting architrave door stoper & transition strip 142 & 144 A&B 23-Aug-23 26-Aug-23 B B

872 872 ELITE18-CON-CE-CIV-IR-0872 FDT test 1st layer sand filling for internal side retaining wall 109 to 114 A&B 25-Aug-23 26-Aug-23 A A

873 873 ELITE18-CON-CE-CIV-IR-0873 FDT test 2nd layer sand filling for internal side retaining wall 109 to 114 A&B 25-Aug-23 26-Aug-23 A A

874 874 ELITE18-CON-CE-CIV-IR-0874 FDT test 3rd layer sand filling for internal side retaining wall 109 to 114 A&B 25-Aug-23 30-Aug-23 A A

875 875 ELITE18-CON-CE-CIV-IR-0875 FDT test 4th layer sand filling for internal side retaining wall 109 to 114 A&B 26-Aug-23 30-Aug-23 C 30-Aug-23 2-Sep-23 A A

876 876 ELITE18-CON-CE-CIV-IR-0876 FDT test 5th layer sand filling for internal side retaining wall 109 to 114 A&B 12-Sep-23 14-Sep-23 A A
Re installation door wardroob jame fram skirting architrave door stoper &
877 877 ELITE18-CON-CE-CIV-IR-0877 ### A&B 1-Sep-23 2-Sep-23 A A
transition strip
878 878 ELITE18-CON-CE-CIV-IR-0878 FDT test soil for retaining wall 93 to 94 A&B 4-Sep-23 8-Sep-23 B B

879 879 ELITE18-CON-CE-CIV-IR-0879 PCC (1:4:8) for retaining wall 93 to 94 A&B 4-Sep-23 8-Sep-23 B B

880 880 ELITE18-CON-CE-CIV-IR-0880 Dismentlling boundry wall block masonory columns & plinth beam elevation 2,4 115 to 120 A&B 8-Sep-23 13-Sep-23 C 19-Oct-23 20-Oct-23 A A

881 881 ELITE18-CON-CE-CIV-IR-0881 7 days cylinder concrete test PCC (1:4:8) retaining wall 93 to 94 A&B 9-Sep-23 14-Sep-23 B B

882 882 ELITE18-CON-CE-CIV-IR-0882 FDT test 6th layer sand filling for internal side retaining wall 109 to 114 A&B 1-Nov-23 6-Nov-23 A A

883 883 ELITE18-CON-CE-CIV-IR-0883 RCC concrete (1:2:4) for retaining wall bed 93 to 94 A&B 16-Sep-23 19-Sep-23 B B

884 884 ELITE18-CON-CE-CIV-IR-0884 Steel for retaining wall bed 93 to 94 A&B 16-Sep-23 19-Sep-23 B B

885 885 ELITE18-CON-CE-CIV-IR-0885 NSL layout & excavation for retaining wall 93 to 107 A&B 16-Sep-23 UR UR

886 886 ELITE18-CON-CE-CIV-IR-0886 07 days cylinder concrete test RCC (1:2:4) retaining wall bed concrete 93 to 94 A&B 21-Sep-23 25-Sep-23 A A

887 887 ELITE18-CON-CE-CIV-IR-0887 Formwork & RCC concrete (1:2:4) for retaining wall 93 to 94 A&B 25-Sep-23 27-Sep-23 B B

888 888 ELITE18-CON-CE-CIV-IR-0888 Steel for retaining wall 93 to 94 A&B 25-Sep-23 27-Sep-23 A A

889 889 ELITE18-CON-CE-CIV-IR-0889 07 days cylinder concrete test RCC (1:2:4) retaining wall bed concrete 93 to 94 A&B 27-Sep-23 30-Sep-23 A A

890 890 ELITE18-CON-CE-CIV-IR-0890 FDT test sand for retaining wall elevation 2,4 114 A&B 27-Sep-23 30-Sep-23 A A

891 891 ELITE18-CON-CE-CIV-IR-0891 28 days cylinder concrete test PCC (1:4:8) retaining wall 93 to 94 A&B 30-Sep-23 13-Oct-23 A A

892 892 ELITE18-CON-CE-CIV-IR-0892 07 days cylinder concrete test PCC (1:4:8) retaining wall 114 to 115 A&B 3-Oct-23 13-Oct-23 A A

893 893 ELITE18-CON-CE-CIV-IR-0893 PCC (1:4:8) for retaining wall 114 to 115 A&B 7-Oct-23 13-Oct-23 B B

894 894 ELITE18-CON-CE-CIV-IR-0894 Form work & RCC concrete (1:2:4) for retaining wall bed 114 to 115 A&B 7-Oct-23 13-Oct-23 B B

895 895 ELITE18-CON-CE-CIV-IR-0895 Steel for retaining wall bed 114 to 115 A&B 7-Oct-23 13-Oct-23 B B

896 896 ELITE18-CON-CE-CIV-IR-0896 07 days cylinder concrete test RCC (1:2:4) retaining wall bed concrete 114 to 115 A&B 9-Oct-23 11-Oct-23 A A

897 897 ELITE18-CON-CE-CIV-IR-0897 Form work & RCC concrete (1:2:4) for retaining wall bed 114 to 115 A&B 10-Oct-23 11-Oct-23 B B

898 898 ELITE18-CON-CE-CIV-IR-0898 Steel for retaining wall 114 to 115 A&B 10-Oct-23 11-Oct-23 A A

Page 35 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
899 899 ELITE18-CON-CE-CIV-IR-0899 28 days cylinder concrete test RCC (1:2:4) retaining wall bed concrete 93 to 94 A&B 11-Oct-23 19-Oct-23 A A

900 900 ELITE18-CON-CE-CIV-IR-0900 07 days cylinder concrete test RCC (1:2:4) retaining wall bed concrete 114 to 115 A&B 11-Oct-23 19-Oct-23 A A

901 901 ELITE18-CON-CE-CIV-IR-0901 NSL layout & excavation for retaining wall 114 to 115 A&B 11-Oct-23 24-Oct-23 A A

902 902 ELITE18-CON-CE-CIV-IR-0902 Sand PCC & RCC bed top level for retaining wall 114 to 115 A&B 11-Oct-23 24-Oct-23 A A
Dismentlling perlino marbal & perlino skirting for floor & stair GF,FF,& Mumty
903 903 ELITE18-CON-CE-CIV-IR-0903 due to retrofitting work (as per approved fixing IR's in hill office fixed befor 101 to 144 A&B 11-Oct-23 17-Oct-23 C C
retrofittting)
Dismentlling composite stone for external sidedue to retrofitting work (as per
904 904 ELITE18-CON-CE-CIV-IR-0904 101 to 144 A&B 11-Oct-23 19-Oct-23 C C
approved fixing IR's in hill office fixed befor retrofittting)
905 905 ELITE18-CON-CE-CIV-IR-0905 28 days cylinder concrete test RCC (1:2:4) retaining wall concrete 93 to 94 A&B 18-Oct-23 21-Oct-23 A A

906 906 ELITE18-CON-CE-CIV-IR-0906 FDT test soil for boundry wall 115 to 120 A&B 25-Oct-23 27-Oct-23 A A

907 907 ELITE18-CON-CE-CIV-IR-0907 PCC (1:4:8) for retaining wall 115 to 120 A&B 20-Oct-23 27-Oct-23 B B

908 908 ELITE18-CON-CE-CIV-IR-0908 Form work & RCC concrete (1:2:4) for retaining wall columns 107 to 115 A&B 20-Oct-23 27-Oct-23 B B

909 909 ELITE18-CON-CE-CIV-IR-0909 Steel for retaining wall columns 107 to 115 A&B 20-Oct-23 27-Oct-23 A A

910 910 ELITE18-CON-CE-CIV-IR-0910 28 days cylinder concrete test RCC (1:4:8) retaining wall 114 to 115 A&B 25-Oct-23 27-Oct-23 A A

911 911 ELITE18-CON-CE-CIV-IR-0911 07 days cylinder concrete test RCC (1:2:4) retaining wall columns concrete 107 to 114 A&B 25-Oct-23 27-Oct-23 A A

912 912 ELITE18-CON-CE-CIV-IR-0912 07 days cylinder concrete test PCC (1:4:8) boundry wall 115 to 120 A&B 25-Oct-23 27-Oct-23 A A

913 913 ELITE18-CON-CE-CIV-IR-0913 NSL layout & excavation for boundry wall 115 to 120 A&B 25-Oct-23 3-Nov-23 A A

914 914 ELITE18-CON-CE-CIV-IR-0914 PCC top level for boundry wall 115 to 120 A&B 25-Oct-23 3-Nov-23 A A

915 915 ELITE18-CON-CE-CIV-IR-0915 RCC top level for boundry wall 115 to 120 A&B 25-Oct-23 3-Nov-23 A A

916 916 ELITE18-CON-CE-CIV-IR-0916 Block masonory for retaining wall 107 to 115 A&B 26-Oct-23 27-Oct-23 A A

917 917 ELITE18-CON-CE-CIV-IR-0917 Plaster for retaining wall internal side 107 to 115 A&B 26-Oct-23 27-Oct-23 A A

918 918 ELITE18-CON-CE-CIV-IR-0918 FDT test soil for reraining wall villa 115 back side to wxisting retaining wall 115 A 30-Oct-23 1-Nov-23 B B

919 919 ELITE18-CON-CE-CIV-IR-0919 28 days cylinder concrete test RCC (1:2:4) retaining wall bead concrete 114 to 115 A&B 30-Oct-23 1-Nov-23 A A
07 days cylinder concrete test PCC (1:4:8) retaining wall back side to existing
920 920 ELITE18-CON-CE-CIV-IR-0920 115 A 30-Oct-23 1-Nov-23 A A
retaining wall
921 921 ELITE18-CON-CE-CIV-IR-0921 Form work & RCC concrete (1:2:4) for boundry wall bed 115 to 120 A&B 31-Oct-23 1-Nov-23 B B

922 922 ELITE18-CON-CE-CIV-IR-0922 Steel for boundry wall bed 115 to 120 A&B 31-Oct-23 1-Nov-23 B B

923 923 ELITE18-CON-CE-CIV-IR-0923 PCC (1:4:8) for retaining wall villa 115 back side to existing retaining wall 115 A&B 31-Oct-23 1-Nov-23 B B
Form work & RCC concrete (1:2:4) for retaining wall bedvilla 115 back side to
924 ELITE18-CON-CE-CIV-IR-0924 115 A&B 31-Oct-23 1-Nov-23 B B
existing retaining wall
925 ELITE18-CON-CE-CIV-IR-0925 Steel for retaining wall bed villa 115 back side to existing retaining wall 115 A&B 31-Oct-23 1-Nov-23 B B

926 ELITE18-CON-CE-CIV-IR-0926 07 days cylinder concrete test RCC (1:2:4) boundry wall bed concrete 119 to 120 A&B 1-Nov-23 6-Nov-23 A A
Re-sizing wardrobe at
927 ELITE18-CON-CE-CIV-IR-0927 villa#122,123,124,125,126,126a,127,128,129,130,131,132,133,134,135,136,137,13 122 to 144 A&B 1-Nov-23 3-Nov-23 B B
8,139,140,141,142,143,144
928 ELITE18-CON-CE-CIV-IR-0928 28 days cylinder concrete test RCC (1:2:4) retaining wall concrete 114,115 A&B 3-Nov-23 7-Nov-23 A A

929 ELITE18-CON-CE-CIV-IR-0929 07 days cylinder concrete test RCC (1:2:4) boundry wall bed concrete 117 to 118 A&B 3-Nov-23 7-Nov-23 A A

930 ELITE18-CON-CE-CIV-IR-0930 07 days cylinder concrete test RCC (1:2:4) boundry wall bed concrete 115 to 117 A&B 3-Nov-23 7-Nov-23 A A

931 ELITE18-CON-CE-CIV-IR-0931 FDT test 7th layer sand filling for internal side retaining wall 109 to 114 A&B 3-Nov-23 7-Nov-23 A A

932 ELITE18-CON-CE-CIV-IR-0932 FDT test 8th layer sand filling for internal for internal side retaining wall 109 to 114 A&B 3-Nov-23 7-Nov-23 A A
07 days cylinder concrete test RCC (1:2:4) retaining wall bed villa 115 back side to
933 ELITE18-CON-CE-CIV-IR-0933 115 A 4-Nov-23 11-Nov-23 A A
existing retaining wall
Form work & RCC concrete (1:2:4) for retaining wall villa 115 back side to
934 ELITE18-CON-CE-CIV-IR-0934 115 A 4-Nov-23 7-Nov-23 B B
existing retaining wall
935 ELITE18-CON-CE-CIV-IR-0935 Steel for retaining wall villa 115 back side to existing retaining wall 115 A 4-Nov-23 7-Nov-23 A A

936 ELITE18-CON-CE-CIV-IR-0936 Form work & RCC concrete (1:2:4) for boundry wall columns 115 to 120 A&B 4-Nov-23 7-Nov-23 B B

937 ELITE18-CON-CE-CIV-IR-0937 Steel for boundry wall columns 115 to 120 A&B 4-Nov-23 7-Nov-23 B B
07 days cylinder concrete test RCC (1:2:4) retaining wall bed villa 115 back side to
938 ELITE18-CON-CE-CIV-IR-0938 115 A 11-Nov-23 23-Nov-23 B B
existing retaining wall
939 ELITE18-CON-CE-CIV-IR-0939 07 days cylinder concrete test RCC (1:2:4) boundry wall columns 115 to 120 A&B 11-Nov-23 23-Nov-23 B B

940 ELITE18-CON-CE-CIV-IR-0940 Block Masonory For Boundry Wall 115 to 120 A&B 11-Nov-23 16-Nov-23 B B

941 ELITE18-CON-CE-CIV-IR-0941 28 days cylinder concrete test RCC (1:2:4) retaining wall columns concrete 107 to 114 A&B 14-Nov-23 23-Nov-23 B B

942 ELITE18-CON-CE-CIV-IR-0942 28 days cylinder concrete test PCC (1:4:8) boundry wall 115 to 120 A&B 14-Nov-23 23-Nov-23 B B

943 ELITE18-CON-CE-CIV-IR-0943 Form work & RCC concrete (1:2:4) for boundry wall plinth beam 115 to 120 A&B 16-Nov-23 23-Nov-23 B B

944 ELITE18-CON-CE-CIV-IR-0944 Steel for boundry wall plinth beam 115 to 120 A&B 16-Nov-23 23-Nov-23 A A

945 ELITE18-CON-CE-CIV-IR-0945 Form work & RCC concrete (1:2:4) for retaining wall capping beam 109 to 114 A&B 16-Nov-23 23-Nov-23 B B

946 ELITE18-CON-CE-CIV-IR-0946 Steel for retaining wall capping beam 109 to 114 A&B 16-Nov-23 23-Nov-23 A A

947 ELITE18-CON-CE-CIV-IR-0947 Primer coat for retaining wall 093 to 115 A&B 16-Nov-23 23-Nov-23 A A

948 ELITE18-CON-CE-CIV-IR-0948 Primer coat for boundry wall plinth beam 115 to 120 A&B 16-Nov-23 UR UR
28 days cylinder concrete test PCC (1:4:8) retaining wall back side to existing
949 ELITE18-CON-CE-CIV-IR-0949 115 A 24-Nov-23 30-Nov-23 B B
retaining wall
950 ELITE18-CON-CE-CIV-IR-0950 28 days cylinder concrete test RCC (1:2:4) boundry wall bed concrete 119 to 120 A&B 24-Nov-23 30-Nov-23 B B

951 ELITE18-CON-CE-CIV-IR-0951 28 days cylinder concrete test RCC (1:2:4) boundry wall bed concrete 117 to 118 A&B 24-Nov-23 30-Nov-23 B B

952 ELITE18-CON-CE-CIV-IR-0952 28 days cylinder concrete test RCC (1:2:4) boundry wall bed concrete 115 to 117 A&B 24-Nov-23 30-Nov-23 B B

953 ELITE18-CON-CE-CIV-IR-0953 07 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam concrete 119 to 120 A&B 24-Nov-23 30-Nov-23 B B

Page 36 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
954 ELITE18-CON-CE-CIV-IR-0954 07 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam concrete 117 to 118 A&B 24-Nov-23 30-Nov-23 B B

955 ELITE18-CON-CE-CIV-IR-0955 07 days cylinder concrete test RCC (1:2:4) retaining wall capping beam concrete 109 to 114 A&B 24-Nov-23 30-Nov-23 B B

956 ELITE18-CON-CE-CIV-IR-0956 07 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam concrete 115 to 117 A&B 24-Nov-23 30-Nov-23 B B

957 ELITE18-CON-CE-CIV-IR-0957 07 days cylinder concrete test RCC (1:2:4) boundry wall capping beam concrete 119 to 120 A&B 24-Nov-23 30-Nov-23 B B
28 days cylinder concrete test RCC (1:2:4) retaining wall bed villa 115 back side to
958 ELITE18-CON-CE-CIV-IR-0958 115 A 25-Nov-23 30-Nov-23 B B
existing retaining wall
959 ELITE18-CON-CE-CIV-IR-0959 FDT test 1st layer sand filling for internal side retaining wall 115 to 115 A&B 25-Nov-23 4-Dec-23 B B

960 ELITE18-CON-CE-CIV-IR-0960 FDT test 2nd layer sand filling for internal side retaining wall 114 to 115 A&B 25-Nov-23 4-Dec-23 B B

961 ELITE18-CON-CE-CIV-IR-0961 FDT test 1st layer sand filling for internal side retaining wall 115 to 120 A&B 25-Nov-23 4-Dec-23 B B

962 ELITE18-CON-CE-CIV-IR-0962 FDT test 2nd layer sand filling for internal side retaining wall 115 to 120 25-Nov-23 4-Dec-23 B B

963 ELITE18-CON-CE-CIV-IR-0963 FDT test 3rd layer sand filling for internal side retaining wall 114 to 115 A&B 27-Nov-23 4-Dec-23 B B

964 ELITE18-CON-CE-CIV-IR-0964 FDT test 4th layer sand filling for internal side retaining wall 114 to 115 A&B 27-Nov-23 4-Dec-23 B B

965 ELITE18-CON-CE-CIV-IR-0965 FDT test 3rd layer sand filling for internal side retaining wall 115 to 120 A&B 27-Nov-23 5-Dec-23 B B

966 ELITE18-CON-CE-CIV-IR-0966 FDT test 4th layer sand filling for internal side retaining wall 115 to 120 A&B 27-Nov-23 5-Dec-23 B B

967 ELITE18-CON-CE-CIV-IR-0967 FDT test 1st layer sand filling for internal side retaining wall 107 to 108 A&B 27-Nov-23 4-Dec-23 B B

968 ELITE18-CON-CE-CIV-IR-0968 FDT test 2nd layer sand filling for internal side retaining wall 107 to 108 A&B 27-Nov-23 4-Dec-23 B B

969 ELITE18-CON-CE-CIV-IR-0969 FDT test 3rd layer sand filling for internal side retaining wall 107 to 108 A&B 28-Nov-23 4-Dec-23 B B

970 ELITE18-CON-CE-CIV-IR-0970 FDT test 4th layer sand filling for internal side retaining wall 107 to 108 A&B 28-Nov-23 UR UR

971 ELITE18-CON-CE-CIV-IR-0971 FDT test 5th layer sand filling for internal side retaining wall 114 to 115 A&B 28-Nov-23 5-Dec-23 B B

972 ELITE18-CON-CE-CIV-IR-0972 FDT test 6th layer sand filling for internal side retaining wall 114 to 115 A&B 28-Nov-23 5-Dec-23 B B

973 ELITE18-CON-CE-CIV-IR-0973 FDT test 5th layer sand filling for internal side retaining wall 115 to 120 A&B 28-Nov-23 5-Dec-23 B B

974 ELITE18-CON-CE-CIV-IR-0974 FDT test 6th layer sand filling for internal side retaining wall 115 to 120 A&B 28-Nov-23 5-Dec-23 B B

975 ELITE18-CON-CE-CIV-IR-0975 07 days cylinder concrete test RCC (1:2:4) boundry wall capping beam concrete 115 to 118 A&B 29-Nov-23 5-Dec-23 B B

976 ELITE18-CON-CE-CIV-IR-0976 07 days cylinder concrete test RCC (1:2:4) retaining wall capping beam concrete 114 to 115 A&B 29-Nov-23 4-Dec-23 B B

977 ELITE18-CON-CE-CIV-IR-0977 Form Work & RCC Concrete(1:2:4) For retaining wall capping beam 114 to 115 A&B 29-Nov-23 30-Nov-23 B B

978 ELITE18-CON-CE-CIV-IR-0978 Steel for retaining wall capping beam 114 to 115 A&B 29-Nov-23 30-Nov-23 B B

979 ELITE18-CON-CE-CIV-IR-0979 Form Work & RCC Concrete(1:2:4) For boundary wall capping beam 115 to 120 A&B 29-Nov-23 30-Nov-23 B B

980 ELITE18-CON-CE-CIV-IR-0980 Steel for boundary wall capping beam 115 to 120 A&B 29-Nov-23 30-Nov-23 B B

981 ELITE18-CON-CE-CIV-IR-0981 Block masonary above plinth beam for boundary wall 115 to 120 A&B 30-Nov-23 4-Dec-23 B B
28 days cylinder concrete test RCC (1:2:4) retaining wall back side to existing
982 ELITE18-CON-CE-CIV-IR-0982 115 A 1-Dec-23 7-Dec-23 B B
retaining wall
983 ELITE18-CON-CE-CIV-IR-0983 28 days cylinder concrete test RCC (1:2:4) boundry wall columns 115 to 120 A&B 1-Dec-23 7-Dec-23 B B

984 ELITE18-CON-CE-CIV-IR-0984 28 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam concrete 119 to 120 A&B 8-Dec-23 14-Dec-23 B B

985 ELITE18-CON-CE-CIV-IR-0985 28 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam concrete 117,118 A&B 9-Dec-23 14-Dec-23 B B

986 ELITE18-CON-CE-CIV-IR-0986 28 days cylinder concrete test RCC (1:2:4) retaining wall capping beam concrete 109 to 114 A&B 9-Dec-23 14-Dec-23 B B

987 ELITE18-CON-CE-CIV-IR-0987 28 days cylinder concrete test RCC (1:2:4) boundary wall plinth beam concrete 115 to 117 A&B 12-Dec-23 UR UR

988 ELITE18-CON-CE-CIV-IR-0988 Installation window frame & window glass with all respect after retrofitting re work 119 to 144 A&B 13-Dec-23 14-Dec-23 A B

989 ELITE18-CON-CE-CIV-IR-0989 28 days cylinder concrete test RCC (1:2:4) boundary wall capping beam concrete 119 to 120 A&B 14-Dec-23 UR UR

990 ELITE18-CON-CE-CIV-IR-0990 Base primer graffy & weather shield for boundary wall external paint rework 139 to 144 A&B 18-Dec-23 UR UR

991 ELITE18-CON-CE-CIV-IR-0991 28 days cylinder concrete test RCC (1:2:4) boundary wall capping beam concrete 115 to 118 A&B 20-Dec-23 27-Dec-23 B B

992 ELITE18-CON-CE-CIV-IR-0992 28 days cylinder concrete test RCC (1:2:4) retaining wall capping beam concrete 114to 115 A&B 20-Dec-23 27-Dec-23 B B

993 ELITE18-CON-CE-CIV-IR-0993 Weep hole PVC pipe for retaining wall 114,115 A&B 22-Dec-23 26-Dec-23 B B

994 ELITE18-CON-CE-CIV-IR-0994 Plaster for boundary wall internal & external side 115 to 120 A&B 22-Dec-23 26-Dec-23 B B

995 ELITE18-CON-CE-CIV-IR-0995 Chiesing chipping cracks repair & plaster for boundary wall re-work 133 to 144 A&B 22-Dec-23 27-Dec-23 B B

1001 TO 1250 143-144


927 1 ELITE18-CON-CE-CIV-IR-1001 Block masonory for toe wall 143,144 A&B 1-Dec-22 3-Dec-22 B B

928 2 ELITE18-CON-CE-CIV-IR-1002 Dismentlling threshold for retrofiting work & debris remove 143,144 A&B 2-Dec-22 7-Dec-22 B B

929 3 ELITE18-CON-CE-CIV-IR-1003 1st coat putti (after primer) for celling paint 143,144 GF,FF,MR 3-Dec-22 9-Dec-22 B B

930 4 ELITE18-CON-CE-CIV-IR-1004 Block masonory for WC mechnical wall 143 GF,FF 3-Dec-22 9-Dec-22 B B

931 5 ELITE18-CON-CE-CIV-IR-1005 Plaster work & wall mounted cement board for cistern flushing tank 143 GF,FF 3-Dec-22 9-Dec-22 B B
Base primer for external graffy (elevation 1,2,3,4) boundry wall internal side
932 6 ELITE18-CON-CE-CIV-IR-1006 143,144 A&B 3-Dec-22 9-Dec-22 B B
OHWT mumty out side & parapet wall internal side
Graffy after base primer for external side (elevation 1,2,3,4) boundry wall internal
933 7 ELITE18-CON-CE-CIV-IR-1007 143,144 A&B 3-Dec-22 9-Dec-22 B B
side OHWT mumty out side & parapet wall internal side
934 8 ELITE18-CON-CE-CIV-IR-1008 Threshold sample GF,FF CVI 143,144 GF,FF 3-Dec-22 9-Dec-22 B B

Page 37 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
935 9 ELITE18-CON-CE-CIV-IR-1009 HDF floor plaster 143,144 A&B 3-Dec-22 9-Dec-22 B 24-Dec-22 29-Dec-22 B 26-Jan-23 31-Jan-23 A A

936 10 ELITE18-CON-CE-CIV-IR-1010 Dismentlling black granite (elevation 1) 143,144 A&B 3-Dec-22 9-Dec-22 B B

937 11 ELITE18-CON-CE-CIV-IR-1011 Installation black granite (elevation 1) 143,144 A&B 3-Dec-22 9-Dec-22 B B

938 12 ELITE18-CON-CE-CIV-IR-1012 Sand top level for external side 143,144 A&B 5-Dec-22 10-Dec-22 A A

939 13 ELITE18-CON-CE-CIV-IR-1013 PCC top level for external side 143,144 A&B 5-Dec-22 10-Dec-22 A A

940 14 ELITE18-CON-CE-CIV-IR-1014 Block masonory top level for external side (toe wall) 143,144 A&B 5-Dec-22 7-Dec-22 A A

941 15 ELITE18-CON-CE-CIV-IR-1015 NSL level & sweet earth top for external side (black side) 143,144 A&B 5-Dec-22 10-Dec-22 A A

942 16 ELITE18-CON-CE-CIV-IR-1016 Installation cover for manhole gully trap electrical chamber & electrical handhole 143,144 A&B 5-Dec-22 10-Dec-22 C 24-Dec-22 29-Dec-22 C 30-Dec-22 5-Jan-23 C 8-Feb-23 8-Feb-23 B B

943 17 ELITE18-CON-CE-CIV-IR-1017 Installation window frame & window glass 143,144 A&B 5-Dec-22 7-Dec-22 C 13-Dec-22 15-Dec-22 C 17-Dec-22 21-Dec-22 B 26-Jan-23 4-Feb-23 A A

944 18 ELITE18-CON-CE-CIV-IR-1018 2nd Coat Putty (After 1st Coat putti) For celling Paint 143,144 GF,FF,MR 13-Dec-22 15-Dec-22 B B

945 19 ELITE18-CON-CE-CIV-IR-1019 Paint (After 2nd Coat putti) For celling Paint 143,144 GF,FF,MR 13-Dec-22 15-Dec-22 B B

946 20 ELITE18-CON-CE-CIV-IR-1020 Dismentlling perlino marbal for stair & debris remove 143,144 A&B 13-Dec-22 15-Dec-22 B B

947 21 ELITE18-CON-CE-CIV-IR-1021 Dismentlling stair skirting for stair & debris remove 143,144 A&B 13-Dec-22 15-Dec-22 B B

948 22 ELITE18-CON-CE-CIV-IR-1022 Installation perlino marble for stair 143,144 A&B 13-Dec-22 15-Dec-22 B B

949 23 ELITE18-CON-CE-CIV-IR-1023 Installation stair skirting for stair 143,144 A&B 13-Dec-22 15-Dec-22 C 24-Dec-22 29-Dec-22 B B

950 24 ELITE18-CON-CE-CIV-IR-1024 Installation glass railling with all respect for stair 143,144 A&B 13-Dec-22 15-Dec-22 B 26-Jan-23 31-Jan-23 A A

951 25 ELITE18-CON-CE-CIV-IR-1025 Inatallation aluminium doors with all respect for kitchen & mumty 143,144 A&B 13-Dec-22 15-Dec-22 B B

952 26 ELITE18-CON-CE-CIV-IR-1026 Installation pavers stone for external side 143,144 A&B 13-Dec-22 15-Dec-22 C 24-Dec-22 29-Dec-22 B 26-Jan-23 1-Feb-23 A A

953 27 ELITE18-CON-CE-CIV-IR-1027 Installation curb stone for external side 143,144 A&B 13-Dec-22 15-Dec-22 B B

954 28 ELITE18-CON-CE-CIV-IR-1028 Installation pavers skirting for external side 143,144 A&B 13-Dec-22 15-Dec-22 C 24-Dec-22 2-Jan-23 B 26-Jan-23 31-Jan-23 A A

955 29 ELITE18-CON-CE-CIV-IR-1029 Paint for MS peragole 143,144 A&B 13-Dec-22 15-Dec-22 B B

956 30 ELITE18-CON-CE-CIV-IR-1030 Paint for MS porch fence 143,144 A&B 13-Dec-22 15-Dec-22 B B

957 31 ELITE18-CON-CE-CIV-IR-1031 MS paragola bulkhead with paint cement bord sheet 143 A 13-Dec-22 15-Dec-22 B B

958 32 ELITE18-CON-CE-CIV-IR-1032 PCC (1:3:6) under curb stone for external side 143,144 A&B 13-Dec-22 15-Dec-22 B B

959 33 ELITE18-CON-CE-CIV-IR-1033 Gola around curb stone for external side 143,144 A&B 13-Dec-22 15-Dec-22 B B

960 34 ELITE18-CON-CE-CIV-IR-1034 Inatallation crema mo for boundry wall 143,144 A&B 13-Dec-22 15-Jan-23 B B

961 35 ELITE18-CON-CE-CIV-IR-1035 Grout filling B/W girder & slab 143,144 A&B 14-Dec-22 15-Dec-22 B B

962 36 ELITE18-CON-CE-CIV-IR-1036 Installation skirting for maid room 143,144 A&B 17-Dec-22 21-Dec-22 B B

963 37 ELITE18-CON-CE-CIV-IR-1037 SBR for columns beam GF,FF & slab thicknesss increse FF,top roof 143,144 A&B 15-Dec-22 19-Dec-22 B B

964 38 ELITE18-CON-CE-CIV-IR-1038 28 days cylinder concrete test PCC (1:3:6) external side 144 B 17-Dec-22 22-Dec-22 B B

965 39 ELITE18-CON-CE-CIV-IR-1039 Installation perlino marble for vanity 143,144 A&B 17-Dec-22 21-Dec-22 B B

966 40 ELITE18-CON-CE-CIV-IR-1040 Installation stair wooden handrale with all respect 143,144 A&B 17-Dec-22 21-Dec-22 B 26-Jan-23 31-Jan-23 A A

967 41 ELITE18-CON-CE-CIV-IR-1041 28 days cylinder concrete test PCC (1:3:6) external side 143 A 21-Dec-22 29-Dec-22 B B

968 42 ELITE18-CON-CE-CIV-IR-1042 Inspection 2 coats of cementitious for UGWT 143 A 22-Dec-22 29-Dec-22 B B

969 43 ELITE18-CON-CE-CIV-IR-1043 Inspection 2 coats of cementitious for OHWT 143 A 22-Dec-22 29-Dec-22 B B

970 44 ELITE18-CON-CE-CIV-IR-1044 Installation doors wardrobes & iron mongries 143 A 29-Dec-22 2-Jan-23 B 10-Jan-23 12-Jan-23 B B

971 45 ELITE18-CON-CE-CIV-IR-1045 Installation doors wardrobes & iron mongries 144 B 29-Dec-22 2-Jan-23 B 10-Jan-23 12-Jan-23 B B

972 46 ELITE18-CON-CE-CIV-IR-1046 Plaster patch for boundry wall elevation 2,3,4 143,144 A&B 29-Dec-22 2-Jan-23 C 11-Feb-23 14-Feb-23 A A

973 47 ELITE18-CON-CE-CIV-IR-1047 Plaster patch for external side elevation 1,2,3,4 143,144 A&B 29-Dec-22 2-Jan-23 B B

974 48 ELITE18-CON-CE-CIV-IR-1048 Plaster patch for internal side 143,144 GF,FF,MR 29-Dec-22 2-Jan-23 A A

975 49 ELITE18-CON-CE-CIV-IR-1049 1st coat putti (after putty 2nd coat) for internal paint 143,144 GF,FF 29-Dec-22 2-Jan-23 B B

976 50 ELITE18-CON-CE-CIV-IR-1050 2nd Coat Putty (After 1st Coat putti) For internal Paint 143,144 GF,FF,MR 29-Dec-22 2-Jan-23 B B

977 51 ELITE18-CON-CE-CIV-IR-1051 Installation HDF floor 143,144 GF,FF 10-Jan-23 12-Jan-23 B B

978 52 ELITE18-CON-CE-CIV-IR-1052 Installation HDF floor skirting 143,144 GF,FF 10-Jan-23 12-Jan-23 B B

979 53 ELITE18-CON-CE-CIV-IR-1053 Installation skirting for around the sky light 144 B 11-Feb-23 14-Feb-23 A A

980 54 ELITE18-CON-CE-CIV-IR-1054 Installation of perlino top at columns of boundry wall 143,144 18-Jan-23 19-Jan-23 A A

981 55 ELITE18-CON-CE-CIV-IR-1055 CPI items safely store & property stacked at storeage 18-Jan-23 19-Jan-23 A A

982 56 ELITE18-CON-CE-CIV-IR-1056 Fixing of cubical glass partetion & glass door 143,144 18-Jan-23 19-Jan-23 B B

983 57 ELITE18-CON-CE-CIV-IR-1057 Micro pile work stage 2 30% final 19-Jan-23 19-Jan-23 B B

984 58 ELITE18-CON-CE-CIV-IR-1058 Micro pile work stage 3 40% work done 100% 19-Jan-23 19-Jan-23 B 12-Sep-23 UR UR

985 59 ELITE18-CON-CE-CIV-IR-1059 Micro pile work stage 1 30% final 19-Jan-23 19-Jan-23 A A

986 60 ELITE18-CON-CE-CIV-IR-1060 Installation black granite strip for shower cabin 143,144 GF,FF 27-Jan-23 1-Feb-23 A A

987 61 ELITE18-CON-CE-CIV-IR-1061 Installation perlino marbal skirting 143,144 GF,FF,M 28-Jan-23 1-Feb-23 A A

988 62 ELITE18-CON-CE-CIV-IR-1062 Installaton floor tile for maid room 143 A 28-Jan-23 1-Feb-23 A A

989 63 ELITE18-CON-CE-CIV-IR-1063 Installation UHWT cover with all respect 143,144 A&B 28-Jan-23 4-Feb-23 A A

Page 38 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
990 64 ELITE18-CON-CE-CIV-IR-1064 Installation transfer & booster pupm cover with all respect 143,144 A&B 28-Jan-23 4-Feb-23 A A

991 65 ELITE18-CON-CE-CIV-IR-1065 Installation window with all resect (withdraw) 143,144 A&B 28-Jan-23 (withdraw)

992 66 ELITE18-CON-CE-CIV-IR-1066 Installation vanity miror with all respect 143,144 GF,FF,MB 28-Jan-23 1-Feb-23 A A

993 67 ELITE18-CON-CE-CIV-IR-1067 Weather sheet after graffy for external side elevation 1,2,3,4 & boundry wall 143,144 A&B 2-Feb-23 4-Feb-23 B B

994 68 ELITE18-CON-CE-CIV-IR-1068 Installation perlino marbal for floor 143,144 GF,FF 2-Feb-23 4-Feb-23 A A

995 69 ELITE18-CON-CE-CIV-IR-1069 Installation perlino marbal top for boundry wall elevation 1 143,144 A&B 11-Feb-23 14-Feb-23 A A

996 70 ELITE18-CON-CE-CIV-IR-1070 Installation gypsum bord jointing & tapping for celling work dry area 143,144 MR 4-Feb-23 7-Feb-23 A A

997 71 ELITE18-CON-CE-CIV-IR-1071 Installation MS angle on top of RCC beam for main gate 143,144 A&B 4-Feb-23 8-Feb-23 A A

998 72 ELITE18-CON-CE-CIV-IR-1072 3rd final coat paint after paint 2nd coat for internal paint (resubmit 21-3-23) 143,144 GF,FF,MR 22-Feb-23 UR UR

999 73 ELITE18-CON-CE-CIV-IR-1073 Perlino marbal cutting grinding polish for lobby area 143 A 4-Feb-23 14-Feb-23 A A

1000 74 ELITE18-CON-CE-CIV-IR-1074

1001 75 ELITE18-CON-CE-CIV-IR-1075 PCC (1:4:8) for wardrobe upstand 143,144 A&B 11-Feb-23 14-Feb-23 A A

1002 76 ELITE18-CON-CE-CIV-IR-1076 Dismentling roof tile on back side 143 A 11-Feb-23 14-Feb-23 A A

1003 77 ELITE18-CON-CE-CIV-IR-1077 Installation plaster & roof tile for top roof back side 143 A 11-Feb-23 14-Feb-23 A A

1004 78 ELITE18-CON-CE-CIV-IR-1078 PCC (1:3:6) for PPRC pads top roof 143,144 A&B 11-Feb-23 14-Feb-23 A A
Dismentlling material concrete+block masonory & excavated material sand
1005 79 ELITE18-CON-CE-CIV-IR-1079 143,144 A&B 11-Feb-23 14-Feb-23 B B
removing dispose f from alocated area
1006 80 ELITE18-CON-CE-CIV-IR-1080 Enamel paint on total installed MEP matrial 143,144 A&B 11-Feb-23 15-Feb-23 A A

1007 81 ELITE18-CON-CE-CIV-IR-1081 Installation floor tile for mumty top 144 B 11-Feb-23 14-Feb-23 A A

1008 82 ELITE18-CON-CE-CIV-IR-1082 Installation floor tile skirting for top roof 143,144 A&B 11-Feb-23 14-Feb-23 A A

1009 83 ELITE18-CON-CE-CIV-IR-1083 Installation floor tile skirting for mumty top 143,144 A&B 11-Feb-23 14-Feb-23 A A

1010 84 ELITE18-CON-CE-CIV-IR-1084 Installation black granite for elevation 2 143,144 A&B 11-Feb-23 14-Feb-23 A A

1011 85 ELITE18-CON-CE-CIV-IR-1085 Window jambs preparation palaster 143,144 A&B 11-Feb-23 14-Feb-23 A A

1012 86 ELITE18-CON-CE-CIV-IR-1086 Catch basin including MS gratewith all respect 143,144 A&B 11-Feb-23 15-Feb-23 A A

1013 87 ELITE18-CON-CE-CIV-IR-1087 Pergola jointing with all respect 143,144 A&B 11-Feb-23 15-Feb-23 A A

1014 88 ELITE18-CON-CE-CIV-IR-1088

1015 89 ELITE18-CON-CE-CIV-IR-1089 2nos 200mm core cut for UPVC catch basin 5nos 200mm external infre hole 143,144 A&B 11-Feb-23 14-Feb-23 A A

1016 90 ELITE18-CON-CE-CIV-IR-1090 2nos 50mm core cute for HDP pips 1nos 75mm copper pipe at family lounge 143,144 A&B 11-Feb-23 14-Feb-23 A A

1017 91 ELITE18-CON-CE-CIV-IR-1091 Gola 1:3:6 & surface cleening at roof top 143,144 A&B 13-Feb-23 20-Feb-23 A A

1018 92 ELITE18-CON-CE-CIV-IR-1092 4mm bitumen sheet jumbolone sheet & 2 layer of polythene sheet at roof top 143,144 A&B 15-Feb-23 20-Feb-23 A A

1019 93 ELITE18-CON-CE-CIV-IR-1093 Fixing of acces panal in celling 143,144 A&B 11-Feb-23 20-Feb-23 A A

1020 94 ELITE18-CON-CE-CIV-IR-1094 Typical perlino marbal on column c-1 mumty floor 143 A 7-Mar-23 8-Mar-23 A A

1021 95 ELITE18-CON-CE-CIV-IR-1095 Dismentlling floor & wall tile kitchen 143,144 A&B 11-Apr-23 14-Apr-23 B B

1022 96 ELITE18-CON-CE-CIV-IR-1096 Installation doors wardrobes skirting transition strip & vanity 144 B 6-Jun-23 8-Jun-23 B B

1023 97 ELITE18-CON-CE-CIV-IR-1097 Installation doors wardrobes skirting door strip & vanity 143 A 6-Jun-23 8-Jun-23 B B

1024 98 ELITE18-CON-CE-CIV-IR-1098 Installation doors wardrobes iron mongries skirting vanity & transition strip final IR 143,144 A&B 6-Jul-23 18-Jul-23 A A

1025 99 ELITE18-CON-CE-CIV-IR-1099 Dismentlling roof tile skirting for top roof 143,144 A&B 2-Aug-23 9-Aug-23 A A

1026 100 ELITE18-CON-CE-CIV-IR-1100 Installation roof tile skirting for top roof 143,144 A&B 2-Aug-23 9-Aug-23 B B

1027 101 ELITE18-CON-CE-CIV-IR-1101 Inspection IR for sky light with all respect 144 B 16-Sep-23 19-Sep-23 A A

1028 102 ELITE18-CON-CE-CIV-IR-1102 Installation peragola cleat with mechanical bolts all respect 143,144 A&B 9-Dec-23 14-Dec-23 A A

1029

1030

1031

1032

1033 1251 TO 1500 141-142


1034 1 ELITE18-CON-CE-CIV-IR-1251 Polythene sheet (1000 micron) for external side 141,142 A&B 1-Dec-22 7-Dec-22 B B

1035 2 ELITE18-CON-CE-CIV-IR-1252 PCC (1:3:6) for external side 141,142 A&B 1-Dec-22 7-Dec-22 B B

1036 3 ELITE18-CON-CE-CIV-IR-1253 Block masonory for toe wall 141,142 A&B 1-Dec-22 3-Dec-22 B B

1037 4 ELITE18-CON-CE-CIV-IR-1254 Dismentlling threshold for retrofiting work & debris remove 141,142 A&B 2-Dec-22 7-Dec-22 B B

1038 5 ELITE18-CON-CE-CIV-IR-1255 Suspension & framming system for celling work 141,142 GF,FF,MR 3-Dec-22 9-Dec-22 B 23-Dec-22 7-Mar-23 A 3-Mar-22 UR UR

1039 6 ELITE18-CON-CE-CIV-IR-1256 Block masonory for WC mechnical wall 141,142 GF,FF 3-Dec-22 9-Dec-22 B B

1040 7 ELITE18-CON-CE-CIV-IR-1257 Installation black granite window sill 141,142 A&B 3-Dec-22 9-Dec-22 C 13-Dec-22 15-Dec-22 C 4-Jan-23 7-Jan-23 C 21-Jan-23 26-Jan-23 B B

1041 8 ELITE18-CON-CE-CIV-IR-1258 Installation perlino marble for floor 142 GF 3-Dec-22 9-Dec-22 B 27-Feb-23 2-Mar-23 B 4-Mar-23 7-Mar-23 C 23-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A A
Base primer for external graffy (elevation 1,2,3,4) boundry wall internal side
1042 9 ELITE18-CON-CE-CIV-IR-1259 141,142 A&B 3-Dec-22 9-Dec-22 C 14-Dec-22 19-Dec-22 B B
OHWT mumty out side & parapet wall internal side
Graffy after base primer for external side (elevation 1,2,3,4) boundry wall internal
1043 10 ELITE18-CON-CE-CIV-IR-1260 141,142 A&B 3-Dec-22 9-Dec-22 B B
side OHWT mumty out side & parapet wall internal side
1044 11 ELITE18-CON-CE-CIV-IR-1261 Sand top level for external side 141,142 A&B 5-Dec-22 10-Dec-22 A A

Page 39 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1045 12 ELITE18-CON-CE-CIV-IR-1262 PCC top level for external side 141,142 A&B 5-Dec-22 10-Dec-22 A A

1046 13 ELITE18-CON-CE-CIV-IR-1263 Block masonory top level for external side (toe wall) 141,142 A&B 5-Dec-22 7-Dec-22 A A

1047 14 ELITE18-CON-CE-CIV-IR-1264 NSL level & sweet earth top for external side (black side) 141,142 A&B 5-Dec-22 10-Dec-22 A A

1048 15 ELITE18-CON-CE-CIV-IR-1265 Installation cover for manhole gully trap electrical chamber & electrical handhole 141,142 A&B 5-Dec-22 10-Dec-22 C 4-Jan-23 7-Jan-23 C 3-Mar-23 7-Mar-23 A A

1049 16 ELITE18-CON-CE-CIV-IR-1266 07 days cylinder concrete test PCC (1:3:6) external side 141,142 A&B 9-Dec-22 21-Dec-22 B B

1050 17 ELITE18-CON-CE-CIV-IR-1267 Surface preparation for paver in external side 141,142 A&B 13-Dec-22 15-Dec-22 B B

1051 18 ELITE18-CON-CE-CIV-IR-1268 Plaster work & wall mounted cement board for cistern flushing tank 141,142 GF,FF 13-Dec-22 15-Dec-22 B B

1052 19 ELITE18-CON-CE-CIV-IR-1269 Cementitious coat for bath & powder room water proofing 141,142 A&B 13-Dec-22 15-Dec-22 B B

1053 20 ELITE18-CON-CE-CIV-IR-1270 Cementitious coat for kitchen water proofing 141,142 A&B 13-Dec-22 15-Dec-22 B B

1054 21 ELITE18-CON-CE-CIV-IR-1271 Wall tile for kitchen 141,142 A&B 13-Dec-22 15-Dec-22 C 24-Dec-22 29-Dec-22 C 4-Feb-23 8-Feb-23 A A

1055 22 ELITE18-CON-CE-CIV-IR-1272 Wall tile for bath & powder room 142 B 13-Dec-22 15-Dec-22 C 12-Jan-23 14-Jan-23 C 16-Feb-23 24-Feb-23 B 20-Mar-23 UR UR

1056 23 ELITE18-CON-CE-CIV-IR-1273 Floor tile for bath & powder room 142 B 13-Dec-22 15-Dec-22 C 24-Dec-22 29-Dec-22 B B

1057 24 ELITE18-CON-CE-CIV-IR-1274 Floor tile for kitchen 142 B 13-Dec-22 15-Dec-22 B 23-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A A

1058 25 ELITE18-CON-CE-CIV-IR-1275 Grout filling B/W girder & slab 141,142 A&B 14-Dec-22 20-Dec-22 B B

1059 26 ELITE18-CON-CE-CIV-IR-1276 SBR for columns beam GF,FF & slab thicknesss increse FF,top roof 141,142 A&B 15-Dec-22 19-Dec-22 B B

1060 27 ELITE18-CON-CE-CIV-IR-1277 Jumbolon XPS board 50mm & polythene sheet laying for top roof 141,142 A&B 23-Dec-22 29-Dec-22 B B

1061 28 ELITE18-CON-CE-CIV-IR-1278 Dismentlling chiping plaster for external side ELV,1,2,3,4 141,142 A&B 23-Dec-22 29-Dec-22 B B

1062 29 ELITE18-CON-CE-CIV-IR-1279 Crack repair with sika rep for external side ELV,1,2,3,4 141,142 A&B 23-Dec-22 29-Dec-22 B B

1063 30 ELITE18-CON-CE-CIV-IR-1280 Dismentling perlino marble for floor & debris remove 142 B 24-Dec-22 29-Dec-22 A A

1064 31 ELITE18-CON-CE-CIV-IR-1281 Plaster floor tile for bath & powder room 142 B 24-Dec-22 29-Dec-22 B B

1065 32 ELITE18-CON-CE-CIV-IR-1282 Installation black granite vertical window sill 141,142 A&B 24-Dec-22 2-Jan-23 C 21-Jan-23 4-Feb-23 B 4-Mar-23 7-Mar-23 C 8-Mar-23 10-Mar-23 A A

1066 33 ELITE18-CON-CE-CIV-IR-1283 Floor tile for kitchen 141 A 24-Dec-22 29-Dec-22 B 23-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A A

1067 34 ELITE18-CON-CE-CIV-IR-1284 28 days cylinder concrete test PCC (1:3:6) external side 141,142 A&B 29-Dec-22 7-Jan-23 B B

1068 35 ELITE18-CON-CE-CIV-IR-1285 Block masonory for internal side 141,142 GF,FF 30-Dec-22 5-Jan-23 B B

1069 36 ELITE18-CON-CE-CIV-IR-1286 Dismentlling columns c-01 for kitchen & debris remove 142 B 2-Jan-23 7-Jan-23 C 3-Mar-23 7-Mar-23 A A

1070 37 ELITE18-CON-CE-CIV-IR-1287 Plaster columns c-01 for kitchen 142 B 2-Jan-23 7-Jan-23 C 3-Mar-23 7-Mar-23 A A

1071 38 ELITE18-CON-CE-CIV-IR-1288 Plaster work for internal walls & columns 141 A 4-Jan-23 7-Jan-23 C 22-Feb-23 23-Feb-23 A A

1072 39 ELITE18-CON-CE-CIV-IR-1289 Plaster patch work for internal walls 141,142 GF,FF,MR 4-Jan-23 7-Jan-23 C 22-Feb-23 23-Feb-23 A A

1073 40 ELITE18-CON-CE-CIV-IR-1290 Surface clearence & primer coat for internal paint 141,142 GF,FF,MR 4-Jan-23 7-Jan-23 B B

1074 41 ELITE18-CON-CE-CIV-IR-1291 1st coat putty after primer for internal paint 142 GF,FF,MR 4-Jan-23 7-Jan-23 B 27-Feb-23 2-Mar-23 A A

1075 42 ELITE18-CON-CE-CIV-IR-1292 Installation gypsum board jointing & tapping for celling work dry area 142 GF,FF 4-Jan-23 7-Jan-23 C 2-Feb-23 7-Feb-23 C 27-Feb-23 2-Mar-23 A A

1076 43 ELITE18-CON-CE-CIV-IR-1293 Installlation composite split stone for external side elevation 1,3,4 141,142 A&B 4-Jan-23 7-Jan-23 C 21-Jan-23 26-Jan-23 B B

1077 44 ELITE18-CON-CE-CIV-IR-1294 Installation stair skirting 142 B 4-Jan-23 7-Jan-23 C 21-Jan-23 26-Jan-23 B 4-Apr-23 6-Apr-23 B 10-May-23 16-May-23 A A

1078 45 ELITE18-CON-CE-CIV-IR-1295 Installation perlino marbal for stair 142 B 4-Jan-23 7-Jan-23 C 21-Jan-23 1-Feb-23 B 27-Feb-23 2-Mar-23 B 4-Mar-23 7-Mar-23 A A

1079 46 ELITE18-CON-CE-CIV-IR-1296 Primer coat for celling work 142 GF,FF,MR 4-Jan-23 7-Jan-23 C 3-Mar-23 7-Feb-23 B B

1080 47 ELITE18-CON-CE-CIV-IR-1297 Plaster patch work for internal walls elevation 1,2,3,4 141,142 A&B 5-Jan-23 7-Jan-23 B B
GF,FF & FF
1081 48 ELITE18-CON-CE-CIV-IR-1298 Dismentlling perlino marbal for stair & debris remove 141,142 10-Jan-23 14-Jan-23 B B
to MF
GF,FF & FF
1082 49 ELITE18-CON-CE-CIV-IR-1299 Dismentlling perlino marbal skirting for stair 141,142 10-Jan-23 14-Jan-23 B B
to MF
1083 50 ELITE18-CON-CE-CIV-IR-1300 Dismentlling perlino marbal for floor & debris remove 142 FF 10-Jan-23 12-Jan-23 B B

1084 51 ELITE18-CON-CE-CIV-IR-1301 Plaster work for HDF floor 142 GF,FF 10-Jan-23 12-Jan-23 C 1-Mar-23 3-Mar-23 A A

1085 52 ELITE18-CON-CE-CIV-IR-1302 2nd coat putty after 1st coat putti for internal paint 142 GF,FF,MR 12-Jan-23 B 27-Feb-23 2-Mar-23 A A

1086 53 ELITE18-CON-CE-CIV-IR-1303 Installation perlino marbal for floor 142 L & L,FF 12-Jan-23 14-Jan-23 B 27-Feb-23 2-Mar-23 A A

1087 54 ELITE18-CON-CE-CIV-IR-1304 Floor tile for bath & powder room 141 A 21-Jan-23 25-Jan-23 C 4-Mar-23 7-Mar-23 B 23-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A A

1088 55 ELITE18-CON-CE-CIV-IR-1305 Skirting for around the sky light 142 MT 21-Jan-23 26-Jan-23 B B

1089 56 ELITE18-CON-CE-CIV-IR-1306 Installation ledge wall top 142 B 18-Jan-23 21-Jan-23 A A

1090 57 ELITE18-CON-CE-CIV-IR-1307 2 coats of cementitious for UGWT 141,142 A&B 21-Jan-23 26-Jan-23 B B

1091 58 ELITE18-CON-CE-CIV-IR-1308 2 coats of cementitious for OHWT 141,142 A&B 21-Jan-23 26-Jan-23 B B

1092 59 ELITE18-CON-CE-CIV-IR-1309 Block masonory for internal side duct 141,142 GF,FF,TR 27-Jan-23 4-Feb-23 B B

1093 60 ELITE18-CON-CE-CIV-IR-1310 Installation black granite strip for shower cabin 141,142 GF,FF 27-Jan-23 4-Feb-23 C 27-Feb-23 2-Mar-23 A A

1094 61 ELITE18-CON-CE-CIV-IR-1311 Installation floor tile for maid room 141,142 A&B 28-Jan-23 4-Feb-23 B 27-Feb-23 2-Mar-23 B B

1095 62 ELITE18-CON-CE-CIV-IR-1312 Installation floor tile for maid bath 141,142 A&B 28-Jan-23 4-Feb-23 B 23-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A A

1096 63 ELITE18-CON-CE-CIV-IR-1313 Installation floor skirting for maid room 141,142 A&B 28-Jan-23 4-Feb-23 B B

1097 64 ELITE18-CON-CE-CIV-IR-1314 Installation wall tile for maid bath (withdraw) 141,142 A&B 28-Jan-23 4-Feb-23 B 27-Feb-23 2-Mar-23 B B

1098 65 ELITE18-CON-CE-CIV-IR-1315 Installation UGWT cover with all respect 141,142 A&B 28-Jan-23 4-Feb-23 B 2-Mar-23 4-Mar-23 B 3-Apr-23 5-Apr-23 A A

1099 66 ELITE18-CON-CE-CIV-IR-1316 Installation UGWT cover concrete uper side 141,142 A&B 28-Jan-23 4-Feb-23 C 2-Mar-23 4-Mar-23 A A

Page 40 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1100 67 ELITE18-CON-CE-CIV-IR-1317 Plaster for under OHWT 141,142 A&B 28-Jan-23 4-Feb-23 B B

1101 68 ELITE18-CON-CE-CIV-IR-1318 Weather sheet after graffy for external side elevation 1,2,3,4 & boundry wall 141,142 A&B 2-Feb-23 7-Feb-23 B B

1102 69 ELITE18-CON-CE-CIV-IR-1319 Dismentling roof tile & skirting for top roof back side 141,142 A&B 2-Feb-23 4-Feb-23 B B

1103 70 ELITE18-CON-CE-CIV-IR-1320 Installation perlino marbal for floor 141,142 GF,FF 2-Feb-23 4-Feb-23 B 27-Feb-23 3-Mar-23 C 23-Mar-23 29-Mar-23 C 4-Apr-23 6-Apr-23 A A

1104 71 ELITE18-CON-CE-CIV-IR-1321 Installation crema mo for boundry wall 141,142 A&B 4-Feb-23 14-Feb-23 B 27-Feb-23 2-Mar-23 A A

1105 72 ELITE18-CON-CE-CIV-IR-1322 Installation roof tile for top roof filling 141,142 A&B 4-Feb-23 8-Feb-23 B 4-Mar-23 10-Mar-23 B 23-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 B B

1106 73 ELITE18-CON-CE-CIV-IR-1323 Installation roof tile skirting for top roof 141,142 A&B 4-Feb-23 9-Feb-23 A A

1107 74 ELITE18-CON-CE-CIV-IR-1324 Installation MS louvers under the OHWT 141,142 A&B 4-Feb-23 7-Feb-23 B 2-Mar-23 4-Mar-23 B B
Installation perlino marbal top for boundry wall elevation 1 (Resubmit IR
1108 75 ELITE18-CON-CE-CIV-IR-1325 141,142 A&B 4-Feb-23 21-Mar-23 A A
4-3-23)
1109 76 ELITE18-CON-CE-CIV-IR-1326 MS pergola bulkhead with paint cement bord sheet 141 A 4-Feb-23 7-Feb-23 C 6-Mar-23 10-Mar-23 A A

1110 77 ELITE18-CON-CE-CIV-IR-1327 Primer coat for celling paint 141,142 A&B 4-Feb-23 7-Feb-23 C 1-Mar-23 3-Mar-23 A A

1111 78 ELITE18-CON-CE-CIV-IR-1328 Plaster for HDF floor 141,142 A&B 4-Feb-23 10-Mar-23 C 1-Mar-23 3-Mar-23 A A

1112 79 ELITE18-CON-CE-CIV-IR-1329 Ist coat putty afterprimer for internal paint 141 GF,FF,MR 4-Feb-23 7-Feb-23 C 4-Mar-23 7-Mar-23 A A

1113 80 ELITE18-CON-CE-CIV-IR-1330 2nd coat putty after 1st coat putti for internal paint 141 GF,FF,MR 4-Feb-23 7-Feb-23 C 4-Mar-23 7-Mar-23 A A

1114 81 ELITE18-CON-CE-CIV-IR-1331 1st coat putty after primer coat for celling paint 141,142 GF,FF,MR 4-Feb-23 7-Feb-23 C 1-Mar-23 3-Mar-23 A A

1115 82 ELITE18-CON-CE-CIV-IR-1332 Dismentlling of window-4 bed-1 141 GF 11-Feb-23 22-Feb-23 A A

1116 83 ELITE18-CON-CE-CIV-IR-1333 Plaster for window-4 jam bed-1 141 GF 11-Feb-23 22-Feb-23 A A
Dismentlling material concrete+block masonory & excavated material sand
1117 84 ELITE18-CON-CE-CIV-IR-1334 141,142 A&B 11-Feb-23 15-Feb-23 B B
removing dispose f from alocated area
2nd coat weather sheet after graffy for external side elevaation 1,2,3,4 & boundry
1118 85 ELITE18-CON-CE-CIV-IR-1335 141,142 A&B 14-Feb-23 21-Feb-23 C 4-Mar-23 7-Mar-23 C 4-Apr-23 6-Apr-23 A A
wall
1119 86 ELITE18-CON-CE-CIV-IR-1336 Black granite strip for shower cabin 141,142 GF,FF 16-Feb-23 23-Feb-23 B B

1120 87 ELITE18-CON-CE-CIV-IR-1337 Perlino marbal threshold 141,142 GF,FF,MR 16-Feb-23 23-Feb-23 B 4-Mar-23 7-Mar-23 C 10-Mar-23 15-Mar-23 B 20-Mar-23 UR UR

1121 88 ELITE18-CON-CE-CIV-IR-1338 Aluminium doors for kitchen & mumty 141,142 A&B 16-Feb-23 22-Feb-23 B 20-Mar-23 UR UR

1122 89 ELITE18-CON-CE-CIV-IR-1339 Installation moisture risitence board jointing & tapping for celling work wet area 142 GF,FF 27-Feb-23 2-Mar-23 C 3-Mar-23 7-Mar-23 A A

1123 90 ELITE18-CON-CE-CIV-IR-1340 Plaster patch work for internal walls 141,142 A&B 24-Feb-23 28-Feb-23 B B

1124 91 ELITE18-CON-CE-CIV-IR-1341 Aluminium windows frames & windows 142 GF,FF,MR 27-Feb-23 3-Mar-23 B 4-Mar-23 7-Mar-23 C 20-Mar-23 11-Apr-23 B B
GF to FF &
1125 92 ELITE18-CON-CE-CIV-IR-1342 Installation perlino marbal skirting for stair 141,142 27-Feb-23 2-Mar-23 A A
FF to MF
1126 93 ELITE18-CON-CE-CIV-IR-1343 Installation perlino marbal skirting for floor 141,142 GF,FF,MR 27-Feb-23 2-Mar-23 A A

1127 94 ELITE18-CON-CE-CIV-IR-1344 Installation pavers for external side with requst to check list 141,142 A&B 27-Feb-23 4-Mar-23 B 3-Apr-23 5-Apr-23 A 15-Sep-23 16-Sep-23 A A

1128 95 ELITE18-CON-CE-CIV-IR-1345 Installation pavers skirting for external side 141,142 A&B 27-Feb-23 7-Mar-23 A A

1129 96 ELITE18-CON-CE-CIV-IR-1346 Installation MS vanity frame for baths & powder room 141,142 A&B 27-Feb-23 3-Mar-23 B B

1130 97 ELITE18-CON-CE-CIV-IR-1347 Installation perlino marbal for vanity 141,142 GF,FF 27-Feb-23 3-Mar-23 A A

1131 98 ELITE18-CON-CE-CIV-IR-1348 Installation vanity miror for baths & powder room 141,142 GF,FF 27-Feb-23 4-Mar-23 A A

1132 99 ELITE18-CON-CE-CIV-IR-1349 PCC (1:4:8) under the kerb stone 141,142 A&B 27-Feb-23 3-Mar-23 B B

1133 100 ELITE18-CON-CE-CIV-IR-1350 Gola around kerb stone 141,142 A&B 27-Feb-23 3-Mar-23 A A

1134 101 ELITE18-CON-CE-CIV-IR-1351 Installation kerb stone for external side elevation 2 141,142 A&B 27-Feb-23 3-Mar-23 A A

1135 102 ELITE18-CON-CE-CIV-IR-1352 Installation MS grating for main gate 141,142 A&B 27-Feb-23 2-Mar-23 B 20-Mar-23 UR UR

1136 103 ELITE18-CON-CE-CIV-IR-1353 1st coat paint after 2nd coat putty for internal paint 142 GF,FF,MR 1-Mar-23 3-Mar-23 A A

1137 104 ELITE18-CON-CE-CIV-IR-1354 2nd coat paint after 1st coat paint for internal paint 142 GF,FF,MR 1-Mar-23 3-Mar-23 B B

1138 105 ELITE18-CON-CE-CIV-IR-1355 3rd final coat paint after 2nd coat paint for internal paint 142 GF,FF.MR 2-Mar-23 4-Mar-23 B B
GF,FF & FF
1139 106 ELITE18-CON-CE-CIV-IR-1356 Installatin glass railing & wooden hand rail with all respect 142 2-Mar-23 4-Mar-23 A A
to M
1140 107 ELITE18-CON-CE-CIV-IR-1357 Fixing cubical glass partition & glass door with all respect for baths 142 GF,FF 2-Mar-23 4-Mar-23 B 20-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A A

1141 108 ELITE18-CON-CE-CIV-IR-1358 PCC (1:4:8) for wordrobe upstand 141,142 A&B 2-Mar-23 4-Mar-23 A A

1142 109 ELITE18-CON-CE-CIV-IR-1359 Installation transfer & booster pupm cover with all respect 142 B 2-Mar-23 UR UR

1143 110 ELITE18-CON-CE-CIV-IR-1360 Installation ledge wall top perlino marbal for baths 141 GF,FF 2-Mar-23 4-Mar-23 B B

1144 111 ELITE18-CON-CE-CIV-IR-1361 Fixing cubical glass partition & glass door with all respect for baths 141 GF,FF 2-Mar-23 10-Mar-23 C 1-Apr-23 3-Apr-23 B 10-May-23 16-May-23 C C

1145 112 ELITE18-CON-CE-CIV-IR-1362 Catch basin including MS grate with all respect 141,142 A&B 2-Mar-23 7-Mar-23 B B

1146 113 ELITE18-CON-CE-CIV-IR-1363 2nd coat putty after 1st coat putty for celling paint 142 GF,FF,MR 2-Mar-23 4-Mar-23 B B

1147 114 ELITE18-CON-CE-CIV-IR-1364 Final coat paint after 2nd coat putty for celling paint 142 GF,FF,MR 2-Mar-23 4-Mar-23 A A

1148 115 ELITE18-CON-CE-CIV-IR-1365 Wall tile for kitchen 141,142 A&B 2-Mar-23 7-Mar-23 A A
Enamel paint on MEP accessories transfer pump cover booster pump cover vanity
1149 116 ELITE18-CON-CE-CIV-IR-1366 141,142 A&B 2-Mar-23 6-Mar-23 B B
frames MS loures
2 nos 200mm core cutt for UPVC catch basin & 5 nos 200mm external infra main
1150 117 ELITE18-CON-CE-CIV-IR-1367 141,142 A&B 2-Mar-23 7-Mar-23 B B
hole
1151 118 ELITE18-CON-CE-CIV-IR-1368 2 nos 75mm core cutt for HDF pipe & 1 nos 75mm copper pipe at family lounge 141,142 A&B 2-Mar-23 7-Mar-23 B B

1152 119 ELITE18-CON-CE-CIV-IR-1369 Fixing of access panel in celling 142 B 2-Mar-23 7-Mar-23 A A

1153 120 ELITE18-CON-CE-CIV-IR-1370 Installation HDF floor skirting 142 GF,FF 2-Mar-23 7-Mar-23 A 4-Mar-23 10-Mar-23 B B

1154 121 ELITE18-CON-CE-CIV-IR-1371 Window & doors jambs prepreation plaster 141,142 A&B 4-Mar-23 7-Mar-23 C 6-Apr-23 10-Apr-23 B B

Page 41 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1155 122 ELITE18-CON-CE-CIV-IR-1372 Aluminium windows frames & window glass with all respect 141 GF,FF,MR 4-Mar-23 8-Mar-23 B 7-Apr-23 11-Apr-23 B B

1156 123 ELITE18-CON-CE-CIV-IR-1373 Paint for MS pergola 141,142 A&B 4-Mar-23 14-Mar-23 C 29-Mar-23 31-Mar-23 B B

1157 124 ELITE18-CON-CE-CIV-IR-1374 Paint for MS porch fence 141,142 A&B 4-Mar-23 8-Mar-23 B 3-Apr-23 5-Apr-23 A A

1158 125 ELITE18-CON-CE-CIV-IR-1375 Installation perlino marbal GF to FF & FF to Mumty for stair 141 A 4-Mar-23 7-Mar-23 B B

1159 126 ELITE18-CON-CE-CIV-IR-1376 Installation gypsum board jointing & tapping for celling work dry area 141 A 4-Mar-23 7-Mar-23 B B

1160 127 ELITE18-CON-CE-CIV-IR-1377 Installation moisture risitence bord jointing & tapping for celling work wet area 141 GF,FF 4-Mar-23 7-Mar-23 B B

1161 128 ELITE18-CON-CE-CIV-IR-1378 Inatallation MS vanity frame for baths & powder room 141 A 4-Mar-23 7-Mar-23 B B

1162 129 ELITE18-CON-CE-CIV-IR-1379 Installation perlino marbal for vanity 141 GF,FF 4-Mar-23 7-Mar-23 A A

1163 130 ELITE18-CON-CE-CIV-IR-1380 Plaster work for HDF floor 141 GF,FF 4-Mar-23 10-Mar-23 A A

1164 131 ELITE18-CON-CE-CIV-IR-1381 Installation HDF floor 141 GF,FF 4-Mar-23 27-Jul-23 B B

1165 132 ELITE18-CON-CE-CIV-IR-1382 Installation HDF floor skirting 141 GF,FF 4-Mar-23 UR UR

1166 133 ELITE18-CON-CE-CIV-IR-1383 Primer coat for celling panit 141 GF,FF,MR 4-Mar-23 7-Mar-23 B B

1167 134 ELITE18-CON-CE-CIV-IR-1384 1st coat putty after primer coat for celling paint 141 GF,FF,MR 4-Mar-23 7-Mar-23 A A

1168 135 ELITE18-CON-CE-CIV-IR-1385 2nd coat putty after 1st coat for celling paint 141 GF,FF,MR 4-Mar-23 7-Mar-23 A A

1169 136 ELITE18-CON-CE-CIV-IR-1386 Fixing of access panel in celling 141 A 4-Mar-23 7-Mar-23 A A

1170 137 ELITE18-CON-CE-CIV-IR-1387 1st coat paint after 2nd coat putty for celling paint 141 GF,FF,MR 4-Mar-23 7-Mar-23 A A

1171 138 ELITE18-CON-CE-CIV-IR-1388 2nd coat paint after 1st coat paint for celling paint 141 A 4-Mar-23 7-Mar-23 A A

1172 139 ELITE18-CON-CE-CIV-IR-1389 Final coat paint after 2nd coat paint for celling paint 141 GF,FF,MR 4-Mar-23 14-Mar-23 B B

1173 140 ELITE18-CON-CE-CIV-IR-1390 1st coat paint after 2nd coat putty for internal wall paint 141 GF,FF,MR 4-Mar-23 7-Mar-23 A A

1174 141 ELITE18-CON-CE-CIV-IR-1391 2nd coat paint after 1st coat paint for internal wall paint 141 GF,FF,MR 4-Mar-23 8-Mar-23 A A

1175 142 ELITE18-CON-CE-CIV-IR-1392 Final coat paint after 2nd coat paint for internal wall paint 141 GF,FF,MR 4-Mar-23 14-Mar-23 B 20-Mar-23 UR UR
GF to FF &
1176 143 ELITE18-CON-CE-CIV-IR-1393 Installation glass railling & wooden hand rail with all respect for stair 141 4-Mar-23 7-Mar-23 B 20-Mar-23 UR 7-Jun-23 9-Jun-23 A A
FF to M
1177 144 ELITE18-CON-CE-CIV-IR-1394 Installation transfer & booster pupm cover with all respect 141 A 4-Mar-23 UR UR

1178 145 ELITE18-CON-CE-CIV-IR-1395 Aluminium windows frames & window glass with all respect 141 GF,FF,MR 4-Mar-23 8-Mar-23 C C

1179 146 ELITE18-CON-CE-CIV-IR-1396 Installation perlino marbal skirting for floor 141 GF,FF,MR 4-Mar-23 7-Mar-23 B 23-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 B 12-May-23 15-May-23 A A

1180 147 ELITE18-CON-CE-CIV-IR-1397 Typical perlino marbal on column c-1 mumty floor 141 A 7-Mar-23 8-Mar-23 A A

1181 148 ELITE18-CON-CE-CIV-IR-1398 Installation perlino marbal GF to FF & FF to Mumty for stair 141 A 20-Mar-23 21-Mar-23 A A

1182 149 ELITE18-CON-CE-CIV-IR-1399 Dismentlling floor & wall tile for kitchen 141,142 A&B 11-Apr-23 14-Apr-23 B B

1183 150 ELITE18-CON-CE-CIV-IR-1400 Installation doors wardrobes iron mongries skirting vanity & transition strip final IR 141,142 A&B 6-Jul-23 18-Apr-23 A A

Final inspection of IR's for villa# 141,142 type A&B ref IR's
1184 151 ELITE18-CON-CE-CIV-IR-1401 141,142 A&B 19-Jul-23 8-Aug-23 B B
0033,1258,1320,1303,1337,1316,1282,1324,1359

1185 152 ELITE18-CON-CE-CIV-IR-1402 Dismentlling roof tile skirting for top roof 141,142 A&B 2-Aug-23 9-Aug-23 A A

1186 153 ELITE18-CON-CE-CIV-IR-1403 Installation roof tile skirting for top roof 141,142 A&B 2-Aug-23 9-Aug-23 B B

1187 154 ELITE18-CON-CE-CIV-IR-1404 Instalaltion of pergola with all respect 141,142 A&B 10-Aug-23 12-Aug-23 A A

1188 155 ELITE18-CON-CE-CIV-IR-1405 Instalaltion pavers forexernal side with requst to check list 141 A 15-Sep-23 14-Sep-23 A A

1189 156 ELITE18-CON-CE-CIV-IR-1406 Inspection IR for sky light with all respect 142 B 16-Sep-23 19-Sep-23 A A

1190 157 ELITE18-CON-CE-CIV-IR-1407 Instalaltion crema mo for boundry wall 141 A 16-Sep-23 19-Sep-23 B B

1191 158 ELITE18-CON-CE-CIV-IR-1408 Installation peragola cleat with mechanical bolts all respect 141,142 A&B 9-Dec-23 14-Dec-23 A A

1192

1193

1194

1195

1196

1197 1501 TO 1750 139-140


1198 1 ELITE18-CON-CE-CIV-IR-1501 FDT test sand filling 1st layer for external side 139,140 A&B 1-Dec-22 7-Dec-22 B B
Pudlo plaster & benching for manhole gully trap electrical chamber & electrical
1199 2 ELITE18-CON-CE-CIV-IR-1502 139,140 A&B 1-Dec-22 7-Dec-22 B B
hanhole
1200 3 ELITE18-CON-CE-CIV-IR-1503 Pond test for manhole & gully trap 139,140 A&B 1-Dec-22 7-Dec-22 B B

1201 4 ELITE18-CON-CE-CIV-IR-1504 Block masonory for toe wall 139,140 A&B 1-Dec-22 3-Dec-22 B B

1202 5 ELITE18-CON-CE-CIV-IR-1505 Dismentlling threshold for retrofiting work & debris remove 139,140 A&B 2-Dec-22 7-Dec-22 B B

1203 6 ELITE18-CON-CE-CIV-IR-1506 FDT test sand filling 2nd layer for external side 139,140 A&B 2-Dec-22 7-Dec-22 B B
Base primer for external graffy (elevation 1,2,3,4) boundry wall internal side
1204 7 ELITE18-CON-CE-CIV-IR-1507 139,140 A&B 3-Dec-22 9-Dec-22 C 14-Dec-22 19-Dec-22 B 10-Mar-23 UR 12-May-23 13-May-23 A A
OHWT mumty out side & parapet wall internal side
Graffy after base primer for external side (elevation 1,2,3,4) boundry wall internal
1205 8 ELITE18-CON-CE-CIV-IR-1508 139,140 A&B 3-Dec-22 9-Dec-22 C 14-Dec-22 19-Dec-22 C 10-Mar-23 13-Mar-23 B 20-Mar-23 UR UR
side OHWT mumty out side & parapet wall internal side
1206 9 ELITE18-CON-CE-CIV-IR-1509 Sand top level for external side 139,140 A&B 5-Dec-22 10-Dec-22 A A

1207 10 ELITE18-CON-CE-CIV-IR-1510 PCC top level for external side 139,140 A&B 5-Dec-22 10-Dec-22 A A

1208 11 ELITE18-CON-CE-CIV-IR-1511 Block masonory top level for external side (toe wall) 139,140 A&B 5-Dec-22 7-Dec-22 A A

1209 12 ELITE18-CON-CE-CIV-IR-1512 NSL level & sweet earth top for external side (black side) 139,140 A&B 5-Dec-22 13-Dec-22 A A

Page 42 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1210 13 ELITE18-CON-CE-CIV-IR-1513 Polythene sheet (1000 micron) for externla side 139,140 A&B 5-Dec-22 9-Dec-22 B B

1211 14 ELITE18-CON-CE-CIV-IR-1514 PCC (1:3:6) for external side 140 A&B 5-Dec-22 10-Dec-22 B B

1212 15 ELITE18-CON-CE-CIV-IR-1515 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 139,140 A&B 6-Dec-22 9-Dec-22 B B

1213 16 ELITE18-CON-CE-CIV-IR-1516 Surface preparation for paver in external side 139,140 A&B 6-Dec-22 13-Dec-22 B B

1214 17 ELITE18-CON-CE-CIV-IR-1517 PCC (1:3:6) for external side (resubmit 22-3-23) 139 A 12-Dec-22 21-Dec-22 A A

1215 18 ELITE18-CON-CE-CIV-IR-1518 Inatallation black granite for partition wall external side 139,140 A&B 13-Dec-22 15-Dec-22 B B

1216 19 ELITE18-CON-CE-CIV-IR-1519 07 days cylinder concrete test PCC (1:3:6) external side 139,140 A&B 14-Dec-22 20-Dec-22 B B

1217 20 ELITE18-CON-CE-CIV-IR-1520 Grout filling B/W girder & slab 139,140 A&B 14-Dec-22 15-Dec-22 B B

1218 21 ELITE18-CON-CE-CIV-IR-1521 SBR for columns beam GF,FF & slab thicknesss increse FF,top roof 139,140 A&B 15-Dec-22 19-Dec-22 B B

1219 22 ELITE18-CON-CE-CIV-IR-1522 Block masonory for internal side 139,140 GF,FF 30-Dec-22 UR UR

1220 23 ELITE18-CON-CE-CIV-IR-1523 Plaster columns c-01 for kitchen & debris remove 140 B 2-Jan-23 7-Jan-23 C C

1221 24 ELITE18-CON-CE-CIV-IR-1524 Plaster columns c-01 for kitchen 140 B 2-Jan-23 7-Jan-23 C C

1222 25 ELITE18-CON-CE-CIV-IR-1525 28 days cylinder concrete test PCC (1:3:6) external side 139,140 A&B 4-Jan-23 7-Jan-23 B B

1223 26 ELITE18-CON-CE-CIV-IR-1526 Dismentlling chiping plaster for external side elevation 1,2,3,4 139,140 A&B 5-Jan-23 7-Jan-23 B B

1224 27 ELITE18-CON-CE-CIV-IR-1527 Cracks repair with sika rep for external side elevation 1,2,3,4 139,140 A&B 5-Jan-23 7-Jan-23 B B

1225 28 ELITE18-CON-CE-CIV-IR-1528 Plaster patch work for external walls elevation 1,2,3,4 139,140 A&B 5-Jan-23 7-Jan-23 B B
GF,FF & FF
1226 29 ELITE18-CON-CE-CIV-IR-1529 Dismentlling perlino marbal for stair 139,140 10-Jan-23 14-Jan-23 B B
to M
GF,FF & FF
1227 30 ELITE18-CON-CE-CIV-IR-1530 Dismentlling perlino marbal skirting for stair 139,140 10-Jan-23 14-Jan-23 B B
to M
1228 31 ELITE18-CON-CE-CIV-IR-1531 Plaster floor tile for bath & powder room 139,140 GF,FF 10-Jan-23 12-Jan-23 C C

1229 32 ELITE18-CON-CE-CIV-IR-1532 Installation perlino marbal for floor 140 GF 10-Jan-23 12-Jan-23 B 25-Mar-23 28-Mar-23 B B

1230 33 ELITE18-CON-CE-CIV-IR-1533 Installation suspension & framming system for celling work dry area 140 B 18-Jan-23 21-Jan-23 B 25-Mar-23 28-Mar-23 B B

1231 34 ELITE18-CON-CE-CIV-IR-1534 Dismentlling perlino marble for FF Family lounge 140 B 18-Jan-23 21-Jan-23 A A

1232 35 ELITE18-CON-CE-CIV-IR-1535 Installation perlino marbal at ff family lounge 140 B 18-Jan-23 21-Jan-23 B 25-Mar-23 28-Mar-23 B B

1233 36 ELITE18-CON-CE-CIV-IR-1536 Block masonory for mechnical wall 139,140 GF,FF 21-Jan-23 24-Jan-23 A A

1234 37 ELITE18-CON-CE-CIV-IR-1537 Block masonory for internal side duct 139,140 GF,FF,TR 2-Feb-23 4-Feb-23 A A

1235 38 ELITE18-CON-CE-CIV-IR-1538 Plaster & corner bits for retrofiting work columns & walls 140 B 9-Feb-23 11-Feb-23 C 23-Feb-23 28-Feb-23 B B

1236 39 ELITE18-CON-CE-CIV-IR-1539 Plaster for internal walls 140 GF 9-Feb-23 11-Feb-23 C 10-Mar-23 13-Mar-23 A A

1237 40 ELITE18-CON-CE-CIV-IR-1540 Dismentlling of window-4 bed-1 139 GF 11-Feb-23 22-Feb-23 A A

1238 41 ELITE18-CON-CE-CIV-IR-1541 Plaster for window-4 jam bed-1 139 GF 11-Feb-23 22-Feb-23 A A

1239 42 ELITE18-CON-CE-CIV-IR-1542 Plaster & corner bits for retrofiting work columns & walls 139 GF,FF 24-Feb-23 28-Feb-23 A A

1240 43 ELITE18-CON-CE-CIV-IR-1543 Plaster patch work for internal walls 139,140 GF,FF,MR 2-Mar-23 4-Mar-23 A A

1241 44 ELITE18-CON-CE-CIV-IR-1544 PCC (1:4:8) for wordrobe upstand 139,140 A&B 7-Mar-23 10-Mar-23 A A

1242 45 ELITE18-CON-CE-CIV-IR-1545
Dismentlling material concrete+block masonory & excavated metrial sand
1243 46 ELITE18-CON-CE-CIV-IR-1546 139,140 A&B 7-Apr-23 11-Apr-23 C 12-May-23 16-May-23 C 24-May-23 A A
removing dispose of from alocated area
1244 47 ELITE18-CON-CE-CIV-IR-1547 Plaster work & wall monunted cement board for cistern flushing tank 139,140 GF,FF 10-Mar-23 13-Mar-23 A A

1245 48 ELITE18-CON-CE-CIV-IR-1548 1st coat weather sheet after graffy for external side elevation 1,2,3,4 bundry wall 139,140 A&B 10-Mar-23 13-Mar-23 B 11-May-23 13-May-23 B B

1246 49 ELITE18-CON-CE-CIV-IR-1549 2nd coat weather sheet after graffy for external side elevation 1,2,3,4 bundry wall 139,140 A&B 10-Mar-23 13-Mar-23 C 10-May-23 13-May-23 C 3-Jun-23 7-Jun-23 C C

1247 50 ELITE18-CON-CE-CIV-IR-1550 Peragola jointing with all respect 139,140 A&B 10-Mar-23 13-Mar-23 A A

1248 51 ELITE18-CON-CE-CIV-IR-1551 Window jambs prepration plaster 139,140 A&B 10-Mar-23 13-Mar-23 C 6-Apr-23 10-Apr-23 B B

1249 52 ELITE18-CON-CE-CIV-IR-1552 Installation Aluminium doors with all respect for kitchen & mumty 139,140 A&B 10-Mar-23 13-Mar-23 B 12-May-23 13-May-23 B 7-Jun-23 9-Jun-23 A A

1250 53 ELITE18-CON-CE-CIV-IR-1553 Cementitious coat for bath & powder room water profing 139,140 GF,FF 10-Mar-23 13-Mar-23 C 29-Mar-23 31-Mar-23 C 12-May-23 13-May-23 B 18-Aug-23 22-Aug-23 C C

1251 54 ELITE18-CON-CE-CIV-IR-1554 MS pergagola bulkhead with paint cement board sheet 139 A 10-Mar-23 13-Mar-23 C 29-Mar-23 31-Mar-23 A A

1252 55 ELITE18-CON-CE-CIV-IR-1555 Installation OHWT cover & concrete uper side 140 B 10-Mar-23 13-Mar-23 B 12-May-23 13-May-23 A A

1253 56 ELITE18-CON-CE-CIV-IR-1556 Block masonory for OHWT 139,140 A&B 10-Mar-23 13-Mar-23 A A

1254 57 ELITE18-CON-CE-CIV-IR-1557 Plaster for under the OHWT 139,140 A&B 10-Mar-23 15-Mar-23 B B

1255 58 ELITE18-CON-CE-CIV-IR-1558 Installation perlino marbal for floor & floor skirting with all respect 139,140 A 10-Mar-23 13-Mar-23 B 11-May-23 13-May-23 A A

1256 59 ELITE18-CON-CE-CIV-IR-1559

1257 60 ELITE18-CON-CE-CIV-IR-1560 Installation perlino marbal for stair skirting with all respect 139,140 A&B 10-Mar-23 13-Mar-23 B 4-Apr-23 7-Apr-23 B 10-May-23 13-May-23 B B

1258 61 ELITE18-CON-CE-CIV-IR-1561 Plaster & roof tile for top roof floor 139,140 A&B 10-Mar-23 13-Mar-23 B B

1259 62 ELITE18-CON-CE-CIV-IR-1562 Jumbolon XPS bord 50mm & polythene sheet laying for top roof 139,140 A&B 10-Mar-23 13-Mar-23 C 22-Mar-23 24-Mar-23 B B

Installation suspensin & framming system for celling work GF,FF & MR
1260 63 ELITE18-CON-CE-CIV-IR-1563 139,140 GF,FF,MR 10-Mar-23 13-Mar-23 B B
installation risitence bord jointing & tapping for celling work dry area
Installation suspensin & framming system for celling work GF,FF & installation
1261 64 ELITE18-CON-CE-CIV-IR-1564 139,140 GF,FF 10-Mar-23 13-Mar-23 C 25-Mar-23 28-Mar-23 B 10-May-23 13-May-23 B B
risitence bord jointing & tapping for celling work wet area
1262 65 ELITE18-CON-CE-CIV-IR-1565 Bath floor tile & wall tile 139,140 GF,FF 10-Mar-23 13-Mar-23 A A

1263 66 ELITE18-CON-CE-CIV-IR-1566 Kitchen floor tile & wall tile 139,140 GF 10-Mar-23 13-Mar-23 B B

1264 67 ELITE18-CON-CE-CIV-IR-1567 Perlino marbal for meter box top & boundry wall column top ele-2 139,140 A&B 10-Mar-23 13-Mar-23 C 25-Mar-23 28-Mar-23 A A

Page 43 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1265 68 ELITE18-CON-CE-CIV-IR-1568 Installation pavers for external side 139,140 A&B 11-Mar-23 14-Mar-23 B 3-Apr-23 5-Apr-23 A A

1266 69 ELITE18-CON-CE-CIV-IR-1569 Installation pavers skirting for external side 139,140 A&B 11-Mar-23 14-Mar-23 C 3-Apr-23 5-Apr-23 A A

1267 70 ELITE18-CON-CE-CIV-IR-1570 Installation curb stone for external side 139,140 A&B 11-Mar-23 14-Mar-23 B B

1268 71 ELITE18-CON-CE-CIV-IR-1571 Installation black granite window sill 139,140 A&B 11-Mar-23 15-Mar-23 B 20-Mar-23 21-Mar-23 B 7-Apr-23 10-Apr-23 B 12-May-23 13-May-23 A A

1269 72 ELITE18-CON-CE-CIV-IR-1572 Installation black granite vertical window sill 139,140 A&B 11-Mar-23 15-Mar-23 B 20-Mar-23 21-Mar-23 A A

1270 73 ELITE18-CON-CE-CIV-IR-1573 Installation ledge wall top perlino marbal for baths 139,140 GF,FF 11-Mar-23 15-Mar-23 B 20-Mar-23 21-Mar-23 A A

1271 74 ELITE18-CON-CE-CIV-IR-1574 Surface clearence & primer coat for internal paint 139,140 GF,FF,MR 11-Mar-23 14-Mar-23 A A

1272 75 ELITE18-CON-CE-CIV-IR-1575 2nd coat paint after paint 1st coat for internal paint 139,140 A&B 11-Mar-23 22-Mar-23 A 20-Mar-23 UR UR

1273 76 ELITE18-CON-CE-CIV-IR-1576 Typical perlino marbal on column c-1 mumty floor 139 A 11-Mar-23 14-Mar-23 A A

1274 77 ELITE18-CON-CE-CIV-IR-1577 Plaster work & wall monunted cement board for cistern flushing tank 139,140 GF,FF 11-Mar-23 15-Mar-23 A A

1275 78 ELITE18-CON-CE-CIV-IR-1578 Installation OHWT cover & concrete uper side 139 A 22-Mar-23 24-Mar-23 B B

1276 79 ELITE18-CON-CE-CIV-IR-1579 Installation threshold perlino marbal 139 GF,FF,MR 25-Mar-23 28-Mar-23 A A

1277 80 ELITE18-CON-CE-CIV-IR-1580 Installation perlino marbal for stair skirting with all respect 139 A 25-Mar-23 28-Mar-23 B 4-Apr-23 7-Apr-23 B 10-May-23 13-May-23 B B

1278 81 ELITE18-CON-CE-CIV-IR-1581 Installation crème mo for boundry wall 139,140 A&B 25-Mar-23 28-Mar-23 B B

1279 82 ELITE18-CON-CE-CIV-IR-1582 Installation black granite strip for shower 139,140 A&B 25-Mar-23 28-Mar-23 A A

1280 83 ELITE18-CON-CE-CIV-IR-1583 Fixing cubical glass partition & glass door with all respect for bath 139 GF,FF 25-Mar-23 28-Mar-23 B B

1281 84 ELITE18-CON-CE-CIV-IR-1584 Fixing cubical glass partition & glass door with all respect for bath 140 GF,FF 25-Mar-23 28-Mar-23 C 3-Apr-23 5-Apr-23 A 10-May-23 13-May-23 C C
GF to FF &
1282 85 ELITE18-CON-CE-CIV-IR-1585 Installation glass railing & wooden hand rail all respect for stair 139 25-Mar-23 28-Mar-23 B B
FF to M
GF to FF &
1283 86 ELITE18-CON-CE-CIV-IR-1586 Installation glass railing & wooden hand rail all respect for stair 140 25-Mar-23 28-Mar-23 A A
FF to M
1284 87 ELITE18-CON-CE-CIV-IR-1587 1st coat putty after primer for internal paint 139,140 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1285 88 ELITE18-CON-CE-CIV-IR-1588 2nd coat putty after 1st coat putty for internal paint 139,140 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1286 89 ELITE18-CON-CE-CIV-IR-1589 Primer coat for celling paint 139,140 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1287 90 ELITE18-CON-CE-CIV-IR-1590 1st coat putty after primer for celling paint 139,140 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1288 91 ELITE18-CON-CE-CIV-IR-1591 2nd coat putty after 1st coat putty for celling paint 139,140 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1289 92 ELITE18-CON-CE-CIV-IR-1592 Final coat paint for celling paint 139,140 GF,FF,MR 28-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 B B

1290 93 ELITE18-CON-CE-CIV-IR-1593 Installation transfer & booster pump cover with all respect 139,140 A&B 28-Mar-23 29-Mar-23 C 6-Apr-23 11-Apr-23 A A

1291 94 ELITE18-CON-CE-CIV-IR-1594 Installation MS louvers under the OHWT with all respect 139,140 A&B 28-Mar-23 29-Mar-23 A A

1292 95 ELITE18-CON-CE-CIV-IR-1595 Gola around the curb stone 139,140 A&B 28-Mar-23 29-Mar-23 A A

1293 96 ELITE18-CON-CE-CIV-IR-1596 PCC (1:3:6) under curb stone 139,140 A&B 28-Mar-23 30-Mar-23 A A

1294 97 ELITE18-CON-CE-CIV-IR-1597 Installation MS vanity frame for baths & powder room 139,140 A&B 28-Mar-23 29-Mar-23 A A

1295 98 ELITE18-CON-CE-CIV-IR-1598 Installation vanity perlino marbal for baths & powder room 139,140 A&B 28-Mar-23 29-Mar-23 A A

1296 99 ELITE18-CON-CE-CIV-IR-1599 Installation vanity miror for baths & powder room 139,140 A&B 28-Mar-23 29-Mar-23 B 12-May-23 13-May-23 A A

1297 100 ELITE18-CON-CE-CIV-IR-1600 Plaster for HDF floor 139,140 GF,FF 28-Mar-23 29-Mar-23 A A

1298 101 ELITE18-CON-CE-CIV-IR-1601 Plaster for HDF floor 139,140 A&B 28-Mar-23 29-Mar-23 B B

1299 102 ELITE18-CON-CE-CIV-IR-1602 Installaion HDF floor skirtig 139,140 GF,FF 28-Mar-23 29-Mar-23 C C

1300 103 ELITE18-CON-CE-CIV-IR-1603 Catch basin including MS gratewith all respect 139,140 A&B 28-Mar-23 29-Mar-23 B B
2 nos 200mm core cutt for UPVC cath basin & 5 nos 200mm external infra main
1301 104 ELITE18-CON-CE-CIV-IR-1604 139,140 A&B 28-Mar-23 7-Apr-23 B B
hole
1302 105 ELITE18-CON-CE-CIV-IR-1605 2 nos 75mm core cutt for HDP pipe & 1 nos 75mm copper pipe at family lounge 139,140 A&B 28-Mar-23 7-Apr-23 A A
Installation cover manhole gully trap electrical chamber & electrical handhole with
1303 106 ELITE18-CON-CE-CIV-IR-1606 139,140 A&B 28-Mar-23 29-Mar-23 C 5-May-23 8-May-23 B B
paint
1304 107 ELITE18-CON-CE-CIV-IR-1607 Installation cover for UGWT with paint 139,140 A&B 29-Mar-23 31-Mar-23 A A

1305 108 ELITE18-CON-CE-CIV-IR-1608 Paint for MS pergola 139,140 A&B 29-Mar-23 31-Mar-23 C 3-Apr-23 5-Apr-23 A A

1306 109 ELITE18-CON-CE-CIV-IR-1609 Installation MS grating for main gate 139,140 A&B 29-Mar-23 31-Mar-23 A A

1307 110 ELITE18-CON-CE-CIV-IR-1610 Paint for MS porch fence 139,140 A&B 29-Mar-23 31-Mar-23 B 3-Apr-23 5-Apr-23 A A

1308 111 ELITE18-CON-CE-CIV-IR-1611 Fixing of access panel in celling 139,140 A&B 29-Mar-23 31-Mar-23 B B
1st coat paint after 2nd coat putty for internal paint GF,FF,MR with request to
1309 112 ELITE18-CON-CE-CIV-IR-1612 139,140 A&B 3-Apr-23 5-Apr-23 A A
check list
2nd coat paint after 1st coat paint for internal paint GF,FF,MR with request to
1310 113 ELITE18-CON-CE-CIV-IR-1613 139,140 A&B 3-Apr-23 6-Apr-23 B B
check list
Final coat paint after 2nd coat paint for internal paint GF,FF,MR with request to
1311 114 ELITE18-CON-CE-CIV-IR-1614 139,140 A&B 3-Apr-23 6-Apr-23 B B
check list
Installation suspension & framming system for celling work GF,FF,MR &
1312 115 ELITE18-CON-CE-CIV-IR-1615 installation gypsum board jointing & tapping for celling work dry area GF,FF,MR 139 A 3-Apr-23 5-Apr-23 A 10-May-23 13-May-23 C C
with request to check list
1313 116 ELITE18-CON-CE-CIV-IR-1616 Bath floor tile & wall tile GF,FF with respect to check list 139 A 7-Apr-23 11-Apr-23 C 13-Apr-23 2-May-23 A A

1314 117 ELITE18-CON-CE-CIV-IR-1617 Installation floor tile for maid room 139,140 A&B 7-Apr-23 10-Apr-23 B B

1315 118 ELITE18-CON-CE-CIV-IR-1618 Installtion floor skirting for maid room 139,140 A&B 7-Apr-23 10-Apr-23 A A

1316 119 ELITE18-CON-CE-CIV-IR-1619 Installation kerb stone for external side elevation 2 139,140 A&B 8-Apr-23 12-Apr-23 A A

1317 120 ELITE18-CON-CE-CIV-IR-1620 Dismentlling floor & wall tile for kitchen 139,140 A&B 11-Apr-23 14-Apr-23 B B

1318 121 ELITE18-CON-CE-CIV-IR-1621 Installation split stone for external side 139,140 A&B 13-Apr-23 15-Apr-23 B 19-May-23 19-May-23 B B

1319 122 ELITE18-CON-CE-CIV-IR-1622 Installation windows frames & windows glass 139,140 A&B 3-May-23 8-May-23 B B

Page 44 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1320 123 ELITE18-CON-CE-CIV-IR-1623 Installation crema mo for boundry wall 139,140 A&B 8-May-23 13-May-23 B B

1321 124 ELITE18-CON-CE-CIV-IR-1624 Installation threshold perlino marbal 140 Mumty 10-May-23 13-May-23 A A

1322 125 ELITE18-CON-CE-CIV-IR-1625 Instalaltion floor & wall tile for maid bath 139,140 A&B 10-May-23 13-May-23 B B

1323 126 ELITE18-CON-CE-CIV-IR-1626 Installation doors wardrobes iron mongries skirting vanity & transition strip final IR 139,140 A&B 6-Jul-23 18-Jul-23 A A
Final inspection of IR's for villa# 139,140 type A&B ref IR's
1324 127 ELITE18-CON-CE-CIV-IR-1627 1583,1615,1564,1548,1549,1558,1560,1580,1625,1611,1603,1599,1553,1585,1586 139,140 A&B 19-Jul-23 22-Jul-23 B B
,1578
1325 128 ELITE18-CON-CE-CIV-IR-1628 Dismentlling roof tile skirting for top roof 139,140 A&B 2-Aug-23 9-Aug-23 A A

1326 129 ELITE18-CON-CE-CIV-IR-1629 Installation roof tile skirting for top roof 139,140 A&B 2-Aug-23 9-Aug-23 B B

1327 130 ELITE18-CON-CE-CIV-IR-1630 Instalaltion of pergola with all respect 139,140 A&B 10-Aug-23 12-Aug-23 A A

1328 131 ELITE18-CON-CE-CIV-IR-1631 Cracks repair plaster for internal walls 139,140 A&B 17-Aug-23 23-Aug-23 C C

1329 132 ELITE18-CON-CE-CIV-IR-1632 Cracks repair paint for internal walls 139,140 A&B 17-Aug-23 23-Aug-23 C C

1330 133 ELITE18-CON-CE-CIV-IR-1633 Pond test for baths 139,140 A&B 18-Aug-23 22-Aug-23 A A

1331 134 ELITE18-CON-CE-CIV-IR-1634 Dismentlling boundry wall PCC kurb stone & pavers for pilling rework 139,140 A&B 8-Sep-23 13-Sep-23 C 23-Sep-23 27-Sep-23 A A

1332 135 ELITE18-CON-CE-CIV-IR-1635 Inspection of ir's for villa#139,140 ref ir's (1289,1623,1570,1568) 139,140 A&B 15-Sep-23 16-Sep-23 A A

1333 136 ELITE18-CON-CE-CIV-IR-1636 Remove sand for pilling rework 139,140 A&B 23-Sep-23 27-Sep-23 A A

1334 137 ELITE18-CON-CE-CIV-IR-1637 PCC (1:4:8) for boundry wall 139,140 A&B 10-Oct-23 11-Oct-23 B B

1335 138 ELITE18-CON-CE-CIV-IR-1638 NSL level & excavation for boundry wall rework 139,140 A&B 11-Oct-23 24-Oct-23 A A

1336 139 ELITE18-CON-CE-CIV-IR-1639 PCC & RCC bed top level for boundry wall rework 139,140 A&B 11-Oct-23 24-Oct-23 A A

1337 140 ELITE18-CON-CE-CIV-IR-1640 07 days cylinder concrete test PCC (1:4:8) boundry wall bed re work 139,140 A&B 13-Oct-23 19-Oct-23 A A

1338 141 ELITE18-CON-CE-CIV-IR-1641 Form work & RCC concrete (1:2:4) for boundry wall bed 139,140 A&B 13-Oct-23 19-Oct-23 B B

1339 142 ELITE18-CON-CE-CIV-IR-1642 Steel for boundry wall bed 139,140 A&B 13-Oct-23 19-Oct-23 A A

1340 143 ELITE18-CON-CE-CIV-IR-1643 07 days cylinder concrete test RCC (1:2:4) boundry wall bed re work 139,140 A&B 16-Oct-23 19-Oct-23 A A

1341 144 ELITE18-CON-CE-CIV-IR-1644 Form work & RCC concrete (1:2:4) for boundry wall top capping beam 139,140 A&B 18-Oct-23 21-Oct-23 B B

1342 145 ELITE18-CON-CE-CIV-IR-1645 Steel for boundry top capping beam 139,140 A&B 18-Oct-23 21-Oct-23 A A

1343 146 ELITE18-CON-CE-CIV-IR-1646 7 days cylinder concrete test RCC (1:2:4) boundry wall bed re work 139,140 A&B 21-Oct-23 6-Nov-23 A A

147 ELITE18-CON-CE-CIV-IR-1647 28 days cylinder concrete test PCC (1:4:8) boundry wall re work 139,140 A&B 3-Nov-23 7-Nov-23 A A

148 ELITE18-CON-CE-CIV-IR-1648 28 days cylinder concrete test RCC (1:2:4) boundry wall bed re work 139,140 A&B 6-Nov-23 11-Nov-23 A A

149 ELITE18-CON-CE-CIV-IR-1649 28 days cylinder concrete test RCC (1:2:4) boundry wall top chapping beam 139,140 A&B 11-Nov-23 23-Nov-23 B B

150 ELITE18-CON-CE-CIV-IR-1650 Installation peragola cleat with mechanical bolts all respect 139,140 A&B 9-Dec-23 14-Dec-23 A A

151 ELITE18-CON-CE-CIV-IR-1651 Block masonary for boundary wall rework 139,140 A&B 18-Dec-23 20-Dec-23 B B

152 ELITE18-CON-CE-CIV-IR-1652 Plaster for boundary wall rework 139,140 A&B 18-Dec-23 20-Dec-23 B B

153 ELITE18-CON-CE-CIV-IR-1653 Dismentling block masonary for bondary wall 140 B 22-Dec-23 26-Dec-23 B B

1344

1345 1751 TO 2000 137-138


1346 1 ELITE18-CON-CE-CIV-IR-1751 Dismentlling threshold for retrofiting work & debris remove 137,138 A&B 2-Dec-22 7-Dec-22 B B

1347 2 ELITE18-CON-CE-CIV-IR-1752 28 days cylinder concrete test RCC (3000 psi) floating slab 137,138 A&B 3-Dec-22 7-Dec-22 B B

1348 3 ELITE18-CON-CE-CIV-IR-1753 FDT test 1st layer sand filling for external side 137,138 A&B 3-Dec-22 9-Dec-22 C 6-Mar-23 10-Mar-23 A A

1349 4 ELITE18-CON-CE-CIV-IR-1754 FDT test 2nd layer sand filling for external side 137,138 A&B 5-Dec-22 9-Dec-22 C 6-Mar-23 10-Mar-23 A A

1350 5 ELITE18-CON-CE-CIV-IR-1755 Polythene sheet (1000 micron) for external side 137,138 A&B 5-Dec-22 9-Dec-22 C 11-Mar-23 15-Mar-23 A A

1351 6 ELITE18-CON-CE-CIV-IR-1756 PCC (1:3:6) for external side 137,138 A&B 5-Dec-22 9-Dec-22 C 11-Mar-23 15-Mar-23 B B
Base primer for external graffy (elevation 1,2,3,4) boundry wall internal side
1352 7 ELITE18-CON-CE-CIV-IR-1757 137,138 A&B 5-Dec-22 9-Dec-22 C 14-Dec-22 19-Dec-22 C 7-Mar-23 10-Apr-23 B 12-May-23 13-May-23 A A
OHWT mumty out side & parapet wall internal side
Graffy after base primer for external side (elevation 1,2,3,4) boundry wall internal
1353 8 ELITE18-CON-CE-CIV-IR-1758 137,138 A&B 5-Dec-22 9-Dec-22 C 14-Dec-22 19-Dec-22 C 7-Mar-23 10-Apr-23 B 12-May-23 13-May-23 A A
side OHWT mumty out side & parapet wall internal side
1354 9 ELITE18-CON-CE-CIV-IR-1759 PCC (1:4:8) for manhole gully trap electrical chmber & electrical handhole 137,138 A&B 5-Dec-22 9-Dec-22 B B

1355 10 ELITE18-CON-CE-CIV-IR-1760 PCC (1:3:6) for manhole gully trap electrical chmber & electrical handhole 137,138 A&B 5-Dec-22 9-Dec-22 B B

1356 11 ELITE18-CON-CE-CIV-IR-1761 Block masnonry for manhole gully trap electrical chamber & electrical handhole 137,138 A&B 13-Dec-22 15-Dec-22 B B
Graffy after base primer for external side (elevation 1,2,3,4) boundry wall internal
1357 12 ELITE18-CON-CE-CIV-IR-1762 137,138 A&B 9-Dec-22 13-Dec-22 C C
side OHWT mumty out side & parapet wall internal side
1358 13 ELITE18-CON-CE-CIV-IR-1763 Dismentlling ceilling with all respect for retrofitting work 137,138 A&B 6-Dec-22 9-Dec-22 B B

1359 14 ELITE18-CON-CE-CIV-IR-1764 28 days cylinder concrete test RCC (4000 psi) retrofitting beam 137,138 A&B 7-Dec-22 14-Dec-22 B B

1360 15 ELITE18-CON-CE-CIV-IR-1765 Block masnonry for toe wall 137,138 A&B 12-Dec-22 15-Dec-22 B B

1361 16 ELITE18-CON-CE-CIV-IR-1766 Grout filling B/W girder & slab 137,138 A&B 14-Dec-22 15-Dec-22 B B

1362 17 ELITE18-CON-CE-CIV-IR-1767 SBR for columns beam GF,FF & slab thicknesss increse FF,top roof 137,138 A&B 15-Dec-22 19-Dec-22 B B

1363 18 ELITE18-CON-CE-CIV-IR-1768 Pond test for top roof 137,138 A&B 23-Dec-22 29-Dec-22 C 5-Jan-23 7-Jan-23 B B

1364 19 ELITE18-CON-CE-CIV-IR-1769 Installation black granite with filling for partition wall external side 137,138 A&B 28-Dec-22 2-Jan-23 C 28-Mar-23 29-Mar-23 C 10-May-23 13-May-23 B 5-Jun-23 7-Jun-23 C C

1365 20 ELITE18-CON-CE-CIV-IR-1770 Block masonory for internal side 137,138 GF,FF 30-Dec-22 5-Jan-23 B B

1366 21 ELITE18-CON-CE-CIV-IR-1771 Plaster & corner bits for internal walls & columns 137 GF,FF 5-Jan-23 7-Jan-23 C 3-Feb-23 8-Feb-23 C 8-Feb-23 10-Feb-23 C 1-Mar-23 3-Mar-23 A A

Page 45 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
GF,FF & FF
1367 22 ELITE18-CON-CE-CIV-IR-1772 Dismentlling perlino marbal for stair 137,138 10-Jan-23 14-Jan-23 B B
to M
GF,FF & FF
1368 23 ELITE18-CON-CE-CIV-IR-1773 Dismentlling perlino marbal skirting for stair 137,138 10-Jan-23 14-Jan-23 B B
to M
1369 24 ELITE18-CON-CE-CIV-IR-1774 Plaster floor tile for bath & powder room 137,138 GF,FF 10-Jan-23 12-Jan-23 C 6-Apr-23 10-Apr-23 C 11-Apr-23 2-May-23 B B

1370 25 ELITE18-CON-CE-CIV-IR-1775 Block masonory for mechnical wall 137,138 GF,FF 21-Jan-23 24-Jan-23 B B

1371 26 ELITE18-CON-CE-CIV-IR-1776 Block masonory for internal side duct 137,138 GF,FF,TR 2-Feb-23 4-Feb-23 A A

1372 27 ELITE18-CON-CE-CIV-IR-1777 Plaster & corner bits for retrofiting work columns & walls 137 GF,FF 8-Feb-23 10-Feb-23 C 1-Mar-23 3-Mar-23 A A

1373 28 ELITE18-CON-CE-CIV-IR-1778 Plaster patch for internal walls 137 GF,FF,MR 8-Feb-23 10-Feb-23 C 2-Mar-23 4-Mar-23 A A

1374 29 ELITE18-CON-CE-CIV-IR-1779 Dismentling of window-4 bed-1 137 GF 11-Feb-23 22-Feb-23 A A

1375 30 ELITE18-CON-CE-CIV-IR-1780 Plaster for internal walls & columns 138 B 27-Feb-23 2-Mar-23 B B

1376 31 ELITE18-CON-CE-CIV-IR-1781 Plaster & corner bits for retrofiting work columns & walls 138 GF,FF 27-Feb-23 2-Mar-23 B B
Pudlo plaster & benching for manhole gully trap electrical chamber & electrical
1377 32 ELITE18-CON-CE-CIV-IR-1782 137,138 A&B 1-Mar-23 4-Mar-23 A A
handhole
1378 33 ELITE18-CON-CE-CIV-IR-1783 Primer coat & membranes bituminous sheet for extrnal side 137,138 A&B 2-Mar-23 4-Mar-23 A A

1379 34 ELITE18-CON-CE-CIV-IR-1784 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 137,138 A&B 2-Mar-23 4-Mar-23 B B

1380 35 ELITE18-CON-CE-CIV-IR-1785 PCC (1:4:8) for wordrobe upstand 137,138 A&B 7-Mar-23 10-Mar-23 A A

1381 36 ELITE18-CON-CE-CIV-IR-1786 Plaster patch for internal walls 138 GF,FF,MR 10-Mar-23 UR UR

1382 37 ELITE18-CON-CE-CIV-IR-1787 Plaster patch for externla walls elevation 1,2,3,4 137,138 A&B 8-Jun-23 9-Jun-23 A A
Dismentlling material concrete+block masonory & excavated metrial sand
1383 38 ELITE18-CON-CE-CIV-IR-1788 137,138 A&B 10-Mar-23 20-Mar-23 C 6-Apr-23 11-Apr-23 C 12-May-23 16-May-23 C 24-May-23 A A
removing dispose of from alocated area
1384 39 ELITE18-CON-CE-CIV-IR-1789 Block masonory for OHWT 137,138 A&B 10-Mar-23 14-Mar-23 A A

1385 40 ELITE18-CON-CE-CIV-IR-1790 Plaster for under the OHWT 137,138 A&B 10-Mar-23 15-Mar-23 B B

1386 41 ELITE18-CON-CE-CIV-IR-1791 Installation perlino marbal for floor skirting with all respect 137,138 A&B 10-Mar-23 15-Mar-23 C 28-Mar-23 29-Mar-23 C 4-Apr-23 6-Apr-23 B 10-May-23 13-May-23 B B

1387 42 ELITE18-CON-CE-CIV-IR-1792 Plaster & roof tile for top roof floor 137,138 A&B 10-Mar-23 21-Mar-23 B B

1388 43 ELITE18-CON-CE-CIV-IR-1793 Jumbolon XPS bord 50mm & polythene sheet laying for top roof 137,138 A&B 10-Mar-23 14-Mar-23 B 22-Mar-23 24-Mar-23 A A
Installation suspensin & framming system for celling work GF,FF & MR
1389 44 ELITE18-CON-CE-CIV-IR-1794 137,138 GF,FF,MR 10-Mar-23 15-Mar-23 C 28-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A A
installation risitence bord jointing & tapping for celling work dry area
Installation suspensin & framming system for celling work GF,FF & MR
1390 45 ELITE18-CON-CE-CIV-IR-1795 137,138 GF,FF 10-Mar-23 15-Mar-23 C 28-Mar-23 29-Mar-23 C 3-Apr-23 5-Apr-23 A 10-May-23 13-May-23 C C
installation risitence bord jointing & tapping for celling work wet area

1391 46 ELITE18-CON-CE-CIV-IR-1796

1392 47 ELITE18-CON-CE-CIV-IR-1797 28 days cylinder concrete test PCC (1:3:6) external side 137,138 A&B 15-Mar-23 21-Mar-23 A A

1393 48 ELITE18-CON-CE-CIV-IR-1798 Installation OHWT cover & concrete uper side 137,138 A&B 22-Mar-23 24-Mar-23 C 29-Mar-23 31-Mar-23 A A

1394 49 ELITE18-CON-CE-CIV-IR-1799 Sand top level for external side 137,138 A&B 22-Mar-23 24-Mar-23 A A

1395 50 ELITE18-CON-CE-CIV-IR-1800 PCC top level for external side 137,138 A&B 22-Mar-23 24-Mar-23 A A

1396 51 ELITE18-CON-CE-CIV-IR-1801 Surface clearence & primer coat for internal paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1397 52 ELITE18-CON-CE-CIV-IR-1802 1st coat putty after primer for internal paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1398 53 ELITE18-CON-CE-CIV-IR-1803 2nd coat putty after 1st coat putty for internal paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 B B

1399 54 ELITE18-CON-CE-CIV-IR-1804 1st coat paint after 2nd coat putty for internal paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 B B

1400 55 ELITE18-CON-CE-CIV-IR-1805 2nd coat paint after 1st coat paint for internal paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 C 3-Apr-23 7-Apr-23 B B

1401 56 ELITE18-CON-CE-CIV-IR-1806 Primer coat for celling paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1402 57 ELITE18-CON-CE-CIV-IR-1807 1st coat putty after primer for celling paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 A A

1403 58 ELITE18-CON-CE-CIV-IR-1808 2nd coat putty after 1st coat putty for celling paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 C 3-Apr-23 6-Apr-23 B B

1404 59 ELITE18-CON-CE-CIV-IR-1809 1st coat paint for celling paint 137,138 GF,FF,MR 28-Mar-23 29-Mar-23 C C

1405 60 ELITE18-CON-CE-CIV-IR-1810 Installation crema mo for boundry wall 137,138 A&B 28-Mar-23 29-Mar-23 B B

1406 61 ELITE18-CON-CE-CIV-IR-1811 Perlino marbal for boundry wall top 137,138 A&B 28-Mar-23 29-Mar-23 B 6-Apr-23 10-Apr-23 C 12-May-23 13-May-23 A A

1407 62 ELITE18-CON-CE-CIV-IR-1812 Installation cover for UGWT with paint 137,138 A&B 29-Mar-23 31-Mar-23 B B

1408 63 ELITE18-CON-CE-CIV-IR-1813 MS peragola bulkhead with paint cement board sheet 137 A 29-Mar-23 31-Mar-23 B B

1409 64 ELITE18-CON-CE-CIV-IR-1814 Peragola jointing with all respect 137,138 A&B 29-Mar-23 31-Mar-23 B B

1410 65 ELITE18-CON-CE-CIV-IR-1815 Installation MS grating for main gate 137,138 A&B 29-Mar-23 31-Mar-23 A A

1411 66 ELITE18-CON-CE-CIV-IR-1816 Paint for MS porch fence 137,138 A&B 29-Mar-23 31-Mar-23 A A

1412 67 ELITE18-CON-CE-CIV-IR-1817 Paint for MS pergola 137,138 A&B 3-Apr-23 5-Apr-23 B B

1413 68 ELITE18-CON-CE-CIV-IR-1818 Installation pavers & pavers skirting for external side with request to check list 137,138 A&B 3-Apr-23 5-Apr-23 B 7-Jun-23 UR UR

1414 69 ELITE18-CON-CE-CIV-IR-1819 28 days cylinder concrete test PCC (1:3:6) external side 137,138 A&B 6-Apr-23 10-Apr-23 B B

1415 70 ELITE18-CON-CE-CIV-IR-1820 Installation transfer & booster pump cover with all respect 137,138 A&B 6-Apr-23 10-Apr-23 C 5-May-23 8-May-23 A A

1416 71 ELITE18-CON-CE-CIV-IR-1821 Window jambs prepration plaster 137,138 A&B 6-Apr-23 10-Apr-23 B B

1417 72 ELITE18-CON-CE-CIV-IR-1822 Plaster for HDF floor 137,138 GF,FF 6-Apr-23 10-Apr-23 A A

1418 73 ELITE18-CON-CE-CIV-IR-1823 Installation MS vanity frame for baths & powder room 137,138 A&B 6-Apr-23 10-Apr-23 A A

1419 74 ELITE18-CON-CE-CIV-IR-1824 Installation vanity perlino marbal for baths & powder room 137,138 A&B 6-Apr-23 10-Apr-23 B B

1420 75 ELITE18-CON-CE-CIV-IR-1825 Installation vanity miror for baths & powder room 137,138 A&B 6-Apr-23 10-Apr-23 A A

1421 76 ELITE18-CON-CE-CIV-IR-1826 Fixing access panel in celling 137,138 A&B 6-Apr-23 10-Apr-23 B B

Page 46 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1422 77 ELITE18-CON-CE-CIV-IR-1827 Installation MS louvers under the OHWT with all respect 137,138 A&B 6-Apr-23 10-Apr-23 A A
GF to FF &
1423 78 ELITE18-CON-CE-CIV-IR-1828 Installation glass railling & wooden hand rail with respect to chak list for stair 137,138 6-Apr-23 10-Apr-23 B 12-May-23 13-May-23 B B
FF to M
1424 79 ELITE18-CON-CE-CIV-IR-1829 Fixing cubical glass partition & glass door with respect to check list for baths 137,138 GF,FF 6-Apr-23 10-Apr-23 B 11-May-23 13-May-23 A A

1425 80 ELITE18-CON-CE-CIV-IR-1830 Kitchen floor tile & wall tile GF with respect to check list 137,138 GF 6-Apr-23 11-Apr-23 C 13-Apr-23 3-May-23 B B

1426 81 ELITE18-CON-CE-CIV-IR-1831 Plaster work & wall mounted cement board for cistern flushing tank 137,138 GF,FF 6-Apr-23 10-Apr-23 A A

1427 82 ELITE18-CON-CE-CIV-IR-1832

1428 83 ELITE18-CON-CE-CIV-IR-1833 Installtion perlino marbal for stair skirting with respect to cheek list 137,138 A&B 7-Apr-23 10-Apr-23 B 10-May-23 13-May-23 C C

1429 84 ELITE18-CON-CE-CIV-IR-1834 Installation floor tile for maid room 137,138 A&B 7-Apr-23 10-Apr-23 B B

1430 85 ELITE18-CON-CE-CIV-IR-1835 Installation floor skirting for maid room 137,138 A&B 7-Apr-23 10-Apr-23 B 10-May-23 13-May-23 B B

1431 86 ELITE18-CON-CE-CIV-IR-1836 Pond test for manhole 137,138 A&B 7-Apr-23 2-May-23 C C

1432 87 ELITE18-CON-CE-CIV-IR-1837 Block masonory for mechnical wall 137,138 GF 7-Apr-23 10-Apr-23 B B

1433 88 ELITE18-CON-CE-CIV-IR-1838 Installation black granite strip for shower cabin 137,138 A&B 7-Apr-23 10-Apr-23 A A

1434 89 ELITE18-CON-CE-CIV-IR-1839 Installation aluminium doors with respect to check list for kitchen & mumty 137,138 A&B 7-Apr-23 10-Apr-23 B 12-May-23 13-May-23 A A

1435 90 ELITE18-CON-CE-CIV-IR-1840 Instalaltion black granite window sill 137,138 GF,FF,MR 7-Apr-23 10-Apr-23 B 11-May-23 13-May-23 B 6-Jun-23 8-Jun-23 B B

1436 91 ELITE18-CON-CE-CIV-IR-1841 Instalaltion black granite vertical window sill 137,138 GF,FF,MR 7-Apr-23 10-Apr-23 B B

1437 92 ELITE18-CON-CE-CIV-IR-1842 Installation kerb stone for external side elevation 2 137,138 A&B 8-Apr-23 12-Apr-23 A A

1438 93 ELITE18-CON-CE-CIV-IR-1843 Dismentlling wall tile for kitchen 137,138 A&B 11-Apr-23 14-Apr-23 B B

1439 94 ELITE18-CON-CE-CIV-IR-1844 Installation perlino marbal thresholdor 137,138 Mumty 13-Apr-23 15-Apr-23 A A

1440 95 ELITE18-CON-CE-CIV-IR-1845 Installation split stone for external side 137,138 A&B 13-Apr-23 15-Apr-23 B 19-May-23 19-May-23 B B

1441 96 ELITE18-CON-CE-CIV-IR-1846 Installation windows frames & windows glass 137,138 A&B 3-May-23 8-May-23 B B

1442 97 ELITE18-CON-CE-CIV-IR-1847 Instalaltion ledge wall top perlino marbal for baths 137,138 GF,FF 5-May-23 8-May-23 B B

1443 98 ELITE18-CON-CE-CIV-IR-1848 Catch basin including MS gratewith all respect 137,138 A&B 5-May-23 8-May-23 B 7-Jun-23 9-Jun-23 C C
Installation cover for manhole gully trap electricla chmber & electrical handhole
1444 99 ELITE18-CON-CE-CIV-IR-1849 137,138 A&B 5-May-23 8-May-23 B B
with paint
1445 100 ELITE18-CON-CE-CIV-IR-1850 PCC (1:3:6) AC outdoor pad & PPRC pad for top roof 137,138 A&B 11-May-23 13-May-23 B B

1446 101 ELITE18-CON-CE-CIV-IR-1851 Final coat paint after 2nd coat paint for internal paint 137,138 GF,FF,MR 10-May-23 13-May-23 C C

1447 102 ELITE18-CON-CE-CIV-IR-1852 Final coat paint after 2nd coat paint for celling paint 137,138 GF,FF,MR 10-May-23 13-May-23 C C
1st coat weather sheet after graffy for external side elevation 1,2,3,4 boundry wall
1448 103 ELITE18-CON-CE-CIV-IR-1853 137,138 A&B 10-May-23 13-May-23 A A
OHWT mumty out side & parapet wall internal side
2nd coat weather sheet after 1st coat for external side elevation 1,2,3,4 boundry
1449 104 ELITE18-CON-CE-CIV-IR-1854 137,138 A&B 10-May-23 13-May-23 C 3-Jun-23 7-Jun-23 C C
wall OHWT mumty out side & parapet wall internal side
1450 105 ELITE18-CON-CE-CIV-IR-1855 Installatin floor & wall tile for maid bath 137,138 A&B 10-May-23 13-May-23 B B

1451 106 ELITE18-CON-CE-CIV-IR-1856 Cracks repair with skia REP for external side elevation 1,2,3,4 137,138 A&B 12-May-23 UR UR

1452 107 ELITE18-CON-CE-CIV-IR-1857 Cementitious Coat For Baths & Powder Room Water Proofing 137,138 GF,FF 12-May-23 13-May-23 C 7-Jun-23 9-Jun-23 C 18-Aug-23 22-Aug-23 A A

1453 108 ELITE18-CON-CE-CIV-IR-1858 Pond test for bath 137,138 FF,MB 15-May-23 22-May-23 B B

1454 109 ELITE18-CON-CE-CIV-IR-1859 Installation doors wardrobes iron mongries skirting vanity & transition strip final IR 137,138 A&B 6-Jul-23 18-Jul-23 A A
Final inspection of IR's for villa# 137,138 type A&B ref IR's
1455 110 ELITE18-CON-CE-CIV-IR-1860 1795,1853,1791,1833,1835,1855,1792,1769,1840,1841,1818,1811,1824,1828,1814 137,138 A&B 19-Jul-23 22-Jul-23 B B
,1826,1848,1820
1456 111 ELITE18-CON-CE-CIV-IR-1861 Dismentlling roof tile skirting for top roof 137,138 A&B 2-Aug-23 9-Aug-23 A A

1457 112 ELITE18-CON-CE-CIV-IR-1862 Installation roof tile skirting for top roof 137,138 A&B 2-Aug-23 9-Aug-23 B B

1458 113 ELITE18-CON-CE-CIV-IR-1863 Instalaltion of pergola with all respect 137,138 A&B 10-Aug-23 12-Aug-23 A A

1459 114 ELITE18-CON-CE-CIV-IR-1864 Pond test for baths 137,138 GF,FF 18-Aug-23 22-Aug-23 A A

1460 115 ELITE18-CON-CE-CIV-IR-1865 IR's for villa 137,138 A&B Ref IR's (1810,1812,1290 137,138 A&B 15-Sep-23 16-Sep-23 A A
Final inspection of IR's for villa# 137,138 type A&B ref IR's
1461 116 ELITE18-CON-CE-CIV-IR-1866 137,138 A&B 27-Sep-23 10-Oct-23 A A
1794,1795,1853,1855,1840,1818,1820
1462 117 ELITE18-CON-CE-CIV-IR-1867 Re installation wardrobe jame frame architrave & transition strip 138 B 13-Oct-23 19-Oct-23 B B

1463 118 ELITE18-CON-CE-CIV-IR-1868 Installation peragola cleat with mechanical bolts all respect 137,138 A&B 9-Dec-23 14-Dec-23 A A

1464

1465

1466

1467

1468 2001 TO 2250 135-136


1469 1 ELITE18-CON-CE-CIV-IR-2001 Dismentlling threshold for retrofiting work & debris remove 135,136 A&B 2-Dec-22 7-Dec-22 B B

1470 2 ELITE18-CON-CE-CIV-IR-2002 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 135,136 FF 3-Dec-22 7-Dec-22 B B

1471 3 ELITE18-CON-CE-CIV-IR-2003 28 days cylinder concrete test PCC (1:4:8) under floating slab 135,136 A&B 5-Dec-22 7-Dec-22 B B

1472 4 ELITE18-CON-CE-CIV-IR-2004 28 days cylinder concrete test RCC (3000 psi) floating slab 135 GF,FF 10-Dec-22 15-Dec-22 B B
Fixing MS beams with MS plates drilling anchoring mechnical & chemeical
1473 5 ELITE18-CON-CE-CIV-IR-2005 135,136 GF,FF 10-Dec-22 15-Dec-22 B B
boulting apoxy with all respect
1474 6 ELITE18-CON-CE-CIV-IR-2006 Primer coat & membranes bituminous sheet for external side 135,136 A&B 14-Dec-22 20-Dec-22 C 24-Feb-23 28-Feb-23 B 8-Mar-23 16-May-23 A A
Base primer for external graffy elevation 1,2,3,4 boundry wall internal side OHWT
1475 7 ELITE18-CON-CE-CIV-IR-2007 135,136 A&B 14-Dec-22 19-Dec-22 C 5-May-23 9-May-23 B B
mumty out side & parapet wall internal side
Graffy after base primer for external side elevation 1,2,3,4 boundry wall internal
1476 8 ELITE18-CON-CE-CIV-IR-2008 135,136 A&B 14-Dec-22 19-Dec-22 C 5-May-23 12-May-23 B B
side OHWT mumty out side & parapet wall internal side

Page 47 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1477 9 ELITE18-CON-CE-CIV-IR-2009 SBR for columns beam GF,FF & slab thicknesss increse FF,top roof 135,136 A&B 15-Dec-22 19-Dec-22 B B

1478 10 ELITE18-CON-CE-CIV-IR-2010 28 days cylinder concrete test RCC (3000 psi) floating slab 136 B 17-Dec-22 22-Dec-22 B B

1479 11 ELITE18-CON-CE-CIV-IR-2011 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 135,136 GF,FF 17-Dec-22 22-Dec-22 B B

1480 12 ELITE18-CON-CE-CIV-IR-2012 Pond test for top roof 135,136 A&B 23-Dec-22 29-Dec-22 C 5-Jan-23 7-Jan-23 B B

1481 13 ELITE18-CON-CE-CIV-IR-2013 Primer coat & membranes bituminous sheet for external side 135,136 A&B 21-Jan-23 24-Jan-23 C 9-May-23 UR UR

1482 14 ELITE18-CON-CE-CIV-IR-2014 Block masonory for internal side retrofiting work 135,136 GF,FF 21-Jan-23 24-Jan-23 B B
Layout & excavation for manhole gully trap,electrical chamber & electrical
1483 15 ELITE18-CON-CE-CIV-IR-2015 135,136 A&B 25-Jan-23 31-Jan-23 A A
handhole
1484 16 ELITE18-CON-CE-CIV-IR-2016 Dismentlling of window-4 bed-1 135 A 16-Feb-23 22-Feb-23 A A

1485 17 ELITE18-CON-CE-CIV-IR-2017 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 135,136 A&B 1-Mar-23 4-Mar-23 A A

1486 18 ELITE18-CON-CE-CIV-IR-2018 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 135,136 A&B 1-Mar-23 4-Mar-23 A A

1487 19 ELITE18-CON-CE-CIV-IR-2019 Block masonory for manhole gully trap electrical chamber & electrical handhole 135,136 A&B 1-Mar-23 4-Mar-23 B B

1488 20 ELITE18-CON-CE-CIV-IR-2020 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 135,136 A&B 2-Mar-23 4-Mar-23 B B

1489 21 ELITE18-CON-CE-CIV-IR-2021 Plaster for internal walls 135 GF 6-Mar-23 7-Mar-23 A A

1490 22 ELITE18-CON-CE-CIV-IR-2022 Plaster & corner bits for retrofiting work columns & walls 135 GF,FF 6-Mar-23 7-Mar-23 A A

1491 23 ELITE18-CON-CE-CIV-IR-2023 PCC (1:4:8) for wordrobe upstand 135,136 A&B 7-Mar-23 10-Mar-23 A A

1492 24 ELITE18-CON-CE-CIV-IR-2024 Plaster & corner bits for retrofiting work columns & walls 136 B 7-Mar-23 10-Mar-23 A A

1493 25 ELITE18-CON-CE-CIV-IR-2025 Plaster patch for internal walls 135,136 GF,FF,MR 20-Mar-23 24-Mar-23 A A

1494 26 ELITE18-CON-CE-CIV-IR-2026 Plaster for internal walls 136 GF 10-Mar-23 UR UR

1495 27 ELITE18-CON-CE-CIV-IR-2027
Dismentlling material concrete+block masonory & excavated metrial sand
1496 28 ELITE18-CON-CE-CIV-IR-2028 135,136 A&B 10-Mar-23 20-Mar-23 C 6-Apr-23 11-Apr-23 C 12-May-23 16-May-23 C 24-May-23 A A
removing dispose of from alocated area
1497 29 ELITE18-CON-CE-CIV-IR-2029 Block masonory for OHWT 135,136 A&B 10-Mar-23 15-Mar-23 B B

1498 30 ELITE18-CON-CE-CIV-IR-2030 Plaster for under the OHWT 135,136 A&B 10-Mar-23 15-Mar-23 B B

1499 31 ELITE18-CON-CE-CIV-IR-2031 FDT test 1st layer sand filling for external side 135,136 A&B 14-Mar-23 17-Mar-23 B B

1500 32 ELITE18-CON-CE-CIV-IR-2032 FDT test 2nd layer sand filling for external side 135,136 A&B 14-Mar-23 21-Mar-23 B B

1501 33 ELITE18-CON-CE-CIV-IR-2033 Polythene sheet 1000 micron for external side 136 B 16-Mar-23 17-Mar-23 B B

1502 34 ELITE18-CON-CE-CIV-IR-2034 PCC (1:3:6) for external side 136 B 16-Mar-23 17-Mar-23 B B

1503 35 ELITE18-CON-CE-CIV-IR-2035 07 days cylinder concrete test PCC (1:3:6) external side 136 B 21-Mar-23 24-Mar-23 A A

1504 36 ELITE18-CON-CE-CIV-IR-2036 Jumbolon XPS board 50mm & polythene sheet laying for top roof 135,136 A&B 22-Mar-23 24-Mar-23 A A

1505 37 ELITE18-CON-CE-CIV-IR-2037 Polythene sheet 1000 micron for external side 135 A 22-Mar-23 24-Mar-23 A A

1506 38 ELITE18-CON-CE-CIV-IR-2038 PCC (1:3:6) for external side 135 A 22-Mar-23 24-Mar-23 B B

1507 39 ELITE18-CON-CE-CIV-IR-2039 Sand top level for external side 135,136 A&B 22-Mar-23 24-Mar-23 A A

1508 40 ELITE18-CON-CE-CIV-IR-2040 PCC top level for external side 135,136 A&B 22-Mar-23 24-Mar-23 A A

1509 41 ELITE18-CON-CE-CIV-IR-2041 07 days cylinder concrete test PCC (1:3:6) external side 135 A 25-Mar-23 30-Mar-23 A A

1510 42 ELITE18-CON-CE-CIV-IR-2042 Surface clearence & primer coat for internal paint 135,136 GF,FF,MR 28-Mar-23 29-Mar-23 B B

1511 43 ELITE18-CON-CE-CIV-IR-2043 1st coat putty after primer for internal paint 135,136 GF,FF,MR 28-Mar-23 29-Mar-23 B B

1512 44 ELITE18-CON-CE-CIV-IR-2044 2nd coat putty after 1st coat putty for internal paint 135,136 GF,FF,MR 28-Mar-23 29-Mar-23 C 3-Apr-23 6-Apr-23 B 4-May-23 9-May-23 B B

1513 45 ELITE18-CON-CE-CIV-IR-2045 Installation perlino marbal for floor 135,136 GF,FF,MF 28-Mar-23 29-Mar-23 B 10-May-23 13-May-23 B B

1514 46 ELITE18-CON-CE-CIV-IR-2046 Installation perlino marbal for stair 135,136 GF,FF,MF 28-Mar-23 29-Mar-23 B 10-May-23 13-May-23 B B

1515 47 ELITE18-CON-CE-CIV-IR-2047 Installation wall tile & floor tile for kitchen 135,136 A&B 29-Mar-23 30-Mar-23 B B

1516 48 ELITE18-CON-CE-CIV-IR-2048 Installation black granite window sill 135,136 A&B 29-Mar-23 31-Mar-23 B 12-Apr-23 16-May-23 C 6-Jun-23 10-Jun-23 B B

1517 49 ELITE18-CON-CE-CIV-IR-2049 Installation black granite vertical window sill 135,136 A&B 29-Mar-23 3-Apr-23 C 7-Apr-23 12-Apr-23 C 5-May-23 12-May-23 B 6-Jun-23 10-Jun-23 B B

1518 50 ELITE18-CON-CE-CIV-IR-2050 Installation black granite with filling for partition wall external side 135,136 A&B 29-Mar-23 3-Apr-23 B 5-Jun-23 7-Jun-23 A A

1519 51 ELITE18-CON-CE-CIV-IR-2051 Installation black granite with filling for partition wall external side (Withdraw) 135,136 A&B 1-Apr-23 (Withdraw)
Installation suspension & framming system for celling work GG,FF,MR & gypsum
1520 52 ELITE18-CON-CE-CIV-IR-2052 135,136 GF,FF,MR 29-Mar-23 31-Mar-23 C 6-Apr-23 11-Apr-23 C 26-May-23 29-May-23 A A
board jointing & tapping for celling work dry area
Installation suspension & framming system for celling work GG,FF,MR & gypsum
1521 53 ELITE18-CON-CE-CIV-IR-2053 board jointing & tapping for celling work wet area GF,FF,MR with respect to cahk 135,136 GF,FF,MR 6-Apr-23 11-Apr-23 C 12-May-23 13-May-23 C 26-May-23 29-May-23 B B
list
1522 54 ELITE18-CON-CE-CIV-IR-2054 Plaster & roof tile for top roof floor 135,136 A&B 29-Mar-23 31-Mar-23 C 7-Apr-23 11-Apr-23 B B

1523 55 ELITE18-CON-CE-CIV-IR-2055 Plaster for HDF floor 135,136 GF,FF 6-Apr-23 11-Apr-23 C 4-May-23 8-May-23 B 6-May-23 8-May-23 A A

1524 56 ELITE18-CON-CE-CIV-IR-2056 Perlino marbal for boundry wall top meter box & top roof column 135,136 A&B 6-Apr-23 10-Apr-23 C 11-Apr-23 2-May-23 C 5-May-23 8-May-23 C 12-May-23 13-May-23 B 7-Jun-23 9-Jun-23 B 30-Oct-23 1-Nov-23 A A

1525 57 ELITE18-CON-CE-CIV-IR-2057 Pergola jointing with all respects 135,136 A&B 6-Apr-23 11-Apr-23 B 30-Oct-23 1-Nov-23 A A
GF to FF &
1526 58 ELITE18-CON-CE-CIV-IR-2058 Installation glass ralling & wooden hand rail with respect to chak list for stair 135,136 6-Apr-23 11-Apr-23 B 12-May-23 13-May-23 B 7-Jun-23 10-Jun-23 A A
FF to M
1527 59 ELITE18-CON-CE-CIV-IR-2059 Block masonory for mechnical wall 135,136 GF,FF 6-Apr-23 11-Apr-23 A A

1528 60 ELITE18-CON-CE-CIV-IR-2060 Plaster work & wall mounted coment board for cistern flushing tank 135,136 GF,FF 6-Apr-23 11-Apr-23 A A

1529 61 ELITE18-CON-CE-CIV-IR-2061 Installation aluminium door with respect to check list for kitchen & mumty 135,136 A&B 7-Apr-23 11-Apr-23 B 12-May-23 13-May-23 B B

1530 62 ELITE18-CON-CE-CIV-IR-2062 Paint for MS peragola 135,136 A&B 7-Apr-23 12-Apr-23 C C

1531 63 ELITE18-CON-CE-CIV-IR-2063 Paint for MS porch fence 135,136 A&B 7-Apr-23 11-Apr-23 B 12-May-23 13-May-23 A A

Page 48 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1532 64 ELITE18-CON-CE-CIV-IR-2064 28 days cylinder concrete test PCC (1:3:6) external side 136 B 11-Apr-23 15-Apr-23 B B

1533 65 ELITE18-CON-CE-CIV-IR-2065 Dismentlling wall tile for kitchen 135,136 A&B 11-Apr-23 14-Apr-23 B B
Pudlo plaster & benching for manhole gully trap electrical chamber & ele ctrical
1534 66 ELITE18-CON-CE-CIV-IR-2066 135,136 A&B 13-Apr-23 15-Apr-23 C 10-May-23 18-May-23 B B
handhole
1535 67 ELITE18-CON-CE-CIV-IR-2067 Installation perlino marbal thresholder 135,136 Mumty 13-Apr-23 2-May-23 A A

1536 68 ELITE18-CON-CE-CIV-IR-2068 Installation perlino marbal thresholder 135,136 A&B 13-Apr-23 15-Apr-23 B 19-May-23 19-May-23 B B

1537 69 ELITE18-CON-CE-CIV-IR-2069 28 days cylinder concrete test PCC (1:3:6) external side 135 A 15-Apr-23 2-May-23 A A

1538 70 ELITE18-CON-CE-CIV-IR-2070 Installation windows frames & windows glass 135,136 A&B 3-May-23 12-May-23 B B
1st coat paint after 2nd coat putty for internal paint GF,FF,MR with requst check
1539 71 ELITE18-CON-CE-CIV-IR-2071 135,136 A&B 4-May-23 9-May-23 B B
list
2nd coat paint after 1st coat paint for internal paint GF,FF,MR with requst check
1540 72 ELITE18-CON-CE-CIV-IR-2072 135,136 A&B 4-May-23 9-May-23 B B
list
Final coat paint after 2nd coat paint for internal paint GF,FF,MR with requst check
1541 73 ELITE18-CON-CE-CIV-IR-2073 135,136 A&B 4-May-23 8-May-23 C C
list
1542 74 ELITE18-CON-CE-CIV-IR-2074 Installation HDF floor 135,136 GF,FF 4-May-23 8-May-23 B B

1543 75 ELITE18-CON-CE-CIV-IR-2075 Installation HDF skirting 135,136 GF,FF 4-May-23 8-May-23 B B

1544 76 ELITE18-CON-CE-CIV-IR-2076 Installation perlino marble skirting for floor 135,136 GF,FF,MF 4-May-23 8-May-23 B 12-May-23 13-May-23 B B
GF to FF &
1545 77 ELITE18-CON-CE-CIV-IR-2077 Installation perlino marble skirting for stair 135,136 4-May-23 11-May-23 B 3-Jun-23 7-Jun-23 A A
FF to MF
1546 78 ELITE18-CON-CE-CIV-IR-2078 Installation wall tile & floor tile for bath & powder room 135,136 GF,FF 4-May-23 8-May-23 C 26-May-23 29-May-23 B B

1547 79 ELITE18-CON-CE-CIV-IR-2079 Installation floor tile for maid room 135,136 A&B 4-May-23 8-May-23 B B

1548 80 ELITE18-CON-CE-CIV-IR-2080 Installation floor skirting for maid room 135,136 A&B 4-May-23 8-May-23 B 10-May-23 13-May-23 B B

1549 81 ELITE18-CON-CE-CIV-IR-2081 Installation cover for UGWT with paint 135,136 A&B 5-May-23 11-May-23 B 16-Sep-23 19-Sep-23 A A

1550 82 ELITE18-CON-CE-CIV-IR-2082 Installation transfer & booster pump cover with all respect 135,136 A&B 5-May-23 8-May-23 B B

1551 83 ELITE18-CON-CE-CIV-IR-2083 Instalaltion pavers & pavers skirting for exterrnal side with request to check list 135,136 A&B 5-May-23 9-May-23 C 13-Jul-23 14-Jul-23 B 26-Sep-23 2-Oct-23 A A

1552 84 ELITE18-CON-CE-CIV-IR-2084 Instalaltion MS vanity frame for baths & powder room 135,136 A&B 5-May-23 8-May-23 B B

1553 85 ELITE18-CON-CE-CIV-IR-2085 Installation vanity perlino marbal for baths & powder room 135,136 A&B 5-May-23 8-May-23 B 7-Jun-23 9-Jun-23 B B

1554 86 ELITE18-CON-CE-CIV-IR-2086 Installation vanity miror for baths & powder room 135,136 A&B 5-May-23 9-May-23 B B

1555 87 ELITE18-CON-CE-CIV-IR-2087 Installation crema mo for boundry wall 135,136 A&B 5-May-23 8-May-23 C 26-May-23 29-May-23 B B

1556 88 ELITE18-CON-CE-CIV-IR-2088 Installation ledge wall top perlino marbal for baths 135,136 GF,FF 5-May-23 11-May-23 B B

1557 89 ELITE18-CON-CE-CIV-IR-2089 Installation kerb stone & side gola for external side elevation 2 135,136 A&B 5-May-23 8-May-23 C 26-May-23 29-May-23 A A

1558 90 ELITE18-CON-CE-CIV-IR-2090 PCC (1:4:8) under kerb stone 135,136 A&B 5-May-23 9-May-23 B B

1559 91 ELITE18-CON-CE-CIV-IR-2091 Fixing cubical glass partition & glass door with respect to check list for baths 135,136 GF,FF 5-May-23 9-May-23 B B

1560 92 ELITE18-CON-CE-CIV-IR-2092 Installation OHWT cover & concrete uper side 135,136 A&B 5-May-23 11-May-23 B B

1561 93 ELITE18-CON-CE-CIV-IR-2093 Installation MS louvers under the OHWT with all respect 135,136 A&B 5-May-23 11-May-23 A A

1562 94 ELITE18-CON-CE-CIV-IR-2094 Installation MS grating for main gate 135,136 A&B 5-May-23 8-May-23 B B

1563 95 ELITE18-CON-CE-CIV-IR-2095 Catch basin including MS gratewith all respect 135,136 A&B 5-May-23 8-May-23 C 26-May-23 29-May-23 B B
Installation cover for manhole gully trap electrical chamber & electrical handhole
1564 96 ELITE18-CON-CE-CIV-IR-2096 135,136 A&B 5-May-23 8-May-23 C 26-May-23 29-May-23 B B
with paint
1565 97 ELITE18-CON-CE-CIV-IR-2097 PCC (1:3:6) AC outdoor pad & PPRC pad for top roof 135,136 A&B 11-May-23 13-May-23 B B

1566 98 ELITE18-CON-CE-CIV-IR-2098 Primer coat for celling paint 135,136 GF,FF,MR 10-May-23 13-May-23 A A

1567 99 ELITE18-CON-CE-CIV-IR-2099 1st coat putty after primer for celling paint 135,136 GF,FF,MR 10-May-23 13-May-23 A A

1568 100 ELITE18-CON-CE-CIV-IR-2100 2nd coat putty after 1st coat putty for celling paint 135,136 A&B 10-May-23 13-May-23 C C

1569 101 ELITE18-CON-CE-CIV-IR-2101 1st coat paint after 2nd coat putty for celling paint 135,136 GF,FF,MR 10-May-23 13-May-23 A A

1570 102 ELITE18-CON-CE-CIV-IR-2102 2nd coat paint after 1st coat paint for celling paint 135,136 GF,FF,MR 10-May-23 13-May-23 B B

1571 103 ELITE18-CON-CE-CIV-IR-2103 Final coat paint after 2nd coat paint for celling paint 135,136 GF,FF,MR 10-May-23 13-May-23 C C
1st coat weather sheet after graffy for external side elevation 1,2,3,4 boundry wall
1572 104 ELITE18-CON-CE-CIV-IR-2104 135,136 A&B 10-May-23 13-May-23 B B
OHWT mumty out side & parapet wall internal side
2nd coat weather sheet after 1st coat for external side elevation 1,2,3,4 boundry
1573 105 ELITE18-CON-CE-CIV-IR-2105 135,136 A&B 10-May-23 13-May-23 C 3-Jun-23 7-Jun-23 B B
wall OHWT mumty out side & parapet wall internal side
1574 106 ELITE18-CON-CE-CIV-IR-2106 Instalaltion floor & wall tile for maid bath 135,136 A&B 10-May-23 B B

1575 107 ELITE18-CON-CE-CIV-IR-2107 Cracks repair with sika REP for external side elevation 1,2,34 135,136 A&B 11-May-23 UR UR

1576 108 ELITE18-CON-CE-CIV-IR-2108 Plaster patch work for external walls elevation 1,2,3,4 135,136 A&B 11-May-23 13-May-23 C 8-Aug-23 10-Aug-23 B B

1577 109 ELITE18-CON-CE-CIV-IR-2109 Installation black granite strip for shower cabin 135,136 A&B 12-May-23 13-May-23 B B

1578 110 ELITE18-CON-CE-CIV-IR-2110 Cementitious coat for baths & powder room water proofing 135,136 GF,FF 12-May-23 13-May-23 C 7-Jun-23 10-Jun-23 B B

1579 111 ELITE18-CON-CE-CIV-IR-2111 MS peragola bulkhead with paint cement board sheet 135 A 12-May-23 13-May-23 C 26-May-23 29-May-23 A A

1580 112 ELITE18-CON-CE-CIV-IR-2112 Inspection of access panal in Celling 135,136 A&B 12-May-23 13-May-23 B B

1581 113 ELITE18-CON-CE-CIV-IR-2113 Pond test for bath 135,136 FF,MB 15-May-23 22-May-23 B B

1582 114 ELITE18-CON-CE-CIV-IR-2114 Installation split stone for external side 135,136 A&B 5-Jun-23 7-Jun-23 B B

1583 115 ELITE18-CON-CE-CIV-IR-2115 Window jambs prepration 135,136 A&B 6-Jun-23 10-Jun-23 B B

1584 116 ELITE18-CON-CE-CIV-IR-2116 Installation doors wardrobes iron mongries skirting vanity & transition strip final IR 135,136 A&B 6-Jul-23 18-Jul-23 A A
Final inspection of IR's for villa# 135,136 type A&B ref IR's
1585 117 ELITE18-CON-CE-CIV-IR-2117 2052,2053,2104,2105,2045,2046,2047,2080,2106,2076,2092,2048,2049,2109,2056 135,136 A&B 19-Jul-23 8-Aug-23 B B
,2085,2061,2007,2008,2094,2057,2112,2095,2082
1586 118 ELITE18-CON-CE-CIV-IR-2118 Dismentlling roof tile skirting for top roof 135,136 A&B 2-Aug-23 9-Aug-23 A A

Page 49 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1587 119 ELITE18-CON-CE-CIV-IR-2119 Installation roof tile skirting for top roof 135,136 A&B 2-Aug-23 9-Aug-23 B B

1588 120 ELITE18-CON-CE-CIV-IR-2120 Instalaltion of pergola with all respect 135,136 A&B 10-Aug-23 12-Aug-23 A A

1589 121 ELITE18-CON-CE-CIV-IR-2121 Pond test for baths 135,136 GF,FF 18-Aug-23 22-Aug-23 B B

1590 122 ELITE18-CON-CE-CIV-IR-2122 Inspection of ir's for villa#135,136 ref ir's (1291,2089,2087,2883) 135,136 A&B 15-Sep-23 16-Sep-23 A A

1591 123 ELITE18-CON-CE-CIV-IR-2123 Installation peragolla cleats with mechanical bolts all respect 135,136 A&B 18-Dec-23 UR UR

1592 124 ELITE18-CON-CE-CIV-IR-2124 Terrazzo layers for OHWT walls & floor 136 B 23-Dec-23 27-Dec-23 C C

1593 .

1594

1595

1596 2251 TO 2500 133-134


1597 1 ELITE18-CON-CE-CIV-IR-2251 Dismentlling threshold for retrofiting work & debris remove 133,134 A&B 2-Dec-22 7-Dec-22 B B

1598 2 ELITE18-CON-CE-CIV-IR-2252 28 days cylinder concrete test PCC (1:4:8) under floating slab 134 A&B 7-Dec-22 14-Dec-22 B B
Fixing MS beams with MS plates drilling anchoring mechnical & chemeical
1599 3 ELITE18-CON-CE-CIV-IR-2253 133,134 GF,FF 10-Dec-22 15-Dec-22 C 20-Dec-22 23-Dec-22 B 24-Jan-23 27-Jan-23 C 8-Apr-23 2-May-23 A A
boulting apoxy with all respect
1600 4 ELITE18-CON-CE-CIV-IR-2254 28 days cylinder concrete test PCC (1:4:8) under floating slab 133 B 10-Dec-22 14-Dec-22 B B

1601 5 ELITE18-CON-CE-CIV-IR-2255 7 days cylinder concrete test RCC (4000 psi) retrofitting beams 133,134 GF,FF 13-Dec-22 20-Dec-22 B B

1602 6 ELITE18-CON-CE-CIV-IR-2256 SBR for slab thickness increse top roof 133,134 A&B 15-Dec-22 19-Dec-22 B B

1603 7 ELITE18-CON-CE-CIV-IR-2257 28 days cylinder concrete test RCC (3000 psi) floating slab 133,134 A&B 17-Dec-22 22-Dec-22 B B

1604 8 ELITE18-CON-CE-CIV-IR-2258 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 133,134 A&B 17-Dec-22 22-Dec-22 B B

1605 9 ELITE18-CON-CE-CIV-IR-2259 07 days cylinder concrete test RCC (4000 psi) retrofitting columns 133,134 GF,FF 21-Dec-22 29-Dec-22 B B

1606 10 ELITE18-CON-CE-CIV-IR-2260 Primer coat & membranes bituminous sheet for top roof 133,134 A&B 23-Dec-22 29-Dec-22 B B

1607 11 ELITE18-CON-CE-CIV-IR-2261 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 133,134 B 3-Jan-23 7-Jan-23 B B

1608 12 ELITE18-CON-CE-CIV-IR-2262 Surface clearence & side gola for top roof 133,134 A&B 5-Jan-23 7-Jan-23 B B

1609 13 ELITE18-CON-CE-CIV-IR-2263 Pond test for top roof 133,134 A&B 5-Jan-23 7-Jan-23 B B

1610 14 ELITE18-CON-CE-CIV-IR-2264 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 133,134 A&B 11-Jan-23 17-Jan-23 A A

1611 15 ELITE18-CON-CE-CIV-IR-2265 Block masonory for internal side 133,134 GF 25-Jan-23 27-Jan-23 A 2-Feb-23 4-Feb-23 A A

1612 16 ELITE18-CON-CE-CIV-IR-2266 Block masonory for internal side retrofiting work 133,134 GF,FF 2-Feb-23 4-Feb-23 B B

1613 17 ELITE18-CON-CE-CIV-IR-2267 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 133,134 A&B 1-Mar-23 4-Mar-23 B B

1614 18 ELITE18-CON-CE-CIV-IR-2268 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 133,134 A&B 1-Mar-23 4-Mar-23 A A

1615 19 ELITE18-CON-CE-CIV-IR-2269 Block masonory for manhole gully trap electrical chamber & electrical handhole 133,134 A&B 1-Mar-23 4-Mar-23 A A

1616 20 ELITE18-CON-CE-CIV-IR-2270 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 133,134 A&B 2-Mar-23 4-Mar-23 B 17-May-23 18-May-23 A A

1617 21 ELITE18-CON-CE-CIV-IR-2271 PCC (1:4:8) for wordrobe upstand 133,134 A&B 7-Mar-23 10-Mar-23 A A

1618 22 ELITE18-CON-CE-CIV-IR-2272 Primer coat & membranes bituminous sheet for external side 133,134 A&B 8-Mar-23 UR UR
Dismentlling material concrete+block masonory & excavated metrial sand
1619 23 ELITE18-CON-CE-CIV-IR-2273 133,134 A&B 7-Apr-23 11-Apr-23 C 12-May-23 16-May-23 C 6-Jun-23 21-Aug-23 A A
removing dispose of from alocated area
1620 24 ELITE18-CON-CE-CIV-IR-2274 Plaster work for retro fitting columns & internal walls 134 GF,FF 10-Mar-23 30-Mar-23 A A

1621 25 ELITE18-CON-CE-CIV-IR-2275 Plaster work & corner beads for retro fitting columns & internal walls 133 GF,FF 22-Mar-23 24-Mar-23 A A

1622 26 ELITE18-CON-CE-CIV-IR-2276 Plaster work for internal walls 133,134 GF 22-Mar-23 24-Mar-23 A A

1623 27 ELITE18-CON-CE-CIV-IR-2277 FDT test 1st layer sand filling for external side 133,134 A&B 27-Mar-23 3-Apr-23 A A

1624 28 ELITE18-CON-CE-CIV-IR-2278 FDT test 2nd layer sand filling for external side 133,134 A&B 27-Mar-23 3-Apr-23 A A

1625 29 ELITE18-CON-CE-CIV-IR-2279 Installation perlino marbal for stair with respect to check list 133 A 7-Apr-23 12-Apr-23 B 8-May-23 12-May-23 B 27-May-23 30-May-23 A 21-Aug-23 24-Aug-23 A A

1626 30 ELITE18-CON-CE-CIV-IR-2280 Installation perlino marbal for stair with respect to check list 134 B 7-Apr-23 12-Apr-23 B 8-May-23 12-May-23 B 27-May-23 30-May-23 B B

1627 31 ELITE18-CON-CE-CIV-IR-2281 Installation perlino marbal for floor with respect to check list 134 B 7-Apr-23 12-Apr-23 C 8-May-23 12-May-23 B 27-May-23 1-Jun-23 B B

1628 32 ELITE18-CON-CE-CIV-IR-2282 Installation perlino marbal for floor with respect to check list 133 A 7-Apr-23 12-Apr-23 B 8-May-23 15-May-23 B 27-May-23 1-Jun-23 A A

1629 33 ELITE18-CON-CE-CIV-IR-2283 7 days cylinder concrete test PCC (1:3:6) external side 133,134 A&B 10-Apr-23 11-Apr-23 B B

1630 34 ELITE18-CON-CE-CIV-IR-2284 Dismentlling wall tile for kitchen 133,134 A&B 11-Apr-23 14-Apr-23 B B
Pudlo plaster & benching for manhole gully trap electrical chamber & ele ctrical
1631 35 ELITE18-CON-CE-CIV-IR-2285 133,134 A&B 13-Apr-23 15-Apr-23 C 10-May-23 15-May-23 C 19-May-23 1-Jun-23 B 19-Aug-23 22-Aug-23 A A
handhole
1632 36 ELITE18-CON-CE-CIV-IR-2286 Jumbolon XPS board 50mm & polythene sheet laying & screeding for top roof 133,134 A&B 14-Apr-23 2-May-23 B B

1633 37 ELITE18-CON-CE-CIV-IR-2287 28 days cylinder concrete test PCC (1:3:6) external side 133,134 A&B 2-May-23 5-May-23 A A

1634 38 ELITE18-CON-CE-CIV-IR-2288 Installation windows frames & windows glass 133,134 A&B 3-May-23 15-May-23 B B

1635 39 ELITE18-CON-CE-CIV-IR-2289 Dismentlling block masonory for boundry wall partion 133,134 A&B 5-May-23 11-May-23 A A

1636 40 ELITE18-CON-CE-CIV-IR-2290 Block masonory for boundry wall partion 133,134 A&B 5-May-23 11-May-23 A A

1637 41 ELITE18-CON-CE-CIV-IR-2291 Plaster for boundry wall partion 133,134 A&B 5-May-23 15-May-23 B B

1638 42 ELITE18-CON-CE-CIV-IR-2292 Installation black granite for partion wall 133,134 A&B 8-May-23 12-May-23 B 5-Jun-23 7-Jun-23 B B

1639 43 ELITE18-CON-CE-CIV-IR-2293 Block masonory for mechnical wall 133,134 GF,FF 8-May-23 12-May-23 B B

1640 44 ELITE18-CON-CE-CIV-IR-2294 Plaster work & wall mounted cement board for cistern tank 133,134 GF,FF 8-May-23 15-May-23 B B

1641 45 ELITE18-CON-CE-CIV-IR-2295 Installation black granite window sill 133 A 8-May-23 12-May-23 B 29-May-23 1-Jun-23 B 6-Jun-23 9-Jun-23 C C

Page 50 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1642 46 ELITE18-CON-CE-CIV-IR-2296 Installation black granite vertical window sill 133 A 8-May-23 12-May-23 B 29-May-23 1-Jun-23 B 6-Jun-23 9-Jun-23 C C

1643 47 ELITE18-CON-CE-CIV-IR-2297 Polythene sheet 1000 micron for external side 133,134 A&B 8-May-23 9-May-23 B B

1644 48 ELITE18-CON-CE-CIV-IR-2298 PCC (1:3:6) for external side 133,134 A&B 8-May-23 9-May-23 B B

1645 49 ELITE18-CON-CE-CIV-IR-2299 Installation OHWT cover & concrete uper side 133,134 A&B 9-May-23 15-May-23 B B

1646 50 ELITE18-CON-CE-CIV-IR-2300 Side gola & laying aggregates for mumty top 133,134 A&B 9-May-23 16-May-23 B B

1647 51 ELITE18-CON-CE-CIV-IR-2301 Plaster for partition wall external side 133,134 A&B 9-May-23 15-May-23 A A

1648 52 ELITE18-CON-CE-CIV-IR-2302 Dismentlling block masonory for partion wall internal side 134 FF 9-May-23 11-May-23 C 3-Aug-23 4-Aug-23 B B

1649 53 ELITE18-CON-CE-CIV-IR-2303 PCC (1:3:6) AC outdoor pad & PPRC pad for top roof 133,134 A&B 11-May-23 25-May-23 B B

1650 54 ELITE18-CON-CE-CIV-IR-2304 Surface clearence primer coat 1st & 2nd coat putty for internal paint 133,134 GF,FF,MR 10-May-23 15-May-23 B 27-May-23 30-May-23 B B
Base primer external graffy elevation 1,2,3,4 OHWT mumty out side & parapet
1651 55 ELITE18-CON-CE-CIV-IR-2305 133,134 A&B 10-May-23 15-May-23 A A
wall internal side
Graffy after base primer for external side elevation 1,2,3,4 boundry wall internal
1652 56 ELITE18-CON-CE-CIV-IR-2306 133,134 A&B 10-May-23 15-May-23 B 27-May-23 1-Jun-23 B 26-Jul-23 5-Aug-23 B B
side OHWT mumty out side & parapet wall internal side
1653 57 ELITE18-CON-CE-CIV-IR-2307 Installation threshold perlino marbal 133,134 Mumty 10-May-23 15-May-23 A A

1654 58 ELITE18-CON-CE-CIV-IR-2308 Instalaltion wall tile & floor tile for kitchen 133,134 A&B 10-May-23 15-May-23 B 27-May-23 1-Jun-23 B B

1655 59 ELITE18-CON-CE-CIV-IR-2309 Instalaltion wall tile & floor tile for bath & powder room 133,134 A&B 10-May-23 13-May-23 C 27-May-23 1-Jun-23 B 12-Jun-23 17-Jun-23 B B

1656 60 ELITE18-CON-CE-CIV-IR-2310 Installation floor & wall tile for maid bath 133,134 A&B 10-May-23 15-May-23 B 5-Jun-23 7-Jun-23 B B

1657 61 ELITE18-CON-CE-CIV-IR-2311 Plaster & roof tile for roof floor 133,134 A&B 10-May-23 15-May-23 C 18-May-23 25-May-23 B B

1658 62 ELITE18-CON-CE-CIV-IR-2312 Cracks repair with sika REP for external side elevation 1,2,3,4 133,134 A&B 11-May-23 UR UR

1659 63 ELITE18-CON-CE-CIV-IR-2313 Plaster patch work for external walls elevatio 1,2,3,4 133,134 A&B 11-May-23 16-May-23 B 8-Aug-23 10-Aug-23 B B

1660 64 ELITE18-CON-CE-CIV-IR-2314 Instalaltion black granite strip for shower cabin 133,134 A&B 12-May-23 15-May-23 B B

1661 65 ELITE18-CON-CE-CIV-IR-2315 Installation aluminium door for kitchen & mumty 133,134 A&B 12-May-23 15-May-23 B 7-Jun-23 10-Jun-23 B B

1662 66 ELITE18-CON-CE-CIV-IR-2316 Installation MS vanity frame for baths & powder room 133,134 A&B 27-May-23 1-Jun-23 B B

1663 67 ELITE18-CON-CE-CIV-IR-2317 Installation vanity perlino marbal for baths & powder room 133,134 A&B 27-May-23 1-Jun-23 B B

1664 68 ELITE18-CON-CE-CIV-IR-2318 Installation vanity miror for baths & powder room 133,134 A&B 27-May-23 1-Jun-23 A A

1665 69 ELITE18-CON-CE-CIV-IR-2319 Fixing cubical glass partition & glass door with respect to check list for baths 133,134 GF,FF 27-May-23 5-Jun-23 C C

1666 70 ELITE18-CON-CE-CIV-IR-2320 Installation black granite strip for shower cabin 134 B 27-May-23 30-May-23 B B
GF to FF &
1667 71 ELITE18-CON-CE-CIV-IR-2321 Installation glass ralling & wooden hand rail with respect to check list for stair 133,134 27-May-23 30-May-23 A 18-Aug-23 23-Aug-23 A A
FF to M
Primer coat 1st coat putty 2nd coat putty 1st coat paint & 2nd coat paint for celling
1668 72 ELITE18-CON-CE-CIV-IR-2322 133,134 GF,FF,MR 27-May-23 14-Jul-23 B B
paint
Installation suspention & framming system for celling work GF,FF,& Maid room &
1669 73 ELITE18-CON-CE-CIV-IR-2323 133,134 GF,FF,MR 27-May-23 3-Jun-23 B 10-Jun-23 17-Jun-23 B B
Installation gypsum board jointing & tapping for celling work dry area
Installation suspention & framming system for celling work GF,FF,& Maid room &
1670 74 ELITE18-CON-CE-CIV-IR-2324 133,134 GF,FF,MR 27-May-23 1-Jun-23 B 10-Jun-23 17-Jun-23 B B
Installation gypsum board jointing & tapping for celling work wet area
1671 75 ELITE18-CON-CE-CIV-IR-2325 Installation pavers & skirting for external side with requst to check list 133,134 A&B 27-May-23 1-Jun-23 C 7-Jun-23 10-Jun-23 B B
PCC (1:4:8) under kerb stone & instalaation kerb stone & side gola for external side
1672 76 ELITE18-CON-CE-CIV-IR-2326 133,134 A&B 27-May-23 3-Jun-23 B B
elevation 2
1673 77 ELITE18-CON-CE-CIV-IR-2327 Perlino marbal for boundry wall top meter box & top roof column 133,134 A&B 27-May-23 1-Jun-23 B 18-Aug-23 22-Aug-23 A A

1674 78 ELITE18-CON-CE-CIV-IR-2328 Instalaltion crema mo for boundry wall 133,134 A&B 27-May-23 1-Jun-23 B B

1675 79 ELITE18-CON-CE-CIV-IR-2329 Fixing of access panel in celling 133,134 A&B 27-May-23 31-May-23 B B

1676 80 ELITE18-CON-CE-CIV-IR-2330 MS peragola bulkhead with paint cement board sheet 133 A 27-May-23 31-May-23 A A

1677 81 ELITE18-CON-CE-CIV-IR-2331 Peragola jointing with all respects 133,134 A&B 27-May-23 31-May-23 B B

1678 82 ELITE18-CON-CE-CIV-IR-2332 Paint for MS Pergola 133,134 A&B 27-May-23 31-May-23 B B

1679 83 ELITE18-CON-CE-CIV-IR-2333 Paint for MS porch fence 133,134 A&B 27-May-23 31-May-23 B B

1680 84 ELITE18-CON-CE-CIV-IR-2334 Catch basin including MS gratewith all respect 133,134 A&B 27-May-23 31-May-23 A A

1681 85 ELITE18-CON-CE-CIV-IR-2335 Instalaltion MS grating for main gate 133,134 A&B 27-May-23 1-Jun-23 B B

1682 86 ELITE18-CON-CE-CIV-IR-2336 Block masonory for OHWT 133,134 A&B 29-May-23 1-Jun-23 A A

1683 87 ELITE18-CON-CE-CIV-IR-2337 Plaster for under the OHWT 133,134 A&B 29-May-23 1-Jun-23 A A
Installation cover for manhole gully trap electrical chamber & electrical hanhole
1684 88 ELITE18-CON-CE-CIV-IR-2338 133,134 A&B 29-May-23 3-Jun-23 A A
with paint
1685 89 ELITE18-CON-CE-CIV-IR-2339 Installation MS louvers under the OHWT with all respect 133,134 A&B 29-May-23 1-Jun-23 A A

1686 90 ELITE18-CON-CE-CIV-IR-2340 Installation transfer & booster pump cover with all respect 133,134 A&B 29-May-23 1-Jun-23 A A

1687 91 ELITE18-CON-CE-CIV-IR-2341 Installation cover for UGWT with paint 133,134 A&B 29-May-23 1-Jun-23 A A

1688 92 ELITE18-CON-CE-CIV-IR-2342 Instalaltion black granite window sill 133,134 GF,FF,MR 29-May-23 3-Jun-23 B B

1689 93 ELITE18-CON-CE-CIV-IR-2343 Installation black granite vertical window sill 134 B 29-May-23 3-Jun-23 B B

1690 94 ELITE18-CON-CE-CIV-IR-2344 Plaster work & wall mounted cement board for cistern flushing tank 133,134 GF,FF 5-Jun-23 7-Jun-23 A A

1691 95 ELITE18-CON-CE-CIV-IR-2345 Installation floor tile & floor skirting for maid room 133,134 A&B 5-Jun-23 7-Jun-23 B B

1692 96 ELITE18-CON-CE-CIV-IR-2346 Installation split stone for external side 133,134 A&B 5-Jun-23 7-Jun-23 B B

1693 97 ELITE18-CON-CE-CIV-IR-2347 Window jambs prepration 133,134 A&B 6-Jun-23 9-Jun-23 B B

1694 98 ELITE18-CON-CE-CIV-IR-2348 Plaster for HDF floor 133,134 GF,FF 6-Jun-23 8-Jun-23 B 17-Aug-23 22-Aug-23 A A

1695 99 ELITE18-CON-CE-CIV-IR-2349 Pond test for bath 133,134 FF,MB 7-Jun-23 10-Jun-23 B B

1696 100 ELITE18-CON-CE-CIV-IR-2350 Cemmentitious coat for baths & powder room water proofing 133,134 GF,FF 7-Jun-23 10-Jun-23 B B

Page 51 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1697 101 ELITE18-CON-CE-CIV-IR-2351 Fixing cubical glass partition & glass door for baths 134 GF,FF 10-Jun-23 17-Jun-23 A A

1698 102 ELITE18-CON-CE-CIV-IR-2352 Installation doors wardrobes iron mongries skirting vanity & transition strip final IR 133,134 A&B 6-Jul-23 18-Jun-23 A A

1699 103 ELITE18-CON-CE-CIV-IR-2353 Installation HDF floor 133,134 GF,FF 11-Jul-23 13-Jul-23 B B
GF,FF &
1700 104 ELITE18-CON-CE-CIV-IR-2354 Final coat paint for internal paint 133,134 13-Jul-23 14-Jul-23 B B
Maid Room
GF,FF &
1701 105 ELITE18-CON-CE-CIV-IR-2355 2nd coat paint & final coat paint for celling paint 134 26-Jul-23 5-Aug-23 B B
Maid Room
1702 106 ELITE18-CON-CE-CIV-IR-2356 Dismentlling roof tile skirting for top roof 133,134 A&B 2-Aug-23 9-Aug-23 A A

1703 107 ELITE18-CON-CE-CIV-IR-2357 Installation roof tile skirting for top roof 133,134 A&B 2-Aug-23 9-Aug-23 B B

1704 108 ELITE18-CON-CE-CIV-IR-2358 Instalaltion of pergola with all respect 133,134 A&B 10-Aug-23 12-Aug-23 A A

1705 109 ELITE18-CON-CE-CIV-IR-2359 Pond test for baths 133,134 GF,FF 18-Aug-23 22-Aug-23 A A

1706 110 ELITE18-CON-CE-CIV-IR-2360 Plaster work for internal patches 133,134 A&B 21-Aug-23 23-Aug-23 B B
Final inspection of IR's for villa#133,134 Ref
1707 111 ELITE18-CON-CE-CIV-IR-2361 IR's(2323,2324,2281,2280,2309,2308,2345,2310,2311,2292,2346,2342,2343,2295, 133,134 A&B 23-Sep-23 27-Aug-23 B B
2296,2320,2325,2317,2315,2333,2335,2331,2329,2281,2328,2326,1292
1708 112 ELITE18-CON-CE-CIV-IR-2362 Side gola & laying aggrgates for mumty top 134 B 9-Dec-23 14-Dec-23 A A

1709

1710

1711

1712

1713 2501 TO 2750 131-132


1714 1 ELITE18-CON-CE-CIV-IR-2501 Dismentlling threshold for retrofiting work & debris remove 131,132 A&B 2-Dec-22 7-Dec-22 B B

1715 2 ELITE18-CON-CE-CIV-IR-2502 07 days cylinder concrete test RCC (4000 psi) floating slab 132 B 2-Dec-22 7-Dec-22 B B

1716 3 ELITE18-CON-CE-CIV-IR-2503 Layout for block masonory 131,132 A&B 5-Dec-22 7-Dec-22 A A

1717 4 ELITE18-CON-CE-CIV-IR-2504 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of beam 131,132 GF,FF 13-Dec-22 15-Dec-22 B B

1718 5 ELITE18-CON-CE-CIV-IR-2505 07 days cylinder concrete test RCC (3000 psi) floating slab 131 A 12-Dec-22 14-Dec-22 B B
Fixing MS beams with MS plates drilling anchoring mechnical & chemeical
1719 6 ELITE18-CON-CE-CIV-IR-2506 131,132 A&B 12-Dec-22 15-Dec-22 C 20-Dec-22 23-Dec-22 B 24-Jan-23 27-Jan-23 C 3-Apr-23 8-Apr-23 A A
boulting apoxy with all respect
1720 7 ELITE18-CON-CE-CIV-IR-2507 SBR for slab thickness increse top roof 131,132 T,R 15-Dec-22 19-Dec-22 B B

1721 8 ELITE18-CON-CE-CIV-IR-2508 28 days cylinder concrete test PCC (1:4:8) under floating slab 131,132 A&B 17-Dec-22 22-Dec-22 B B

1722 9 ELITE18-CON-CE-CIV-IR-2509 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 131,132 A&B 17-Dec-22 22-Dec-22 B B

1723 10 ELITE18-CON-CE-CIV-IR-2510 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 131,132 A&B 17-Dec-22 22-Dec-22 B B

1724 11 ELITE18-CON-CE-CIV-IR-2511 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 131,132 GF,FF 21-Dec-22 29-Dec-22 B B

1725 12 ELITE18-CON-CE-CIV-IR-2512 28 days cylinder concrete test RCC (3000 psi) floating slab 132 B 23-Dec-22 29-Dec-22 B B

1726 13 ELITE18-CON-CE-CIV-IR-2513 28 days cylinder concrete test RCC (3000 psi) floating slab 131 A 2-Jan-23 7-Jan-23 B B

1727 14 ELITE18-CON-CE-CIV-IR-2514 Dismentlling balck granite window sill for retrofitting work & debris remove 131,132 A&B 4-Jan-23 7-Jan-23 C 5-Jun-23 7-Jun-23 B B

1728 15 ELITE18-CON-CE-CIV-IR-2515 Surface clearence & side gola for top roof 131,132 A&B 5-Jan-23 7-Jan-23 B B

1729 16 ELITE18-CON-CE-CIV-IR-2516 Primer coat & membranes bituminous sheet for top roof 131,132 A&B 5-Jan-23 7-Jan-23 B B

1730 17 ELITE18-CON-CE-CIV-IR-2517 Pond test for top roof 131,132 A&B 5-Jan-23 12-Jan-23 B B

1731 18 ELITE18-CON-CE-CIV-IR-2518 28 days cylinder concrete test RCC (4000 psi) retrofitting beams 131,132 GF,FF 11-Jan-23 17-Jan-23 A A

1732 19 ELITE18-CON-CE-CIV-IR-2519 Block masonory & lintels for internal side 131,132 A&B 27-Feb-23 2-Mar-23 A A

1733 20 ELITE18-CON-CE-CIV-IR-2520 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 131,132 A&B 1-Mar-23 4-Mar-23 A A

1734 21 ELITE18-CON-CE-CIV-IR-2521 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 131,132 A&B 1-Mar-23 4-Mar-23 A A

1735 22 ELITE18-CON-CE-CIV-IR-2522 Block masonory for manhole gully trap electrical chamber & electrical handhole 131,132 A&B 1-Mar-23 4-Mar-23 C 14-Mar-23 17-Mar-23 A A

1736 23 ELITE18-CON-CE-CIV-IR-2523 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 131,132 A&B 2-Mar-23 4-Mar-23 B 17-May-23 18-May-23 A A

1737 24 ELITE18-CON-CE-CIV-IR-2524 PCC (1:4:8) for wordrobe upstand 131,132 A&B 7-Mar-23 10-Mar-23 A A

1738 25 ELITE18-CON-CE-CIV-IR-2525 Plaster work for retro fitting columns & internal walls 132 B 10-Mar-23 30-Mar-23 A A

1739 26 ELITE18-CON-CE-CIV-IR-2526 Primer coat & membranes bituminous sheet for external side 131,132 A&B 14-Mar-23 17-Mar-23 A A

1740 27 ELITE18-CON-CE-CIV-IR-2527 Block masonory for internal side retrofiting work 131,132 GF,FF 15-Mar-23 21-Mar-23 A A

1741 28 ELITE18-CON-CE-CIV-IR-2528 Plaster work & conner beads for retro fitting columns & internal walls 131 GF,FF 22-Mar-23 24-Mar-23 A A

1742 29 ELITE18-CON-CE-CIV-IR-2529 Plaster work for internal walls 131,132 GF 22-Mar-23 24-Mar-23 A A

1743 30 ELITE18-CON-CE-CIV-IR-2530 Installation perlino marbal for floor with respect to check list 132 B 7-Apr-23 12-Apr-23 B 27-May-23 1-Jun-23 C 5-Jun-23 7-Jun-23 B 21-Aug-23 24-Aug-23 A A

1744 31 ELITE18-CON-CE-CIV-IR-2531 Dismentlling wall tile for kitchen 131,132 A&B 11-Apr-23 14-Apr-23 A A

1745 32 ELITE18-CON-CE-CIV-IR-2532 Jumbolon XPS board 50mm & polythene sheet laying & screeding for top roof 131,132 A&B 14-Apr-23 2-May-23 B B

1746 33 ELITE18-CON-CE-CIV-IR-2533 FDT test 1st layer sand filling for external side 131,132 A&B 15-Apr-23 2-May-23 B B

1747 34 ELITE18-CON-CE-CIV-IR-2534 FDT test 2nd layer sand filling for external side 131,132 A&B 15-Apr-23 2-May-23 B B

1748 35 ELITE18-CON-CE-CIV-IR-2535 Installation perlino marbal for floor with respect to check list 131 A 8-May-23 12-May-23 B 27-May-23 1-Jun-23 C 7-Jun-23 B 21-Aug-23 24-Aug-23 B B

1749 36 ELITE18-CON-CE-CIV-IR-2536 Polythene sheet 1000 micron for external side 131,132 A&B 8-May-23 9-May-23 B B

1750 37 ELITE18-CON-CE-CIV-IR-2537 PCC (1:3:6) for external side 131,132 A&B 8-May-23 9-May-23 B B

1751 38 ELITE18-CON-CE-CIV-IR-2538 Installation OHWT cover & concrete uper side 131,132 A&B 9-May-23 16-May-23 A A

Page 52 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1752 39 ELITE18-CON-CE-CIV-IR-2539 Side gola & laying aggregates for mumty top 131,132 A&B 9-May-23 16-May-23 A A

1753 40 ELITE18-CON-CE-CIV-IR-2540 Plaster for partition wall external side 131,132 A&B 9-May-23 16-May-23 B B

1754 41 ELITE18-CON-CE-CIV-IR-2541 PCC (1:3:6) AC outdoor pad & PPRC pad for top roof 131,132 A&B 11-May-23 25-May-23 B B

1755 42 ELITE18-CON-CE-CIV-IR-2542 Instalaltion perlino marbal for stair with respect to check list 131,132 A&B 10-May-23 16-May-23 C 29-May-23 5-Jun-23 B 27-Jul-23 5-Aug-23 B B

1756 43 ELITE18-CON-CE-CIV-IR-2543 07 days cylinder concrete test PCC (1:3:6) external side 131,132 A&B 11-May-23 17-May-23 A A

1757 44 ELITE18-CON-CE-CIV-IR-2544 Installation aluminium door for kitchen & mumty 131,132 A&B 11-May-23 16-May-23 B 7-Jun-23 10-Jun-23 B 18-Aug-23 22-Aug-23 B B
Base primer for external graffy elevation 1,2,3,4 boundry wall internal side OHWT
1758 45 ELITE18-CON-CE-CIV-IR-2545 131,132 A&B 12-May-23 15-May-23 C 5-Jun-23 7-Jun-23 B 26-Jun-23 5-Aug-23 A A
mumty out side & parapet wall internal side
Graffy after base primer for external side elevation 1,2,3,4 boundry wall internal
1759 46 ELITE18-CON-CE-CIV-IR-2546 131,132 A&B 12-May-23 16-May-23 C 5-Jun-23 7-Jun-23 B 26-Jun-23 5-Aug-23 B B
side OHWT mumty out side & parapet wall internal side
1760 47 ELITE18-CON-CE-CIV-IR-2547 Plaster roof tile & skirting for top roof floor 131,132 A&B 18-May-23 25-May-23 B B
Pudlo plaster & benching for manhole gully trap electrical chamber & electrical
1761 48 ELITE18-CON-CE-CIV-IR-2548 131,132 A&B 19-May-23 22-May-23 A A
handhole
1762 49 ELITE18-CON-CE-CIV-IR-2549 Installation black granite window sill 131,132 A&B 29-May-23 5-Jun-23 B 22-Aug-23 UR UR

1763 50 ELITE18-CON-CE-CIV-IR-2550 Installation black granite vertical window sill 131,132 A&B 29-May-23 5-Jun-23 B 22-Aug-23 24-Aug-23 A A

1764 51 ELITE18-CON-CE-CIV-IR-2551 Installation pavers & skirting for external side 131,132 A&B 29-May-23 5-Jun-23 C 7-Jun-23 10-Jun-23 B B
PCC (1:4:8) under kerb stone & installation kerb stone & side gola for external side
1765 52 ELITE18-CON-CE-CIV-IR-2552 131,132 A&B 29-May-23 1-Jun-23 B B
elevation 2
1766 53 ELITE18-CON-CE-CIV-IR-2553 Installation wall tile & floor tile for kitchen 131,132 A&B 29-May-23 1-Jun-23 C 5-Jun-23 7-Jun-23 B B
Installation suspention & framing system for celling work GF,FF,MR & installation
1767 54 ELITE18-CON-CE-CIV-IR-2554 131,132 GF,FF,MR 29-May-23 1-Jun-23 C 10-Jun-23 17-Jun-23 B 12-Aug-23 16-Aug-23 A A
gypsum board jointing & tapping for celling work dry area
Installation suspention & framing system for celling work GF,FF,MR & installation
1768 55 ELITE18-CON-CE-CIV-IR-2555 131,132 GF,FF,MR 29-May-23 1-Jun-23 C 10-Jun-23 17-Jun-23 B 12-Aug-23 16-Aug-23 A A
gypsum board jointing & tapping for celling work wet area
1769 56 ELITE18-CON-CE-CIV-IR-2556 Block masonory for OHWT 131,132 A&B 29-May-23 1-Jun-23 A A

1770 57 ELITE18-CON-CE-CIV-IR-2557 Plaster for under the OHWT 131,132 A&B 29-May-23 1-Jun-23 A A

1771 58 ELITE18-CON-CE-CIV-IR-2558 28 days cylinder concrete test PCC (1:3:6) external side 131,132 A&B 3-Jun-23 7-Jun-23 C 8-Jun-23 12-Jun-23 A A

1772 59 ELITE18-CON-CE-CIV-IR-2559 Installation threshold perlino marbal mumty 131,132 A&B 3-Jun-23 7-Jun-23 B 27-Jul-23 5-Aug-23 B B

1773 60 ELITE18-CON-CE-CIV-IR-2560 Block masonory for mechnical wall 131,132 GF,FF 5-Jun-23 7-Jun-23 A A

1774 61 ELITE18-CON-CE-CIV-IR-2561 Plaster work & wall mounted cement board for cistern flushing tank 131,132 GF,FF 5-Jun-23 7-Jun-23 A A

1775 62 ELITE18-CON-CE-CIV-IR-2562 Primer coat 1st coat putty 2nd coat putty & 1st coat paint for celling paint 131,132 GF,FF,MR 5-Jun-23 7-Jun-23 B B

1776 63 ELITE18-CON-CE-CIV-IR-2563 Primer coat 1st coat putty 2nd coat putty & 1st coat paint for internal paint 131,132 GF,FF,MR 6-Jun-23 8-Jun-23 B B

1777 64 ELITE18-CON-CE-CIV-IR-2564 Installatin floor & wall tile for maid bath 131,132 A&B 5-Jun-23 7-Jun-23 C 12-Jun-23 17-Jun-23 A A

1778 65 ELITE18-CON-CE-CIV-IR-2565 Instalaltion floor tile & floor skirting for maid room 131,132 A&B 5-Jun-23 7-Jun-23 B 27-Jul-23 6-Aug-23 B B

1779 66 ELITE18-CON-CE-CIV-IR-2566 Instalaltion split stone for external side 131,132 A&B 5-Jun-23 7-Jun-23 B B

1780 67 ELITE18-CON-CE-CIV-IR-2567 Installation black granite for partition wall (Resubmit IR 12-8-23) 131,132 A&B 6-Jun-23 16-Aug-23 B B

1781 68 ELITE18-CON-CE-CIV-IR-2568 Sand excavated during pilling works 131,132 A&B 6-Jun-23 8-Jun-23 B B

1782 69 ELITE18-CON-CE-CIV-IR-2569 Dismentlling perlino marbal for floor FF & debris remove 131 A 6-Jun-23 7-Jun-23 B B

1783 70 ELITE18-CON-CE-CIV-IR-2570 Plaster patch work for external side elevation 1,2,3,4 131,132 A&B 6-Jun-23 8-Jun-23 B B

1784 71 ELITE18-CON-CE-CIV-IR-2571 Window jambs prepration 131,132 A&B 6-Jun-23 8-Jun-23 B B

1785 72 ELITE18-CON-CE-CIV-IR-2572 Plaster for HDF floor 131,132 GF,FF 6-Jun-23 8-Jun-23 B B

1786 73 ELITE18-CON-CE-CIV-IR-2573 Installation black granite strip for shower cabin 131,132 GF,FF 6-Jun-23 8-Jun-23 B 22-Aug-23 UR UR

1787 74 ELITE18-CON-CE-CIV-IR-2574 Installation MS vanity frame for baths & powder room 131,132 A&B 7-Jun-23 10-Jun-23 B B

1788 75 ELITE18-CON-CE-CIV-IR-2575 Installation vanity perlino marbal for baths & powder room 131,132 A&B 7-Jun-23 10-Jun-23 B B

1789 76 ELITE18-CON-CE-CIV-IR-2576

1790 77 ELITE18-CON-CE-CIV-IR-2577 Fixing of access panel in celling 131,132 A&B 7-Jun-23 9-Jun-23 A A

1791 78 ELITE18-CON-CE-CIV-IR-2578 Pond test for baths 131,132 FF,MR 7-Jun-23 10-Jun-23 A A

1792 79 ELITE18-CON-CE-CIV-IR-2579 Installation glass railing & wooden hans rail for stair GF to FF & FF to Mumty 131,132 A&B 7-Jun-23 9-Jun-23 B 18-Aug-23 22-Aug-23 B B

1793 80 ELITE18-CON-CE-CIV-IR-2580 Paint for MS porch fence 131,132 A&B 7-Jun-23 10-Jun-23 A A

1794 81 ELITE18-CON-CE-CIV-IR-2581 Peragola jointing with all respect 131,132 A&B 7-Jun-23 10-Jun-23 B B

1795 82 ELITE18-CON-CE-CIV-IR-2582 Paint for MS peragola 131,132 A&B 7-Jun-23 10-Jun-23 B B

1796 83 ELITE18-CON-CE-CIV-IR-2583 Instalaltion MS louvers under the OHWT with all respect 131,132 A&B 7-Jun-23 10-Jun-23 A A

1797 84 ELITE18-CON-CE-CIV-IR-2584 Instalaltion transfer & booster pump cover with all respect 131,132 A&B 7-Jun-23 10-Jun-23 B B

1798 85 ELITE18-CON-CE-CIV-IR-2585 Instalaltion cover for UGWT with paint 131,132 A&B 7-Jun-23 10-Jun-23 A A

1799 86 ELITE18-CON-CE-CIV-IR-2586 Instalaltion perlino marbal for stair GF to FF & FF to mumty 131,132 A&B 7-Jun-23 9-Jun-23 C 13-Jul-23 17-Jul-23 A A

1800 87 ELITE18-CON-CE-CIV-IR-2587 Installation perlino skirting for floor 131,132 GF,FF,M 7-Jun-23 10-Jun-23 B B

1801 88 ELITE18-CON-CE-CIV-IR-2588 Installation MS grating for main gate 131,132 A&B 7-Jun-23 10-Jun-23 B 18-Aug-23 23-Aug-23 A A

1802 89 ELITE18-CON-CE-CIV-IR-2589 Instalaltion wall tile & floor tile for baths & powder room 131,132 A&B 12-Jun-23 17-Jun-23 B B

1803 90 ELITE18-CON-CE-CIV-IR-2590 Installation crema mo for boundry wall 131,132 A&B 24-Jun-23 6-Jul-23 B B

1804 91 ELITE18-CON-CE-CIV-IR-2591 Perlino marbal for boundry wall top meter box & top rooof column 131,132 A&B 24-Jun-23 6-Jul-23 A A
Instalaltion cover for manhole gully trap electrical chamber & electrical handhole
1805 92 ELITE18-CON-CE-CIV-IR-2592 131,132 A&B 24-Jun-23 6-Jul-23 B 27-Oct-23 28-Oct-23 A A
with paint
1806 93 ELITE18-CON-CE-CIV-IR-2593 Installation doors wardrobes iron mongries skirting vanity & transition strip final IR 131,132 A&B 6-Jul-23 18-Jul-23 A A

Page 53 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1807 94 ELITE18-CON-CE-CIV-IR-2594 Installation HDF floor 131,132 GF,FF 11-Jul-23 13-Jul-23 B B

1808 95 ELITE18-CON-CE-CIV-IR-2595 MS pergola bulkhead with paint cement board sheet 131 A 12-Jul-23 13-Jul-23 B B

1809 96 ELITE18-CON-CE-CIV-IR-2596 Fixing cubical glass partition & glass door for baths 131,132 A&B 13-Jul-23 17-Jul-23 A A

1810 97 ELITE18-CON-CE-CIV-IR-2597 2nd coat paint & final coat paint for internal paint 131,132 GF,FF,MR 13-Jul-23 17-Jul-23 B 26-Jul-23 5-Aug-23 B B

1811 98 ELITE18-CON-CE-CIV-IR-2598 2nd coat paint & final coat paint for celling paint 131,132 GF,FF,MR 13-Jul-23 17-Jul-23 B 26-Jul-23 5-Aug-23 B B
GF to FF &
1812 99 ELITE18-CON-CE-CIV-IR-2599 Stair skirting 131,132 13-Jul-23 14-Jul-23 A A
FF to Mumty
1813 100 ELITE18-CON-CE-CIV-IR-2600 Instalaltion vanity miror for baths & powder room 131,132 A&B 13-Jul-23 14-Jul-23 A A

1814 101 ELITE18-CON-CE-CIV-IR-2601 Dismentling roof tile skirting for top roof 131,132 A&B 2-Aug-23 9-Aug-23 A A

1815 102 ELITE18-CON-CE-CIV-IR-2602 Installation roof tile skirting for top roof 131,132 A&B 2-Aug-23 9-Aug-23 B B

1816 103 ELITE18-CON-CE-CIV-IR-2603 Plaster patch work for retrofitting work external walls elevation 1,2,3,4 131,132 A&B 8-Aug-23 10-Aug-23 B B

1817 104 ELITE18-CON-CE-CIV-IR-2604 Instalaltion of pergola with all respect 131,132 A&B 10-Aug-23 12-Aug-23 A A

1818 105 ELITE18-CON-CE-CIV-IR-2605 Plaster work for internal patches 131,132 A&B 21-Aug-23 24-Aug-23 B B

1819 106 ELITE18-CON-CE-CIV-IR-2606 Instalaltion peragola cleats with mechanical bolts all respect 131,132 A&B 29-Aug-23 1-Sep-23 B B

1820 107 ELITE18-CON-CE-CIV-IR-2607 Instalaltion window frames & window glass with all respect 131,132 A&B 7-Sep-23 9-Sep-23 B B
Final inspection of IR's for villa 131,132 A&B Ref IR's
1821 108 ELITE18-CON-CE-CIV-IR-2608 131,132 A&B 13-Sep-23 14-Sep-23 A A
(2535,2553,2547,2566,2572,2573,2551,2575,2595,2581,2574,2584,2590
1822 109 ELITE18-CON-CE-CIV-IR-2609 Catch basin including MS grate with all respect 131,132 A&B 15-Sep-23 16-Sep-23 A A

1823 110 ELITE18-CON-CE-CIV-IR-2610 Inspection of IR's ref ir's (2552,1978) 131,132 A&B 15-Sep-23 16-Sep-23 A A

1824 111 ELITE18-CON-CE-CIV-IR-2611 Terrazzo layers for OHWT walls & floor 132 B 23-Dec-23 27-Dec-23 C C

1825

1826

1827

1828

1829

1830

1831 2751 TO 3000 129-130


1832 1 ELITE18-CON-CE-CIV-IR-2751 Dismentlling threshold for retrofiting work & debris remove 129,130 A&B 2-Dec-22 7-Dec-22 B B

1833 2 ELITE18-CON-CE-CIV-IR-2752 07 days cylinder concrete test PCC (1:4:8) under floating slab 129,130 A&B 2-Dec-22 7-Dec-22 B B

1834 3 ELITE18-CON-CE-CIV-IR-2753 Steel & filler board for floatting slab 129 A 5-Dec-22 15-Dec-22 B B

1835 4 ELITE18-CON-CE-CIV-IR-2754 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of column 129,130 A&B 13-Dec-22 15-Dec-22 B B

1836 5 ELITE18-CON-CE-CIV-IR-2755 RCC concrete (1:2:4) for floatting slab (Resubmit ir 7-1-23) 129 A 13-Dec-22 10-Jan-23 B B

1837 6 ELITE18-CON-CE-CIV-IR-2756 07 days cylinder concrete test RCC (3000 psi) floating slab 130 B 12-Dec-22 14-Dec-22 B B
Fixing MS beams with MS plates drilling anchoring mechnical & chemeical
1838 7 ELITE18-CON-CE-CIV-IR-2757 129,130 A&B 12-Dec-22 15-Dec-22 C 20-Dec-22 22-Dec-22 C 23-Dec-22 24-Dec-22 C 18-Jan-23 21-Jan-23 B 3-Apr-23 8-Apr-23 A A
boulting apoxy with all respect
1839 8 ELITE18-CON-CE-CIV-IR-2758 07 days cylinder concrete test RCC (4000 psi) retrofittings columns 129,130 GF 13-Dec-22 20-Dec-22 B B

1840 9 ELITE18-CON-CE-CIV-IR-2759 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 129,130 A&B 17-Dec-22 22-Dec-22 B B

1841 10 ELITE18-CON-CE-CIV-IR-2760 RCC top level for floatting slab 129,130 A&B 20-Dec-22 29-Dec-22 A A

1842 11 ELITE18-CON-CE-CIV-IR-2761 PCC top level for under the floatting slab 129,130 A&B 20-Dec-22 29-Dec-22 A A

1843 12 ELITE18-CON-CE-CIV-IR-2762 Sand top level for under the floatting slab 129,130 A&B 20-Dec-22 29-Dec-22 A A

1844 13 ELITE18-CON-CE-CIV-IR-2763 07 days cylinder concrete test RCC (4000 psi) retrofitting columns 129,130 FF 21-Dec-22 29-Dec-22 B B

1845 14 ELITE18-CON-CE-CIV-IR-2764 28 days cylinder concrete test PCC (1:4:8) under floating slab 129,130 A&B 23-Dec-22 29-Dec-22 B B

1846 15 ELITE18-CON-CE-CIV-IR-2765 28 days cylinder concrete test RCC (3000 psi) floating slab 130 B 2-Jan-23 7-Jan-23 B B

1847 16 ELITE18-CON-CE-CIV-IR-2766 28 days cylinder concrete test RCC (4000 psi) rofitting columns 129,130 GF 3-Jan-23 7-Jan-23 B B

1848 17 ELITE18-CON-CE-CIV-IR-2767 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of beam 129,130 FF 3-Jan-23 7-Jan-23 B B

1849 18 ELITE18-CON-CE-CIV-IR-2768 Dismentlling balck granite window sill for retrofitting work & debris remove 129,130 A&B 4-Jan-23 7-Jan-23 C 5-Jun-23 8-Jun-23 B B

1850 19 ELITE18-CON-CE-CIV-IR-2769 Surface clearence & side gola for top roof 129,130 A&B 5-Jan-23 7-Jan-23 C C

1851 20 ELITE18-CON-CE-CIV-IR-2770 Primer coat & membranes bituminous sheet for top roof 129,130 A&B 5-Jan-23 7-Jan-23 C 21-Jan-23 26-Jan-23 B B

1852 21 ELITE18-CON-CE-CIV-IR-2771 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of beam 129,130 GF 7-Jan-23 12-Jan-23 C 21-Jan-23 26-Jan-23 B B

1853 22 ELITE18-CON-CE-CIV-IR-2772 Layout for block masonory 129,130 A&B 9-Jan-23 12-Jan-23 A A

1854 23 ELITE18-CON-CE-CIV-IR-2773 28 days cylinder concrete test RCC (3000 psi) floating slab 129 A 11-Jan-23 14-Jan-23 B B

1855 24 ELITE18-CON-CE-CIV-IR-2774 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 129,130 FF 11-Jan-23 17-Jan-23 A A

1856 25 ELITE18-CON-CE-CIV-IR-2775 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 129,130 FF 11-Jan-23 17-Jan-23 A A

1857 26 ELITE18-CON-CE-CIV-IR-2776 Pond test for top roof 129,130 A&B 21-Jan-23 24-Jan-23 B B

1858 27 ELITE18-CON-CE-CIV-IR-2777 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 129,130 GF 28-Jan-23 4-Feb-23 A A

1859 28 ELITE18-CON-CE-CIV-IR-2778 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 129,130 FF 1-Feb-23 4-Feb-23 A A

1860 29 ELITE18-CON-CE-CIV-IR-2779 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 129,130 GF 18-Feb-23 23-Feb-23 A A

1861 30 ELITE18-CON-CE-CIV-IR-2780 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 129,130 A&B 2-Mar-23 4-Mar-23 B 17-May-23 18-May-23 B B

Page 54 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1862 31 ELITE18-CON-CE-CIV-IR-2781 PCC (1:4:8) for wordrobe upstand 129,130 A&B 7-Mar-23 10-Mar-23 A A

1863 32 ELITE18-CON-CE-CIV-IR-2782 Block masonory & lintels for internal side 129,130 GF 20-Mar-23 24-Mar-23 B B

1864 33 ELITE18-CON-CE-CIV-IR-2783 Primer coat & membranes bituminous sheet for external side 129,130 A&B 22-Mar-23 24-Mar-23 A A

1865 34 ELITE18-CON-CE-CIV-IR-2784 PCC (1:4:8) for manhole gully trap,electrical chamber & electrical handhole 129,130 A&B 29-Mar-23 1-Apr-23 A A

1866 35 ELITE18-CON-CE-CIV-IR-2785 PCC (1:3:6) for manhole gully trap,electrical chamber & electrical handhole 129,130 A&B 29-Mar-23 1-Apr-23 A A

1867 36 ELITE18-CON-CE-CIV-IR-2786 Block masonory for manhole gully trap,electrical chamber & electrical handhole 130 A&B 29-Mar-23 1-Apr-23 B B

1868 37 ELITE18-CON-CE-CIV-IR-2787 Plaster work for internal walls 129,130 A&B 6-Apr-23 8-Apr-23 B 6-Jun-23 8-Jun-23 C 12-Jul-23 14-Jul-23 B B

1869 38 ELITE18-CON-CE-CIV-IR-2788 Plaster work & corner beads for retro fitting columns & internal walls 129,130 GF,FF 6-Apr-23 10-Apr-23 A A

1870 39 ELITE18-CON-CE-CIV-IR-2789 Plaster & roof tile for top roof floor 129,130 A&B 7-Apr-23 12-Apr-23 C 18-May-23 25-May-23 B B

1871 40 ELITE18-CON-CE-CIV-IR-2790 Dismentlling wall tile for kitchen 129,130 A&B 11-Apr-23 14-Apr-23 A A

1872 41 ELITE18-CON-CE-CIV-IR-2791 Jumbolon XPS board 50mm & polythene sheet laying & screeding for top roof 129,130 A&B 14-Apr-23 2-May-23 B B

1873 42 ELITE18-CON-CE-CIV-IR-2792 FDT test 1st layer sand filling for external side 129,130 A&B 4-May-23 11-May-23 A A

1874 43 ELITE18-CON-CE-CIV-IR-2793 Dismentlling split stone for external side 130 B 5-May-23 8-May-23 B B

1875 44 ELITE18-CON-CE-CIV-IR-2794 Plaster for split stone external side 130 B 8-May-23 9-May-23 A A

1876 45 ELITE18-CON-CE-CIV-IR-2795 Block masonory for manhole gully trap,electrical chamber & electrical handhole 129 A 8-May-23 18-May-23 B B

1877 46 ELITE18-CON-CE-CIV-IR-2796 Installation OHWT cover & concrete uper side 129,130 A&B 9-May-23 16-May-23 A A

1878 47 ELITE18-CON-CE-CIV-IR-2797 Side gola & laying aggregates for mumty top 129,130 A&B 9-May-23 16-May-23 A A

1879 48 ELITE18-CON-CE-CIV-IR-2798 Plaster for partition wall external side 129,130 A&B 9-May-23 16-May-23 B B

1880 49 ELITE18-CON-CE-CIV-IR-2799 PCC (1:3:6) AC outdoor pad & PPRC pad for top roof 129,130 A&B 10-May-23 25-May-23 B B
Pudlo plaster & benching for manhole gully trap electrical chamber & electrical
1881 50 ELITE18-CON-CE-CIV-IR-2800 129,130 A&B 18-May-23 22-May-23 C 29-May-23 5-Jun-23 C 12-Jul-23 13-Jul-23 B B
handhole
1882 51 ELITE18-CON-CE-CIV-IR-2801 Instalaltion of perlino floor marbal floor skirting ledge wall top & threshold 130 GF,FF,MR 31-May-23 5-Jun-23 B 24-Jun-23 6-Jul-23 B 26-Jul-23 5-Aug-23 B B

1883 52 ELITE18-CON-CE-CIV-IR-2802 Installation of perlino floor marbal 129 GF,FF,M 31-May-23 5-Jun-23 B 24-Jun-23 6-Jul-23 B 26-Jul-23 5-Aug-23 B B

1884 53 ELITE18-CON-CE-CIV-IR-2803 Installation of perlino marbal for stair 129 GF,FF,M 31-May-23 5-Jun-23 B 26-Jun-23 5-Aug-23 B B

1885 54 ELITE18-CON-CE-CIV-IR-2804 Installation of perlino marbal for stair 130 GF,FF 31-May-23 5-Jun-23 B 26-Jul-23 5-Aug-23 B B

1886 55 ELITE18-CON-CE-CIV-IR-2805 Instalaltion black granite window sill 129,130 GF,FF,MR 31-May-23 5-Jun-23 B 22-Aug-23 UR UR

1887 56 ELITE18-CON-CE-CIV-IR-2806 Instalaltion black granite verticla window sill 129,130 GF,FF,MR 31-May-23 5-Jun-23 B 22-Aug-23 24-Aug-23 B 2-Oct-23 10-Oct-23 A A
Installation suspension & framming system for celling work GF,FF,Maid Room &
1888 57 ELITE18-CON-CE-CIV-IR-2807 129,130 GF,FF,MR 5-Jun-23 8-Jun-23 C 24-Jun-23 6-Jul-23 B 26-Jul-23 5-Aug-23 A A
gypsum board jointing & tapping for celling work dry area
1889 58 ELITE18-CON-CE-CIV-IR-2808 Instalaation pavers & pavers skirting for external side 129,130 A&B 5-Jun-23 8-Jun-23 C 24-Jun-23 6-Jul-23 B 13-Jul-23 20-Jul-23 B 26-Sep-23 27-Sep-23 A A

1890 59 ELITE18-CON-CE-CIV-IR-2809 Primer caot 1st coat putty & nd coat putty for internal paint 129,130 GF,FF,MR 5-Jun-23 8-Jun-23 B 24-Jun-23 6-Jul-23 B 12-0-2023 12-Aug-23 A A

1891 60 ELITE18-CON-CE-CIV-IR-2810 Block masonory for mechnical wall 129,130 GF,FF 5-Jun-23 8-Jun-23 B B

1892 61 ELITE18-CON-CE-CIV-IR-2811 Plaster work & wall mounted cement board for cistern flushing tank 129,130 GF,FF 5-Jun-23 8-Jun-23 B 27-Jul-23 5-Aug-23 A A

1893 62 ELITE18-CON-CE-CIV-IR-2812 Instalaltion split stone for external side 130 B 5-Jun-23 8-Jun-23 B B

1894 63 ELITE18-CON-CE-CIV-IR-2813 Instalaltion split stone for external side 129 A 5-Jun-23 8-Jun-23 B B

1895 64 ELITE18-CON-CE-CIV-IR-2814 Sand excavated during pilling works 129,130 A&B 6-Jun-23 8-Jun-23 B B

1896 65 ELITE18-CON-CE-CIV-IR-2815 Plaster patch work for external side elevation 1,2,3,4 129,130 A&B 6-Jun-23 8-Jun-23 B B

1897 66 ELITE18-CON-CE-CIV-IR-2816 Cementtitious coat for baths & powder room water proofing 129,130 A&B 9-Jun-23 15-Jun-23 A A

1898 67 ELITE18-CON-CE-CIV-IR-2817 Pond test for baths 129,130 FF,MB 9-Jun-23 15-Jun-23 A A

1899 68 ELITE18-CON-CE-CIV-IR-2818 Block masonory for mechnical wall 129 GF,FF 10-Jun-23 14-Jun-23 A A

1900 69 ELITE18-CON-CE-CIV-IR-2819 Plaster work & wall mounted cement board for cistern flushing tank 129 GF,FF 10-Jun-23 17-Jun-23 B 27-Jul-23 5-Aug-23 A A

1901 70 ELITE18-CON-CE-CIV-IR-2820 Installation black granite for partition wall 129,130 A&B 17-Jun-23 6-Jul-23 B B

1902 71 ELITE18-CON-CE-CIV-IR-2821 07 days cylinder concrete test PCC (1:3:6) external side 129,130 A&B 17-Jun-23 20-Jun-23 B B

1903 72 ELITE18-CON-CE-CIV-IR-2822 Polythene sheet 1000 micron for external side 129,130 A&B 17-Jun-23 20-Jun-23 A A

1904 73 ELITE18-CON-CE-CIV-IR-2823 PCC (1:3:6) for external side 129,130 A&B 17-Jun-23 20-Jun-23 B B
Primer caot 1st coat putty 2nd coat putty 1st coat paint 2nd coat paint & final coat
1905 74 ELITE18-CON-CE-CIV-IR-2824 129,130 GF,FF,MR 24-Jun-23 6-Jul-23 B 12-Aug-23 16-Aug-23 A A
paint for celling paint
Base primer for external graffy elevation 1,2,3,4 OHWT mumty out side boundry
1906 75 ELITE18-CON-CE-CIV-IR-2825 129,130 A&B 24-Jun-23 6-Jul-23 B B
wall internal side & parapet wall internal side
Graffy & weather sheet for external side elevation 1,2,3,4 OHWT mumty out side
1907 76 ELITE18-CON-CE-CIV-IR-2826 129,130 A&B 24-Jun-23 6-Jul-23 B 26-Jul-23 5-Aug-23 A A
boundry wall internal side & parapet wall internal side
Installation of suspension & framming system for celling work GF,FF,Maid room
1908 77 ELITE18-CON-CE-CIV-IR-2827 129,130 GF,FF,MR 24-Jun-23 6-Jul-23 B 26-Jul-23 5-Aug-23 A A
& installation gypsum board jointing & tapping for celling work wet area
1909 78 ELITE18-CON-CE-CIV-IR-2828 Installation crema mo for boundry wall 129,130 A&B 24-Jun-23 6-Jul-23 B B

1910 79 ELITE18-CON-CE-CIV-IR-2829 Perlino marbal for boundry wall top meter box & top roof column 129,130 A&B 24-Jun-23 6-Jul-23 B B

1911 80 ELITE18-CON-CE-CIV-IR-2830 Installation wall tile & floor tile for kitchen 129,130 A&B 24-Jun-23 6-Jul-23 A A

1912 81 ELITE18-CON-CE-CIV-IR-2831 Instalaltion wall tile & floor tile for baths & powder room 129,130 A&B 24-Jun-23 6-Jul-23 B B

1913 82 ELITE18-CON-CE-CIV-IR-2832 Fixing of access panel in celling 129,130 A&B 24-Jun-23 6-Jul-23 B B

1914 83 ELITE18-CON-CE-CIV-IR-2833 Block masonory for OHWT 129,130 A&B 24-Jun-23 6-Jul-23 A A

1915 84 ELITE18-CON-CE-CIV-IR-2834 Plaster for under te OHWT 129,130 A&B 24-Jun-23 6-Jul-23 A A

1916 85 ELITE18-CON-CE-CIV-IR-2835 Installation MS louvers under the OHWT with all respect 129,130 A&B 24-Jun-23 6-Jul-23 A A

Page 55 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1917 86 ELITE18-CON-CE-CIV-IR-2836 Instalaltion transfer & booster pump cover with all respect 129,130 A&B 24-Jun-23 6-Jul-23 C 12-Jul-23 13-Jul-23 B B

1918 87 ELITE18-CON-CE-CIV-IR-2837 Installation cover for UGWT with paint 129,130 A&B 24-Jun-23 6-Jul-23 B B
Installation cover for manhole gully trap electrical chamber & electrical handhole
1919 88 ELITE18-CON-CE-CIV-IR-2838 129,130 A&B 24-Jun-23 6-Jul-23 B 17-Aug-23 21-Aug-23 A A
with paint
1920 89 ELITE18-CON-CE-CIV-IR-2839 28 days cylinder concrete test PCC (1:3:6) external side 129,130 A&B 7-Jul-23 13-Jul-23 B B

1921 90 ELITE18-CON-CE-CIV-IR-2840 Installation doors wardrobes iron mongries skirting vanity & transition strip final IR 129,130 A&B 6-Jul-23 20-Jul-23 B 24-Jul-23 7-Aug-23 B B

1922 91 ELITE18-CON-CE-CIV-IR-2841 Installation HDF floor 129,130 GF,FF 11-Jul-23 13-Jul-23 B B

1923 92 ELITE18-CON-CE-CIV-IR-2842 MS pergola bulkhead with paint cement board sheet 129 A 12-Jul-23 13-Jul-23 B B

1924 93 ELITE18-CON-CE-CIV-IR-2843 Peragola jointing with all respect 129,130 A&B 12-Jul-23 13-Jul-23 B 15-Sep-23 18-Sep-23 A A

1925 94 ELITE18-CON-CE-CIV-IR-2844 Paint for MS peragola 129,130 A&B 12-Jul-23 13-Jul-23 B B

1926 95 ELITE18-CON-CE-CIV-IR-2845 Paint for MS porch fence 129,130 A&B 12-Jul-23 13-Jul-23 B B

1927 96 ELITE18-CON-CE-CIV-IR-2846 Fixing cubical glass partition & glass door for baths 129,130 GF,FF 13-Jul-23 14-Jul-23 A A
GF to FF &
1928 97 ELITE18-CON-CE-CIV-IR-2847 Installation glass ralling & wooden hand rail for stair 129,130 13-Jul-23 14-Jul-23 B 18-Aug-23 22-Aug-23 A A
FF to Mumty
GF to FF &
1929 98 ELITE18-CON-CE-CIV-IR-2848 Stair skirting 129,130 13-Jul-23 14-Jul-23 A A
FF to Mumty
1930 99 ELITE18-CON-CE-CIV-IR-2849 Installation floor & wall tile for maid bath 129,130 A&B 13-Jul-23 14-Jul-23 B 27-Jul-23 5-Aug-23 B B

1931 100 ELITE18-CON-CE-CIV-IR-2850 Instalaltion floor tile & floor skirting for maid room 129,130 A&B 13-Jul-23 14-Jul-23 B 27-Jul-23 5-Aug-23 A A

1932 101 ELITE18-CON-CE-CIV-IR-2851 Instalaltion MS vanity frame for bath & powder room 129,130 A&B 13-Jul-23 14-Jul-23 B B

1933 102 ELITE18-CON-CE-CIV-IR-2852 Installation vanity perlino marbal for baths & powder room 129,130 A&B 13-Jul-23 17-Jul-23 B 18-Aug-23 22-Aug-23 A A

1934 103 ELITE18-CON-CE-CIV-IR-2853 Instalaltion vanity miror for baths & powder room 129,130 A&B 13-Jul-23 14-Jul-23 A A

1935 104 ELITE18-CON-CE-CIV-IR-2854 Plaster for HDF floor 129,130 GF,FF 13-Jul-23 14-Jul-23 A A

1936 105 ELITE18-CON-CE-CIV-IR-2855 Installation black granite strip for shower cabin 129,130 GF,FF 13-Jul-23 14-Jul-23 A A

1937 106 ELITE18-CON-CE-CIV-IR-2856 Installation aluminium door for kitchen & mumty 129,130 A&B 13-Jul-23 17-Jul-23 B B

1938 107 ELITE18-CON-CE-CIV-IR-2857 Installation MS grating for main gate 129,130 A&B 14-Jul-23 17-Jul-23 A A

1939 108 ELITE18-CON-CE-CIV-IR-2858 Final coat paint for internal paint 129,130 GF,FF,MR 26-Jul-23 5-Aug-23 A A

1940 109 ELITE18-CON-CE-CIV-IR-2859 Installation threshold perlino marbal mumty 129,130 A&B 27-Jul-23 5-Aug-23 B B

1941 110 ELITE18-CON-CE-CIV-IR-2860 Instalaltion of pergola with all respect 129,130 A&B 10-Aug-23 12-Aug-23 A A

1942 111 ELITE18-CON-CE-CIV-IR-2861 Window jambs prepration 129,130 GF,FF 17-Aug-23 22-Aug-23 A A

1943 112 ELITE18-CON-CE-CIV-IR-2862 Plaster work for internal patches 129,130 A&B 21-Aug-23 24-Aug-23 B B
Final Inspection of ir for villa 129,130 ref
1944 113 ELITE18-CON-CE-CIV-IR-2863 129,130 A&B 29-Aug-23 31-Aug-23 A A
ir(2831,2789,2820,2806,2829,2856,2825,2845,2842,2843,2832
1945 114 ELITE18-CON-CE-CIV-IR-2864 Instalaltion peragola cleats with mechanical bolts all respect 129,130 A&B 29-Aug-23 1-Sep-23 B B
PCC (1:4:8) under kerb stone & installation kerb stone & side gola for external side
1946 115 ELITE18-CON-CE-CIV-IR-2865 129,130 A&B 5-Sep-23 8-Sep-23 A A
elevation 2
1947 116 ELITE18-CON-CE-CIV-IR-2866 Instalaltion window frames & window glass with all respect 129,130 A&B 7-Sep-23 9-Sep-23 B B
Final inspection of ir's for villa 129,130 ref ir
1948 117 ELITE18-CON-CE-CIV-IR-2867 129,130 A&B 13-Sep-23 14-Sep-23 A A
(2800,2831,2789,2820,2842,2825,2856,2829,2843,2828,2845)
1949 118 ELITE18-CON-CE-CIV-IR-2868 Inspection of IR;s for villa#129,130 A&B Ref IR's (1977,2837,2852,2832,2806) 129,130 A&B 15-Sep-23 16-Sep-23 A A

1950 119 ELITE18-CON-CE-CIV-IR-2869 Catch basin including MS grate with all respect 129,130 A&B 15-Sep-23 16-Sep-23 A A

1951

1952

1953

1954

1955

1956 3001 TO 3250 127-128


1957 1 ELITE18-CON-CE-CIV-IR-3001 Dismentlling threshold for retrofiting work & debris remove 127,128 A&B 2-Dec-22 7-Dec-22 B B

1958 2 ELITE18-CON-CE-CIV-IR-3002 Steel fixing & anchor epoxy for column jackting 127,128 GF,FF 5-Dec-22 9-Dec-22 B B

1959 3 ELITE18-CON-CE-CIV-IR-3003 Polythene sheeet (1000 micron) under the PCC floating slab 127,128 A&B 13-Dec-22 14-Dec-22 B B

1960 4 ELITE18-CON-CE-CIV-IR-3004 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of column 127,128 A&B 10-Dec-22 13-Dec-22 B B

1961 5 ELITE18-CON-CE-CIV-IR-3005 PCC (1:4:8) under the floating slab 127,128 A&B 13-Dec-22 13-Dec-22 B B
Fixing MS beams with MS plates drilling anchoring mechnical & chemeical
1962 6 ELITE18-CON-CE-CIV-IR-3006 127,128 A&B 12-Dec-22 15-Dec-22 C 20-Dec-22 22-Dec-22 C 23-Dec-22 29-Dec-22 C 18-Jan-23 21-Jan-23 B 3-Apr-23 6-Apr-23 A A
boulting apoxy with all respect
1963 7 ELITE18-CON-CE-CIV-IR-3007 Steel & filler board for floatting slab 127,128 A&B 15-Dec-22 20-Dec-22 B B

1964 8 ELITE18-CON-CE-CIV-IR-3008 RCC concrete (1:2:4) for floatting slab 127,128 A&B 15-Dec-22 20-Dec-22 B B

1965 9 ELITE18-CON-CE-CIV-IR-3009 07 days cylinder concrete test PCC (1:4:8) under floating slab 127,128 A&B 17-Dec-22 22-Dec-22 B B

1966 10 ELITE18-CON-CE-CIV-IR-3010 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 127,128 A&B 17-Dec-22 22-Dec-22 B B

1967 11 ELITE18-CON-CE-CIV-IR-3011 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 127,128 A&B 17-Dec-22 22-Dec-22 B B

1968 12 ELITE18-CON-CE-CIV-IR-3012 RCC top level for floatting slab 127,128 A&B 20-Dec-22 28-Dec-22 C 9-Jan-23 12-Jan-23 A A

1969 13 ELITE18-CON-CE-CIV-IR-3013 PCC top level for under the floatting slab 127,128 A&B 20-Dec-22 29-Dec-22 B B

1970 14 ELITE18-CON-CE-CIV-IR-3014 Sand top level for under the floatting slab 127,128 A&B 20-Dec-22 29-Dec-22 B B

1971 15 ELITE18-CON-CE-CIV-IR-3015 07 days cylinder concrete test RCC (3000 psi) floating slab 128 B 24-Dec-22 29-Dec-22 B B

Page 56 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
1972 16 ELITE18-CON-CE-CIV-IR-3016 Dismentlling balck granite window sill for retrofitting work & debris remove 127,128 A&B 4-Jan-23 7-Jan-23 C 5-Jun-23 8-Jun-23 B B

1973 17 ELITE18-CON-CE-CIV-IR-3017 Steel & filler board for floatting slab 127 A 6-Jan-23 10-Jan-23 B B

1974 18 ELITE18-CON-CE-CIV-IR-3018 RCC concrete (1:2:4) for floatting slab 127 A 6-Jan-23 10-Jan-23 B B

1975 19 ELITE18-CON-CE-CIV-IR-3019 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of beam ,128 A,B 7-Jan-23 12-Jan-23 C 21-Jan-23 26-Jan-23 B B

1976 20 ELITE18-CON-CE-CIV-IR-3020 28 days cylinder concrete test PCC (1:4:8) under floating slab 127,128 A,B 7-Jan-23 12-Jan-23 B B

1977 21 ELITE18-CON-CE-CIV-IR-3021 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 127,128 A,B 7-Jan-23 12-Jan-23 B B

1978 22 ELITE18-CON-CE-CIV-IR-3022 Layout for block masonory 127,128 A,B 9-Jan-23 12-Jan-23 A A

1979 23 ELITE18-CON-CE-CIV-IR-3023 07 days cylinder concrete test RCC (3000 psi) floating slab 127 A 14-Jan-23 17-Jan-23 A A

1980 24 ELITE18-CON-CE-CIV-IR-3024 28 days cylinder concrete test RCC (3000 psi) floating slab 128 B 14-Jan-23 18-Jan-23 A A

1981 25 ELITE18-CON-CE-CIV-IR-3025 Primer coat & membranes bituminous sheet for top roof 127,128 A,B 21-Jan-23 25-Jan-23 B B

1982 26 ELITE18-CON-CE-CIV-IR-3026 Pond test for top roof 127,128 A,B 21-Jan-23 27-Jan-23 B B

1983 27 ELITE18-CON-CE-CIV-IR-3027 07 days cylinder concrete test RCC (4000 psi) retrofitting beam 127,128 GF 28-Jan-23 4-Feb-23 A A

1984 28 ELITE18-CON-CE-CIV-IR-3028 Block masonory & lintels for internal side 127,128 GF 2-Feb-23 4-Feb-23 A A

1985 29 ELITE18-CON-CE-CIV-IR-3029 28 days cylinder concrete test RCC (3000 psi) floating slab 127 A 4-Feb-23 8-Feb-23 A A

1986 30 ELITE18-CON-CE-CIV-IR-3030 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 127,128 GF 18-Feb-23 23-Feb-23 A A

1987 31 ELITE18-CON-CE-CIV-IR-3031 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of column 127,128 FF 25-Feb-23 28-Feb-23 C 1-Mar-23 3-Mar-23 B B

1988 32 ELITE18-CON-CE-CIV-IR-3032 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of beam 127,128 FF 1-Mar-23 3-Mar-23 A A

1989 33 ELITE18-CON-CE-CIV-IR-3033 PCC (1:3:6) for AC outdoor pedestal & exhaust fan pad 127,128 A&B 2-Mar-23 4-Mar-23 B 17-May-23 18-May-23 B B

1990 34 ELITE18-CON-CE-CIV-IR-3034 PCC (1:4:8) for wordrobe upstand 127,128 A&B 7-Mar-23 10-Mar-23 A A

1991 35 ELITE18-CON-CE-CIV-IR-3035 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 127,128 FF 8-Mar-23 15-Mar-23 A A

1992 36 ELITE18-CON-CE-CIV-IR-3036 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 127,128 FF 8-Mar-23 15-Mar-23 B B

1993 37 ELITE18-CON-CE-CIV-IR-3037 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 127,128 FF 29-Mar-23 6-Apr-23 A A

1994 38 ELITE18-CON-CE-CIV-IR-3038 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 127,128 FF 29-Mar-23 6-Apr-23 B B

1995 39 ELITE18-CON-CE-CIV-IR-3039 Primer coat & membranes bituminous sheet for external side 127,128 A&B 29-Mar-23 1-Apr-23 A A

1996 40 ELITE18-CON-CE-CIV-IR-3040 Plaster work for internal walls 127,128 GF 6-Apr-23 8-Apr-23 B B

1997 41 ELITE18-CON-CE-CIV-IR-3041 Plaster work & corner beads for retro fittig columns & internal walls 127,128 GF,FF 6-Apr-23 8-Apr-23 A A

1998 42 ELITE18-CON-CE-CIV-IR-3042 Dismentlling wall tile for kitchen 127,128 A&B 11-Apr-23 14-Apr-23 A A

1999 43 ELITE18-CON-CE-CIV-IR-3043 Jumbolon XPS board 50mm & polythene sheet laying & screeding for top roof 127,128 A&B 14-Apr-23 2-May-23 B B

2000 44 ELITE18-CON-CE-CIV-IR-3044 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 127,128 A&B 8-May-23 18-May-23 A A

2001 45 ELITE18-CON-CE-CIV-IR-3045 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 127,128 A&B 8-May-23 18-May-23 B B

2002 46 ELITE18-CON-CE-CIV-IR-3046 Installation OHWT cover & concrete & concrete uper side 127,128 A&B 9-May-23 16-May-23 A A

2003 47 ELITE18-CON-CE-CIV-IR-3047 Side gola & laying aggregates for mumty top 127,128 A&B 9-May-23 16-May-23 A A

2004 48 ELITE18-CON-CE-CIV-IR-3048 Plaster for partition wall external side 127,128 A&B 9-May-23 16-May-23 B B

2005 49 ELITE18-CON-CE-CIV-IR-3049 PCC (1:3:6) AC outdoor pad & PPRC pad for top roof 127,128 A&B 10-May-23 25-May-23 B B

2006 50 ELITE18-CON-CE-CIV-IR-3050 Plaster roof tile & skirting for top roof floor 127,128 A&B 18-May-23 25-May-23 B B
Pudlo plaster & benching for manhole gully trap electrical chamber & electrical
2007 51 ELITE18-CON-CE-CIV-IR-3051 127,128 A&B 29-May-23 6-Jul-23 C 19-Aug-23 UR UR
handhole
2008 52 ELITE18-CON-CE-CIV-IR-3052 Block masonory for manhole gully trap electrical chamber & electrical handhole 127,128 A&B 29-May-23 8-Jun-23 A A

2009 53 ELITE18-CON-CE-CIV-IR-3053 FDT test 1st layer sand filling for extrnal side 127,128 A&B 5-Jun-23 8-Jun-23 B B

2010 54 ELITE18-CON-CE-CIV-IR-3054 Dismentling perlino marbal for stair GF,FF & debris remove 127,128 A&B 6-Jun-23 8-Jun-23 B B

2011 55 ELITE18-CON-CE-CIV-IR-3055 Plaster patch work for external side elevation 1,2,3,4 127,128 A&B 6-Jun-23 8-Jun-23 B B

2012 56 ELITE18-CON-CE-CIV-IR-3056 Polythene sheeet (1000 micron) for external side 128 B 7-Jun-23 10-Jun-23 A A

2013 57 ELITE18-CON-CE-CIV-IR-3057 PCC (1:3:6) for external side 128 B 7-Jun-23 10-Jun-23 B B

2014 58 ELITE18-CON-CE-CIV-IR-3058 FDT test 1st layer sand filling for extrnal side 127 A 9-Jun-23 12-Jun-23 A A

2015 59 ELITE18-CON-CE-CIV-IR-3059 Polythene sheet 1000 micron for external side 127 A 12-Jun-23 14-Jun-23 A A

2016 60 ELITE18-CON-CE-CIV-IR-3060 PCC (1:3:6) for external side 127 A 12-Jun-23 14-Jun-23 B B

2017 61 ELITE18-CON-CE-CIV-IR-3061 07 days cylinder concrete test PCC (1:3:6) external side 128 B 14-Jun-23 17-Jun-23 A A

2018 62 ELITE18-CON-CE-CIV-IR-3062 Dismentlling perlino marbal for floor first floor & debris remove 127 A 15-Jun-23 17-Jun-23 A A

2019 63 ELITE18-CON-CE-CIV-IR-3063 Dismentlling split stone for external side 128 B 15-Jun-23 17-Jun-23 A A

2020 64 ELITE18-CON-CE-CIV-IR-3064 07 days cylinder concrete test PCC (1:3:6) external side 127 A 15-Jun-23 17-Jun-23 A A

2021 65 ELITE18-CON-CE-CIV-IR-3065 Installation wall & floor tile for kitchen 127,128 A&B 23-Jun-23 6-Jul-23 B 27-Jul-23 5-Aug-23 B B

2022 66 ELITE18-CON-CE-CIV-IR-3066 Block masonory for mechnical wall 127,128 GF,FF 23-Jun-23 6-Jul-23 B B

2023 67 ELITE18-CON-CE-CIV-IR-3067 Plaster work & wall mounted cement board for cistern flushing tank 127,128 GF,FF 23-Jun-23 6-Jul-23 B 13-Jul-23 17-Jul-23 A A

2024 68 ELITE18-CON-CE-CIV-IR-3068 28 days cylinder concrete test RCC concrete (1:3:6) external side 128 B 7-Jul-23 13-Jul-23 B B

2025 69 ELITE18-CON-CE-CIV-IR-3069 28 days cylinder concrete test RCC concrete (1:3:6) external side 127 A 7-Jul-23 13-Jul-23 A A

2026 70 ELITE18-CON-CE-CIV-IR-3070 Installation perlino marble for floor 127,128 A&B 6-Jul-23 8-Jul-23 B 26-Jul-23 5-Aug-23 B 12-Aug-23 16-Aug-23 A A

Page 57 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
Base primer & graffy for external side elevation 1,2,3,4 OHWT mumty out side
2027 71 ELITE18-CON-CE-CIV-IR-3071 127,128 A&B 6-Jul-23 8-Jul-23 B 18-Aug-23 23-Aug-23 B B
boundry wall internal wall internal side & parapet wall internal side
GF to FF &
2028 72 ELITE18-CON-CE-CIV-IR-3072 Installation perlino marbal for stair 127,128 6-Jul-23 8-Jul-23 A A
FF to Mumty
GF to FF &
2029 73 ELITE18-CON-CE-CIV-IR-3073 Primer coat 1st coat putty & 2nd coat putty for celling paint 127,128 FF to Maid 6-Jul-23 8-Jul-23 C C
room
GF,FF, Maid
2030 74 ELITE18-CON-CE-CIV-IR-3074 Primer coat 1st coat putty & 2nd coat putty for internal paint 127,128 6-Jul-23 8-Jul-23 C C
room
2031 75 ELITE18-CON-CE-CIV-IR-3075 Installation black granite for parition wall external side 127,128 A&B 6-Jul-23 8-Jul-23 C 26-Jul-23 5-Aug-23 B 30-Oct-23 1-Nov-23 B B
GF,FF, Maid
2032 76 ELITE18-CON-CE-CIV-IR-3076 Installation black granite window sill 127,128 6-Jul-23 8-Jul-23 B B
room
2033 77 ELITE18-CON-CE-CIV-IR-3077 Installation split stone for external side 128 B 13-Jul-23 17-Jul-23 B B

2034 78 ELITE18-CON-CE-CIV-IR-3078 Installation split stone for external side 127 A 13-Jul-23 14-Jul-23 B B

2035 79 ELITE18-CON-CE-CIV-IR-3079 Block masonory for OHWT 127,128 A&B 13-Jul-23 17-Jul-23 A A

2036 80 ELITE18-CON-CE-CIV-IR-3080 Plaster for under the OHWT 127,128 A&B 13-Jul-23 17-Jul-23 A A

2037 81 ELITE18-CON-CE-CIV-IR-3081 Installation MS louvers under the OHWT with all respect 127,128 A&B 13-Jul-23 18-Jul-23 B B
Instalaltion suspension & framming system for celling work GF,FF & maid room
2038 82 ELITE18-CON-CE-CIV-IR-3082 installation gypsum board jointing & tapping for celling work wet area GF,FF & 128 B 18-Jul-23 22-Jul-23 B 26-Jul-23 5-Aug-23 B 12-Aug-23 16-Aug-23 A A
Maid Room
2039 83 ELITE18-CON-CE-CIV-IR-3083 Instalaltion wall tile & floor tile for baths & powder room 127,128 A&B 18-Jul-23 20-Jul-23 B 30-Oct-23 1-Nov-23 A A
Instalaltion suspension & framming system for celling work GF,FF & maid room
2040 84 ELITE18-CON-CE-CIV-IR-3084 installation gypsum board jointing & tapping for celling work dry area GF,FF & 128 B 18-Jul-23 22-Jul-23 B 26-Jul-23 5-Aug-23 A A
Maid Room
2041 85 ELITE18-CON-CE-CIV-IR-3085 Installation perlino marbal for ledge wall top 128 GF,FF 18-Jul-23 20-Jul-23 B B

2042 86 ELITE18-CON-CE-CIV-IR-3086 Installation black granite vertical window sill 127,128 GF,FF,MR 18-Jul-23 20-Jul-23 B 30-Oct-23 1-Nov-23 B B

2043 87 ELITE18-CON-CE-CIV-IR-3087 Installation MS grating for main gate 127,128 A&B 18-Jul-23 20-Jul-23 B 30-Oct-23 1-Nov-23 B B

2044 88 ELITE18-CON-CE-CIV-IR-3088 Installation aluminium door for kitchen & mumty 128 B 18-Jul-23 20-Jul-23 B 22-Aug-23 24-Aug-23 A A

2045 89 ELITE18-CON-CE-CIV-IR-3089 Installation threshold perlino marbal mumty 127,128 A&B 27-Jul-23 5-Aug-23 A A

2046 90 ELITE18-CON-CE-CIV-IR-3090 Installation floor tile & floor skirting for maid room 127,128 A&B 27-Jul-23 5-Aug-23 B 30-Oct-23 1-Nov-23 A A

2047 91 ELITE18-CON-CE-CIV-IR-3091 Installation floor & wall tile for maid bath 127,128 A&B 27-Jul-23 5-Aug-23 B 30-Oct-23 1-Nov-23 A A

2048 92 ELITE18-CON-CE-CIV-IR-3092 Plaster patch work & retrofitting work plaster for external side elevation 1,2,3,4 127,128 A&B 27-Jul-23 5-Aug-23 B B

2049 93 ELITE18-CON-CE-CIV-IR-3093 Installation MS vanity for baths & powder room 127,128 A&B 27-Jul-23 5-Aug-23 A A

2050 94 ELITE18-CON-CE-CIV-IR-3094 Installation vanity perlino marbal for baths & powder room 127,128 A&B 27-Jul-23 5-Aug-23 B B

2051 95 ELITE18-CON-CE-CIV-IR-3095 Installation vanity miror for baths & powder room 127,128 A&B 27-Jul-23 5-Aug-23 B B

2052 96 ELITE18-CON-CE-CIV-IR-3096 Plaster patch work for retrofitting work external walls elevation 1,2,3,4 127,128 A&B 8-Aug-23 10-Aug-23 B B

2053 97 ELITE18-CON-CE-CIV-IR-3097 MS pergola bulkhead with paint cement board sheet 127,128 A&B 9-Aug-23 10-Aug-23 B 30-Oct-23 1-Nov-23 A A

2054 98 ELITE18-CON-CE-CIV-IR-3098 Perlino marbal for boundry wall top meter box & top roof column 127,128 A&B 10-Aug-23 12-Aug-23 B B

2055 99 ELITE18-CON-CE-CIV-IR-3099 Installation MS vanity frame for baths & powder room 127,128 A&B 10-Aug-23 12-Aug-23 A A

2056 100 ELITE18-CON-CE-CIV-IR-3100 Installation of pergola with all respect 127,128 A&B 10-Aug-23 12-Aug-23 A A

2057 101 ELITE18-CON-CE-CIV-IR-3101 Installation black granite strip for shower cabin 127,128 GF,FF 10-Aug-23 12-Aug-23 A A

2058 102 ELITE18-CON-CE-CIV-IR-3102 Installation crema mo for boundry wall 127,128 A&B 10-Aug-23 12-Aug-23 A A

2059 103 ELITE18-CON-CE-CIV-IR-3103 Fixing cubical glass partition & glass door for baths 127,128 GF,FF 12-Aug-23 16-Aug-23 A A
Primer coat 1st coat putty 2nd coat putty 1st coat paint 2nd coat paint & final coat
2060 104 ELITE18-CON-CE-CIV-IR-3104 127,128 GF,FF,MR 12-Aug-23 16-Aug-23 A A
paint for celling paint
Primer coat 1st coat putty 2nd coat putty 1st coat paint 2nd coat paint & final coat
2061 105 ELITE18-CON-CE-CIV-IR-3105 127,128 GF,FF,MR 12-Aug-23 16-Aug-23 A A
paint for internal paint
Installation suspension & framming system for celling work GF,FF,Maid Room &
2062 106 ELITE18-CON-CE-CIV-IR-3106 127 GF,FF,MR 12-Aug-23 16-Aug-23 C 18-Aug-23 UR UR
gypsum board jointing & tapping for celling work dry area
Installation suspension & framming system for celling work GF,FF,Maid Room &
2063 107 ELITE18-CON-CE-CIV-IR-3107 127 GF,FF,MR 12-Aug-23 16-Aug-23 C 18-Aug-23 UR UR
gypsum board jointing & tapping for celling work wet area
Graffy & weather sheet for external side elevation 1,2,3,4 OHWT mumty out side
2064 108 ELITE18-CON-CE-CIV-IR-3108 127,128 A&B 12-Aug-23 16-Aug-23 A A
boundry wall internal side & parapet wall internal side
2065 109 ELITE18-CON-CE-CIV-IR-3109 Installation cover for UGWT with paint 127,128 A&B 12-Aug-23 16-Aug-23 A A

2066 110 ELITE18-CON-CE-CIV-IR-3110 Installation perlino marbal skirting for floor 127,128 GF,FF,MF 12-Aug-23 16-Aug-23 A A

2067 111 ELITE18-CON-CE-CIV-IR-3111 Instalaltion perlino marbal skirting for stair GF to FF & FF to MF 127,128 A&B 12-Aug-23 16-Aug-23 A A

2068 112 ELITE18-CON-CE-CIV-IR-3112 Dispose of excavated during piling works 127,128 A&B 16-Aug-23 21-Aug-23 A A

2069 113 ELITE18-CON-CE-CIV-IR-3113 Window jambs prepration 127,128 GF,FF 17-Aug-23 22-Aug-23 A A

2070 114 ELITE18-CON-CE-CIV-IR-3114 Plaster for HDF floor 127,128 GF,FF 17-Aug-23 22-Aug-23 A A
Installation cover for manhole gully trap electrical chamber & electrical handhole
2071 115 ELITE18-CON-CE-CIV-IR-3115 127,128 A&B 17-Aug-23 21-Aug-23 A A
with paint
2072 116 ELITE18-CON-CE-CIV-IR-3116 Installation pavers & pavers skirting for external side 127,128 A&B 18-Aug-23 22-Aug-23 B 16-Sep-23 26-Sep-23 C 2-Oct-23 10-Oct-23 B B

2073 117 ELITE18-CON-CE-CIV-IR-3117 Instalaltion aluminium door for kitchen & mumty 127 A 18-Aug-23 22-Aug-23 A A

2074 118 ELITE18-CON-CE-CIV-IR-3118 Installation glass railling & wooden hand rall respect for stair 127 A 18-Aug-23 22-Aug-23 B 16-Sep-23 26-Sep-23 A A

2075 119 ELITE18-CON-CE-CIV-IR-3119 Cementitious coat for baths & powder bath water prooofing 127,128 GF,FF 18-Aug-23 22-Aug-23 A A

2076 120 ELITE18-CON-CE-CIV-IR-3120 Pond test for baths 127,128 GF,FF 18-Aug-23 22-Aug-23 A A

2077 121 ELITE18-CON-CE-CIV-IR-3121 Plaster work for internal patches 127,128 A&B 21-Aug-23 24-Aug-23 B B

2078 122 ELITE18-CON-CE-CIV-IR-3122 Installation transfer & booster pump cover with all respect 127,128 A&B 22-Aug-23 24-Aug-23 A A

2079 123 ELITE18-CON-CE-CIV-IR-3123 Fixing of access panel in celling 127,128 A&B 22-Aug-23 24-Aug-23 A A

2080 124 ELITE18-CON-CE-CIV-IR-3124 Instalaltion doors wardrobes iron mongries vanity & transition strip final ir 127,128 A&B 26-Aug-23 29-Aug-23 C 11-Sep-23 18-Sep-23 C 25-Sep-23 26-Sep-23 A A

2081 125 ELITE18-CON-CE-CIV-IR-3125 Instalaltion peragola cleats with mechanical bolts all respect 127,128 A&B 29-Aug-23 1-Sep-23 B B

Page 58 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2082 126 ELITE18-CON-CE-CIV-IR-3126 Installation HDF floor & skirting 127,128 GF,FF 31-Aug-23 2-Sep-23 A A
PCC (1:4:8) under kerb stone & installation kerb stone & side gola for external side
2083 127 ELITE18-CON-CE-CIV-IR-3127 127,128 A&B 5-Sep-23 8-Sep-23 A A
elevation 2
2084 128 ELITE18-CON-CE-CIV-IR-3128 Instalaltion window frames & window glass with all respect 127,128 A&B 7-Sep-23 9-Sep-23 B B

2085 129 ELITE18-CON-CE-CIV-IR-3129 Peragola paint with all respect 127,128 A&B 13-Sep-23 15-Sep-23 A A

2086 130 ELITE18-CON-CE-CIV-IR-3130 Peragola paint with all respect 127,128 A&B 13-Sep-23 15-Sep-23 A A

2087 131 ELITE18-CON-CE-CIV-IR-3131 Instalaltion perlino marbal for main enteance 127,128 A&B 14-Sep-23 16-Sep-23 C C

2088 132 ELITE18-CON-CE-CIV-IR-3132 Peragola paint with all respect 127,128 A&B 15-Sep-23 18-Sep-23 A A

2089 133 ELITE18-CON-CE-CIV-IR-3133 Catch basin including MS grate with all respect 127,128 A&B 15-Sep-23 18-Sep-23 A A

2090 134 ELITE18-CON-CE-CIV-IR-3134 Inspection ir for sky light with all respect 128 B 16-Sep-23 26-Sep-23 A A

2091 135 ELITE18-CON-CE-CIV-IR-3135 Roof tile & skirting for top roof floor 127,128 A&B 8-Dec-23 11-Dec-23 A A

2092

2093

2094

2095

2096 3251 TO 3500 126-126A


2097 1 ELITE18-CON-CE-CIV-IR-3251 Steel & anchor epoxy for slab thickness increase 126,126a A&B 13-Dec-22 14-Dec-22 C 13-Dec-22 20-Dec-22 B B

2098 2 ELITE18-CON-CE-CIV-IR-3252 Slab thickness increae drilling 12mm,14mm & 24mm for share links top roof 126,126a A&B 12-Dec-22 14-Dec-22 C 2-Jan-23 5-Jan-23 B B

2099 3 ELITE18-CON-CE-CIV-IR-3253 Block masonory for under the plinth beam & entrance lobby wall 126,126a A&B 14-Dec-22 15-Dec-22 B B

2100 4 ELITE18-CON-CE-CIV-IR-3254 RCC concrete (4000 psi ) & SBR for slab thikness increase top roof 126,126a A&B 15-Dec-22 20-Dec-22 C 3-Jan-23 7-Jan-23 B B

2101 5 ELITE18-CON-CE-CIV-IR-3255 Drilling with epoxy 24mm for coulmns share links 126,126a A&B 15-Dec-22 20-Dec-22 C 16-Mar-23 17-Mar-23 B B

2102 6 ELITE18-CON-CE-CIV-IR-3256 Layout columns drilling top buttom for retrofitting work 126,126a GF,FF 20-Dec-22 29-Dec-22 C C

2103 7 ELITE18-CON-CE-CIV-IR-3257 Layout columns formwork for retrofitting work 126,126a GF,FF 20-Dec-22 29-Dec-22 B B

2104 8 ELITE18-CON-CE-CIV-IR-3258 Layout share links for slab thickness increase top roof 126,126a GF,FF 20-Dec-22 22-Dec-22 A A

2105 9 ELITE18-CON-CE-CIV-IR-3259 Layout MS girder & RCC beam drilling 126,126a GF,FF 20-Dec-22 25-Dec-22 C C

2106 10 ELITE18-CON-CE-CIV-IR-3260 FDT test 1st layer sand filling for under the floatting slab 126a A&B 20-Dec-22 29-Dec-22 B B

2107 11 ELITE18-CON-CE-CIV-IR-3261 Installation MS girders IPE-180 & HEA-280 126a B 21-Dec-22 22-Dec-22 B B

2108 12 ELITE18-CON-CE-CIV-IR-3262 Installation MS girders IPE-180 & HEA-280 126 A 21-Dec-22 22-Dec-22 B B

2109 13 ELITE18-CON-CE-CIV-IR-3263 Drilling & mechnical boulting 126a B 21-Dec-22 22-Dec-22 B B

2110 14 ELITE18-CON-CE-CIV-IR-3264 Drilling & mechnical boulting 126 A 21-Dec-22 22-Dec-22 B B

2111 15 ELITE18-CON-CE-CIV-IR-3265 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 126,126a TR 11-Jan-23 17-Jan-23 A A

2112 16 ELITE18-CON-CE-CIV-IR-3266 Dismentlling balck granite window sill for retrofitting work & debris remove 126,126a A&B 4-Jan-23 7-Jan-23 C 5-Jun-23 8-Jun-23 C 3-Aug-23 8-Aug-23 A A

2113 17 ELITE18-CON-CE-CIV-IR-3267 RCC top level for slab thickness increase 126,126a A&B 9-Jan-23 12-Jan-23 A A

2114 18 ELITE18-CON-CE-CIV-IR-3268 Dismentlling for slab thicknes increase 126 A 12-Jan-23 14-Jan-23 B B

2115 19 ELITE18-CON-CE-CIV-IR-3269 07 days cylinder concrete test RCC (4000 psi) retrofiting column starter upto SOG 126,126a GF 31-Jan-23 4-Feb-23 A A

2116 20 ELITE18-CON-CE-CIV-IR-3270 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 126,126a TR 1-Feb-23 4-Feb-23 A A

2117 21 ELITE18-CON-CE-CIV-IR-3271 FDT test 1st layer sand filling for under the floatting slab 126 A 8-Feb-23 11-Feb-23 C 11-Feb-23 15-Feb-23 B B

2118 22 ELITE18-CON-CE-CIV-IR-3272 FDT test 2nd layer sand filling for under the floatting slab 126A B 8-Feb-23 11-Feb-23 C 13-Feb-23 15-Feb-23 C 15-Feb-23 22-Feb-23 B B

2119 23 ELITE18-CON-CE-CIV-IR-3273 FDT test 3rd layer sand filling for under the floatting slab 126A B 18-Feb-23 23-Feb-23 C 23-Feb-23 23-Feb-23 B B

2120 24 ELITE18-CON-CE-CIV-IR-3274 28 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 126,126a GF 20-Feb-23 23-Feb-23 B B

2121 25 ELITE18-CON-CE-CIV-IR-3275 PCC (1:4:8) under the floating slab 126a B 21-Feb-23 2-Mar-23 B B

2122 26 ELITE18-CON-CE-CIV-IR-3276 Polythene sheet 1000 micron under the PCC floating slab 126a B 21-Feb-23 28-Feb-23 A A

2123 27 ELITE18-CON-CE-CIV-IR-3277 FDT test 2nd layer sand filling for under the floatting slab 126 A 23-Feb-23 28-Feb-23 C 25-Feb-23 1-Mar-23 B B

2124 28 ELITE18-CON-CE-CIV-IR-3278 Fixing & anchor epoxy for beam jackting 126,126a GF 25-Feb-23 28-Feb-23 C C

2125 29 ELITE18-CON-CE-CIV-IR-3279 Steel & anchor epoxy for collumn jackiting 126,126a GF 25-Feb-23 28-Feb-23 C 7-Mar-23 10-Mar-23 A A

2126 30 ELITE18-CON-CE-CIV-IR-3280 Steel & anchor epoxy for slab thickness increase 126,126a FF 25-Feb-23 28-Feb-23 C 6-Mar-23 7-Mar-23 B B

2127 31 ELITE18-CON-CE-CIV-IR-3281 07 days cylinder concrete test PCC (1:4:8) under floating slab 126a B 3-Mar-23 7-Mar-23 A A

2128 32 ELITE18-CON-CE-CIV-IR-3282 FDT test 3rd layer sand filling for under the floatting slab 126a A 9-Mar-23 15-Mar-23 A A

2129 33 ELITE18-CON-CE-CIV-IR-3283 RCC concrete (4000 psi ) & SBR for slab thikness increase 126,126a A&B 11-Mar-23 15-Mar-23 B B

2130 34 ELITE18-CON-CE-CIV-IR-3284 07 days cylinder concrete test RCC (4000 psi) slab thikness increase 126 A 14-Mar-23 21-Mar-23 B B

2131 35 ELITE18-CON-CE-CIV-IR-3285 07 days cylinder concrete test RCC (4000 psi) retrofiting column 126 A 16-Mar-23 21-Mar-23 A A

2132 36 ELITE18-CON-CE-CIV-IR-3286 RCC concrete (4000 psi ) & SBR for retrofiting columns 126 GF 16-Mar-23 17-Mar-23 B B

2133 37 ELITE18-CON-CE-CIV-IR-3287 Steel & anchor epoxy for beam jacting 126,126a GF 16-Mar-23 17-Mar-23 B B

2134 38 ELITE18-CON-CE-CIV-IR-3288 Primer coat & membranes bituminous sheet for top roof 126,126a TR 16-Mar-23 21-Mar-23 A A

2135 39 ELITE18-CON-CE-CIV-IR-3289 Pond test for top roof 126,126a A&B 22-Mar-23 24-Mar-23 A A

2136 40 ELITE18-CON-CE-CIV-IR-3290 RCC top level for slab thickness increase 126,126a FF 22-Mar-23 24-Mar-23 A A

Page 59 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2137 41 ELITE18-CON-CE-CIV-IR-3291 PCC (1:4:8) under the floating slab 126 A 22-Mar-23 24-Mar-23 B 17-May-23 18-May-23 B B

2138 42 ELITE18-CON-CE-CIV-IR-3292 Polthene sheet 1000 micron under the PCC floating slab 126 A 22-Mar-23 24-Mar-23 A A

2139 43 ELITE18-CON-CE-CIV-IR-3293 Steel & filler board for floatting slab 126a B 22-Mar-23 24-Mar-23 A A

2140 44 ELITE18-CON-CE-CIV-IR-3294 RCC concrete (1:2:4) for floatting slab 126a B 22-Mar-23 24-Mar-23 B B

2141 45 ELITE18-CON-CE-CIV-IR-3295 28 days cylinder concrete test PCC (1:4:8) under floating slab 126a B 24-Mar-23 28-Mar-23 A A

2142 46 ELITE18-CON-CE-CIV-IR-3296 07 days cylinder concrete test RCC (1:2:4) under floating slab 126a B 24-Mar-23 30-Mar-23 A A

2143 47 ELITE18-CON-CE-CIV-IR-3297 Surface clearence & side gola for top roof 126,126a A&B 24-Mar-23 28-Mar-23 B B

2144 48 ELITE18-CON-CE-CIV-IR-3298 07 days cylinder concrete test RCC (1:4:8) under floating slab 126 A 24-Mar-23 28-Mar-23 A A

2145 49 ELITE18-CON-CE-CIV-IR-3299 RCC concrete 4000 psi & SBR for retrofiting columns 126a B 3-Apr-23 6-Apr-23 B B

2146 50 ELITE18-CON-CE-CIV-IR-3300 RCC concrete (1:2:4) for floatting slab 126 A 3-Apr-23 6-Apr-23 B B

2147 51 ELITE18-CON-CE-CIV-IR-3301 Steel & filler board for floattting slab 126 A 3-Apr-23 6-Apr-23 A A

2148 52 ELITE18-CON-CE-CIV-IR-3302 07 days cylinder concrete test RCC (4000 psi) retrofiting column 126a B 3-Apr-23 6-Apr-23 B B

2149 53 ELITE18-CON-CE-CIV-IR-3303 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 126a B 6-Apr-23 10-Apr-23 B B

2150 54 ELITE18-CON-CE-CIV-IR-3304 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 126 A 6-Apr-23 10-Apr-23 B B

2151 55 ELITE18-CON-CE-CIV-IR-3305 07 days cylinder concrete test RCC (1:2:4) floating slab 126 A 10-Apr-23 13-Apr-23 B B

2152 56 ELITE18-CON-CE-CIV-IR-3306 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 126,126A A&B 14-Apr-23 15-Apr-23 B B

2153 57 ELITE18-CON-CE-CIV-IR-3307 28 days cylinder concrete test RCC (1:2:4) floating slab 126a B 14-Apr-23 15-Apr-23 B B

2154 58 ELITE18-CON-CE-CIV-IR-3308 RCC concrete 4000 psi & SBR for retrofiting beams 126,126a GF 14-Apr-23 17-Apr-23 B B

2155 59 ELITE18-CON-CE-CIV-IR-3309 28 days cylinder concrete test PCC (1:4:8) under floating slab 126 A 15-Apr-23 2-May-23 A A

2156 60 ELITE18-CON-CE-CIV-IR-3310 RCC concrete 4000 psi & SBR for retrofiting columns 126,126a FF 15-Apr-23 2-May-23 B B

2157 61 ELITE18-CON-CE-CIV-IR-3311 Fixing & anchor epoxy for beam jackting 126,126a FF 15-Apr-23 2-May-23 A A

2158 62 ELITE18-CON-CE-CIV-IR-3312 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 126,126a FF 2-May-23 5-May-23 A A

2159 63 ELITE18-CON-CE-CIV-IR-3313 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 126a GF 2-May-23 5-May-23 A A

2160 64 ELITE18-CON-CE-CIV-IR-3314 28 days cylinder concrete test RCC (1:2:4) floating slab 126 A 2-May-23 5-May-23 A A

2161 65 ELITE18-CON-CE-CIV-IR-3315 Block masonory & lintels for retrofitting work & partition walls 126,126a GF 3-May-23 8-May-23 A A

2162 66 ELITE18-CON-CE-CIV-IR-3316 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 126,126a A&B 5-May-23 9-May-23 A A

2163 67 ELITE18-CON-CE-CIV-IR-3317 Steel fixing & anchor epoxy for beam jackting 126,126a FF 8-May-23 9-May-23 B B

2164 68 ELITE18-CON-CE-CIV-IR-3318 RCC concrete 4000 psi & SBR for retroftting beams 126,126a FF 8-May-23 9-May-23 B B

2165 69 ELITE18-CON-CE-CIV-IR-3319 Block masonory for partion wall external side 126,126a A&B 9-May-23 13-May-23 B B

2166 70 ELITE18-CON-CE-CIV-IR-3320 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 126,126a A&B 11-May-23 17-May-23 A A

2167 71 ELITE18-CON-CE-CIV-IR-3321 Jumbolon XPS board 50mm & polythene sheet laying & screeding for top roof 126,126a A&B 12-May-23 17-May-23 B B

2168 72 ELITE18-CON-CE-CIV-IR-3322 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 126,126a FF 15-May-23 18-May-23 A A

2169 73 ELITE18-CON-CE-CIV-IR-3323 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 126,126a FF 3-Jun-23 7-Jun-23 A A
Fixing MS girders with MS plates drilling anchoring connector mechnical &
2170 74 ELITE18-CON-CE-CIV-IR-3324 126,126a GF 3-Jun-23 14-Jun-23 C 21-Jul-23 25-Jul-23 B B
chemical boulting apoxy with all respect
2171 75 ELITE18-CON-CE-CIV-IR-3325 Primer coat & membranes bituminous sheet for external side 126,126a A&B 5-Jun-23 8-Jun-23 B B

2172 76 ELITE18-CON-CE-CIV-IR-3326 Plaster work corner beads for retro fitting columns & internal walls 126,126a GF 7-Jun-23 12-Jun-23 B 5-Aug-23 10-Aug-23 A A

2173 77 ELITE18-CON-CE-CIV-IR-3327 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 126,126a A&B 9-Jun-23 12-Jun-23 B B

2174 78 ELITE18-CON-CE-CIV-IR-3328 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 126,126a A&B 9-Jun-23 12-Jun-23 B B

2175 79 ELITE18-CON-CE-CIV-IR-3329 Installation MS girders with MS plates drilling anchoring mechnical boulting 126,126a FF 10-Jun-23 15-Jun-23 B B

2176 80 ELITE18-CON-CE-CIV-IR-3330 FDT test layer sand filling for external side 126,126a A&B 14-Jun-23 17-Jun-23 B B

2177 81 ELITE18-CON-CE-CIV-IR-3331 FDT test 2nd layer sand filling for external side 126,126a A&B 14-Jun-23 17-Jun-23 B B

2178 82 ELITE18-CON-CE-CIV-IR-3332 Plaster work corner beads for retro fitting columns & internal walls 126,126a FF 22-Jun-23 6-Jul-23 B B

2179 83 ELITE18-CON-CE-CIV-IR-3333 Block masonory for manhole gully trap electrical chamber & electrical handhole 126,126a A&B 12-Jul-23 14-Jul-23 A A

2180 84 ELITE18-CON-CE-CIV-IR-3334 Pudlo & plaster & benching gully trap electrical chamber & electrical handhole 126,126a A&B 12-Jul-23 13-Jul-23 B B

2181 85 ELITE18-CON-CE-CIV-IR-3335 FDT test 1st layer sand filling for external side left & right side 126,126a A&B 12-Jul-23 17-Jul-23 A A

2182 86 ELITE18-CON-CE-CIV-IR-3336 FDT test 2nd layer sand filling for external side left & right 126,126a A&B 12-Jul-23 17-Jul-23 A A

2183 87 ELITE18-CON-CE-CIV-IR-3337 Side gola & laying aggregates for Mumty top 126,126a A&B 13-Jul-23 19-Jul-23 B B

2184 88 ELITE18-CON-CE-CIV-IR-3338 FDT test 3rd layer sand filling for external side 126,126a A&B 18-Jul-23 20-Jul-23 B B

2185 89 ELITE18-CON-CE-CIV-IR-3339 Block masonory & lintels for retrofiting work & parttition walls 126,126a FF 19-Jul-23 24-Jul-23 C 18-Aug-23 22-Aug-23 B B

2186 90 ELITE18-CON-CE-CIV-IR-3340 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 126,126a A&B 20-Jul-23 24-Jul-23 A A

2187 91 ELITE18-CON-CE-CIV-IR-3341 Dismantling split stone for external side 126a B 24-Jul-23 7-Aug-23 B B

2188 92 ELITE18-CON-CE-CIV-IR-3342 Plaster for split stone external side 126a B 24-Jul-23 7-Aug-23 A A

2189 93 ELITE18-CON-CE-CIV-IR-3343 Grout filling B/W girder & slab 126,126a A&B 26-Jul-23 3-Aug-23 B B

2190 94 ELITE18-CON-CE-CIV-IR-3344 Pudlo & plaster & benching gully trap electrical chamber & electrical handhole 126,126a A&B 2-Aug-23 7-Aug-23 C 21-Aug-23 26-Aug-23 C 14-Sep-23 16-Sep-23 A A

2191 95 ELITE18-CON-CE-CIV-IR-3345 Installation perlino marbal for floor 126a GF,FF,MR 5-Aug-23 8-Aug-23 B 28-Oct-23 1-Nov-23 B B

Page 60 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2192 96 ELITE18-CON-CE-CIV-IR-3346 Installation wall tile for baths & powder room 126,126a GF,FF,MB 5-Aug-23 9-Aug-23 C 12-Aug-23 16-Aug-23 A A

2193 97 ELITE18-CON-CE-CIV-IR-3347 Installation floor tile & skirting for maid room 126a B 5-Aug-23 8-Aug-23 A A

2194 98 ELITE18-CON-CE-CIV-IR-3348 Installation crema mo for external side elevation 1 126a B 5-Aug-23 8-Aug-23 A A

2195 99 ELITE18-CON-CE-CIV-IR-3349 Installation black granite marble for partition wall external side 126,126a A&B 5-Aug-23 8-Aug-23 B B

2196 100 ELITE18-CON-CE-CIV-IR-3350 Installation window sill horizontal 126a GF,FF,MR 5-Aug-23 8-Aug-23 B 16-Sep-23 19-Sep-23 A A

2197 101 ELITE18-CON-CE-CIV-IR-3351 Installation black granite for external side elevation 1 126a B 5-Aug-23 8-Aug-23 A A

2198 102 ELITE18-CON-CE-CIV-IR-3352 Installation perlino marbal for stair GF to FF & FF to M 126a GF,FF,M 5-Aug-23 8-Aug-23 B 16-Sep-23 19-Sep-23 B 30-Oct-23 1-Nov-23 B B

2199 103 ELITE18-CON-CE-CIV-IR-3353 Installation vanity frame for baths & powder room 126a GF,FF 5-Aug-23 8-Aug-23 C C
Installation suspension & framming system for celling work GF,FF,maid room
2200 104 ELITE18-CON-CE-CIV-IR-3354 126a GF,FF,MR 5-Aug-23 8-Aug-23 C 12-Aug-23 16-Aug-23 C 18-Aug-23 25-Aug-23 A A
gypsum board jointing & tapping for celling work dry area
2201 105 ELITE18-CON-CE-CIV-IR-3355 FDT test 3rd layer sand filling for externla side left & rifgt side 126,126a A&B 5-Aug-23 10-Aug-23 C 11-Aug-23 16-Aug-23 A A

2202 106 ELITE18-CON-CE-CIV-IR-3356 Block masonory for mechnical wall 126,126a GF,FF 7-Aug-23 8-Aug-23 B B

2203 107 ELITE18-CON-CE-CIV-IR-3357 Plaster work & wall mounted cement board for cistern flushing tank 126,126a GF,FF 7-Aug-23 9-Aug-23 B 16-Aug-23 19-Aug-23 A A

2204 108 ELITE18-CON-CE-CIV-IR-3358 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 126,126a A&B 10-Aug-23 16-Aug-23 A A

2205 109 ELITE18-CON-CE-CIV-IR-3359 Installation skirting for maid room 126 A 12-Aug-23 16-Aug-23 A A

2206 110 ELITE18-CON-CE-CIV-IR-3360 Installation perlino marbal for floor 126 GF,FF,MR 12-Aug-23 16-Aug-23 B 28-Oct-23 1-Nov-23 B B

2207 111 ELITE18-CON-CE-CIV-IR-3361 Instalaltion perlino marbal for stair 126 GF,FF,MR 12-Aug-23 16-Aug-23 B B

2208 112 ELITE18-CON-CE-CIV-IR-3362 Installation wall tile & floor tile for kitchen 126,126a A&B 12-Aug-23 16-Aug-23 A A

2209 113 ELITE18-CON-CE-CIV-IR-3363 Instalaltion suspension & framing system for celling work GF,FF,MR wet area 126,126a A&B 12-Aug-23 16-Aug-23 C 28-Oct-23 1-Nov-23 B B

2210 114 ELITE18-CON-CE-CIV-IR-3364 Installation floor tile for maid bath 126,126a A&B 12-Aug-23 16-Aug-23 A A

2211 115 ELITE18-CON-CE-CIV-IR-3365 Plaster & roof tile for top roof floor 126,126a A&B 12-Aug-23 16-Aug-23 C 3-Oct-23 4-Oct-23 B 30-Oct-23 1-Nov-23 B B

2212 116 ELITE18-CON-CE-CIV-IR-3366 Installation split stone for external side 126,126a A&B 16-Aug-23 18-Aug-23 A A

2213 117 ELITE18-CON-CE-CIV-IR-3367 Polythene sheet 1000 micron for external side 126,126a A&B 16-Aug-23 21-Aug-23 A A

2214 118 ELITE18-CON-CE-CIV-IR-3368 PCC (1:3:6) for external side 126,126a A&B 16-Aug-23 21-Aug-23 B B

2215 119 ELITE18-CON-CE-CIV-IR-3369 Window jambs prepration 126,126a GF,FF 17-Aug-23 22-Aug-23 A A

2216 120 ELITE18-CON-CE-CIV-IR-3370 Instalaltion window sill horizontal 126 A 18-Aug-23 22-Aug-23 A A

2217 121 ELITE18-CON-CE-CIV-IR-3371 Cementitious coat for baths & powder bath water prooofing 126,126a GF,FF 18-Aug-23 22-Aug-23 A A

2218 122 ELITE18-CON-CE-CIV-IR-3372 Pond test for baths 126,126a GF,FF 18-Aug-23 22-Aug-23 A A

2219 123 ELITE18-CON-CE-CIV-IR-3373 Installation OHWT cover & concrete uper side 126,126a A&B 21-Aug-23 26-Aug-23 C 24-Aug-23 26-Aug-23 A A

2220 124 ELITE18-CON-CE-CIV-IR-3374 Plaster work for internal & external patches 126,126a A&B 21-Aug-23 26-Aug-23 B B

2221 125 ELITE18-CON-CE-CIV-IR-3375 Plaster for HDF floor 126,126a GF,FF 22-Aug-23 26-Aug-23 A A

2222 126 ELITE18-CON-CE-CIV-IR-3376 7 days cylinder concrete test PCC (1:3:6) external side left side & right side 126,126a A&B 23-Aug-23 26-Aug-23 A A

2223 127 ELITE18-CON-CE-CIV-IR-3377 Instalaltion peragola cleats with mechanical bolts all respect 126,126a A&B 29-Aug-23 1-Sep-23 B B

2224 128 ELITE18-CON-CE-CIV-IR-3378 Installation MS porch fence for boundry wall with paint 126,126a A&B 29-Aug-23 30-Aug-23 B 10-Dec-23 14-Dec-23 A A

2225 129 ELITE18-CON-CE-CIV-IR-3379 Plaster for partition wall externals side 126,126a A&B 2-Sep-23 5-Sep-23 A A

2226 130 ELITE18-CON-CE-CIV-IR-3380 28 days cylinder concrete test PCC (1:3:6) external side left side & right side 126,126a A&B 6-Sep-23 8-Sep-23 A A

2227 131 ELITE18-CON-CE-CIV-IR-3381 Installation black granite for external side elevation 1 126,126a A&B 7-Sep-23 8-Sep-23 A A

2228 132 ELITE18-CON-CE-CIV-IR-3382 PCC & plaster for top slopw adjust external side elevation 1 126A B 7-Sep-23 8-Sep-23 A A

2229 133 ELITE18-CON-CE-CIV-IR-3383 Installation vanity frame for baths & powder room 126,126a GF,FF 8-Sep-23 11-Sep-23 B B

2230 134 ELITE18-CON-CE-CIV-IR-3384 Installation vanity marbal for baths & powder room 126,126a GF,FF 8-Sep-23 11-Sep-23 A A

2231 135 ELITE18-CON-CE-CIV-IR-3385 Installation vanity miror for baths & powder room 126,126a GF,FF 8-Sep-23 14-Sep-23 C 27-Sep-23 2-Oct-23 B 28-Oct-23 1-Nov-23 B B
PCC (1:4:8) under kerb stone & installation kerb stone & side gola for external side
2232 136 ELITE18-CON-CE-CIV-IR-3386 126,126a A&B 8-Sep-23 11-Sep-23 A A
elevation 2
2233 137 ELITE18-CON-CE-CIV-IR-3387 Catch basin including MS grate with all respect 126,126a A&B 8-Sep-23 13-Sep-23 C 27-Sep-23 2-Oct-23 B B

2234 138 ELITE18-CON-CE-CIV-IR-3388 Installation crememo for boundry wall 126,126a A&B 8-Sep-23 13-Sep-23 B B
Primer coat 1st coat putty 2nd coat putty 1st coat paint & 2nd coat paint for internal
2235 139 ELITE18-CON-CE-CIV-IR-3389 126 GF,FF,MR 9-Sep-23 14-Sep-23 B 28-Oct-23 1-Nov-23 B B
paint
Base primer coat for external paint elevation 1,2,3,4 boundry wall OHWT mumty
2236 140 ELITE18-CON-CE-CIV-IR-3390 126,126a A&B 9-Sep-23 14-Sep-23 A A
out side & parapet internal side
2237 141 ELITE18-CON-CE-CIV-IR-3391 Dismentlling boundry wall column for retrofitting work 126,126a A&B 9-Sep-23 UR UR

2238 142 ELITE18-CON-CE-CIV-IR-3392 Installation aluminium door for kitchen & mumty 126,126a A&B 12-Sep-23 16-Sep-23 B 30-Oct-23 1-Nov-23 B B

2239 143 ELITE18-CON-CE-CIV-IR-3393 Perlino marbal for boundry wall top meter box & top roof column 126,126a A&B 13-Sep-23 15-Sep-23 A A

2240 144 ELITE18-CON-CE-CIV-IR-3394 Installation floor skirting 126,126a GF,FF,M 13-Sep-23 15-Sep-23 A A

2241 145 ELITE18-CON-CE-CIV-IR-3395 Installation stair skirting GF to FF & FF to mumty 126,126a A&B 13-Sep-23 15-Sep-23 A A

2242 146 ELITE18-CON-CE-CIV-IR-3396 Instalaltion perlino marbal for ledge wall top 126,126a GF,FF, 13-Sep-23 15-Sep-23 A A

2243 147 ELITE18-CON-CE-CIV-IR-3397 Installation perlino marbal threshold 126,126a GF,FF,M 13-Sep-23 15-Sep-23 A A

2244 148 ELITE18-CON-CE-CIV-IR-3398 Instalaltion black granite strip for shower cabin 126,126a GF,FF 13-Sep-23 15-Sep-23 A A

2245 149 ELITE18-CON-CE-CIV-IR-3399 Primer coat 1st coat putty 2nd coat putty 1st coat paint for celling paint 126,126a GF,FF,MR 13-Sep-23 15-Sep-23 A A

2246 150 ELITE18-CON-CE-CIV-IR-3400 Peragola paint with all respect 126,126a A&B 13-Sep-23 15-Sep-23 C 16-Sep-23 19-Sep-23 C 27-Sep-23 2-Oct-23 B 28-Nov-23 30-Nov-23 A A

Page 61 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2247 151 ELITE18-CON-CE-CIV-IR-3401 Installation gypsum board jointing & tapping for celling work dry area 126,126a GF,FF,MR 14-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 B 28-Oct-23 1-Nov-23 B B

2248 152 ELITE18-CON-CE-CIV-IR-3402 Instalaltion moisture risitence board for celling work wet area 126,126a GF,FF,MR 14-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 B B

2249 153 ELITE18-CON-CE-CIV-IR-3403 Installation floor tile for baths & powder room 126,126a GF,FF,MR 14-Sep-23 16-Sep-23 B B

2250 154 ELITE18-CON-CE-CIV-IR-3404 Sand excavated during piling works 126,126a A&B 16-Nov-23 UR UR

2251 155 ELITE18-CON-CE-CIV-IR-3405 MS pergola bulkhead with cement board paint 126 A 15-Sep-23 18-Sep-23 C 27-Sep-23 2-Oct-23 B B

2252 156 ELITE18-CON-CE-CIV-IR-3406 Peragola jointing with all respect 126,126a A&B 15-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 B 11-Dec-23 14-Dec-23 A A

2253 157 ELITE18-CON-CE-CIV-IR-3407 Installation cover for UGWT with paint 126,126a A&B 15-Sep-23 18-Sep-23 A A

Installation cover including slab for manhole gully trap electrical chamber &
2254 158 ELITE18-CON-CE-CIV-IR-3408 126,126a A&B 15-Sep-23 16-Sep-23 B B
electrical hanhole with paint

2255 159 ELITE18-CON-CE-CIV-IR-3409 PCC (1:3:6) AC pad & PPRC pad for top roof 126,126a A&B 16-Nov-23 23-Nov-23 C 9-Dec-23 UR UR

2256 160 ELITE18-CON-CE-CIV-IR-3410 Black masonory plaster for duct & DB area 126,126a GF,FF,M 16-Sep-23 20-Sep-23 A A

2257 161 ELITE18-CON-CE-CIV-IR-3411 Instalaltion window sill vertical 126,126a GF,FF,MR 16-Sep-23 19-Sep-23 A A

2258 162 ELITE18-CON-CE-CIV-IR-3412 Instalaltion MS grating for main gate 126,126a A&B 16-Sep-23 19-Sep-23 C 26-Sep-23 2-Oct-23 A A

2259 163 ELITE18-CON-CE-CIV-IR-3413 Installation MS louvers under the OHWT with all respect 126,126a A&B 16-Sep-23 19-Sep-23 A A

2260 164 ELITE18-CON-CE-CIV-IR-3414 Block masonory for OHWT 126,126a A&B 16-Sep-23 20-Sep-23 A A

2261 165 ELITE18-CON-CE-CIV-IR-3415 Plaster for under the OHWT 126,126a A&B 16-Sep-23 20-Sep-23 A A

2262 166 ELITE18-CON-CE-CIV-IR-3416 Instalaltion glass railling & wooden hand rail for stair 126,126a A&B 16-Sep-23 19-Sep-23 B 30-Oct-23 1-Nov-23 B B

2263 167 ELITE18-CON-CE-CIV-IR-3417 Fixing cubical glass partition & glass door for baths 126,126a GF,FF 22-Sep-23 23-Sep-23 B 27-Oct-23 1-Nov-23 B B

2264 168 ELITE18-CON-CE-CIV-IR-3418 Installation transfer & booster pump cover with all respect 126,126a A&B 22-Sep-23 23-Sep-23 A A

2265 169 ELITE18-CON-CE-CIV-IR-3419 Fixing of access penal in celling 126,126a A&B 22-Sep-23 23-Sep-23 B 30-Oct-23 1-Nov-23 B B

2266 170 ELITE18-CON-CE-CIV-IR-3420 Installation pavers & paver skirting for external side 126,126a A&B 22-Sep-23 26-Sep-23 C 27-Sep-23 2-Oct-23 B 30-Oct-23 1-Nov-23 B B

2267 171 ELITE18-CON-CE-CIV-IR-3421 2nd coat paint for celling paint 126,126a GF,FF,MR 26-Sep-23 27-Sep-23 C C

2268 172 ELITE18-CON-CE-CIV-IR-3422 2nd coat paint for internal paint 126,126a A&B 26-Sep-23 27-Sep-23 C C
Primer coat 1st coat putty 2nd coat putty 1st coat paint & 2nd coat paint for internal
2269 173 ELITE18-CON-CE-CIV-IR-3423 126,126a GF,FF,MR 27-Sep-23 2-Oct-23 B 14-Nov-23 16-Nov-23 B B
paint
2270 174 ELITE18-CON-CE-CIV-IR-3424 Instalaltion perlino marbal for floor 126a FF 4-Oct-23 6-Oct-23 C 9-Oct-23 10-Oct-23 B 28-Oct-23 1-Nov-23 B B

2271 175 ELITE18-CON-CE-CIV-IR-3425 Instalaltion perlino marbal for floor 126 FF,M 4-Oct-23 6-Oct-23 C 9-Oct-23 10-Oct-23 B B

2272 176 ELITE18-CON-CE-CIV-IR-3426 Installation doors wardrobes iron mongries skirting vanity & tranition strip final ir 126,126a A&B 13-Oct-23 15-Oct-23 B B

2273 177 ELITE18-CON-CE-CIV-IR-3427 Installation window frames & window glass with all respect 126,126a A&B 17-Oct-23 19-Oct-23 B B

2274 178 ELITE18-CON-CE-CIV-IR-3428 Installation HDF floor & skirting 126,126a GF,FF 17-Oct-23 19-Oct-23 B B

2275 179 ELITE18-CON-CE-CIV-IR-3429 2nd & final coat paint for celling dry & wet area 126,126a GF,FF,MR 28-Oct-23 1-Nov-23 B B
Weather sheild 1st coat & 2nd coat for external paint elevation 1,2,3,4 OHWT
2276 180 ELITE18-CON-CE-CIV-IR-3430 126,126a A&B 16-Nov-23 24-Nov-23 A A
mumty out side boundry wall & parapet wall
181 ELITE18-CON-CE-CIV-IR-3431 Base primer & graffy for external paint boundry wall 126,126a A&B 16-Nov-23 24-Nov-23 A A

2277 182 ELITE18-CON-CE-CIV-IR-3432 Installation cremmo for boundary wall 126,126a A&B 9-Dec-23 14-Dec-23 A A

2278

2279

2280 3501 TO 3750 124-125


2281 1 ELITE18-CON-CE-CIV-IR-3501 Steel & anchor epoxy for slab thickness increase Top Roof 124,125 A&B 9-Dec-22 13-Dec-22 B B

2282 2 ELITE18-CON-CE-CIV-IR-3502 Slab thickness increae drilling 12mm,14mm & 24mm for share links top roof 124,125 A&B 12-Dec-22 14-Dec-22 B B

2283 3 ELITE18-CON-CE-CIV-IR-3503 FDT test 1st layer sand filling for under the floating slab 124,125 A&B 13-Dec-22 20-Dec-22 C 22-Dec-22 29-Dec-22 C 30-Dec-22 5-Jan-23 C 2-Jan-23 5-Jan-23 B B

2284 4 ELITE18-CON-CE-CIV-IR-3504 Block masonory for under the plinth beam & entrance lobby wall 124,125 A&B 14-Dec-22 15-Dec-22 B B

2285 5 ELITE18-CON-CE-CIV-IR-3505 RCC concrete (4000 psi ) & SBR for slab thikness increase top roof 124,125 A&B 15-Dec-22 20-Dec-22 C 3-Jan-23 7-Jan-23 B B

2286 6 ELITE18-CON-CE-CIV-IR-3506 Drilling with epoxy 24mm for coulmns share links 124,125 A&B 15-Dec-22 20-Dec-22 C C

2287 7 ELITE18-CON-CE-CIV-IR-3507 Installation MS girders 124,125 GF,FF 15-Dec-22 20-Dec-22 C 21-Dec-22 22-Dec-22 B B

2288 8 ELITE18-CON-CE-CIV-IR-3508 Layout columns top & buttom for retrofitting work 124,125 GF,FF 20-Dec-22 22-Dec-22 A A

2289 9 ELITE18-CON-CE-CIV-IR-3509 Layout columns formwork for retrofitting work 124,125 GF,FF 20-Dec-22 22-Dec-22 A A

2290 10 ELITE18-CON-CE-CIV-IR-3510 Layout share links for slab thickness increase top roof 124,125 A&B 20-Dec-22 22-Dec-22 A A

2291 11 ELITE18-CON-CE-CIV-IR-3511 Layout MS girder & RCC beam drilling 124,125 GF,FF 20-Dec-22 29-Dec-22 B B

2292 12 ELITE18-CON-CE-CIV-IR-3512 Drilling & mechnical boulting 124,125 GF,FF 21-Dec-22 22-Dec-22 B B

2293 13 ELITE18-CON-CE-CIV-IR-3513 FDT test 2nd layer sand filling for under the floating slab 124,125 A&B 23-Dec-22 29-Dec-22 C 30-Dec-22 5-Jan-23 C 2-Jan-23 5-Jan-23 B B

2294 14 ELITE18-CON-CE-CIV-IR-3514 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 124,125 TR 11-Jan-23 17-Jan-23 A A

2295 15 ELITE18-CON-CE-CIV-IR-3515 Dismentlling balck granite window sill for retrofitting work & debris remove 124,125 A&B 4-Jan-23 7-Jan-23 C 5-Jun-23 8-Jun-23 C 3-Aug-23 8-Aug-23 A A

2296 16 ELITE18-CON-CE-CIV-IR-3516 RCC top level for slab thickness increase 124,125 A&B 9-Jan-23 12-Jan-23 A A

2297 17 ELITE18-CON-CE-CIV-IR-3517 Dismentlling for slab thickness increase FF & debris remove 124,125 A&B 11-Jan-23 14-Jan-23 B B

2298 18 ELITE18-CON-CE-CIV-IR-3518 FDT test 3rd layer sand filling for under the floating slab 125 B 31-Jan-23 4-Feb-23 A A

Page 62 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2299 19 ELITE18-CON-CE-CIV-IR-3519 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 124,125 A&B 1-Feb-23 4-Feb-23 A A

2300 20 ELITE18-CON-CE-CIV-IR-3520 FDT test 3rd layer sand filling for under the floating slab 124 A 2-Feb-23 8-Feb-23 A A

2301 21 ELITE18-CON-CE-CIV-IR-3521 Polythene sheet 1000 micron under the PCC floating slab 124,125 A&B 16-Feb-23 22-Feb-23 B B

2302 22 ELITE18-CON-CE-CIV-IR-3522 PCC (1:4:8) under the floating slab 124,125 A&B 16-Feb-23 22-Feb-23 B B

2303 23 ELITE18-CON-CE-CIV-IR-3523 07 days cylinder concrete test PCC (1:4:8) under floating slab 125 B 24-Feb-23 28-Feb-23 B B

2304 24 ELITE18-CON-CE-CIV-IR-3524 Polythene sheet 1000 micron under the PCC floating slab 124 A 25-Feb-23 28-Feb-23 B B

2305 25 ELITE18-CON-CE-CIV-IR-3525 PCC (1:4:8) under the floating slab 124 A 25-Feb-23 2-Mar-23 B B

2306 26 ELITE18-CON-CE-CIV-IR-3526 Fixing & anchor epoxy for beam jackting 124,125 A&B 25-Feb-23 28-Feb-23 C C

2307 27 ELITE18-CON-CE-CIV-IR-3527 Fixing & anchor epoxy for columns jackting 124,125 A&B 25-Feb-23 28-Feb-23 C C

2308 28 ELITE18-CON-CE-CIV-IR-3528 Steel & anchor epoxy for slab thickness increase 124,125 FF 25-Feb-23 28-Feb-23 C 6-Mar-23 7-Mar-23 B B

2309 29 ELITE18-CON-CE-CIV-IR-3529 07 days cylinder concrete test PCC (1:4:8) under floating slab 124 A 28-Feb-23 4-Mar-23 A A

2310 30 ELITE18-CON-CE-CIV-IR-3530 Steel & filler board for floatting slab 125 B 6-Mar-23 9-Mar-23 A A

2311 31 ELITE18-CON-CE-CIV-IR-3531 Steel fixing & anchor epoxy for column jackiting 124,125 GF 7-Mar-23 10-Mar-23 A A

2312 32 ELITE18-CON-CE-CIV-IR-3532 RCC concrete (1:2:4) for floatting slab 125 B 11-Mar-23 15-Mar-23 B B

2313 33 ELITE18-CON-CE-CIV-IR-3533 Steel fixing & anchor epoxy for column jackiting 124,125 A&B 11-Mar-23 15-Mar-23 B B

2314 34 ELITE18-CON-CE-CIV-IR-3534 Steel fixing & anchor epoxy for beam jackiting 124,125 A&B 11-Mar-23 15-Mar-23 B B

2315 35 ELITE18-CON-CE-CIV-IR-3535 RCC concrete (4000 psi ) & SBR for slab thikness increase 124,125 FF 11-Mar-23 15-Mar-23 B B

2316 36 ELITE18-CON-CE-CIV-IR-3536 07 days cylinder concrete test RCC (1:2:4) floating slab 125 B 13-Mar-23 17-Mar-23 B B

2317 37 ELITE18-CON-CE-CIV-IR-3537 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 124,125 A&B 14-Mar-23 21-Mar-23 A A

2318 38 ELITE18-CON-CE-CIV-IR-3538 28 days cylinder concrete test PCC (1:4:8) under floating slab 125 B 17-Mar-23 24-Mar-23 A A

2319 39 ELITE18-CON-CE-CIV-IR-3539 Primer coat & membranes bituminous sheet for top roof 124,125 A&B 17-Mar-23 21-Mar-23 A A

2320 40 ELITE18-CON-CE-CIV-IR-3540 07 days cylinder concrete test PCC (1:2:4) floating slab 124 A 20-Mar-23 24-Mar-23 B B

2321 41 ELITE18-CON-CE-CIV-IR-3541 07 days cylinder concrete test PCC (1:4:8) under floating slab 124 A 21-Mar-23 24-Mar-23 A A

2322 42 ELITE18-CON-CE-CIV-IR-3542 Pond test for top roof 124,125 A&B 22-Mar-23 24-Mar-23 A A

2323 43 ELITE18-CON-CE-CIV-IR-3543 RCC top level for slab thickness increase 124,125 FF 22-Mar-23 24-Mar-23 A A

2324 44 ELITE18-CON-CE-CIV-IR-3544 Steel & filler board for floatting slab 124 A 22-Mar-23 24-Mar-23 A A

2325 45 ELITE18-CON-CE-CIV-IR-3545 RCC concrete (1:2:4) for floatting slab 124 A 22-Mar-23 24-Mar-23 B B

2326 46 ELITE18-CON-CE-CIV-IR-3546 Surface clearence & side gola for top roof 124,125 A&B 24-Mar-23 28-Mar-23 B B

2327 47 ELITE18-CON-CE-CIV-IR-3547

2328 48 ELITE18-CON-CE-CIV-IR-3548 28 days cylinder concrete test RCC (1:2:4) floating slab 125 A 31-Mar-23 6-Apr-23 A A

2329 49 ELITE18-CON-CE-CIV-IR-3549 RCC concrete 4000 psi & SBR for retrofiting columns 124,125 A&B 3-Apr-23 6-Apr-23 B B

2330 50 ELITE18-CON-CE-CIV-IR-3550 RCC concrete 4000 psi & SBR for retrofiting beams 124,125 A&B 3-Apr-23 6-Apr-23 B B

2331 51 ELITE18-CON-CE-CIV-IR-3551 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 124,125 FF 6-Apr-23 10-Apr-23 B B

2332 52 ELITE18-CON-CE-CIV-IR-3552 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 124,125 GF 10-Apr-23 13-Apr-23 B B

2333 53 ELITE18-CON-CE-CIV-IR-3553 28 days cylinder concrete test RCC (1:2:4) floating slab 124 A 10-Apr-23 11-Apr-23 B B

2334 54 ELITE18-CON-CE-CIV-IR-3554 RCC concrete (4000 psi) & SBR for retrofitting columns 124,125 FF 14-Apr-23 17-Apr-23 B B

2335 55 ELITE18-CON-CE-CIV-IR-3555 Fixing & anchore epoxy for column jackting 124,125 FF 14-Apr-23 17-Apr-23 B B

2336 56 ELITE18-CON-CE-CIV-IR-3556 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 124,125 GF 15-Apr-23 2-May-23 B B

2337 57 ELITE18-CON-CE-CIV-IR-3557 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 124,125 GF 2-May-23 5-May-23 A A

2338 58 ELITE18-CON-CE-CIV-IR-3558 28 days cylinder concrete test RCC (4000 psi) retrofitting beams 124,125 GF 2-May-23 5-May-23 A A

2339 59 ELITE18-CON-CE-CIV-IR-3559 Block masonory & lintels for retrofitting work & partition walls 124,125 GF 5-May-23 9-May-23 A A

2340 60 ELITE18-CON-CE-CIV-IR-3560 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 124,125 FF 6-May-23 9-May-23 A A

2341 61 ELITE18-CON-CE-CIV-IR-3561 Steel fixing & anchor epoxy for beam jackting 124,125 FF 8-May-23 9-May-23 B B

2342 62 ELITE18-CON-CE-CIV-IR-3562 RCC concrete 4000 psi & SBR for retrofitting beams 124,125 FF 8-May-23 9-May-23 B B

2343 63 ELITE18-CON-CE-CIV-IR-3563 Block masonory for partition wall external side 124,125 A&B 9-May-23 13-May-23 B B

2344 64 ELITE18-CON-CE-CIV-IR-3564 Jumbolon XPS board 50mm & polythene sheet laying & screeding for top roof 124,125 A&B 12-May-23 17-May-23 B B

2345 65 ELITE18-CON-CE-CIV-IR-3565 07 days cylinder concrete test RCC (4000 psi) retrofitting beam 124,125 FF 15-May-23 18-May-23 A A

2346 66 ELITE18-CON-CE-CIV-IR-3566 28 days cylinder concrete test RCC (4000 psi) retrofitting beam 124,125 FF 3-Jun-23 7-Jun-23 A A
Fixing MS girders with MS plates drilling anchoring mechnical & chemical
2347 67 ELITE18-CON-CE-CIV-IR-3567 124,125 GF 3-Jun-23 14-Jun-23 C 21-Jul-23 25-Jul-23 B B
boulting apoxy with all respect
2348 68 ELITE18-CON-CE-CIV-IR-3568 Primer coat & membranes bituminous sheet for external side 124,125 A&B 5-Jun-23 8-Jun-23 B B

2349 69 ELITE18-CON-CE-CIV-IR-3569 Plaster work & corner beads for retro fitting columns & internal walls 124,125 GF 7-Jun-23 12-Jun-23 B 5-Aug-23 10-Aug-23 A A

2350 70 ELITE18-CON-CE-CIV-IR-3570 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 124,125 A&B 9-Jun-23 12-Jun-23 B B

2351 71 ELITE18-CON-CE-CIV-IR-3571 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 124,125 A&B 9-Jun-23 12-Jun-23 B B

2352 72 ELITE18-CON-CE-CIV-IR-3572 Installation MS girders with MS plates drilling anchoring mechnical boulting 124,125 FF 10-Jun-23 15-Jun-23 B B

2353 73 ELITE18-CON-CE-CIV-IR-3573 FDT test 1st layer sand filling for external side 124,125 A&B 14-Jun-23 17-Jun-23 B B

Page 63 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2354 74 ELITE18-CON-CE-CIV-IR-3574 FDT test 2nd layer sand filling for externals side 124,125 A&B 14-Jun-23 17-Jun-23 B B

2355 75 ELITE18-CON-CE-CIV-IR-3575 Plaster work & corner beads for retro fitting columns & internal walls 124,125 FF 22-Jun-23 6-Jul-23 B B

2356 76 ELITE18-CON-CE-CIV-IR-3576 Block masonory for manhole gully trap electrical chamber & electrical handhole 124,125 A&B 12-Jul-23 14-Jul-23 A A

2357 77 ELITE18-CON-CE-CIV-IR-3577 Pudlo & benching for manhole gully trap electrical chamber & electrical handhole 124,125 A&B 12-Jul-23 13-Jul-23 B 14-Sep-23 16-Sep-23 A A

2358 78 ELITE18-CON-CE-CIV-IR-3578 FDT test 1st layer sand filling for external side left & right side 124,125 A&B 12-Jul-23 17-Jul-23 A A

2359 79 ELITE18-CON-CE-CIV-IR-3579 FDT test 2nd layer sand filling for external side left & right 124,125 A&B 12-Jul-23 17-Jul-23 A A

2360 80 ELITE18-CON-CE-CIV-IR-3580 Side gola & laying aggregates for Mumty top 124,125 A&B 13-Jul-23 19-Jul-23 B B

2361 81 ELITE18-CON-CE-CIV-IR-3581 FDT test 3rd layer sand filling for external side 124,125 A&B 18-Jul-23 20-Jul-23 B B

2362 82 ELITE18-CON-CE-CIV-IR-3582 Block masonory & lintels for retrofiting work & parttition walls 124,125 FF 19-Jul-23 24-Jul-23 C 18-Aug-23 22-Aug-23 B B

2363 83 ELITE18-CON-CE-CIV-IR-3583 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 124,125 A&B 20-Jul-23 24-Jul-23 A A

2364 84 ELITE18-CON-CE-CIV-IR-3584 Grout filling BW girder & slab 124,125 A&B 26-Jul-23 3-Aug-23 B B

2365 85 ELITE18-CON-CE-CIV-IR-3585 Installation perlino marbal for floor & threshold 124,125 GF,FF,MR 4-Aug-23 7-Aug-23 B 14-Sep-23 16-Sep-23 A A

2366 86 ELITE18-CON-CE-CIV-IR-3586 Installation black granite marble for partition wall external side 124,125 A&B 4-Aug-23 7-Aug-23 B 9-Dec-23 14-Dec-23 A A

2367 87 ELITE18-CON-CE-CIV-IR-3587 Installation window sill horizontal 124,125 GF,FF,MR 4-Aug-23 7-Aug-23 B 16-Sep-23 19-Sep-23 A A

2368 88 ELITE18-CON-CE-CIV-IR-3588 Installation window sill vertical 124,125 GF,FF,MR 4-Aug-23 7-Aug-23 A A

2369 89 ELITE18-CON-CE-CIV-IR-3589 Installation wall tile for baths & powder room 124,125 GF,FF 4-Aug-23 7-Aug-23 B 30-Oct-23 1-Nov-23 A A

Installation suspension & framing system for celling work GF,FF,maid room dry
2370 90 ELITE18-CON-CE-CIV-IR-3590 124,125 GF,FF,MR 4-Aug-23 7-Aug-23 C 11-Aug-23 12-Aug-23 B 28-Oct-23 1-Nov-23 B B
area
Installation suspension & framing system for celling work GF,FF,maid room wet
2371 91 ELITE18-CON-CE-CIV-IR-3591 124,125 GF,FF,MR 4-Aug-23 7-Aug-23 C 11-Aug-23 12-Aug-23 B 28-Oct-23 1-Nov-23 B B
area
2372 92 ELITE18-CON-CE-CIV-IR-3592 FDT test 3rd layer sand filling for external side left & right side 124,125 A&B 5-Aug-23 10-Aug-23 C 11-Aug-23 16-Aug-23 A A

2373 93 ELITE18-CON-CE-CIV-IR-3593 Block masonory for mechnical wall 124,125 GF,FF 7-Aug-23 8-Aug-23 C 16-Aug-23 19-Aug-23 A A

2374 94 ELITE18-CON-CE-CIV-IR-3594 Plaster work & wall mounted cement board for cistern flushing tank 124,125 A&B 7-Aug-23 9-Aug-23 A A

2375 95 ELITE18-CON-CE-CIV-IR-3595 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 124,125 A&B 10-Aug-23 16-Aug-23 A A
GF to FF &
2376 96 ELITE18-CON-CE-CIV-IR-3596 Installation perlino marbal for stair 124,125 11-Aug-23 12-Aug-23 B 16-Sep-23 19-Sep-23 B 30-Oct-23 1-Nov-23 B B
FF to M
GF to FF &
2377 97 ELITE18-CON-CE-CIV-IR-3597 Stair skirting GF toFF & FF to Mumty 124,125 11-Aug-23 12-Aug-23 B B
FF to M
2378 98 ELITE18-CON-CE-CIV-IR-3598 Cementitious coat for baths & powder room water profing 125 B 11-Aug-23 12-Aug-23 A A

2379 99 ELITE18-CON-CE-CIV-IR-3599 Primer coat 1st coat putty & 2nd coat putty & 1st coat paint for internal paint 125 GF,FF,MR 11-Aug-23 12-Aug-23 B 8-Sep-23 11-Sep-23 A A

2380 100 ELITE18-CON-CE-CIV-IR-3600 Instalaltion wall tile & floor tile for kitchen 124,125 A&B 12-Aug-23 16-Aug-23 A A

2381 101 ELITE18-CON-CE-CIV-IR-3601 Installation skirting for maid room 124,125 A&B 12-Aug-23 16-Aug-23 C 14-Sep-23 16-Sep-23 A A

2382 102 ELITE18-CON-CE-CIV-IR-3602 Instalaltion floor tile for maid bath 124,125 A&B 12-Aug-23 16-Aug-23 C 27-Sep-23 2-Oct-23 B B

2383 103 ELITE18-CON-CE-CIV-IR-3603 Plaster & roof tile & roof skirting for top roof 124,125 A&B 12-Aug-23 16-Aug-23 C 3-Oct-23 4-Oct-23 B 30-Oct-23 1-Nov-23 B B

2384 104 ELITE18-CON-CE-CIV-IR-3604 Instalaltion split stone for external side 124,125 A&B 16-Aug-23 18-Aug-23 A A

2385 105 ELITE18-CON-CE-CIV-IR-3605 Polythene sheet 1000 micron for external side 124,125 A&B 16-Aug-23 21-Aug-23 B B

2386 106 ELITE18-CON-CE-CIV-IR-3606 PCC (1:3:6) for external side 124,125 A&B 16-Aug-23 21-Aug-23 B B

2387 107 ELITE18-CON-CE-CIV-IR-3607 Cementitious coat for baths & powder bath water prooofing 124,125 GF,FF 18-Aug-23 22-Aug-23 A A

2388 108 ELITE18-CON-CE-CIV-IR-3608 Pond test for baths 124,125 GF,FF 18-Aug-23 22-Aug-23 A A

2389 109 ELITE18-CON-CE-CIV-IR-3609 Installation OHWT cover & concrete uper side 124,125 A&B 21-Aug-23 26-Aug-23 C 24-Aug-23 26-Aug-23 B B

2390 110 ELITE18-CON-CE-CIV-IR-3610 Plaster work for internal patches 124,125 A&B 21-Aug-23 24-Aug-23 B B

2391 111 ELITE18-CON-CE-CIV-IR-3611 Instalaltion gypsum board jointing & taping for celling work dry area 125 GF,FF,MR 22-Aug-23 26-Aug-23 B 24-Aug-23 26-Aug-23 B 28-Oct-23 1-Nov-23 B B

2392 112 ELITE18-CON-CE-CIV-IR-3612 7 days cylinder concrete test PCC (1:3:6) external side left side & right side 124,125 A&B 23-Aug-23 26-Aug-23 A A

2393 113 ELITE18-CON-CE-CIV-IR-3613 Plaster for HDF floor GF,FF 124,125 GF,FF 23-Aug-23 26-Aug-23 B B

2394 114 ELITE18-CON-CE-CIV-IR-3614 Installation gypsum board jointing & taping for celling work dry area 124 GF,FF,MR 14-Sep-23 16-Sep-23 B 28-Oct-23 1-Nov-23 B B

2395 115 ELITE18-CON-CE-CIV-IR-3615 Instalaltion peragola cleats with mechanical bolts all respect 124,125 A&B 29-Aug-23 1-Sep-23 B B

2396 116 ELITE18-CON-CE-CIV-IR-3616 Installation MS porch fence for boundry wall with paint 124,125 A&B 29-Aug-23 30-Aug-23 B 9-Dec-23 14-Dec-23 A A

2397 117 ELITE18-CON-CE-CIV-IR-3617 Plaster for partition wall externals side 124,125 A&B 2-Sep-23 5-Sep-23 A A
PCC (1:4:8) under kerb stone & installation kerb stone & side gola for external side
2398 118 ELITE18-CON-CE-CIV-IR-3618 124,125 A&B 5-Sep-23 8-Sep-23 A A
elevation 2
2399 119 ELITE18-CON-CE-CIV-IR-3619 Applying primer coat bituminious sheet 4mm & secreed for bath floor 124,125 FF,MB 5-Sep-23 8-Sep-23 B B

2400 120 ELITE18-CON-CE-CIV-IR-3620 28 days cylinder concrete test PCC (1:3:6) external side left side & right side 124,125 A&B 6-Sep-23 8-Sep-23 A A

2401 121 ELITE18-CON-CE-CIV-IR-3621 Plaster work for external patches retrofitting work 124,125 A&B 8-Sep-23 13-Sep-23 B B

2402 122 ELITE18-CON-CE-CIV-IR-3622 Primer coat 1st coat putty & 2nd coat putty for internal paint 124 GF,FF,MR 9-Sep-23 14-Sep-23 A A

2403 123 ELITE18-CON-CE-CIV-IR-3623 Installation vanity frame for baths & powder room 124,125 A&B 8-Sep-23 11-Sep-23 A A

2404 124 ELITE18-CON-CE-CIV-IR-3624 Dismentlling boundry wall column for retrofitting work 124,125 A&B 9-Sep-23 UR UR

2405 125 ELITE18-CON-CE-CIV-IR-3625 Installation vanity marbal for baths & powder room 124,125 GF,FF 12-Sep-23 14-Sep-23 B 30-Oct-23 1-Nov-23 B B

2406 126 ELITE18-CON-CE-CIV-IR-3626 Installation vanity miror for baths & powder room 124,125 GF,FF 12-Sep-23 14-Sep-23 B 30-Oct-23 1-Nov-23 B B

2407 127 ELITE18-CON-CE-CIV-IR-3627 1st coat paint for internal paint 124 GF,FF,MR 12-Sep-23 14-Sep-23 A A
Base primer & graffy for external paint elevation 1,2,3,4,OHWT mumty outer side
2408 128 ELITE18-CON-CE-CIV-IR-3628 124,125 A&B 12-Sep-23 14-Sep-23 A A
& parapet wall internal side

Page 64 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2409 129 ELITE18-CON-CE-CIV-IR-3629 Installation glass ralling for stair 124,125 A&B 12-Sep-23 14-Sep-23 B 30-Oct-23 1-Nov-23 B B

2410 130 ELITE18-CON-CE-CIV-IR-3630 Installation aluminium door for kitchen & mumty 124,125 A&B 12-Sep-23 14-Sep-23 B 30-Oct-23 1-Nov-23 B B

2411 131 ELITE18-CON-CE-CIV-IR-3631 Installation paver skirting for external side 124,125 A&B 12-Sep-23 14-Sep-23 C 22-Sep-23 26-Sep-23 C 27-Sep-23 2-Oct-23 B 30-Oct-23 1-Nov-23 B B

2412 132 ELITE18-CON-CE-CIV-IR-3632 Installation floor skirting 124,125 GF,FF,M 12-Sep-23 16-Sep-23 B 30-Oct-23 1-Nov-23 B B

2413 133 ELITE18-CON-CE-CIV-IR-3633 Installation stair skirting GF to FF & FF to M 124,125 A&B 12-Sep-23 14-Sep-23 B 30-Oct-23 1-Nov-23 B B

2414 134 ELITE18-CON-CE-CIV-IR-3634 Primer coat 1st coat putty & 2nd coat putty & 1st coat paint for celling paint 124,125 GF,FF,MR 13-Sep-23 15-Sep-23 A A

2415 135 ELITE18-CON-CE-CIV-IR-3635 Peragola paint with all respect 124,125 A&B 13-Sep-23 15-Sep-23 C 16-Sep-23 19-Sep-23 C 27-Sep-23 2-Oct-23 B 28-Nov-23 30-Nov-23 A A

2416 136 ELITE18-CON-CE-CIV-IR-3636 Installation moisture for celling work wet area 124,125 GF,FF,MR 14-Sep-23 16-Sep-23 B 28-Oct-23 1-Nov-23 B B

2417 137 ELITE18-CON-CE-CIV-IR-3637 Instalaltion floor tile for baths & powder room 124,125 GF,FF,MB 14-Sep-23 16-Sep-23 B B

2418 138 ELITE18-CON-CE-CIV-IR-3638 Sand excavated during piling works 124,125 A&B 16-Nov-23 UR UR

2419 139 ELITE18-CON-CE-CIV-IR-3639 MS pergola bulkhead with cement board paint 124 A 15-Sep-23 18-Sep-23 C 27-Sep-23 2-Oct-23 B 9-Dec-23 14-Dec-23 A A

2420 140 ELITE18-CON-CE-CIV-IR-3640 Peragola jointing with all respect 124,125 A&B 15-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 B 11-Dec-23 14-Dec-23 A A

2421 141 ELITE18-CON-CE-CIV-IR-3641 Catch basin including MS grate with all respect 124,125 A&B 15-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 B B

2422 142 ELITE18-CON-CE-CIV-IR-3642 Instalaltion cover for UGWT with paint 124,125 A&B 15-Sep-23 18-Sep-23 C 27-Sep-23 2-Oct-23 B B
Installation cover including slab for manhole gully trap electrical chamber &
2423 143 ELITE18-CON-CE-CIV-IR-3643 124,125 A&B 15-Sep-23 16-Sep-23 B B
electrical hanhole with paint
2424 144 ELITE18-CON-CE-CIV-IR-3644 Window jambs prepration 124,125 GF,FF,M 16-Sep-23 19-Sep-23 A A

2425 145 ELITE18-CON-CE-CIV-IR-3645 PCC (1:3:6) ac pad & PPRC pad for top roof 124,125 A&B 16-Nov-23 23-Nov-23 C 9-Dec-23 UR UR

2426 146 ELITE18-CON-CE-CIV-IR-3646 Block masonory plaster for duct & DB area 124,125 GF,FF,M 16-Sep-23 20-Sep-23 A A

2427 147 ELITE18-CON-CE-CIV-IR-3647 Instalaltion MS grating for main gate 124,125 A&B 16-Sep-23 19-Sep-23 C 26-Sep-23 2-Oct-23 A A

2428 148 ELITE18-CON-CE-CIV-IR-3648 Installation black granite strip for shower cabin 124,125 GF,FF 16-Sep-23 19-Sep-23 A A

2429 149 ELITE18-CON-CE-CIV-IR-3649 Instalaltion MS louvers under the OHWT with all respect 124,125 A&B 16-Sep-23 19-Sep-23 B B

2430 150 ELITE18-CON-CE-CIV-IR-3650 Block masonory for OHWT 124,125 A&B 16-Sep-23 20-Sep-23 A A

2431 151 ELITE18-CON-CE-CIV-IR-3651 Plaster for under the OHWT 124,125 A&B 16-Sep-23 20-Sep-23 A A

2432 152 ELITE18-CON-CE-CIV-IR-3652 Instalaltion wooden hand rail for stair 124,125 A&B 16-Sep-23 19-Sep-23 B 30-Oct-23 1-Nov-23 B B

2433 153 ELITE18-CON-CE-CIV-IR-3653 Fixing cubical glass partition & glass door for baths 124,125 GF,FF 22-Sep-23 23-Sep-23 C 27-Sep-23 2-Oct-23 B 27-Oct-23 1-Nov-23 B B

2434 154 ELITE18-CON-CE-CIV-IR-3654 Instalaltion transfer & booster pump cover with all respect 124,125 A&B 22-Sep-23 23-Sep-23 A A

2435 155 ELITE18-CON-CE-CIV-IR-3655 Fixing of access penal in celling 124,125 A&B 22-Sep-23 23-Sep-23 B 30-Oct-23 1-Nov-23 B B

2436 156 ELITE18-CON-CE-CIV-IR-3656 2nd coat paint for celling paint 124,125 GF,FF,MR 26-Sep-23 27-Sep-23 C C

2437 157 ELITE18-CON-CE-CIV-IR-3657 2nd coat paint for internal paint 124,125 A&B 26-Sep-23 27-Sep-23 C C

2438 158 ELITE18-CON-CE-CIV-IR-3658 Installation doors wardrobes iron mongries skirting vanity & tranition strip final ir 124,125 A&B 13-Oct-23 15-Oct-23 B B

2439 159 ELITE18-CON-CE-CIV-IR-3659 Instalaltion window frame & window glass with all respect 124,125 A&B 17-Oct-23 19-Oct-23 B B

2440 160 ELITE18-CON-CE-CIV-IR-3660 Installation HDF floor & skirting 124,125 A&B 17-Oct-23 19-Oct-23 B B

2441 161 ELITE18-CON-CE-CIV-IR-3661 2nd & final coat paint for internal walls 124,125 GF,FF,MR 28-Oct-23 1-Nov-23 B B

2442 162 ELITE18-CON-CE-CIV-IR-3662 2nd & final coat paint for celling paint dry & wet araea 124,125 GF,FF,MR 28-Oct-23 1-Nov-23 B B

2443 163 ELITE18-CON-CE-CIV-IR-3663 Instalaltion perlino marbal for boundry wall top top roof column & meter box top 124,125 A&B 15-Nov-23 23-Nov-23 A A
Weather sheild 1st coat & 2nd coat for external paint elevation 1,2,3,4 OHWT
2444 164 ELITE18-CON-CE-CIV-IR-3664 124,125 A&B 16-Nov-23 24-Nov-23 A A
mumty out side boundry wall & parapet wall
2445 165 ELITE18-CON-CE-CIV-IR-3665 Base primer & graffy for external paint boundry wall 124,125 A&B 16-Nov-23 24-Nov-23 A A

2446 166 ELITE18-CON-CE-CIV-IR-3666 Installation cremmo for boundary wall 124,125 A&B 9-Dec-23 14-Dec-23 A A

2447

2448

2449 3751 TO 4000 122-123


2450 1 ELITE18-CON-CE-CIV-IR-3751 Steel & anchor epoxy for slab thickness increase Top Roof 122,123 A&B 9-Dec-22 13-Dec-22 B B

2451 2 ELITE18-CON-CE-CIV-IR-3752 Slab thickness increase drilling 12mm,14mm & 24 mm for share links top roof 122,123 A&B 12-Dec-22 14-Dec-22 B B

2452 3 ELITE18-CON-CE-CIV-IR-3753 Fixing & anchor epoxy for column jackting 122,123 A&B 12-Dec-22 14-Dec-22 B B

2453 4 ELITE18-CON-CE-CIV-IR-3754 Columns horizontal drilling 12mm & vertical drilling 25mm for share links 122,123 GF,FF 12-Dec-22 14-Dec-22 B B

2454 5 ELITE18-CON-CE-CIV-IR-3755 Block masonory for under the plinth beam & entrance lobby wall 122,123 A&B 14-Dec-22 15-Dec-22 B B

2455 6 ELITE18-CON-CE-CIV-IR-3756 RCC concrete (4000 psi ) & SBR for slab thikness increase top roof 122,123 A&B 15-Dec-22 20-Dec-22 C 3-Jan-23 7-Jan-23 B B

2456 7 ELITE18-CON-CE-CIV-IR-3757 Drilling with epoxy 24mm for coulmns share links 122,123 A&B 15-Dec-22 20-Dec-22 C C
Installation MS girders with MS plates drilling anchoring mechoring mechnical
2457 8 ELITE18-CON-CE-CIV-IR-3758 122,123 GF,FF 15-Dec-22 20-Dec-22 C 21-Dec-22 22-Dec-22 B 10-Jun-23 15-Jun-23 B B
boulting
2458 9 ELITE18-CON-CE-CIV-IR-3759 Layout columns drilling top buttom for retrofitting work 122,123 GF,FF 20-Dec-22 22-Dec-22 A A

2459 10 ELITE18-CON-CE-CIV-IR-3760 Layout columns formwork for retrofitting work 122,123 GF,FF 20-Dec-22 29-Dec-22 A A

Page 65 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2460 11 ELITE18-CON-CE-CIV-IR-3761 Layout share links for slab thickness increase top rrof 122,123 A&B 20-Dec-22 29-Dec-22 B B

2461 12 ELITE18-CON-CE-CIV-IR-3762 Layout MS girder & RCC beam drilling 122,123 GF,FF 20-Dec-22 22-Dec-22 B B

2462 13 ELITE18-CON-CE-CIV-IR-3763 Drilling & mechnical boulting 123 B 21-Dec-22 22-Dec-22 B B

2463 14 ELITE18-CON-CE-CIV-IR-3764 Drilling & mechnical boulting 122 A 21-Dec-22 22-Dec-22 B B

2464 15 ELITE18-CON-CE-CIV-IR-3765 Dismentlling balck granite window sill for retrofitting work & debris remove 122,123 A&B 6-Jan-23 7-Jan-23 C 5-Jun-23 8-Jun-23 C 3-Aug-23 8-Aug-23 A A

2465 16 ELITE18-CON-CE-CIV-IR-3766 Formwork & RCC concrete (4000 psi) & SBR with bonding agent of columns 122,123 A&B 7-Jan-23 12-Jan-23 B B

2466 17 ELITE18-CON-CE-CIV-IR-3767 RCC top level for slab thickness increase 122,123 TR 9-Jan-23 12-Jan-23 A A

2467 18 ELITE18-CON-CE-CIV-IR-3768 Dismentlling for slab thickness increase FF & debris remove 123 B 12-Jan-23 17-Jan-23 B B

2468 19 ELITE18-CON-CE-CIV-IR-3769 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 122,123 A&B 12-Jan-23 17-Jan-23 A A

2469 20 ELITE18-CON-CE-CIV-IR-3770 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 122,123 GF 14-Jan-23 27-Jan-23 A A

2470 21 ELITE18-CON-CE-CIV-IR-3771 FDT test 3rd layer sand filling for under the floating slab 123 B 31-Jan-23 4-Feb-23 A A

2471 22 ELITE18-CON-CE-CIV-IR-3772 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 122,123 A&B 2-Feb-23 8-Feb-23 A A

2472 23 ELITE18-CON-CE-CIV-IR-3773 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 122,123 GF 7-Feb-23 11-Feb-23 A A

2473 24 ELITE18-CON-CE-CIV-IR-3774 FDT test 1st layer sand filling for under the floating slab 122 A 11-Feb-23 15-Feb-23 B B

2474 25 ELITE18-CON-CE-CIV-IR-3775 FDT test 2nd layer sand filling for under the floating slab 122 A 11-Feb-23 15-Feb-23 B B

2475 26 ELITE18-CON-CE-CIV-IR-3776 FDT test 3rd layer sand filling for under the floating slab 122 A 16-Feb-23 22-Feb-23 C 22-Feb-23 23-Feb-23 B B

2476 27 ELITE18-CON-CE-CIV-IR-3777 Polythene sheet 1000 micron under the PCC floating slab 123 B 16-Feb-23 20-Feb-23 A A

2477 28 ELITE18-CON-CE-CIV-IR-3778 PCC (1:4:8) under the floating slab 123 B 16-Feb-23 22-Feb-23 B B

2478 29 ELITE18-CON-CE-CIV-IR-3779 Polythene sheet 1000 micron under the PCC floating slab 122 A 21-Feb-23 23-Feb-23 A A

2479 30 ELITE18-CON-CE-CIV-IR-3780 PCC (1:4:8) under the floating slab 122 A 21-Feb-23 23-Feb-23 B B

2480 31 ELITE18-CON-CE-CIV-IR-3781 Primer coat & membranes bituminous sheet for top roof 122,123 A&B 17-Mar-23 21-Mar-23 A A

2481 32 ELITE18-CON-CE-CIV-IR-3782 07 days cylinder concrete test PCC (1:4:8) under floating slab 123 B 24-Feb-23 1-Mar-23 B B

2482 33 ELITE18-CON-CE-CIV-IR-3783 07 days cylinder concrete test PCC (1:4:8) under floating slab 122 A 1-Mar-23 4-Mar-23 A A

2483 34 ELITE18-CON-CE-CIV-IR-3784 Steel & filler board for floatting slab 122 A 6-Mar-23 9-Mar-23 B B

2484 35 ELITE18-CON-CE-CIV-IR-3785 RCC concrete (1:2:4) for floatting slab 122 A 11-Mar-23 15-Mar-23 B B

2485 36 ELITE18-CON-CE-CIV-IR-3786 07 days cylinder concrete test RCC (1:2:4) floting slab 122 A 13-Mar-23 17-Mar-23 B B

2486 37 ELITE18-CON-CE-CIV-IR-3787 Steel & anchor epoxy for beam jackting 122,123 GF 16-Mar-23 17-Mar-23 B B

2487 38 ELITE18-CON-CE-CIV-IR-3788 Steel & filler board for floatting slab 123 B 16-Mar-23 17-Mar-23 B B

2488 39 ELITE18-CON-CE-CIV-IR-3789 RCC concrete (1:2:4) for floatting slab 123 B 16-Mar-23 17-Mar-23 B B

2489 40 ELITE18-CON-CE-CIV-IR-3790 28 days cylinder concrete test PCC (1:4:8) under floating slab 123 B 16-Mar-23 24-Mar-23 A A

2490 41 ELITE18-CON-CE-CIV-IR-3791 Primer coat & membranes bituminous sheet for top roof 122,123 A&B 17-Mar-23 21-Mar-23 A A

2491 42 ELITE18-CON-CE-CIV-IR-3792 07 days cylinder concrete test RCC (1:2:4) floating slab 123 B 20-Mar-23 24-Mar-23 A A

2492 43 ELITE18-CON-CE-CIV-IR-3793 28 days cylinder concrete test PCC (1:4:8) under floating slab 122 A 22-Mar-23 24-Mar-23 A A

2493 44 ELITE18-CON-CE-CIV-IR-3794 Pond test for top roof 122,123 A&B 22-Mar-23 24-Mar-23 A A

2494 45 ELITE18-CON-CE-CIV-IR-3795 Surface clearence & side gola for top roof 122,123 A&B 24-Mar-23 28-Mar-23 B B

2495 46 ELITE18-CON-CE-CIV-IR-3796 28 days cylinder concrete test RCC (1:2:4) floating slab 122 A 31-Mar-23 6-Apr-23 A A

2496 47 ELITE18-CON-CE-CIV-IR-3797 28 days cylinder concrete test RCC (1:2:4) floating slab 123 B 10-Apr-23 11-Apr-23 B B

2497 48 ELITE18-CON-CE-CIV-IR-3798 Block masonory for partition wall external side 122,123 A&B 9-May-23 13-May-23 B B

2498 49 ELITE18-CON-CE-CIV-IR-3799 Jumbolon XPS board 50mm & polythene sheet laying & screeding for top roof 122,123 A&B 12-May-23 17-May-23 B B

2499 50 ELITE18-CON-CE-CIV-IR-3800 RCC concrete 4000 psi & SBR for retrofiting beams 122,123 GF 11-May-23 16-May-23 B B

2500 51 ELITE18-CON-CE-CIV-IR-3801 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 122,123 GF 16-May-23 22-May-23 B B

2501 52 ELITE18-CON-CE-CIV-IR-3802 Primer coat & membranes bituminous sheet for external side 122,123 A&B 25-May-23 29-May-23 B B

2502 53 ELITE18-CON-CE-CIV-IR-3803 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 122,123 FF 27-May-23 30-May-23 B B

2503 54 ELITE18-CON-CE-CIV-IR-3804 RCC concrete 4000 Psi & SBR for retrofitting columns 122,123 FF 27-May-23 30-May-23 B B

2504 55 ELITE18-CON-CE-CIV-IR-3805 Steel & anchor epoxy for columns jactting 122,123 FF 27-May-23 30-May-23 A A

2505 56 ELITE18-CON-CE-CIV-IR-3806 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 122,123 GF 6-Jun-23 8-Jun-23 A A

2506 57 ELITE18-CON-CE-CIV-IR-3807 RCC concrete 4000 Psi & SBR for retrofitting beams 122,123 FF 12-Jun-23 14-Jun-23 B B

2507 58 ELITE18-CON-CE-CIV-IR-3808 Steel & anchore epoxy for beams jackting 122,123 FF 12-Jun-23 14-Jun-23 A A

2508 59 ELITE18-CON-CE-CIV-IR-3809 FDT test 1st layer sand filling for external side 122,123 A&B 14-Jun-23 17-Jun-23 B B

2509 60 ELITE18-CON-CE-CIV-IR-3810 FDT test 2nd layer sand filling for external side 122,123 A&B 14-Jun-23 17-Jun-23 B B

2510 61 ELITE18-CON-CE-CIV-IR-3811 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 122,123 A&B 17-Jun-23 20-Jun-23 B B

2511 62 ELITE18-CON-CE-CIV-IR-3812 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 122,123 FF 17-Jun-23 20-Jun-23 B B

2512 63 ELITE18-CON-CE-CIV-IR-3813 Steel & anchore epoxy for slab thickness increase 122,123 FF 17-Jun-23 20-Jun-23 B B

2513 64 ELITE18-CON-CE-CIV-IR-3814 RCC concrete 4000 Psi & SBR for slab thickness increase 122,123 FF 17-Jun-23 20-Jun-23 B B

2514 65 ELITE18-CON-CE-CIV-IR-3815 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 122,123 FF 22-Jun-23 6-Jul-23 A A

Page 66 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2515 66 ELITE18-CON-CE-CIV-IR-3816 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 122,123 FF 7-Jul-23 13-Jul-23 A A

2516 67 ELITE18-CON-CE-CIV-IR-3817 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 122,123 FF 13-Jul-23 17-Jul-23 A A

2517 68 ELITE18-CON-CE-CIV-IR-3818 Side gola & laying aggregates for Mumty top 122,123 A&B 13-Jul-23 19-Jul-23 B B

2518 69 ELITE18-CON-CE-CIV-IR-3819 FDT test 3rd layer sand filling for external side 122,123 A&B 18-Jul-23 20-Jul-23 B B

2519 70 ELITE18-CON-CE-CIV-IR-3820 Block masonory & lintels for retrofiting work & parttition walls 122,123 GF,FF 19-Jul-23 24-Jul-23 C 25-Jul-23 27-Jul-23 B 9-Aug-23 10-Aug-23 C 27-Sep-23 28-Sep-23 A A

2520 71 ELITE18-CON-CE-CIV-IR-3821 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 122,123 A&B 20-Jul-23 24-Jul-23 A A
Fixing MS girders with MS plates drilling anchoring connector mechnical &
2521 72 ELITE18-CON-CE-CIV-IR-3822 122,123 GF,FF 21-Jul-23 12-Aug-23 B B
chemical boulting apoxy with all respect
2522 73 ELITE18-CON-CE-CIV-IR-3823 Grout filling BW girder & slab 122,123 A&B 26-Jul-23 3-Aug-23 B B

2523 74 ELITE18-CON-CE-CIV-IR-3824 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 122,123 A&B 26-Jul-23 3-Aug-23 A A

2524 75 ELITE18-CON-CE-CIV-IR-3825 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 122,123 A&B 26-Jul-23 3-Aug-23 A A

2525 76 ELITE18-CON-CE-CIV-IR-3826 Block masonory for manhole gully trap electrical chamber & electrical handhole 122,123 A&B 26-Jul-23 3-Aug-23 A A

2526 77 ELITE18-CON-CE-CIV-IR-3827 Pudlo & benching for manhole gully trap electrical chamber & electrical handhole 122,123 A&B 2-Aug-23 7-Aug-23 C 21-Aug-23 26-Aug-23 C 14-Sep-23 16-Sep-23 A A

2527 78 ELITE18-CON-CE-CIV-IR-3828 FDT test 1st layer sand filling for external side left & right side 122,123 A&B 5-Aug-23 10-Aug-23 A A

2528 79 ELITE18-CON-CE-CIV-IR-3829 FDT test 2nd layer sand filling for external side left & right side 122,123 A&B 5-Aug-23 10-Aug-23 A A

2529 80 ELITE18-CON-CE-CIV-IR-3830 FDT test 3rd layer sand filling for external side left & right side 122,123 A&B 5-Aug-23 10-Aug-23 C 11-Aug-23 16-Aug-23 A A

2530 81 ELITE18-CON-CE-CIV-IR-3831 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 122,123 A&B 10-Aug-23 16-Aug-23 A A

2531 82 ELITE18-CON-CE-CIV-IR-3832 Instalaltion wall tile & floor tile for kitchen 122,123 A&B 10-Aug-23 12-Aug-23 B 14-Sep-23 16-Aug-23 B B

2532 83 ELITE18-CON-CE-CIV-IR-3833 Installation of perlino floor marbal 123 GF,FF,M 10-Aug-23 12-Aug-23 B 28-Oct-23 1-Nov-23 B B

2533 84 ELITE18-CON-CE-CIV-IR-3834 Installation window sill horizontal 122,123 GF,FF,MR 10-Aug-23 12-Aug-23 B 16-Sep-23 19-Sep-23 A A

2534 85 ELITE18-CON-CE-CIV-IR-3835 Installation window sill vertical 122,123 GF,FF,MR 10-Aug-23 12-Aug-23 B 16-Sep-23 19-Sep-23 A A

2535 86 ELITE18-CON-CE-CIV-IR-3836

2536 87 ELITE18-CON-CE-CIV-IR-3837 Installation of perlino floor marbal for stair GF to FF & FF to M 122,123 GF,FF,MR 11-Aug-23 12-Aug-23 B 16-Sep-23 19-Sep-23 B 30-Oct-23 1-Nov-23 B B

2537 88 ELITE18-CON-CE-CIV-IR-3838 Installation black granite elevation 1 123 B 11-Aug-23 12-Aug-23 B B

2538 89 ELITE18-CON-CE-CIV-IR-3839 Instllation black granite for partition wall 122,123 A&B 11-Aug-23 12-Aug-23 B 30-Oct-23 1-Nov-23 B B

2539 90 ELITE18-CON-CE-CIV-IR-3840

2540 91 ELITE18-CON-CE-CIV-IR-3841 Installation suspention & framing system for celling work GF,FF,MR dry area 122,123 A&B 12-Aug-23 16-Aug-23 A A

2541 92 ELITE18-CON-CE-CIV-IR-3842 Installation suspention & framing system for celling work GF,FF,MR wet area 122,123 A&B 12-Aug-23 16-Aug-23 A A

2542 93 ELITE18-CON-CE-CIV-IR-3843 Instalaltion of perlino floor marbal 122,123 GF,FF,MR 12-Aug-23 16-Aug-23 B 28-Oct-23 1-Nov-23 B B

2543 94 ELITE18-CON-CE-CIV-IR-3844 Installation skirting for maid room 122,123 A&B 12-Aug-23 16-Aug-23 A A

2544 95 ELITE18-CON-CE-CIV-IR-3845 Installation floor & wall tile for maid bath 122,123 A&B 12-Aug-23 16-Aug-23 C 14-Sep-23 16-Sep-23 B B

2545 96 ELITE18-CON-CE-CIV-IR-3846 Plaster & roof tile & roof skirting for top roof 122,123 A&B 12-Aug-23 16-Aug-23 C 3-Oct-23 4-Oct-23 B 30-Oct-23 1-Nov-23 B B

2546 97 ELITE18-CON-CE-CIV-IR-3847 Installatin split stone for external side 122,123 A&B 16-Aug-23 19-Aug-23 A A

2547 98 ELITE18-CON-CE-CIV-IR-3848 Block masonory for mechnical wall 122,123 GF,FF 16-Aug-23 19-Aug-23 A A

2548 99 ELITE18-CON-CE-CIV-IR-3849 Plaster work & wall mounted cement board for cistern flushing tank 122,123 GF,FF 16-Aug-23 19-Aug-23 C 14-Sep-23 16-Sep-23 A A

2549 100 ELITE18-CON-CE-CIV-IR-3850 Polythene sheet 1000 micron for external side 122,123 A&B 16-Aug-23 21-Aug-23 B B

2550 101 ELITE18-CON-CE-CIV-IR-3851 PCC (1:3:6) for external side 122,123 A&B 16-Aug-23 21-Aug-23 B B

2551 102 ELITE18-CON-CE-CIV-IR-3852 Dismentlling boundry wall plinth beam & column 122 A 18-Aug-23 22-Aug-23 B B
Plaster work & corner beads for retro fiting columns & internal walls with all
2552 103 ELITE18-CON-CE-CIV-IR-3853 122,123 GF,FF 21-Aug-23 26-Aug-23 A A
respect
2553 104 ELITE18-CON-CE-CIV-IR-3854 Installation OHWT cover & concrete uper side 122,123 A&B 21-Aug-23 26-Aug-23 C 24-Aug-23 26-Aug-23 A A

2554 105 ELITE18-CON-CE-CIV-IR-3855 7 days cylinder concrete test PCC (1:3:6) external side left side & right side 122,123 A&B 23-Aug-23 26-Aug-23 A A

2555 106 ELITE18-CON-CE-CIV-IR-3856 Installation floor & wall tile for baths & powder room 122,123 GF,FF 24-Aug-23 26-Aug-23 C 8-Sep-23 11-Sep-23 A A

2556 107 ELITE18-CON-CE-CIV-IR-3857 Instalaltion peragola cleats with mechanical bolts all respect 122,123 A&B 29-Aug-23 1-Sep-23 B B

2557 108 ELITE18-CON-CE-CIV-IR-3858 Installation MS porch fence for boundry wall with paint 122,123 A&B 29-Aug-23 30-Aug-23 B 9-Dec-23 14-Dec-23 A A

2558 109 ELITE18-CON-CE-CIV-IR-3859 RCC concrete (1:2:4) plinth beam & columns for boundry wall 122 A 29-Aug-23 31-Aug-23 B B

2559 110 ELITE18-CON-CE-CIV-IR-3860 PCC (1:4:8) for under the trench drain grating foundation 122 A 29-Aug-23 31-Aug-23 B B

2560 111 ELITE18-CON-CE-CIV-IR-3861 Steel grating angle & formwork for trench drain grating foundation 122 A 29-Aug-23 31-Aug-23 B B

2561 112 ELITE18-CON-CE-CIV-IR-3862 RCC concrete (1:2:4) for trench drain grating foundation 122 A 29-Aug-23 31-Aug-23 B B

2562 113 ELITE18-CON-CE-CIV-IR-3863 Block masonry for boundry wall 122 A 30-Aug-23 1-Sep-23 A A

2563 114 ELITE18-CON-CE-CIV-IR-3864 HDF floor plaster 122 GF,FF 1-Sep-23 2-Sep-23 A A

2564 115 ELITE18-CON-CE-CIV-IR-3865 Plaster for partition wall externals side 122,123 A&B 2-Sep-23 5-Sep-23 A A
PCC (1:4:8) under kerb stone & installation kerb stone & side gola for external side
2565 116 ELITE18-CON-CE-CIV-IR-3866 122,123 A&B 5-Sep-23 8-Sep-23 A A
elevation 2
2566 117 ELITE18-CON-CE-CIV-IR-3867 Applying primer coat bituminious sheet 4mm & secreed for bath floor 122,123 FF,MB 5-Sep-23 8-Sep-23 B B

2567 118 ELITE18-CON-CE-CIV-IR-3868 28 days cylinder concrete test PCC (1:3:6) external side left side & right side 122,123 A&B 6-Sep-23 8-Sep-23 A A

2568 119 ELITE18-CON-CE-CIV-IR-3869 Installation vanity frame for baths & powder room 122,123 GF,FF 8-Sep-23 11-Sep-23 A A

2569 120 ELITE18-CON-CE-CIV-IR-3870 Plaster work for external patches retrofitting work 122,123 A&B 8-Sep-23 13-Sep-23 B B

Page 67 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2570 121 ELITE18-CON-CE-CIV-IR-3871 Dismentlling boundry wall column for retrofitting work 123 B 9-Sep-23 13-Sep-23 B B

2571 122 ELITE18-CON-CE-CIV-IR-3872 Installation vanity marbal for baths & powder room 122,123 A&B 9-Sep-23 14-Sep-23 C 27-Sep-23 2-Oct-23 B B

2572 123 ELITE18-CON-CE-CIV-IR-3873 Installation vanity miror for baths & powder room 122,123 A&B 9-Sep-23 14-Sep-23 C 27-Sep-23 2-Oct-23 B 30-Oct-23 1-Nov-23 B B

2573 124 ELITE18-CON-CE-CIV-IR-3874 Installation gypsum board jointing & tapping for celling work dry area 122,123 GF,FF 9-Sep-23 14-Sep-23 B 28-Oct-23 1-Nov-23 B B

2574 125 ELITE18-CON-CE-CIV-IR-3875 Primer coat 1st coat putty & 2nd coat putty for internal paint 122,123 GF,FF,MR 9-Sep-23 14-Sep-23 B B

2575 126 ELITE18-CON-CE-CIV-IR-3876 Installation gypsum board jointing & tapping for celling work wet area 122,123 GF,FF,MR 9-Sep-23 14-Sep-23 A A

2576 127 ELITE18-CON-CE-CIV-IR-3877 Primer coat 1st coat putty & 2nd coat putty for celling paint 122,123 GF,FF,MR 9-Sep-23 14-Sep-23 C 27-Sep-23 2-Oct-23 B 27-Oct-23 1-Nov-23 B B
Bas primer & graffy for external paint elevation 1,2,3,4 OHWT mumty out side &
2577 128 ELITE18-CON-CE-CIV-IR-3878 122,123 A&B 9-Sep-23 14-Sep-23 A A
parapet wall internal side
2578 129 ELITE18-CON-CE-CIV-IR-3879 Instalaltion aluminium door for kitchen & mumty 122,123 A&B 12-Sep-23 14-Sep-23 B 30-Oct-23 1-Nov-23 B B

2579 130 ELITE18-CON-CE-CIV-IR-3880 Insstallation perlino marbal for ledge wall top 122,123 GF,FF 13-Sep-23 15-Sep-23 A A

2580 131 ELITE18-CON-CE-CIV-IR-3881 Installation floor skirting 122,123 GF,FF,M 13-Sep-23 15-Sep-23 B 30-Oct-23 1-Nov-23 B B

2581 132 ELITE18-CON-CE-CIV-IR-3882 Instalaltion stair skirting GF to FF & FF to Mumty 122,123 A&B 13-Sep-23 15-Sep-23 A A

2582 133 ELITE18-CON-CE-CIV-IR-3883 Installation perlino marbal threshold 122,123 GF,FF,M 13-Sep-23 15-Sep-23 B 30-Oct-23 1-Nov-23 A A

2583 134 ELITE18-CON-CE-CIV-IR-3884 Installatin cremamo for boundry wall 122,123 A&B 13-Sep-23 15-Sep-23 A A

2584 135 ELITE18-CON-CE-CIV-IR-3885 Installation black granite strip for shower cabin 122,123 GF,FF 13-Sep-23 15-Sep-23 A A

2585 136 ELITE18-CON-CE-CIV-IR-3886 Bas primer & graffy for external paint boundry wall 122,123 A&B 13-Sep-23 15-Sep-23 B B

2586 137 ELITE18-CON-CE-CIV-IR-3887 1st coat paint for celling paint 122,123 GF,FF,MR 13-Sep-23 15-Sep-23 A A

2587 138 ELITE18-CON-CE-CIV-IR-3888 1st coat paint for internal walls paint 122,123 GF,FF,MR 13-Sep-23 15-Sep-23 A A

2588 139 ELITE18-CON-CE-CIV-IR-3889 Peragola paint with all respect 122,123 A&B 13-Sep-23 15-Sep-23 C 16-Sep-23 19-Sep-23 C 27-Sep-23 2-Oct-23 C 28-Nov-23 30-Nov-23 A A

2589 140 ELITE18-CON-CE-CIV-IR-3890 Cementitious coat for baths & powder bath water proofing 122,123 GF,FF,MB 14-Sep-23 16-Sep-23 B B

2590 141 ELITE18-CON-CE-CIV-IR-3891 Pond test for baths 122,123 GF,FF,MB 14-Sep-23 16-Sep-23 A A

2591 142 ELITE18-CON-CE-CIV-IR-3892 HDF floor plaster 123 GF,FF 14-Sep-23 16-Sep-23 B B

2592 143 ELITE18-CON-CE-CIV-IR-3893 Sand excavated during piling works 122,123 A&B 16-Nov-23 20-Dec-23 C C

2593 144 ELITE18-CON-CE-CIV-IR-3894 MS installation porch fence for boundry wall with paint 122 A 15-Sep-23 16-Sep-23 A A

2594 145 ELITE18-CON-CE-CIV-IR-3895 MS pergola bulkhead with cement board paint 122 A 15-Sep-23 18-Sep-23 C 27-Sep-23 2-Oct-23 B B

2595 146 ELITE18-CON-CE-CIV-IR-3896 Peragola jointing with all respect 122,123 A&B 15-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 B B

2596 147 ELITE18-CON-CE-CIV-IR-3897 Catch basin including MS grate with all respect 122,123 A&B 15-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 B 30-Oct-23 1-Nov-23 B B

2597 148 ELITE18-CON-CE-CIV-IR-3898 Instalaltion cover for UGWT with paint 122,123 A&B 15-Sep-23 18-Sep-23 A A
Installation cover including slab for manhole gully trap electrical chamber &
2598 149 ELITE18-CON-CE-CIV-IR-3899 122,123 A&B 15-Sep-23 16-Sep-23 B B
electrical hanhole with paint
2599 150 ELITE18-CON-CE-CIV-IR-3900 Window jambs prepration 122,123 GF,FF,M 16-Sep-23 19-Sep-23 A A

2600 151 ELITE18-CON-CE-CIV-IR-3901 PCC (1:3:6) AC pad & PPRC pad for top roof 122,123 A&B 16-Nov-23 23-Nov-23 C 9-Dec-23 UR UR

2601 152 ELITE18-CON-CE-CIV-IR-3902 Blcok masonory plaster for duct & db area 122,123 GF,FF,M 16-Sep-23 20-Sep-23 A A

2602 153 ELITE18-CON-CE-CIV-IR-3903 Instalaltion MS grating for main gate 122,123 A&B 16-Sep-23 19-Sep-23 B 30-Oct-23 1-Nov-23 B B

2603 154 ELITE18-CON-CE-CIV-IR-3904 Instalaltion MS louvers under the OHWT with all respect 122,123 A&B 16-Sep-23 19-Sep-23 B 30-Oct-23 1-Nov-23 B B

2604 155 ELITE18-CON-CE-CIV-IR-3905 Block masonory for OHWT 122,123 A&B 16-Sep-23 20-Sep-23 B B

2605 156 ELITE18-CON-CE-CIV-IR-3906 Plaster for under the OHWT 122,123 A&B 16-Sep-23 20-Sep-23 A A

2606 157 ELITE18-CON-CE-CIV-IR-3907

2607 158 ELITE18-CON-CE-CIV-IR-3908

2608 159 ELITE18-CON-CE-CIV-IR-3909

2609 160 ELITE18-CON-CE-CIV-IR-3910 Instalaltion glass railling & wooden hand rail for stair 122,123 A&B 16-Sep-23 19-Sep-23 B 30-Oct-23 1-Nov-23 B B

2610 161 ELITE18-CON-CE-CIV-IR-3911 Fixing cubical glass partition & glass door for baths 122,123 GF,FF 22-Sep-23 23-Sep-23 C 27-Sep-23 2-Oct-23 B 27-Oct-23 1-Nov-23 B B

2611 162 ELITE18-CON-CE-CIV-IR-3912 Instalaltion transfer & booster pump cover with all respect 122,123 A&B 22-Sep-23 23-Sep-23 A A

2612 163 ELITE18-CON-CE-CIV-IR-3913 Fixing of access penal in celling 122,123 A&B 22-Sep-23 23-Sep-23 B 30-Oct-23 1-Nov-23 B B

2613 164 ELITE18-CON-CE-CIV-IR-3914 Installation pavers & paver skirting for external side 122,123 A&B 22-Sep-23 26-Sep-23 C 14-Nov-23 16-Nov-23 B B

2614 165 ELITE18-CON-CE-CIV-IR-3915 2nd coat paint for celling paint 122,123 GF,FF,MR 26-Sep-23 27-Sep-23 C 14-Nov-23 16-Nov-23 B B

2615 166 ELITE18-CON-CE-CIV-IR-3916 2nd coat paint for internal paint 122,123 A&B 26-Sep-23 27-Sep-23 C C

2616 167 ELITE18-CON-CE-CIV-IR-3917 Plaster for boundry wall elevation 4 122 A 26-Sep-23 28-Sep-23 B B

2617 168 ELITE18-CON-CE-CIV-IR-3918 Graffy for rework boundry wall elevation 4 122 A 26-Sep-23 27-Sep-23 C C

2618 169 ELITE18-CON-CE-CIV-IR-3919 Steel formwork RCC concrete (1:2:4) block masonory & plaster for meter box 122 A 2-Oct-23 13-Oct-23 A A

2619 170 ELITE18-CON-CE-CIV-IR-3920 Installation doors wardrobes iron mongries skirting vanity & tranition strip final ir 122,123 A&B 13-Oct-23 15-Oct-23 B B

2620 171 ELITE18-CON-CE-CIV-IR-3921 Installation window frame & window glass with all respect 122,123 A&B 17-Oct-23 19-Oct-23 B B

2621 172 ELITE18-CON-CE-CIV-IR-3922 Installation HDF floor & skirting 122,123 GF,FF 17-Oct-23 19-Oct-23 B B

2622 173 ELITE18-CON-CE-CIV-IR-3923 2nd & final coat paint for internal walls paint 122,123 GF,FF,MR 28-Oct-23 1-Nov-23 B B

2623 174 ELITE18-CON-CE-CIV-IR-3924 Instalaltion perlino marbal for boundry wall top top roof column & meter box top 122,123 A&B 15-Nov-23 23-Nov-23 A A
Weather sheild 1st coat & 2nd coat for external paint elevation 1,2,3,4 OHWT
2624 175 ELITE18-CON-CE-CIV-IR-3925 122,123 A&B 16-Nov-23 24-Nov-23 A A
mumty out side boundry wall & parapet wall

Page 68 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2625

2626

2627

2628 4001 TO 4250 119-120


2629 1 ELITE18-CON-CE-CIV-IR-4001 Dismentlling block work under the plinth beam for pile cap & debris remove 119,119 A&B 11-Dec-22 14-Dec-22 B B

2630 2 ELITE18-CON-CE-CIV-IR-4002 Primer coat for pile cape internal & external side 119,120 A&B 12-Dec-22 14-Dec-22 B B

2631 3 ELITE18-CON-CE-CIV-IR-4003 Drilling with epoxy 24mm for coulmns share links 119,120 GF,FF 15-Dec-22 20-Dec-22 C C

2632 4 ELITE18-CON-CE-CIV-IR-4004 Installation MS girders IPE-180 & IPE-270 120 FF 21-Dec-22 22-Dec-22 B B

2633 5 ELITE18-CON-CE-CIV-IR-4005 Drilling & mechnical boulting 120 FF 21-Dec-22 22-Dec-22 B B

2634 6 ELITE18-CON-CE-CIV-IR-4006 Laying & fixing of MS peragola 119 A 27-Dec-22 29-Dec-22 B B

2635 7 ELITE18-CON-CE-CIV-IR-4007 Block masonory for under the plinth beam & entrance lobby wall 119,120 A&B 28-Dec-22 29-Dec-22 B B

2636 8 ELITE18-CON-CE-CIV-IR-4008 Steel & anchor epoxy for slab thickness increase 119,120 TR 10-Jan-23 14-Jan-23 B B

2637 9 ELITE18-CON-CE-CIV-IR-4009 Slab thickness increase drilling 12mm,14mm & 24mm for share links 119,120 TR 10-Jan-23 14-Jan-23 B B

2638 10 ELITE18-CON-CE-CIV-IR-4010 FDT test 1st layer sand filling for under the floating slab 120 B 8-Feb-23 15-Feb-23 B B

2639 11 ELITE18-CON-CE-CIV-IR-4011 Laying & fixing of MS peragola 120 B 15-Feb-23 23-Feb-23 B B

2640 12 ELITE18-CON-CE-CIV-IR-4012 Slab cutting & plaster 119 A 25-Feb-23 1-Mar-23 C C

2641 13 ELITE18-CON-CE-CIV-IR-4013 Dismentlling for slab thickness increase first floor & debris remove 119,120 A&B 25-Feb-23 28-Feb-23 B B

2642 14 ELITE18-CON-CE-CIV-IR-4014 Steel & anchor epoxy for slab thickness increase 119,120 A&B 25-Feb-23 28-Feb-23 C 6-Mar-23 7-Mar-23 B B

2643 15 ELITE18-CON-CE-CIV-IR-4015 FDT test 1st layer sand filling for under the floating slab 119 A 20-Mar-23 28-Mar-23 B B

2644 16 ELITE18-CON-CE-CIV-IR-4016 Dismentlling for slab thickness increase top roof & debris remove 119,120 TR 6-Mar-23 7-Mar-23 B B

2645 17 ELITE18-CON-CE-CIV-IR-4017 Steel & anchor epoxy for slab thickness increase 119,120 TR 6-Mar-23 7-Mar-23 B B

2646 18 ELITE18-CON-CE-CIV-IR-4018 Steel & anchor epoxy for column jackting 119,120 GF 7-Mar-23 10-Mar-23 A A

2647 19 ELITE18-CON-CE-CIV-IR-4019 RCC concrete 4000 psi & SBR for slab thikness increase 119,120 A&B 11-Mar-23 15-Mar-23 B B

2648 20 ELITE18-CON-CE-CIV-IR-4020 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 119,120 A&B 14-Mar-23 21-Mar-23 A A

2649 21 ELITE18-CON-CE-CIV-IR-4021 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 119,120 GF 15-Mar-23 21-Mar-23 A A

2650 22 ELITE18-CON-CE-CIV-IR-4022 Steel & anchor epoxy for beam jackting 119,120 GF 16-Mar-23 17-Mar-23 B B

2651 23 ELITE18-CON-CE-CIV-IR-4023 RCC concrete 4000 psi & SBR for retrofiting columns 119,120 GF 16-Mar-23 17-Mar-23 B B

2652 24 ELITE18-CON-CE-CIV-IR-4024 FDT test 2nd layer sand filling for under the floating slab 120 B 20-Mar-23 24-Mar-23 B B

2653 25 ELITE18-CON-CE-CIV-IR-4025 FDT test 3rd layer sand filling for under the floating slab 120 B 20-Mar-23 28-Mar-23 C 3-Apr-23 6-Apr-23 B B

2654 26 ELITE18-CON-CE-CIV-IR-4026 RCC top level for slab thickness increase 119,120 TR 22-Mar-23 24-Mar-23 A A

2655 27 ELITE18-CON-CE-CIV-IR-4027

2656 28 ELITE18-CON-CE-CIV-IR-4028 Primer coat & membranes bitumiinous sheet for top roof 119,120 A&B 1-Apr-23 5-Apr-23 A A

2657 29 ELITE18-CON-CE-CIV-IR-4029 Pond test for top roof 119,120 A&B 1-Apr-23 5-Apr-23 A A

2658 30 ELITE18-CON-CE-CIV-IR-4030 RCC concrete 4000 psi & SBR for retrofiting beams 119,120 GF 3-Apr-23 6-Apr-23 B B

2659 31 ELITE18-CON-CE-CIV-IR-4031 Surface clearence & side gola for top roof 119,120 A&B 3-Apr-23 6-Apr-23 A A

2660 32 ELITE18-CON-CE-CIV-IR-4032 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 119,120 TR 6-Apr-23 10-Apr-23 B B

2661 33 ELITE18-CON-CE-CIV-IR-4033 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 119,120 GF 6-Apr-23 10-Apr-23 B B

2662 34 ELITE18-CON-CE-CIV-IR-4034 28 days cylinder concrete test RCC (4000 psi) retrofitting beams 119,120 GF 2-May-23 8-May-23 A A

2663 35 ELITE18-CON-CE-CIV-IR-4035 FDT test 2nd layer sand filling for under the floating slab 119 A 5-May-23 11-May-23 A A

2664 36 ELITE18-CON-CE-CIV-IR-4036 Steel fixing & anchor epoxy for column jackting 119,120 A&B 8-May-23 9-May-23 B B

2665 37 ELITE18-CON-CE-CIV-IR-4037 RCC concrete (4000 psi) & SBR for retrofitting column 119,120 FF 8-May-23 9-May-23 B B

2666 38 ELITE18-CON-CE-CIV-IR-4038 PCC (1:4:8) under the floating slab 120 B 11-May-23 16-May-23 B B

2667 39 ELITE18-CON-CE-CIV-IR-4039 Polythene sheet 1000 micron under the PCC floating slab 120 B 11-May-23 16-May-23 A A

2668 40 ELITE18-CON-CE-CIV-IR-4040 07 days cylinder concrete test RCC (4000 psi) retrofitting columns 119,120 FF 15-May-23 18-May-23 A A

2669 41 ELITE18-CON-CE-CIV-IR-4041 07 days cylinder concrete test PCC (1:4:8) under floating slab 120 B 15-May-23 18-May-23 A A

2670 42 ELITE18-CON-CE-CIV-IR-4042 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 119,120 FF 15-May-23 18-May-23 A A

2671 43 ELITE18-CON-CE-CIV-IR-4043 RCC concrete (1:2:4) for floatting slab 120 B 15-May-23 17-May-23 B B

2672 44 ELITE18-CON-CE-CIV-IR-4044 Steel & filler board for floating slab 120 B 15-May-23 17-May-23 A A

2673 45 ELITE18-CON-CE-CIV-IR-4045 RCC concrete 4000 psi & SBR for slab thikness increase 119,120 FF 18-May-23 20-May-23 B B

2674 46 ELITE18-CON-CE-CIV-IR-4046 07 days cylinder concrete test RCC (1:2:4) floating slab 120 B 20-May-23 25-May-23 B B

2675 47 ELITE18-CON-CE-CIV-IR-4047 07 days cylinder concrete test PCC (1:4:8) under floating slab 119 A 20-May-23 25-May-23 B B

2676 48 ELITE18-CON-CE-CIV-IR-4048 Primer coat & membranes bituminous sheet for external side 119,120 A&B 22-May-23 25-May-23 B B

Page 69 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2677 49 ELITE18-CON-CE-CIV-IR-4049 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 119,120 FF 27-May-23 30-May-23 B B

2678 50 ELITE18-CON-CE-CIV-IR-4050 Steel fixing & anchor epoxy for beams jackting 119,120 FF 27-May-23 30-May-23 A A

2679 51 ELITE18-CON-CE-CIV-IR-4051 RCC concrete 4000 Psi & SBR for retrofitting beams 119,120 FF 27-May-23 30-May-23 B B

2680 52 ELITE18-CON-CE-CIV-IR-4052 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 119,120 A&B 3-Jun-23 7-Jun-23 A A

2681 53 ELITE18-CON-CE-CIV-IR-4053 28 days cylinder concrete test RCC (1:4:8) under floating slab 120 B 3-Jun-23 7-Jun-23 A A
Fixing MS girders with MS plates drilling anchoring mechnical & chemical
2682 54 ELITE18-CON-CE-CIV-IR-4054 119,120 GF 3-Jun-23 12-Jun-23 B B
boulting apoxy with all respect
2683 55 ELITE18-CON-CE-CIV-IR-4055 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 119,120 A&B 5-Jun-23 7-Jun-23 A A

2684 56 ELITE18-CON-CE-CIV-IR-4056 PCC (1:4:8) under the floating slab 119 A 5-Jun-23 7-Jun-23 B B

2685 57 ELITE18-CON-CE-CIV-IR-4057 Polythene sheet 1000 micron under the PCC floating slab 119 A 5-Jun-23 7-Jun-23 A A

2686 58 ELITE18-CON-CE-CIV-IR-4058 Steel & filler board for floatting slab 119 A 6-Jun-23 8-Jun-23 A A

2687 59 ELITE18-CON-CE-CIV-IR-4059 RCC concrete (1:2:4) for floatting slab 119 A 6-Jun-23 8-Jun-23 B B

2688 60 ELITE18-CON-CE-CIV-IR-4060 Block masonory & lintels for retrofitting work & partition walls 120 GF 7-Jun-23 12-Jun-23 B B

2689 61 ELITE18-CON-CE-CIV-IR-4061 28 days cylinder concrete test RCC (1:2:4) floating slab 120 B 10-Jun-23 14-Jun-23 A A

2690 62 ELITE18-CON-CE-CIV-IR-4062 28 days cylinder concrete test PCC (1:4:8) under floating slab 119 A 10-Jun-23 14-Jun-23 B B

2691 63 ELITE18-CON-CE-CIV-IR-4063 Fixing MS girders with MS plates drilling anchoring mechnical boulting 119,120 A&B 10-Jun-23 15-Jun-23 B B

2692 64 ELITE18-CON-CE-CIV-IR-4064 07 days cylinder concrete test RCC (1:2:4) floating slab 119 A 12-Jun-23 14-Jun-23 B B

2693 65 ELITE18-CON-CE-CIV-IR-4065 Jumbolon XPS board 50 mm & polythene sheet laying & screeding for top roof 119,120 A&B 12-Jun-23 14-Jun-23 B B

2694 66 ELITE18-CON-CE-CIV-IR-4066 FDT test 3rd layer sand filling for under the floating slab 119 A 3-Jun-23 14-Jun-23 B B

2695 67 ELITE18-CON-CE-CIV-IR-4067 FDT test 1st layer sand filling for externla side 119,120 A&B 14-Jun-23 17-Jun-23 B B

2696 68 ELITE18-CON-CE-CIV-IR-4068 FDT test 2nd layer sand filling for externla side 119,120 A&B 14-Jun-23 17-Jun-23 B B

2697 69 ELITE18-CON-CE-CIV-IR-4069 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 119,120 FF 17-Jun-23 20-Jun-23 B B

2698 70 ELITE18-CON-CE-CIV-IR-4070 28 days cylinder concrete test RCC (1:2:4) floating slab 119 A 7-Jul-23 13-Jul-23 A A

2699 71 ELITE18-CON-CE-CIV-IR-4071 FDT test 3rd layer sand filling for external side 119,120 A&B 18-Jul-23 20-Jul-23 B B

2700 72 ELITE18-CON-CE-CIV-IR-4072 Block masonory & lintels for retrofiting work & parttition walls 120 FF 19-Jul-23 24-Jul-23 C 26-Jul-23 3-Aug-23 B B

2701 73 ELITE18-CON-CE-CIV-IR-4073 Block masonory & lintels for retrofiting work & parttition walls 119 GF,FF 19-Jul-23 24-Jul-23 C 25-Jul-23 27-Jul-23 B B

2702 74 ELITE18-CON-CE-CIV-IR-4074 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 119,120 A&B 20-Jul-23 24-Jul-23 A A

2703 75 ELITE18-CON-CE-CIV-IR-4075 Drilling anchoring connector mechnical & chemical boulting epoxy 119,120 FF 22-Jul-23 25-Jul-23 B B

2704 76 ELITE18-CON-CE-CIV-IR-4076 Grout filling BW girder & slab 119,120 A&B 26-Jul-23 3-Aug-23 B B

2705 77 ELITE18-CON-CE-CIV-IR-4077 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 119,120 A&B 2-Aug-23 7-Aug-23 A A

2706 78 ELITE18-CON-CE-CIV-IR-4078 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 119,120 A&B 2-Aug-23 7-Aug-23 A A

2707 79 ELITE18-CON-CE-CIV-IR-4079 Block masonory formanhole gully trap electrical chamber & electrical handhole 119,120 A&B 2-Aug-23 7-Aug-23 A A

2708 80 ELITE18-CON-CE-CIV-IR-4080 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 119,120 A&B 10-Aug-23 16-Aug-23 A A

2709 81 ELITE18-CON-CE-CIV-IR-4081

2710 82 ELITE18-CON-CE-CIV-IR-4082 Side gola & laying aggregates for mumty top 119,120 A&B 16-Aug-23 19-Aug-23 A A

2711 83 ELITE18-CON-CE-CIV-IR-4083 Block masonory for partition wall external side 119,120 A&B 19-Aug-23 26-Aug-23 B B

2712 84 ELITE18-CON-CE-CIV-IR-4084 Installation perlino marbal for floor 119 GF 22-Aug-23 26-Aug-23 c 24-Aug-23 26-Aug-23 B 28-Oct-23 31-Oct-23 B 11-Nov-23 16-Nov-23 B 8-Dec-23 11-Dec-23 A A

2713 85 ELITE18-CON-CE-CIV-IR-4085 Plaster work patches & corner beads for retrofitting work & internal walls 119,120 GF,FF 22-Aug-23 26-Aug-23 B B

2714 86 ELITE18-CON-CE-CIV-IR-4086 OHWT concrete uper side 119,120 A&B 23-Aug-23 26-Aug-23 A A

2715 87 ELITE18-CON-CE-CIV-IR-4087 Instalaltion peragola cleats with mechanical bolts all respect 119,120 A&B 29-Aug-23 1-Sep-23 B B

2716 88 ELITE18-CON-CE-CIV-IR-4088 Installation MS porch fence for boundry wall 119,120 A&B 29-Aug-23 30-Aug-23 B B

2717 89 ELITE18-CON-CE-CIV-IR-4089 Plaster for partition wall external side 119,120 A&B 2-Sep-23 5-Sep-23 A A

2718 90 ELITE18-CON-CE-CIV-IR-4090 Block masonory for mechnical wall 120 GF,FF 7-Sep-23 8-Sep-23 A A

2719 91 ELITE18-CON-CE-CIV-IR-4091 Plaster work & wall mounted cement board for cistern flushing tank 120 GF,FF 7-Sep-23 8-Sep-23 A A

2720 92 ELITE18-CON-CE-CIV-IR-4092 Plaster work for external patches retrofitting work 119,120 A&B 8-Sep-23 13-Sep-23 B B

2721 93 ELITE18-CON-CE-CIV-IR-4093 Dismentlling boundry wall column for retrofitting work 119,120 A&B 9-Sep-23 UR UR

2722 94 ELITE18-CON-CE-CIV-IR-4094 Plaster for boundry wall elevation 3 119,120 A&B 13-Sep-23 18-Sep-23 B B

2723 95 ELITE18-CON-CE-CIV-IR-4095 Peragola paint with all respect 119,120 A&B 13-Sep-23 15-Sep-23 C 27-Sep-23 2-Oct-23 B 28-Nov-23 30-Nov-23 B B

2724 96 ELITE18-CON-CE-CIV-IR-4096 PCC (1:3:6) for external side front & back sidwe 119,120 A&B 14-Sep-23 18-Sep-23 B B

2725 97 ELITE18-CON-CE-CIV-IR-4097 Polythene sheet 1000 micron for external side front & back side 119,120 A&B 14-Sep-23 18-Sep-23 B B

2726 98 ELITE18-CON-CE-CIV-IR-4098 Block masonory for mechnical wall 119 GF,FF 14-Sep-23 16-Sep-23 C 27-Sep-23 30-Sep-23 C 14-Nov-23 23-Nov-23 B B

2727 99 ELITE18-CON-CE-CIV-IR-4099 Plaster work & wall mounted cement board for cistern flushing tank 119 GF,FF 14-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 C 14-Nov-23 16-Nov-23 A A

2728 100 ELITE18-CON-CE-CIV-IR-4100 Cementitious coat for baths & powder bath water proofing 120 GF,FF,MB 14-Sep-23 16-Sep-23 A A

2729 101 ELITE18-CON-CE-CIV-IR-4101 Pond test for baths 119,120 FF,MB 14-Sep-23 16-Sep-23 A A

2730 102 ELITE18-CON-CE-CIV-IR-4102 Instalaltion suspension & framming system for celling work GF,FF,MR Dry area 120 B 14-Sep-23 16-Sep-23 C 27-Sep-23 2-Oct-23 B B

2731 103 ELITE18-CON-CE-CIV-IR-4103 PCC (1:4:8) for under the trench drain grating foundation 119,120 A&B 16-Sep-23 19-Sep-23 A A

Page 70 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2732 104 ELITE18-CON-CE-CIV-IR-4104 Blcok masonory plaster for duct & db area 119,120 GF,FF,M 16-Sep-23 20-Sep-23 C 27-Sep-23 30-Sep-23 C 14-Nov-23 24-Nov-23 B B

2733 105 ELITE18-CON-CE-CIV-IR-4105 Fixing MS cover & plaster for OHWT 119,120 A&B 16-Sep-23 19-Sep-23 A A

2734 106 ELITE18-CON-CE-CIV-IR-4106 Applying primer coat bituminious sheet 4mm & screed for baths floor baths floor 119,120 FF,MB 22-Sep-23 23-Sep-23 A A

2735 107 ELITE18-CON-CE-CIV-IR-4107 Instalaltion window sill horizontal 120 GF,FF,MR 22-Sep-23 26-Sep-23 A A
Bas primer for external paint elevation 1,2,3,4 OHWT out side & parapet wall
2736 108 ELITE18-CON-CE-CIV-IR-4108 119,120 A&B 22-Sep-23 2-Oct-23 C 11-Nov-23 16-Nov-23 A A
internal side
Graffy for external paint elevation 1,2,3,4 OHWT mumty out side & parapet wall
2737 109 ELITE18-CON-CE-CIV-IR-4109 119,120 A&B 22-Sep-23 2-Oct-23 C 11-Nov-23 16-Nov-23 B B
internal side
2738 110 ELITE18-CON-CE-CIV-IR-4110 Steel grating angle & formwork for trench drain grating foundation 119,120 A&B 2-Oct-23 13-Oct-23 A A

2739 111 ELITE18-CON-CE-CIV-IR-4111 RCC concrte (1:2:4) for trench drain grating foundation 119,120 A&B 2-Oct-23 13-Oct-23 A A

2740 112 ELITE18-CON-CE-CIV-IR-4112 Dismentlling perlino marbal for floor 119,120 FF,M 19-Oct-23 20-Oct-23 A A
GF to FF &
2741 113 ELITE18-CON-CE-CIV-IR-4113 Dismentlling perlino marbal for stair 119,120 19-Oct-23 20-Oct-23 A A
FF to M
2742 114 ELITE18-CON-CE-CIV-IR-4114 Dismentling composite stone for external side elevation 1 119,120 A&B 19-Oct-23 20-Oct-23 A A

2743 115 ELITE18-CON-CE-CIV-IR-4115 Installation aluminium door for kitchen & mumty 120 B 19-Oct-23 20-Oct-23 B 11-Dec-23 14-Dec-23 B B

2744 116 ELITE18-CON-CE-CIV-IR-4116 Instalaltion vanity frame for baths & powder room 120 GF,FF 19-Oct-23 20-Oct-23 B B

2745 117 ELITE18-CON-CE-CIV-IR-4117 Instalaltion vanity marble for baths & powder room 120 GF,FF 19-Oct-23 20-Oct-23 C 11-Nov-23 16-Nov-23 B 11-Dec-23 14-Dec-23 A A

2746 118 ELITE18-CON-CE-CIV-IR-4118 Instalaltion vanity miror for baths & powder room 120 GF,FF,MB 19-Oct-23 20-Oct-23 C 11-Nov-23 16-Nov-23 B B

2747 119 ELITE18-CON-CE-CIV-IR-4119 FDT test 3rd layer sand filling for external sideright side 119 A 28-Oct-23 1-Nov-23 A A

2748 120 ELITE18-CON-CE-CIV-IR-4120 Instalaltion black granite for partion wall external side 119,120 A&B 30-Oct-23 1-Nov-23 B 9-Dec-23 15-Dec-23 A A

2749 121 ELITE18-CON-CE-CIV-IR-4121 PCC (1:3:6) for external PCC right side 119 A 31-Oct-23 1-Nov-23 B B

2750 122 ELITE18-CON-CE-CIV-IR-4122 Polythene sheet for external side right side 119 A 31-Oct-23 1-Nov-23 A A

2751 123 ELITE18-CON-CE-CIV-IR-4123 07 days cylinder concrete test RCC (1:3:6) external side right side 119 A 3-Nov-23 7-Nov-23 A A

124 ELITE18-CON-CE-CIV-IR-4124 Instalaltion wall tile floor tile for baths & powder room 119,120 GF,FF,MB 11-Nov-23 16-Nov-23 B 8-Dec-23 11-Dec-23 B B

125 ELITE18-CON-CE-CIV-IR-4125 Installation wall tile floor tile for kitchen 119,120 A&B 11-Nov-23 16-Nov-23 B B

126 ELITE18-CON-CE-CIV-IR-4126 Instalaltion perlino marbal for floor 120 GF,FF 11-Nov-23 16-Nov-23 B 8-Dec-23 11-Dec-23 A A
Primer coat 1st coat putty 2nd coat putty 1st coat paint & 2nd coat paint for internal
127 ELITE18-CON-CE-CIV-IR-4127 119,120 GF,FF,M 11-Nov-23 16-Nov-23 B 9-Dec-23 15-Dec-23 A A
paint
Primer coat 1st coat putty 2nd coat putty 1st coat paint & 2nd coat paint for celling
128 ELITE18-CON-CE-CIV-IR-4128 119,120 GF,FF,M 11-Nov-23 16-Nov-23 B 9-Dec-23 15-Dec-23 A A
paint
129 ELITE18-CON-CE-CIV-IR-4129 Instalaltion cremamo for boundry wall 119,120 A&B 11-Nov-23 16-Nov-23 B B

130 ELITE18-CON-CE-CIV-IR-4130 Installation perlino marbla for boundry wall top top roof column & meter box top 119,120 A&B 11-Nov-23 16-Nov-23 B 11-Dec-23 14-Dec-23 A A

131 ELITE18-CON-CE-CIV-IR-4131 Instalaltion woindow silll vertical 119,120 GF,FF,MR 11-Nov-23 16-Nov-23 B 9-Dec-23 15-Dec-23 A A

2752 132 ELITE18-CON-CE-CIV-IR-4132 Instalaltion window sill horizontal 119 GF,FF,MR 11-Nov-23 16-Nov-23 B 9-Dec-23 15-Dec-23 A A

133 ELITE18-CON-CE-CIV-IR-4133 Installation suspension & framming system for celling work dry area 119 GF,FF,MR 11-Nov-23 16-Nov-23 A A

134 ELITE18-CON-CE-CIV-IR-4134 Installation suspension & framming system for celling work wet area 119,120 GF,FF,MR 11-Nov-23 16-Nov-23 A A

135 ELITE18-CON-CE-CIV-IR-4135 Installation moisture reisitent board tapping & jointing for celling work wet area 119,120 GF,FF,MR 11-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A

136 ELITE18-CON-CE-CIV-IR-4136 Installation moisture reisitent board tapping & jointing for celling work dry area 119,120 GF,FF,MR 11-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A
GF to FF &
137 ELITE18-CON-CE-CIV-IR-4137 Installation perlino marbal & skirting for stair 119,120 11-Nov-23 16-Nov-23 B 8-Dec-23 11-Dec-23 A A
FF to M
138 ELITE18-CON-CE-CIV-IR-4138 Installation pavers & paver skirting for external side 119,120 A&B 11-Nov-23 16-Nov-23 B B

139 ELITE18-CON-CE-CIV-IR-4139 Instalaltion vanity fram for baths & powder room 119,120 GF,FF 11-Nov-23 16-Nov-23 B B

140 ELITE18-CON-CE-CIV-IR-4140 Instalaltion vanity marbal for baths & powder room 119 GF,FF 11-Nov-23 16-Nov-23 B B

141 ELITE18-CON-CE-CIV-IR-4141 Instalaltion vanity miror for baths & powder room 119,120 GF,FF,MB 11-Nov-23 16-Nov-23 B 11-Dec-23 14-Dec-23 A A

142 ELITE18-CON-CE-CIV-IR-4142 Installation ledge wall top for baths & powder room 119,120 GF,FF 11-Nov-23 16-Nov-23 B B

143 ELITE18-CON-CE-CIV-IR-4143 Installation thresh hold 119,120 GF,FF,M 11-Nov-23 16-Nov-23 B B

144 ELITE18-CON-CE-CIV-IR-4144 Instalaltion black granite strips for shower cabin 119,120 GF,FF 11-Nov-23 16-Nov-23 B B

145 ELITE18-CON-CE-CIV-IR-4145 Plaster for HDF floor GF,FF 119,120 GF,FF 11-Nov-23 16-Nov-23 B B

2753 146 ELITE18-CON-CE-CIV-IR-4146 Instalaltion perlino skirting for floor 119,120 GF,FF,M 11-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A

147 ELITE18-CON-CE-CIV-IR-4147 Instalaltion black granite for partition wall external side 119,120 A&B 13-Nov-23 16-Nov-23 B B

148 ELITE18-CON-CE-CIV-IR-4148 Installation composite stone for external side elevation 1 119,120 A&B 14-Nov-23 16-Nov-23 B B

149 ELITE18-CON-CE-CIV-IR-4149 Installation floor skirting for maid room 119,120 A&B 15-Nov-23 23-Nov-23 B 8-Dec-23 11-Dec-23 A A

150 ELITE18-CON-CE-CIV-IR-4150 Plaster roof tile & roof skirting for top roof 119,120 A&B 15-Nov-23 23-Nov-23 B 8-Dec-23 11-Dec-23 B B

151 ELITE18-CON-CE-CIV-IR-4151 Instalaltion aluminium door for kitchen & mumty 119 A 15-Nov-23 17-Nov-23 C 11-Dec-23 14-Dec-23 B B

152 ELITE18-CON-CE-CIV-IR-4152 Installation transfer & booster pump cover with all respect 119,120 A&B 15-Nov-23 23-Nov-23 B B

153 ELITE18-CON-CE-CIV-IR-4153 Fixing of access penal in celling 119,120 A&B 15-Nov-23 23-Nov-23 B B

154 ELITE18-CON-CE-CIV-IR-4154 Installation MS louvers under the OHWT with all respect 119,120 A&B 15-Nov-23 23-Nov-23 B 11-Dec-23 14-Dec-23 A A

155 ELITE18-CON-CE-CIV-IR-4155 Block masonory for OHWT 119,120 A&B 15-Nov-23 23-Nov-23 A A

156 ELITE18-CON-CE-CIV-IR-4156 Plaster for under the OHWT 119,120 A&B 15-Nov-23 23-Nov-23 A A

157 ELITE18-CON-CE-CIV-IR-4157 Instalaltion MS grating for main gate 119,120 A&B 15-Nov-23 24-Nov-23 B 9-Dec-23 14-Dec-23 A A

158 ELITE18-CON-CE-CIV-IR-4158 MS pergola bulkhead with cement board paint 119 A 15-Nov-23 24-Nov-23 B 9-Dec-23 14-Dec-23 A A

Page 71 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
159 ELITE18-CON-CE-CIV-IR-4159 Instalaltion MS porch fence for boundry wall with apint 119,120 A&B 15-Nov-23 24-Nov-23 B 9-Dec-23 14-Dec-23 A A

160 ELITE18-CON-CE-CIV-IR-4160 Window jambs prepration 119,120 GF,FF,M 15-Nov-23 23-Nov-23 B B


Weather sheild 1st coat & 2nd coat for external paint elevation 1,2,3,4 OHWT
161 ELITE18-CON-CE-CIV-IR-4161 119,120 A&B 16-Nov-23 24-Nov-23 B B
mumty out side boundry wall & parapet wall
162 ELITE18-CON-CE-CIV-IR-4162 PCC (1:3:6) AC pad & PPRC pad for top roof 119,120 A&B 16-Nov-23 23-Nov-23 C 9-Dec-23 UR UR

163 ELITE18-CON-CE-CIV-IR-4163 Cementitious coat pond test for baths & powder bath water proofing 119,120 GF,FF,MB 16-Nov-23 23-Nov-23 B B

164 ELITE18-CON-CE-CIV-IR-4164 Installation glass railling for stairs 119,120 A&B 20-Nov-23 23-Nov-23 B 11-Dec-23 14-Dec-23 A A

165 ELITE18-CON-CE-CIV-IR-4165 Installation of cubical glass partition & glass door for baths 119,120 GF,FF 20-Nov-23 23-Nov-23 B 11-Dec-23 14-Dec-23 A A

166 ELITE18-CON-CE-CIV-IR-4166 07 days cylinder concrete test PCC (1:3:6) external side right side 119 A 24-Nov-23 30-Nov-23 B B

167 ELITE18-CON-CE-CIV-IR-4167 Installation doors wardrobes iron mongries vanity & transition strrip final ir 119,120 A&B 24-Nov-23 27-Nov-23 B 8-Dec-23 9-Dec-23 B B

168 ELITE18-CON-CE-CIV-IR-4168 Pudlo plaster for manhole gully trap electrical chamber & electrical handhole 119,120 A&B 25-Nov-23 28-Nov-23 C 8-Dec-23 11-Dec-23 B B

169 ELITE18-CON-CE-CIV-IR-4169 Dismentlling blocl masonory RCC columns plinth beam & PCC for boundry wall 120 B 27-Nov-23 28-Nov-23 C C

170 ELITE18-CON-CE-CIV-IR-4170 FDT test sand filling for under PCC boundry wall 120 B 27-Nov-23 4-Dec-23 B B

171 ELITE18-CON-CE-CIV-IR-4171 NSL & layout for boundry wall re work 120 B 27-Nov-23 UR UR

172 ELITE18-CON-CE-CIV-IR-4172 Excavation for boundry wall re work 120 B 27-Nov-23 UR UR

173 ELITE18-CON-CE-CIV-IR-4173 Installation cover for UGWT with paint 119,120 A&B 28-Nov-23 30-Nov-23 B B

174 ELITE18-CON-CE-CIV-IR-4174 Sand top level PCC top level & RCC top level for boundry wall re work 120 B 28-Nov-23 UR UR

175 ELITE18-CON-CE-CIV-IR-4175 PCC (1:4:8) for left side boundry wall re-work 120 B 29-Nov-23 30-Nov-23 B B

176 ELITE18-CON-CE-CIV-IR-4176 Steel for left side boundry wall re-work 120 B 29-Nov-23 30-Nov-23 B B

177 ELITE18-CON-CE-CIV-IR-4177 Form work & RCC concrete (3000 psi) for left side boundry wall re-work 120 B 29-Nov-23 30-Nov-23 B B

178 ELITE18-CON-CE-CIV-IR-4178 07 days cylinder concrete test PCC (1:4:8) boundry wall re work elevation 3 120 B 1-Dec-23 7-Dec-23 B B

179 ELITE18-CON-CE-CIV-IR-4179 07 days cylinder concrete test RCC (1:2:4) boundry wall bed re work 120 B 4-Dec-23 7-Dec-23 B B

180 ELITE18-CON-CE-CIV-IR-4180 07 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam re-work 120 B 6-Dec-23 14-Dec-23 B B

181 ELITE18-CON-CE-CIV-IR-4181 Steel for left side boundry wall plinth beam re work 120 B 6-Dec-23 8-Dec-23 B B

182 ELITE18-CON-CE-CIV-IR-4182 Form work & RCC concrete (3000 psi) for left side boundry wall plinth beam 120 B 6-Dec-23 8-Dec-23 B B
Instalaltion cover including slab for manhole gully trap electrical chamber &
183 ELITE18-CON-CE-CIV-IR-4183 119,120 A&B 8-Dec-23 11-Dec-23 A A
electrical handhole withpaint
184 ELITE18-CON-CE-CIV-IR-4184 Installation window frames & window glass with all respect 119,120 A&B 9-Dec-23 14-Dec-23 B B

185 ELITE18-CON-CE-CIV-IR-4185 PCC (1:4:8) under karb stone & instalaltion kerb stone & side gola for external side 119,120 A&B 9-Dec-23 14-Dec-23 C C

186 ELITE18-CON-CE-CIV-IR-4186 Peragola jointing with all respects 119,120 A&B 11-Dec-23 15-Dec-23 A A

187 ELITE18-CON-CE-CIV-IR-4187 28 days cylinder concrete test PCC (1:4:8) boundary wall re-work elevation-3 120 B 22-Dec-23 27-Dec-23 B B

188 ELITE18-CON-CE-CIV-IR-4188 Block masonary for boundary wall elevation-3 rework 120 B 22-Dec-23 UR UR

189 ELITE18-CON-CE-CIV-IR-4189 28 days cylinder concrete test RCC (1:2:4) boundry wall bed re work 120 B 27-Dec-23 29-Dec-23 B B

190 ELITE18-CON-CE-CIV-IR-4190 28 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam re work 120 B 27-Dec-23 29-Dec-23 B B

2754

2755 4251 TO 4500 117-118


2756 1 ELITE18-CON-CE-CIV-IR-4251 Laying & fixing of MS peragola 117 A 12-Dec-22 14-Dec-22 B B

2757 2 ELITE18-CON-CE-CIV-IR-4252 Dismentlling block work under the plinth beam for pile cap & debris remove 117,117 A&B 11-Dec-22 14-Dec-22 B B

2758 3 ELITE18-CON-CE-CIV-IR-4253 Primer coat for pile cape internal & external side 117,118 A&B 12-Dec-22 14-Dec-22 B B

2759 4 ELITE18-CON-CE-CIV-IR-4254 Drilling with epoxy 24mm for coulmns share links 117,118 A&B 15-Dec-22 20-Dec-22 C C

2760 5 ELITE18-CON-CE-CIV-IR-4255 FDT test 1st layer sand filling for under the floating slab 117,118 A&B 20-Dec-22 29-Dec-22 B B

2761 6 ELITE18-CON-CE-CIV-IR-4256 Installation MS girders IPE-180 & IPE-280 117 A 21-Dec-22 22-Dec-22 B B

2762 7 ELITE18-CON-CE-CIV-IR-4257 Drilling & mechnical boulting 117 FF 21-Dec-22 22-Dec-22 B B

2763 8 ELITE18-CON-CE-CIV-IR-4258 Laying & fixing of MS peragola 118 B 27-Dec-22 29-Dec-22 C 15-Feb-23 23-Feb-23 A A

2764 9 ELITE18-CON-CE-CIV-IR-4259 Block masonory for under the plinth beam & entrance lobby wall 117,118 A&B 28-Dec-22 29-Dec-22 B B

2765 10 ELITE18-CON-CE-CIV-IR-4260 FDT test 2nd layer sand filling for under the floating slab 117,118 A&B 31-Jan-23 4-Feb-23 A A

2766 11 ELITE18-CON-CE-CIV-IR-4261 07 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 117,118 GF 10-Feb-23 15-Feb-23 A A

2767 12 ELITE18-CON-CE-CIV-IR-4262 Slab cutting & plaster 117 A 25-Feb-23 1-Mar-23 C C

2768 13 ELITE18-CON-CE-CIV-IR-4263 Dismentlling for slab thickness increase first floor & debris remove 117,118 A&B 25-Feb-23 28-Feb-23 B B

2769 14 ELITE18-CON-CE-CIV-IR-4264 Steel & anchore epoxy for slab thickness increase 117,118 A&B 25-Feb-23 28-Feb-23 C 6-Mar-23 7-Mar-23 B B

2770 15 ELITE18-CON-CE-CIV-IR-4265 28 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 117,118 A&B 3-Mar-23 7-Mar-23 A A

2771 16 ELITE18-CON-CE-CIV-IR-4266 Dimentlling for slab thickness increase top roof & debris remove 117,118 TR 6-Mar-23 7-Mar-23 B B

2772 17 ELITE18-CON-CE-CIV-IR-4267 Steel & anchore epoxy for slab thickness increase 117,118 TR 6-Mar-23 7-Mar-23 B B

2773 18 ELITE18-CON-CE-CIV-IR-4268 RCC concrete 4000 psi & SBR for slab thikness increase 117,118 TR 11-Mar-23 15-Mar-23 B B

Page 72 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2774 19 ELITE18-CON-CE-CIV-IR-4269 FDT test 3rd layer sand filling for under the floating slab 117,118 A&B 11-Mar-23 21-Mar-23 A A

2775 20 ELITE18-CON-CE-CIV-IR-4270 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 117,118 TR 14-Mar-23 21-Mar-23 A A

2776 21 ELITE18-CON-CE-CIV-IR-4271 Steel & anchore epoxy for column jackting 117,118 A&B 14-Mar-23 17-Mar-23 B B

2777 22 ELITE18-CON-CE-CIV-IR-4272 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 117 GF 16-Mar-23 21-Mar-23 B B

2778 23 ELITE18-CON-CE-CIV-IR-4273 RCC concrete 4000 psi & SBR for retrofiting columns 117,118 GF 16-Mar-23 17-Mar-23 B B

2779 24 ELITE18-CON-CE-CIV-IR-4274 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 118 GF 21-Mar-23 24-Mar-23 A A

2780 25 ELITE18-CON-CE-CIV-IR-4275 RCC top level for slab thickness increase 117,118 TR 22-Mar-23 24-Mar-23 A A

2781 26 ELITE18-CON-CE-CIV-IR-4276 PCC (1:4:8) under the floating slab 117,118 A&B 22-Mar-23 24-Mar-23 B 17-May-23 18-May-23 B B

2782 27 ELITE18-CON-CE-CIV-IR-4277 Polythene sheet 1000 micron under the PCC floating slab 117,118 A&B 22-Mar-23 24-Mar-23 A A

2783 28 ELITE18-CON-CE-CIV-IR-4278 07 days cylinder concrete test PCC (1:4:8) under floating slab 117,118 A&B 25-Mar-23 28-Mar-23 A A

2784 29 ELITE18-CON-CE-CIV-IR-4279 Prmer coat & membranes bitumiinous sheet for top roof 117,118 A&B 1-Apr-23 5-Apr-23 A A

2785 30 ELITE18-CON-CE-CIV-IR-4280 Pond test for top roof 117,118 A&B 1-Apr-23 5-Apr-23 A A

2786 31 ELITE18-CON-CE-CIV-IR-4281 Steel & anchor epoxy for beam jackting 117,118 GF 3-Apr-23 6-Apr-23 A A

2787 32 ELITE18-CON-CE-CIV-IR-4282 Surface clearence & side gola for top roof 117,118 A&B 3-Apr-23 6-Apr-23 A A

2788 33 ELITE18-CON-CE-CIV-IR-4283 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 117,118 TR 6-Apr-23 10-Apr-23 B B

2789 34 ELITE18-CON-CE-CIV-IR-4284 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 117 A 6-Apr-23 10-Apr-23 B B

2790 35 ELITE18-CON-CE-CIV-IR-4285 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 118 B 11-Apr-23 15-Apr-23 B B

2791 36 ELITE18-CON-CE-CIV-IR-4286 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 117,118 GF 14-Apr-23 15-Apr-23 B B

2792 37 ELITE18-CON-CE-CIV-IR-4287 RCC concrete 4000 psi & SBR for retrofiting beams 117,118 GF 14-Apr-23 17-Apr-23 B B

2793 38 ELITE18-CON-CE-CIV-IR-4288 28 days cylinder concrete test PCC (1:4:8) under floating slab 117,118 A&B 15-Apr-23 2-May-23 A A

2794 39 ELITE18-CON-CE-CIV-IR-4289 28 days cylinder concrete test RCC (4000 psi) retrofitting beams 117,118 A&B 5-May-23 9-May-23 A A

2795 40 ELITE18-CON-CE-CIV-IR-4290 RCC concrete (1:2:4) for floatting slab 117 A 8-May-23 9-May-23 B B

2796 41 ELITE18-CON-CE-CIV-IR-4291 Steel & filler board for floatting slab 117 A 8-May-23 9-May-23 B B

2797 42 ELITE18-CON-CE-CIV-IR-4292 RCC concrete 4000 psi & SBR for slab thikness increase 117,118 A&B 11-May-23 16-May-23 B B

2798 43 ELITE18-CON-CE-CIV-IR-4293 07 days cylinder concrete test PCC (1:2:4) floating slab 117 A 15-May-23 18-May-23 A A

2799 44 ELITE18-CON-CE-CIV-IR-4294 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 117,118 A&B 15-May-23 18-May-23 A A

2800 45 ELITE18-CON-CE-CIV-IR-4295 RCC concrete 4000 PSI & SBR for retrofitting columns 117,118 A&B 15-May-23 17-May-23 B B

2801 46 ELITE18-CON-CE-CIV-IR-4296 Steel & anchor epoxy for column jackting 117,118 FF 15-May-23 17-May-23 A A

2802 47 ELITE18-CON-CE-CIV-IR-4297 07 days cylinder concrete test RCC (4000 psi) retrofitting columns 117,118 FF 18-May-23 22-May-23 A A

2803 48 ELITE18-CON-CE-CIV-IR-4298 Primer coat & membranes bituminous sheet for external side 117,118 A&B 22-May-23 25-May-23 B B

2804 49 ELITE18-CON-CE-CIV-IR-4299 07 days cylinder concrete test RCC (1:2:4) floating slab 118 B 23-May-23 29-May-23 A A

2805 50 ELITE18-CON-CE-CIV-IR-4300 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 117,118 FF 25-May-23 29-May-23 A A

2806 51 ELITE18-CON-CE-CIV-IR-4301 Steel & filler board for floatting slab 118 B 27-May-23 30-May-23 A A

2807 52 ELITE18-CON-CE-CIV-IR-4302 RCC concrete (1:2:4) for floatting slab 118 B 27-May-23 30-May-23 B B

2808 53 ELITE18-CON-CE-CIV-IR-4303 Steel fixing & anchor epoxy for beam jacktting 117,118 FF 27-May-23 30-May-23 A A

2809 54 ELITE18-CON-CE-CIV-IR-4304 RCC concrete 4000 Psi & SBR for retrofitting beams 117,118 FF 27-May-23 30-May-23 B B

2810 55 ELITE18-CON-CE-CIV-IR-4305 28 days cylinder concrete test RCC (1:2:4) floating slab 117 A 3-Jun-23 7-Jun-23 A A
Fixing MS girders with MS plates drilling anchoring mechnical & chemical
2811 56 ELITE18-CON-CE-CIV-IR-4306 117 GF 3-Jun-23 12-Jun-23 B B
boulting apoxy with all respect
2812 57 ELITE18-CON-CE-CIV-IR-4307 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 117,118 A&B 5-Jun-23 7-Jun-23 A A

2813 58 ELITE18-CON-CE-CIV-IR-4308 Block masonory & lintels for retrofitting work & partition walls 117 GF 7-Jun-23 12-Jun-23 B B

2814 59 ELITE18-CON-CE-CIV-IR-4309 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 117,118 A&B 8-Jun-23 12-Jun-23 A A

2815 60 ELITE18-CON-CE-CIV-IR-4310 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 117,118 A&B 9-Jun-23 12-Jun-23 A A

2816 61 ELITE18-CON-CE-CIV-IR-4311 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 117,118 A&B 9-Jun-23 12-Jun-23 B B

2817 62 ELITE18-CON-CE-CIV-IR-4312 Fixing MS girders with MS plates drilling anchoring mechnical boulting 118 GF,FF 10-Jun-23 15-Jun-23 B B

2818 63 ELITE18-CON-CE-CIV-IR-4313 Jumbolon XPS board 50 mm & polythene sheet laying & screeding for top roof 117,118 A&B 12-Jun-23 14-Jun-23 B B

2819 64 ELITE18-CON-CE-CIV-IR-4314 28 days cylinder concrete test RCC (1:2:4) floating slab 118 B 14-Jun-23 17-Jun-23 A A

2820 65 ELITE18-CON-CE-CIV-IR-4315 FDT test 1st layer sand filling for exteral side 117,118 A&B 17-Jun-23 20-Jun-23 B B

2821 66 ELITE18-CON-CE-CIV-IR-4316 FDT test 2nd layer sand filling for external side 117,118 A&B 17-Jun-23 20-Jun-23 B B

2822 67 ELITE18-CON-CE-CIV-IR-4317 28 days cylinder concrete test RCC (4000 psi) retrofitting beams 117,118 A&B 17-Jun-23 20-Jun-23 B B

2823 68 ELITE18-CON-CE-CIV-IR-4318 FDT test 3rd layer sand filling for external side 117,118 A&B 18-Jul-23 20-Jul-23 B B

2824 69 ELITE18-CON-CE-CIV-IR-4319 Block masonory & lintels for retrofiting work & parttition walls 117 FF 19-Jul-23 24-Jul-23 C 26-Jul-23 3-Aug-23 B B

2825 70 ELITE18-CON-CE-CIV-IR-4320 Block masonory & lintels for retrofiting work & parttition walls 118 GF,FF 19-Jul-23 24-Jul-23 C 26-Jul-23 3-Aug-23 B B

2826 71 ELITE18-CON-CE-CIV-IR-4321 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 117,118 A&B 20-Jul-23 24-Jul-23 A A

2827 72 ELITE18-CON-CE-CIV-IR-4322 Drilling anchoring connector mechnical & chemical boulting epoxy 118 GF,FF 22-Jul-23 25-Jul-23 B B
Fixing MS girders with MS plates drilling anchoring connector mechnical &
2828 73 ELITE18-CON-CE-CIV-IR-4323 117 FF 22-Jul-23 25-Jul-23 B B
chemical boulting epoxy

Page 73 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2829 74 ELITE18-CON-CE-CIV-IR-4324 Grout filling BW girder & slab 117,118 A&B 26-Jul-23 3-Aug-23 B B

2830 75 ELITE18-CON-CE-CIV-IR-4325 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 117,118 A&B 10-Aug-23 16-Aug-23 A A

2831 76 ELITE18-CON-CE-CIV-IR-4326

2832 77 ELITE18-CON-CE-CIV-IR-4327 Side gola & laying aggregates for mumty top 117,118 A&B 16-Aug-23 19-Aug-23 A A

2833 78 ELITE18-CON-CE-CIV-IR-4328 Block masonory for partition wall external side 117,118 A&B 19-Aug-23 26-Aug-23 B B

2834 79 ELITE18-CON-CE-CIV-IR-4329 OHWT concrete uper side 117,118 A&B 23-Aug-23 26-Aug-23 A A

2835 80 ELITE18-CON-CE-CIV-IR-4330 Instalaltion peragola cleats with mechanical bolts all respect 117,118 A&B 29-Aug-23 1-Sep-23 B B

2836 81 ELITE18-CON-CE-CIV-IR-4331 Installation MS porch fence for boundry wall 117,118 A&B 29-Aug-23 30-Aug-23 B 9-Dec-23 14-Dec-23 A A

2837 82 ELITE18-CON-CE-CIV-IR-4332 Plaster for partition wall externals side 117,118 A&B 2-Sep-23 5-Sep-23 A A

2838 83 ELITE18-CON-CE-CIV-IR-4333 Plaster work patches & corner beads for retrofitting work & internal walls 117 A 4-Sep-23 8-Sep-23 A A

2839 84 ELITE18-CON-CE-CIV-IR-4334 Plaster work for external patches retrofitting work 117,118 A&B 8-Sep-23 13-Sep-23 B B

2840 85 ELITE18-CON-CE-CIV-IR-4335 Dismentlling boundry wall column for retrofitting work 117,118 A&B 9-Sep-23 13-Sep-23 B B

2841 86 ELITE18-CON-CE-CIV-IR-4336 PCC (1:3:6) for external side front & back side 117,118 A&B 14-Sep-23 18-Sep-23 B B

2842 87 ELITE18-CON-CE-CIV-IR-4337 Polythene sheet 1000 micron for extrnal side front side & back side 117,118 A&B 14-Sep-23 18-Sep-23 B B

2843 88 ELITE18-CON-CE-CIV-IR-4338 PCC (1:4:8) for under the trench drain grating foundation 117,118 A&B 16-Sep-23 20-Sep-23 A A

2844 89 ELITE18-CON-CE-CIV-IR-4339 Fixing MS cover & plaster for OHWT 117,118 A&B 16-Sep-23 19-Sep-23 A A

2845 90 ELITE18-CON-CE-CIV-IR-4340 Steel grating angle & formwork for trench drain grating foundation 117,118 A&B 2-Oct-23 13-Oct-23 A A

2846 91 ELITE18-CON-CE-CIV-IR-4341 RCC concrte (1:2:4) for trench drain grating foundation 117,118 A&B 2-Oct-23 13-Oct-23 A A

2847 92 ELITE18-CON-CE-CIV-IR-4342 Plaster work patches & corner beads for retrofitting work & internal walls 118 GF,FF 19-Oct-23 20-Oct-23 B B

2848 93 ELITE18-CON-CE-CIV-IR-4343 Instalaltion black granite for partion wall external side 117,118 A&B 30-Oct-23 1-Nov-23 B 9-Dec-23 14-Dec-23 A A

2849 94 ELITE18-CON-CE-CIV-IR-4344 FDT test 3rd layer sand filling for external side right side 117 A 7-Nov-23 23-Nov-23 A A

95 ELITE18-CON-CE-CIV-IR-4345 FDT test 3rd layer sand filling for external side left side 118 B 11-Nov-23 23-Nov-23 A A

2850 96 ELITE18-CON-CE-CIV-IR-4346 PCC (1:3:6) for external side left & right side 117,118 A&B 11-Nov-23 16-Nov-23 B B

2851 97 ELITE18-CON-CE-CIV-IR-4347 Polythene sheet (1000 micron) for external side left & right side) 117,118 A&B 11-Nov-23 16-Nov-23 A A

98 ELITE18-CON-CE-CIV-IR-4348 07 days cylinder concrete test PCC (1:3:6) external side left side & right side 117,118 A&B 13-Nov-23 24-Nov-23 B B

99 ELITE18-CON-CE-CIV-IR-4349 Instalaltion aluminium door for kitchen & mumty 117,118 A&B 15-Nov-23 23-Nov-23 B B

100 ELITE18-CON-CE-CIV-IR-4350 Installation perlino marbal for floor 117,118 A&B 16-Nov-23 23-Nov-23 B 8-Dec-23 11-Dec-23 B B

101 ELITE18-CON-CE-CIV-IR-4351 Instalaltion perlino marbal for floor 118 B 16-Nov-23 23-Nov-23 B 8-Dec-23 11-Dec-23 A A

102 ELITE18-CON-CE-CIV-IR-4352 Block masonory for manhole gully trap electrical chamber & electrical handhole 117,118 A&B 25-Nov-23 28-Nov-23 B B

103 ELITE18-CON-CE-CIV-IR-4353 Pudlo plaster for manhole gully trap electrical chamber & electrical handhole 117,118 A&B 25-Nov-23 28-Nov-23 C C

104 ELITE18-CON-CE-CIV-IR-4354 28 days cylinder concrete test PCC (1:3:6) external side left side & right side 117,118 A&B 4-Dec-23 7-Dec-23 B B

105 ELITE18-CON-CE-CIV-IR-4355 Installation perlino marbal for floor 117 GF 6-Dec-23 9-Dec-23 B B

106 ELITE18-CON-CE-CIV-IR-4356 Installation perlino marbal threshold 117,118 GF,FF,M 6-Dec-23 9-Dec-23 B B

107 ELITE18-CON-CE-CIV-IR-4357 Dismentling perlino marbal for floor 117,118 FF 6-Dec-23 9-Dec-23 A A

108 ELITE18-CON-CE-CIV-IR-4358 Dismentling perlino marbal for stair GF to FF & FF to Mumty 117,118 A&B 6-Dec-23 9-Dec-23 B B

109 ELITE18-CON-CE-CIV-IR-4359 Applying primer coat bituminious sheet (4mm) & screed for baths floor 117,118 FF,MB 6-Dec-23 9-Dec-23 A A

110 ELITE18-CON-CE-CIV-IR-4360 Cementitious coat pond test for baths & powder bath water proofing 117,118 GF,FF,MB 6-Dec-23 9-Dec-23 A A

111 ELITE18-CON-CE-CIV-IR-4361 Instalaltion wall tile floor tile for baths & powder room 117,118 GF,FF,MB 6-Dec-23 9-Dec-23 B B

112 ELITE18-CON-CE-CIV-IR-4362 Instalaltion wall tile floor tile for baths & kitchen 117,118 A&B 6-Dec-23 9-Dec-23 B B

113 ELITE18-CON-CE-CIV-IR-4363 Installation cremamo for boundry wall 117,118 A&B 6-Dec-23 9-Dec-23 B B

114 ELITE18-CON-CE-CIV-IR-4364 Installation perlino marbal for boundry wall top top roof column & meter box top 117,118 A&B 6-Dec-23 9-Dec-23 B B

115 ELITE18-CON-CE-CIV-IR-4365 Installation black granite for partion wall external side 117,118 A&B 6-Dec-23 9-Dec-23 B B

116 ELITE18-CON-CE-CIV-IR-4366 Installation window sill horizontal 117,118 GF,FF,MR 6-Dec-23 9-Dec-23 B B

117 ELITE18-CON-CE-CIV-IR-4367 Instalaltion window sill vertical 117,118 GF,FF,MR 6-Dec-23 9-Dec-23 B B

118 ELITE18-CON-CE-CIV-IR-4368 Instalaltion perlino marbla & skirting for stair GF to FF & FF to mumty 117,118 A&B 6-Dec-23 9-Dec-23 B B

119 ELITE18-CON-CE-CIV-IR-4369 PCC (1:4:8) under kerb stone & instalaltion kerb stone & side gola for external side 117,118 A&B 8-Dec-23 9-Dec-23 B B

120 ELITE18-CON-CE-CIV-IR-4370 Installation suspension & framming system for celling work dry area 117,118 GF,FF,MR 11-Dec-23 14-Dec-23 B B

121 ELITE18-CON-CE-CIV-IR-4371 Instalaltion suspension & framming system for celling work wet area 117,118 GF,FF,MR 7-Dec-23 9-Dec-23 B B

122 ELITE18-CON-CE-CIV-IR-4372 Instalaltion moisture board tapping & jointing for celling work wet area 117,118 GF,FF,MR 7-Dec-23 9-Dec-23 B B

123 ELITE18-CON-CE-CIV-IR-4373 Instalaltion gypsum board tapping & jointing for celling work dry area 117,118 GF,FF,MR 7-Dec-23 9-Dec-23 B B
Primer coat 1st coat putty 2nd coat putty 1st coat paint 2nd coat & final coat paint
124 ELITE18-CON-CE-CIV-IR-4374 117,118 GF,FF,M 7-Dec-23 9-Dec-23 B B
for internal paint
Primer coat 1st coat putty 2nd coat putty 1st coat paint 2nd coat paint for celling
125 ELITE18-CON-CE-CIV-IR-4375 117,118 GF,FF,M 7-Dec-23 9-Dec-23 B B
paint
Base primer graffy & weather sheild for external paint elevation 1,2,34 OHWT
126 ELITE18-CON-CE-CIV-IR-4376 117,118 A&B 7-Dec-23 9-Dec-23 B B
mumty out side boundry wall & partition wall
127 ELITE18-CON-CE-CIV-IR-4377 Instalaltion perlino marbal for floor 117,118 FF,MB 8-Dec-23 11-Dec-23 B B

128 ELITE18-CON-CE-CIV-IR-4378 Instalaltion floor skirting for maid room 117,118 A&B 8-Dec-23 11-Dec-23 B B

Page 74 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
129 ELITE18-CON-CE-CIV-IR-4379 Plaster roof tile & roof skirting for top roof 117,118 A&B 8-Dec-23 11-Dec-23 B B

130 ELITE18-CON-CE-CIV-IR-4380 Installation composite stone for external side 117,118 A&B 9-Dec-23 14-Dec-23 A A

131 ELITE18-CON-CE-CIV-IR-4381 Block masonory for mechnical wall 117,118 GF,FF 9-Dec-23 14-Dec-23 A A

132 ELITE18-CON-CE-CIV-IR-4382 Plaster work & wall mounted cement board for cistern flushing tank 117,118 GF,FF 9-Dec-23 14-Dec-23 B B

133 ELITE18-CON-CE-CIV-IR-4383 Instalaltion perlino marbal skirting for floor 117,118 GF,FF,M 9-Dec-23 14-Dec-23 C C

134 ELITE18-CON-CE-CIV-IR-4384 PCC (1:3:6) AC pad & PPRC pad for top roof 117,118 A&B 9-Dec-23 UR UR

135 ELITE18-CON-CE-CIV-IR-4385 Block masonory plaster for duct & DB area 117,118 GF,FF,M 9-Dec-23 14-Dec-23 B B

136 ELITE18-CON-CE-CIV-IR-4386 Plaster for HDF floor 117,118 GF,FF 9-Dec-23 15-Dec-23 B B

137 ELITE18-CON-CE-CIV-IR-4387 Instalaltion black granite strips for shower cabin 117,118 GF,FF 9-Dec-23 15-Dec-23 B B

138 ELITE18-CON-CE-CIV-IR-4388 Instalaltion pavers & pavers skirting for external side 117,118 A&B 9-Dec-23 15-Dec-23 B B
Installation of cover including slab for manhole gully trap electrical chamber &
139 ELITE18-CON-CE-CIV-IR-4389 117,118 A&B 9-Dec-23 14-Dec-23 B B
electrial handhole with paint
140 ELITE18-CON-CE-CIV-IR-4390 Peragola paint with all respect 117,118 A&B 9-Dec-23 14-Dec-23 B B

141 ELITE18-CON-CE-CIV-IR-4391 Installation MS gratting for main gate 117,118 A&B 9-Dec-23 14-Dec-23 B B

142 ELITE18-CON-CE-CIV-IR-4392 Peragola joimting with all respects 117,118 A&B 11-Dec-23 14-Dec-23 A A

143 ELITE18-CON-CE-CIV-IR-4393 Fixing of access panel in celling 117,118 A&B 11-Dec-23 14-Dec-23 B B

144 ELITE18-CON-CE-CIV-IR-4394 Instalaltion vanity miror for baths & powder room 117,118 GF,FF,MB 11-Dec-23 14-Dec-23 B B

145 ELITE18-CON-CE-CIV-IR-4395 Instalaltion MS louvers under the OHWT with all respect 117,118 A&B 11-Dec-23 14-Dec-23 A A

146 ELITE18-CON-CE-CIV-IR-4396 Instalaltion vanity frame for baths & powder room 117,118 GF,FF 11-Dec-23 14-Dec-23 B B

147 ELITE18-CON-CE-CIV-IR-4397 Installation transfer & booster pump cover with all respect 117,118 A&B 11-Dec-23 14-Dec-23 A A

148 ELITE18-CON-CE-CIV-IR-4398 Instalaltion perlino marbal for boundry wall top top roof column & meter box top 117,118 A&B 11-Dec-23 14-Dec-23 A A

149 ELITE18-CON-CE-CIV-IR-4399 Instalation of cubical glass partition & glass door for baths 117,118 GF,FF 11-Dec-23 14-Dec-23 B B

150 ELITE18-CON-CE-CIV-IR-4400 Installation of glass railing & wooden hand rail for stair GF to FF & FF to Mumty 117,118 A&B 11-Dec-23 14-Dec-23 B B

151 ELITE18-CON-CE-CIV-IR-4401 Instalaltion aluminium door for kitchen & mumty 117,118 A&B 11-Dec-23 14-Dec-23 B B

152 ELITE18-CON-CE-CIV-IR-4402 Instalaltion vanity marbal for baths & powder room 117,118 GF,FF 11-Dec-23 14-Dec-23 B B

ELITE18-CON-CE-CIV-IR-4403 Installation door wardrobe ironmongries vanity & transition strip final IR 117,118 GF,FF 22-Dec-23 27-Dec-23 B B

2852

2853 4501 TO 4750 115-116


Dismentlling manhole gully trap electrical chamber & electrical handhole & debris
2854 1 ELITE18-CON-CE-CIV-IR-4501 115,116 A&B 12-Dec-22 14-Dec-22 B B
remove
2855 2 ELITE18-CON-CE-CIV-IR-4502 Dismentlling block masonory for walls & debris remove 115,116 A&B 10-Jan-23 14-Dec-22 B B

2856 3 ELITE18-CON-CE-CIV-IR-4503 Dismentlling RCC concrete SOG & debris remove 115,116 A&B 10-Jan-23 14-Dec-22 B B

2857 4 ELITE18-CON-CE-CIV-IR-4504 Excavation of soil to clear the raft under SOG & remove soil out side 115,116 A&B 10-Jan-23 14-Dec-22 C C

2858 5 ELITE18-CON-CE-CIV-IR-4505 Dismentlling block work under the plinth beam for pile cap & debris remove 115,116 A&B 21-Jan-23 24-Jan-23 B B

2859 6 ELITE18-CON-CE-CIV-IR-4506 Block masonory for under the plinth beam & entrance lobby wall 115,116 A&B 28-Jan-23 4-Feb-23 B B

2860 7 ELITE18-CON-CE-CIV-IR-4507 Laying & fixing of MS peragola 115,116 A&B 15-Feb-23 23-Feb-23 A A

2861 8 ELITE18-CON-CE-CIV-IR-4508 Slab cutting & plaster 115 A 25-Feb-23 1-Mar-23 C C

2862 9 ELITE18-CON-CE-CIV-IR-4509 Dismentlling for slab thickness increase first floor & debris remove 115,116 A&B 25-Feb-23 28-Feb-23 A A

2863 10 ELITE18-CON-CE-CIV-IR-4510 Steel & anchore epoxy for slab thickness increase 115,116 A&B 25-Feb-23 28-Feb-23 C 6-Mar-23 7-Mar-23 B B

2864 11 ELITE18-CON-CE-CIV-IR-4511 Steel & anchore epoxy for slab thickness increase 115,116 TR 6-Mar-23 7-Mar-23 B B

2865 12 ELITE18-CON-CE-CIV-IR-4512 Dimentlling for slab thickness increase top roof & debris remove 115,116 TR 6-Mar-23 7-Mar-23 B B

2866 13 ELITE18-CON-CE-CIV-IR-4513 RCC concrete 4000 psi & SBR for slab thikness increase 115,116 A&B 11-Mar-23 15-Mar-23 B B

2867 14 ELITE18-CON-CE-CIV-IR-4514 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 115,116 A&B 14-Mar-23 21-Mar-23 A A

2868 15 ELITE18-CON-CE-CIV-IR-4515 RCC top level for slab thickness increase 115,116 TR 22-Mar-23 24-Mar-23 A A

2869 16 ELITE18-CON-CE-CIV-IR-4516 FDT test 1st layer sand filling for under the floating slab 115,116 B 29-Mar-23 1-Apr-23 C 3-Apr-23 6-Apr-23 B B

2870 17 ELITE18-CON-CE-CIV-IR-4517 Surface clearence & side gola for top roof 115,116 A&B 3-Apr-23 6-Apr-23 A A

2871 18 ELITE18-CON-CE-CIV-IR-4518 Primer coat & membranes bituminous sheet for top roof 115,116 A&B 3-Apr-23 6-Apr-23 A A

2872 19 ELITE18-CON-CE-CIV-IR-4519 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 115,116 TR 6-Apr-23 10-Apr-23 B B

2873 20 ELITE18-CON-CE-CIV-IR-4520 Pond test for top roof 115,116 A&B 5-May-23 UR UR

2874 21 ELITE18-CON-CE-CIV-IR-4521 FDT test 2nd layer sand filling for under the floating slab 115,116 A&B 6-May-23 11-May-23 A A

2875 22 ELITE18-CON-CE-CIV-IR-4522 RCC concrete 4000 psi & SBR for slab thikness increase 115,116 FF 11-May-23 16-May-23 B B

2876 23 ELITE18-CON-CE-CIV-IR-4523 RCC concrete 4000 psi & SBR for retrofitting columns 115,116 GF 11-May-23 16-May-23 B B

2877 24 ELITE18-CON-CE-CIV-IR-4524 Steel & anchor epoxy for column jackting 115,116 GF 11-May-23 16-May-23 A A

Page 75 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2878 25 ELITE18-CON-CE-CIV-IR-4525 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 115,116 FF 15-May-23 18-May-23 A A

2879 26 ELITE18-CON-CE-CIV-IR-4526 RCC concrete 4000 PSI & SBR for retrofitting beams 115,116 GF 15-May-23 17-May-23 B B

2880 27 ELITE18-CON-CE-CIV-IR-4527 Steel & anchor epoxy for beam jackting 115,116 GF 15-May-23 17-May-23 A A

2881 28 ELITE18-CON-CE-CIV-IR-4528 07 days cylinder concrete test RCC (4000 psi) retrofitting columns 115,116 GF 16-May-23 22-May-23 B B

2882 29 ELITE18-CON-CE-CIV-IR-4529 FDT test 3rd layer sand filling for under the floatting slab 116 B 17-May-23 20-May-23 B B

2883 30 ELITE18-CON-CE-CIV-IR-4530 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 115,116 GF 20-May-23 25-May-23 B B

2884 31 ELITE18-CON-CE-CIV-IR-4531 FDT test 3rd layer sand filling for under the floatting slab 115 A 22-May-23 25-May-23 B B

2885 32 ELITE18-CON-CE-CIV-IR-4532 Primer coat & membranes bituminous sheet for external side 115,116 A&B 23-May-23 25-May-23 B B

2886 33 ELITE18-CON-CE-CIV-IR-4533 07 days cylinder concrete test PCC (1:4:8) under floating slab 116 B 24-May-23 29-May-23 B B

2887 34 ELITE18-CON-CE-CIV-IR-4534 07 days cylinder concrete test PCC (1:4:8) under floating slab 115 A 27-May-23 30-May-23 B B

2888 35 ELITE18-CON-CE-CIV-IR-4535 RCC concrete 4000 psi & SBR for retrofitting columns 115,116 FF 27-May-23 30-May-23 B B

2889 36 ELITE18-CON-CE-CIV-IR-4536 Steel & anchor epoxy for columns jactting 115,116 FF 27-May-23 30-May-23 A A

2890 37 ELITE18-CON-CE-CIV-IR-4537 Polythene sheet 1000 micron under the PCC floatting slab 115,116 A&B 27-May-23 30-May-23 A A

2891 38 ELITE18-CON-CE-CIV-IR-4538 PCC (1:4:8) under the floatting slab 115,116 A&B 27-May-23 30-May-23 B B

2892 39 ELITE18-CON-CE-CIV-IR-4539 07 days cylinder concrete test RCC (4000 psi) retrofitting columns 115,116 FF 31-May-23 7-Jun-23 A A

2893 40 ELITE18-CON-CE-CIV-IR-4540 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 115,116 A&B 5-Jun-23 7-Jun-23 A A

2894 41 ELITE18-CON-CE-CIV-IR-4541 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 115,116 GF 6-Jun-23 8-Jun-23 A A

2895 42 ELITE18-CON-CE-CIV-IR-4542 RCC concrete 4000 psi & SBR for retrofitting beams 115,116 A&B 7-Jun-23 10-Jun-23 B B

2896 43 ELITE18-CON-CE-CIV-IR-4543 Steel & anchore epoxy for beam jackting 115,116 FF 7-Jun-23 10-Jun-23 A A

2897 44 ELITE18-CON-CE-CIV-IR-4544 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 115,116 FF 9-Jun-23 12-Jun-23 A A

2898 45 ELITE18-CON-CE-CIV-IR-4545 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 115,116 A&B 9-Jun-23 12-Jun-23 B B

2899 46 ELITE18-CON-CE-CIV-IR-4546 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 115,116 A&B 9-Jun-23 12-Jun-23 A A

2900 47 ELITE18-CON-CE-CIV-IR-4547 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 115,116 GF 10-Jun-23 14-Jun-23 A A

2901 48 ELITE18-CON-CE-CIV-IR-4548 Installation MS girders with MS plates drilling anchoring mechnical boulting 115,116 GF,FF 10-Jun-23 15-Jun-23 B B

2902 49 ELITE18-CON-CE-CIV-IR-4549 Steel & filler board for floatting slab 115 A 12-Jun-23 14-Jun-23 A A

2903 50 ELITE18-CON-CE-CIV-IR-4550 RCC concrete (1:2:4) for floatting slab 115 A 12-Jun-23 14-Jun-23 B B

2904 51 ELITE18-CON-CE-CIV-IR-4551 Jumbolon XPS board 50 mm & polythene sheet laying & screeding for top roof 115,116 A&B 12-Jun-23 14-Jun-23 B B

2905 52 ELITE18-CON-CE-CIV-IR-4552 28 days cylinder concrete test PCC (1:4:8) under floating slab 116 B 14-Jun-23 17-Jun-23 A A

2906 53 ELITE18-CON-CE-CIV-IR-4553 Steel & filler board for floatting slab 116 B 14-Jun-23 17-Jun-23 A A

2907 54 ELITE18-CON-CE-CIV-IR-4554 RCC concrete (1:2:4) for floatting slab 116 B 14-Jun-23 17-Jun-23 B B

2908 55 ELITE18-CON-CE-CIV-IR-4555 07 days cylinder concrete test RCC (1:2:4) floating slab 115 A 17-Jun-23 20-Jun-23 A A

2909 56 ELITE18-CON-CE-CIV-IR-4556 28 days cylinder concrete test PCC (1:4:8) under floating slab 115 A 17-Jun-23 20-Jun-23 A A

2910 57 ELITE18-CON-CE-CIV-IR-4557 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 115,116 A&B 19-Jun-23 20-Jun-23 A A

2911 58 ELITE18-CON-CE-CIV-IR-4558 07 days cylinder concrete test RCC (1:2:4) floating slab 116 B 20-Jun-23 6-Jul-23 A A

2912 59 ELITE18-CON-CE-CIV-IR-4559 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 115,116 FF 7-Jul-23 13-Jul-23 B B

2913 60 ELITE18-CON-CE-CIV-IR-4560 28 days cylinder concrete test RCC (1:2:4) floating slab 115 A 7-Jul-23 13-Jul-23 A A

2914 61 ELITE18-CON-CE-CIV-IR-4561 28 days cylinder concrete test RCC (1:2:4) floating slab 116 B 11-Jul-23 13-Jul-23 A A

2915 62 ELITE18-CON-CE-CIV-IR-4562 FDT test 1st layer sand filling for external side 115,116 A&B 12-Jul-23 17-Jul-23 A A

2916 63 ELITE18-CON-CE-CIV-IR-4563 FDT test 2nd layer sand filling for external side 115,116 A&B 12-Jul-23 17-Jul-23 A A

2917 64 ELITE18-CON-CE-CIV-IR-4564 FDT test 3rd layer sand filling for external side 115,116 A&B 18-Jul-23 20-Jul-23 B B

2918 65 ELITE18-CON-CE-CIV-IR-4565 Block masonory & lintels for retrofiting work & parttition walls 115,116 GF,FF 19-Jul-23 24-Jul-23 C 26-Jul-23 3-Aug-23 B B

2919 66 ELITE18-CON-CE-CIV-IR-4566 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 115,116 A&B 20-Jul-23 24-Jul-23 A A

2920 67 ELITE18-CON-CE-CIV-IR-4567 Drilling anchoring connector mechnical & chemical boulting epoxy 115,116 GF,FF 22-Jul-23 25-Jul-23 B B

2921 68 ELITE18-CON-CE-CIV-IR-4568 Grout filling BW girder & slab 115,116 A&B 26-Jul-23 3-Aug-23 B B

2922 69 ELITE18-CON-CE-CIV-IR-4569 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 115,116 A&B 10-Aug-23 16-Aug-23 A A

2923 70 ELITE18-CON-CE-CIV-IR-4570

2924 71 ELITE18-CON-CE-CIV-IR-4571 Side gola & laying aggregates for mumty top 115,116 A&B 16-Aug-23 19-Aug-23 A A

2925 72 ELITE18-CON-CE-CIV-IR-4572 Block masonory for partition wall external side 115,116 A&B 19-Aug-23 26-Aug-23 A A

2926 73 ELITE18-CON-CE-CIV-IR-4573 OHWT concrete uper side 115,116 A&B 23-Aug-23 26-Aug-23 A A

2927 74 ELITE18-CON-CE-CIV-IR-4574 Plaster work patches & corner beads for retrofitting work & internal wall 116 GF,FF 26-Aug-23 30-Aug-23 B B

2928 75 ELITE18-CON-CE-CIV-IR-4575 Instalaltion peragola cleats with mechanical bolts all respect 115,116 A&B 29-Aug-23 1-Sep-23 B B

2929 76 ELITE18-CON-CE-CIV-IR-4576 Installation MS porch fence for boundry wall 115,116 A&B 29-Aug-23 30-Aug-23 B B

2930 77 ELITE18-CON-CE-CIV-IR-4577 Plaster for partition wall externals side 115,116 A&B 2-Sep-23 5-Sep-23 A A

2931 78 ELITE18-CON-CE-CIV-IR-4578 Plaster work patches & corner beads for retrofitting work & internal wall 115 A 5-Sep-23 8-Sep-23 A A

2932 79 ELITE18-CON-CE-CIV-IR-4579 Plaster work for external patches retrofitting work 115,116 A&B 8-Sep-23 13-Sep-23 B B

Page 76 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2933 80 ELITE18-CON-CE-CIV-IR-4580 Dismentlling boundry wall column for retrofitting work 115,116 A&B 9-Sep-23 13-Sep-23 B B

2934 81 ELITE18-CON-CE-CIV-IR-4581 PCC (1:3:6) for external side front & back side 115,116 A&B 14-Sep-23 18-Sep-23 B B

2935 82 ELITE18-CON-CE-CIV-IR-4582 Polythene sheet 1000 micron for external side front & back side 115,116 A&B 14-Sep-23 18-Sep-23 B B

2936 83 ELITE18-CON-CE-CIV-IR-4583 Fixing MS cover & plaster for OHWT 115,116 A&B 16-Sep-23 19-Sep-23 A A

2937 84 ELITE18-CON-CE-CIV-IR-4584 PCC (1:4:8) for under the trench drain gratting foundation 115,116 A&B 2-Oct-23 13-Oct-23 A A

2938 85 ELITE18-CON-CE-CIV-IR-4585 Steel grating angle & formwork for trench drain grating foundation 115,116 A&B 6-Oct-23 13-Oct-23 C 9-Dec-23 14-Dec-23 C C

2939 86 ELITE18-CON-CE-CIV-IR-4586 RCC concrete (1:2:4) for trench drain grating foundation 115,116 A&B 6-Oct-23 13-Oct-23 C 9-Dec-23 UR UR

2940 87 ELITE18-CON-CE-CIV-IR-4587 Instalaltion black granite for partion wall external side 115,116 A&B 30-Oct-23 1-Nov-23 B 9-Dec-23 UR UR

2941 88 ELITE18-CON-CE-CIV-IR-4588 Installation perlino marbal for floor 116 GF 16-Nov-23 23-Nov-23 B B

89 ELITE18-CON-CE-CIV-IR-4589 Block masonory for manhole gully trap electrical chamber & electrical handhole 115,116 A&B 25-Nov-23 28-Nov-23 C C

2942 90 ELITE18-CON-CE-CIV-IR-4590 Installation perlino marbal for stair GF to FF & FF to M 116 B 8-Dec-23 11-Dec-23 C C

91 ELITE18-CON-CE-CIV-IR-4591 Terrazzo layer for OHWT walls & floor 115,116 A&B 23-Dec-23 27-Dec-23 C C

2943

2944

2945 4751 TO 5000 113-114


Dismentlling manhole gully trap electrical chamber & electrical handhole & debris
2946 1 ELITE18-CON-CE-CIV-IR-4751 113,114 A&B 11-Dec-22 14-Dec-22 B B
remove
2947 2 ELITE18-CON-CE-CIV-IR-4752 Laying & fixing of MS peragola 113,114 A&B 12-Dec-22 14-Dec-22 B B

2948 3 ELITE18-CON-CE-CIV-IR-4753 Dismentling block masonory for wall & debris remove 114 B 28-Dec-22 2-Jan-23 B B

2949 4 ELITE18-CON-CE-CIV-IR-4754 Dismentlling RCC concrete SOG & debris remove 114 B 28-Dec-22 2-Jan-23 B B

2950 5 ELITE18-CON-CE-CIV-IR-4755 Excavation of soil to clear the raft under SOG & remove soil out side 114 B 10-Jan-23 14-Jan-23 B B

2951 6 ELITE18-CON-CE-CIV-IR-4756 Dismentlling for slab thickness increase FF & debris remove 113,114 A&B 12-Jan-23 14-Jan-23 B B

2952 7 ELITE18-CON-CE-CIV-IR-4757 Dismentlling block work under the plinth beam for pile cap & debris remove 113,114 A&B 12-Jan-23 14-Jan-23 B B

2953 8 ELITE18-CON-CE-CIV-IR-4758 Block masonory for under the plinth beam & entrance lobby wall 113,114 A&B 28-Jan-23 4-Feb-23 B B

2954 9 ELITE18-CON-CE-CIV-IR-4759 FDT test 1st layer sand filling for under the floating slab 113 A 15-Feb-23 20-Feb-23 B B

2955 10 ELITE18-CON-CE-CIV-IR-4760 FDT test 1st layer sand filling for under the floating slab 114 B 22-Feb-23 23-Feb-23 B B

2956 11 ELITE18-CON-CE-CIV-IR-4761 FDT test 2nd layer sand filling for under the floating slab 113 A 23-Feb-23 23-Feb-23 C 25-Feb-23 28-Feb-23 B B

2957 12 ELITE18-CON-CE-CIV-IR-4762 Slab cutting & plaster 113 A 25-Feb-23 1-Mar-23 C C

2958 13 ELITE18-CON-CE-CIV-IR-4763 07 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 113,114 GF 24-Mar-23 30-Mar-23 A A

2959 14 ELITE18-CON-CE-CIV-IR-4764 FDT test 3rd layer sand filling for under the floating slab 113 A 27-Mar-23 30-Mar-23 A A

2960 15 ELITE18-CON-CE-CIV-IR-4765 FDT test 4th layer sand filling for under the floating slab 113 A 29-Mar-23 1-Apr-23 C 6-May-23 13-May-23 C 24-May-23 27-May-23 B B

2961 16 ELITE18-CON-CE-CIV-IR-4766 FDT test 2nd layer sand filling for under the floating slab 114 B 6-Apr-23 8-Apr-23 A A

2962 17 ELITE18-CON-CE-CIV-IR-4767 07 days cylinder concrete test RCC (4000 psi) retrofiting colums 113 GF 10-Apr-23 13-Apr-23 B B

2963 18 ELITE18-CON-CE-CIV-IR-4768 28 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 113,114 GF 14-Apr-23 15-Apr-23 B B

2964 19 ELITE18-CON-CE-CIV-IR-4769 RCC concrete 4000 psi & SBR for retrofiting columns 113 GF 14-Apr-23 17-Apr-23 B B

2965 20 ELITE18-CON-CE-CIV-IR-4770 Steel & anchore epoxy for column jackting 113 GF 14-Apr-23 17-Apr-23 B B

2966 21 ELITE18-CON-CE-CIV-IR-4771 Fixing & anchor epoxy for beam jackting 113,114 GF 15-Apr-23 2-May-23 A A

2967 22 ELITE18-CON-CE-CIV-IR-4772 RCC concrete 4000 psi & SBR for retrofiting columns 114 GF 15-Apr-23 2-May-23 B B

2968 23 ELITE18-CON-CE-CIV-IR-4773 Steel & anchore epoxy for column jackting 114 GF 15-Apr-23 2-May-23 A A

2969 24 ELITE18-CON-CE-CIV-IR-4774 07 days cylinder concrete test RCC (4000 psi) retrofiting colums 114 GF 2-May-23 5-May-23 A A

2970 25 ELITE18-CON-CE-CIV-IR-4775 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 113,114 GF 2-May-23 5-May-23 A A

2971 26 ELITE18-CON-CE-CIV-IR-4776 28 days cylinder concrete test RCC (4000 psi) retrofiting colums 113 GF 2-May-23 5-May-23 A A

2972 27 ELITE18-CON-CE-CIV-IR-4777 FDT test 3rd layer sand filling for under the floating slab 114 B 6-May-23 11-May-23 A A

2973 28 ELITE18-CON-CE-CIV-IR-4778 FDT test 4th layer sand filling for under the floating slab 114 B 6-May-23 11-May-23 A A

2974 29 ELITE18-CON-CE-CIV-IR-4779 RCC concrete 4000 psi & SBR for retrofiting beams 113,114 GF 9-May-23 11-May-23 B B

2975 30 ELITE18-CON-CE-CIV-IR-4780 28 days cylinder concrete test RCC (4000 psi) retrofiting colums 114 GF 9-May-23 UR UR

2976 31 ELITE18-CON-CE-CIV-IR-4781 PCC (1:4:8) under the floating slab 114 B 12-May-23 16-May-23 B B

2977 32 ELITE18-CON-CE-CIV-IR-4782 Polythene sheet 1000 micron under the PCC floating slab 114 B 12-May-23 16-May-23 B B

2978 33 ELITE18-CON-CE-CIV-IR-4783 07 days cylinder concrete test PCC (1:4:8) under floating slab 114 B 15-May-23 18-May-23 A A

2979 34 ELITE18-CON-CE-CIV-IR-4784 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 113,114 GF 15-May-23 18-May-23 A A

2980 35 ELITE18-CON-CE-CIV-IR-4785 07 days cylinder concrete test PCC (1:4:8) under floating slab 113 A 18-May-23 22-May-23 A A

2981 36 ELITE18-CON-CE-CIV-IR-4786 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 113,114 FF 24-May-23 29-May-23 B B

2982 37 ELITE18-CON-CE-CIV-IR-4787 07 days cylinder concrete test RCC (1:2:4) floating slab 113 A 27-May-23 30-May-23 B B

2983 38 ELITE18-CON-CE-CIV-IR-4788 Primer coat & membranes bituminous sheet for external side 113,114 A&B 27-May-23 30-May-23 B B

Page 77 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
2984 39 ELITE18-CON-CE-CIV-IR-4789 RCC concrete 4000 Psi & SBR for retrofitting columns 113,114 FF 27-May-23 30-May-23 B B

2985 40 ELITE18-CON-CE-CIV-IR-4790 Steel & anchore epoxy for column jackting 113,114 FF 27-May-23 30-May-23 B B

2986 41 ELITE18-CON-CE-CIV-IR-4791 Steel & filler board for floatting slab 113 A 27-May-23 30-May-23 A A

2987 42 ELITE18-CON-CE-CIV-IR-4792 RCC concrete (1:2:4) for floatting slab 113 A 27-May-23 30-May-23 B B

2988 43 ELITE18-CON-CE-CIV-IR-4793 07 days cylinder concrete test RCC (1:2:4) floating slab 114 B 3-Jun-23 7-Jun-23 A A

2989 44 ELITE18-CON-CE-CIV-IR-4794 28 days cylinder concrete test PCC (1:4:8) floating slab 114 B 3-Jun-23 7-Jun-23 B B

2990 45 ELITE18-CON-CE-CIV-IR-4795 PCC (1:4:8) under the floating slab 113 A 5-Jun-23 7-Jun-23 B B

2991 46 ELITE18-CON-CE-CIV-IR-4796 Polythene sheet 1000 micron under the PCC floating slab 113 A 5-Jun-23 7-Jun-23 B B

2992 47 ELITE18-CON-CE-CIV-IR-4797 Steel & filler board for floatting slab 114 B 6-Jun-23 8-Jun-23 A A

2993 48 ELITE18-CON-CE-CIV-IR-4798 RCC concrete (1:2:4) for floatting slab 114 B 6-Jun-23 8-Jun-23 B B

2994 49 ELITE18-CON-CE-CIV-IR-4799 RCC concrete 4000 psi & SBR for retrofitting beam 113,114 FF 7-Jun-23 10-Jun-23 B B

2995 50 ELITE18-CON-CE-CIV-IR-4800 Steel & anchor epoxy for beam jackting 113,114 FF 7-Jun-23 10-Jun-23 B B

2996 51 ELITE18-CON-CE-CIV-IR-4801 RCC concrete 4000 psi & SBR for slab thikness increase 113,114 FF 7-Jun-23 17-Jun-23 B B

2997 52 ELITE18-CON-CE-CIV-IR-4802 Steel & anchore epoxy for slab thikness increase 113,114 FF 7-Jun-23 17-Jun-23 B B

2998 53 ELITE18-CON-CE-CIV-IR-4803 28 days cylinder concrete test PCC (1:4:8) under floatting slab 113 A 8-Jun-23 12-Jun-23 A A

2999 54 ELITE18-CON-CE-CIV-IR-4804 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 113,114 A&B 8-Jun-23 12-Jun-23 A A

3000 55 ELITE18-CON-CE-CIV-IR-4805 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 113,114 A&B 10-Jun-23 17-Jun-23 A A

3001 56 ELITE18-CON-CE-CIV-IR-4806 Fixing MS girders with MS plates drilling anchoring mechnical boulting 113,114 GF,FF 10-Jun-23 15-Jun-23 B B

3002 57 ELITE18-CON-CE-CIV-IR-4807 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 113,114 FF 14-Jun-23 17-Jun-23 A A

3003 58 ELITE18-CON-CE-CIV-IR-4808 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 113,114 A&B 15-Jun-23 17-Jun-23 C 2-Aug-23 7-Aug-23 A A

3004 59 ELITE18-CON-CE-CIV-IR-4809 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 113,114 A&B 15-Jun-23 17-Jun-23 C 2-Aug-23 7-Aug-23 A A

3005 60 ELITE18-CON-CE-CIV-IR-4810 28 days cylinder concrete test RCC (1:2:4) floating slab 113 A 17-Jun-23 20-Jun-23 A A

3006 61 ELITE18-CON-CE-CIV-IR-4811 Steel & anchore epoxy for slab thikness increase top roof 113,114 A&B 17-Jun-23 20-Jun-23 A A

3007 62 ELITE18-CON-CE-CIV-IR-4812 RCC concrete 4000 psi & SBR for slab thikness increase top roof 113,114 TR 17-Jun-23 20-Jun-23 B B

3008 63 ELITE18-CON-CE-CIV-IR-4813 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 113,114 TR 22-Jun-23 6-Jul-23 A A

3009 64 ELITE18-CON-CE-CIV-IR-4814 Primer coat & membranes bituminous sheet for top roof 113,114 A&B 22-Jun-23 6-Jul-23 B B

3010 65 ELITE18-CON-CE-CIV-IR-4815 Pond test for top roof 113,114 A&B 22-Jun-23 6-Jul-23 B B

3011 66 ELITE18-CON-CE-CIV-IR-4816 28 days cylinder concrete test RCC (1:2:4) floating slab 114 B 23-Jun-23 6-Jul-23 B B

3012 67 ELITE18-CON-CE-CIV-IR-4817 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 113,114 A&B 7-Jul-23 13-Jul-23 B B

3013 68 ELITE18-CON-CE-CIV-IR-4818 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 113,114 A&B 7-Jul-23 13-Jul-23 B B

3014 69 ELITE18-CON-CE-CIV-IR-4819 Surface clearence & side gola for top roof 113,114 A&B 12-Jul-23 14-Jul-23 B B

3015 70 ELITE18-CON-CE-CIV-IR-4820 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 113,114 TR 12-Jul-23 17-Jul-23 A A

3016 71 ELITE18-CON-CE-CIV-IR-4821 Jumbolon XPS board 50mm polythene sheet laying & screeding for top roof 113,114 A&B 14-Jul-23 17-Jul-23 A A

3017 72 ELITE18-CON-CE-CIV-IR-4822 Block masonory & lintels for retrofiting work & parttition walls 113,114 GF,FF 19-Jul-23 24-Jul-23 C 25-Jul-23 27-Jul-23 B B

3018 73 ELITE18-CON-CE-CIV-IR-4823 Drilling anchoring connector mechnical & chemical boulting epoxy 113,114 GF,FF 22-Jul-23 25-Jul-23 B B

3019 74 ELITE18-CON-CE-CIV-IR-4824 Block masonory & lintels for retrofiting work & parttition walls 113 FF 26-Jul-23 3-Aug-23 B B

3020 75 ELITE18-CON-CE-CIV-IR-4825 FDT test 1st layer sand filling for external side 113,114 A&B 26-Jul-23 3-Aug-23 A A

3021 76 ELITE18-CON-CE-CIV-IR-4826 FDT test 2nd layer sand filling for external side 113,114 A&B 26-Jul-23 3-Aug-23 A A

3022 77 ELITE18-CON-CE-CIV-IR-4827 FDT test 3rd layer sand filling for external side 113,114 A&B 26-Jul-23 3-Aug-23 A A

3023 78 ELITE18-CON-CE-CIV-IR-4828 Block masonory for partition wall external side 113,114 A&B 7-Aug-23 8-Aug-23 A A

3024 79 ELITE18-CON-CE-CIV-IR-4829 Block masonory for manhole gully trap electrical chamber & electrical handhole 113 A 2-Aug-23 7-Aug-23 A A

3025 80 ELITE18-CON-CE-CIV-IR-4830 Installation window sill horizontal 113 GF,FF,MR 11-Aug-23 12-Aug-23 B B

3026 81 ELITE18-CON-CE-CIV-IR-4831

3027 82 ELITE18-CON-CE-CIV-IR-4832 Side gola & laying aggregates for mumty top 113,114 A&B 16-Aug-23 19-Aug-23 A A

3028 83 ELITE18-CON-CE-CIV-IR-4833 Block masonory FF with all respect 114 B 18-Aug-23 22-Aug-23 B B

3029 84 ELITE18-CON-CE-CIV-IR-4834 PCC (1:3:6) for external back & front side 113,114 A&B 21-Aug-23 24-Aug-23 B B

3030 85 ELITE18-CON-CE-CIV-IR-4835 Polythene sheet for external back & front side 113,114 A&B 21-Aug-23 24-Aug-23 A A

3031 86 ELITE18-CON-CE-CIV-IR-4836 Installation perlino marbal for floor 114 GF,FF 22-Aug-23 26-Aug-23 B 24-Aug-23 26-Aug-23 B 28-Oct-23 31-Oct-23 B B

3032 87 ELITE18-CON-CE-CIV-IR-4837 Installation perlino marbal for stair GF to FF & FF to Mumty 113 A 22-Aug-23 26-Aug-23 C 24-Aug-23 26-Aug-23 B 22-Sep-23 26-Sep-23 B 4-Oct-23 6-Oct-23 B B

3033 88 ELITE18-CON-CE-CIV-IR-4838 Instalaltion perlino marbal for floor 113 GF 23-Aug-23 26-Aug-23 C 24-Aug-23 26-Aug-23 B B

3034 89 ELITE18-CON-CE-CIV-IR-4839 OHWT concrete uper side 113,114 A&B 23-Aug-23 26-Aug-23 A A
07 days cylinder concrete test PCC (1:3:6) EXTERNAL SIDE FRONT SIDE &
3035 90 ELITE18-CON-CE-CIV-IR-4840 113,114 A&B 24-Aug-23 26-Aug-23 A A
BACK SIDE
3036 91 ELITE18-CON-CE-CIV-IR-4841 Instalaltion peragola cleats with mechanical bolts all respect 113,114 A&B 29-Aug-23 1-Sep-23 B B

3037 92 ELITE18-CON-CE-CIV-IR-4842 Installation MS porch fence for boundry wall 113,114 A&B 29-Aug-23 30-Aug-23 B 9-Dec-23 14-Dec-23 A A

3038 93 ELITE18-CON-CE-CIV-IR-4843 Removing old plaster for internal walls 114 B 29-Aug-23 1-Sep-23 B B

Page 78 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3039 94 ELITE18-CON-CE-CIV-IR-4844 Dismentlling perlino marbal for floor 113 FF 29-Aug-23 1-Sep-23 A A

3040 95 ELITE18-CON-CE-CIV-IR-4845 Plaster for partition wall externals side 113,114 A&B 2-Sep-23 5-Sep-23 A A

3041 96 ELITE18-CON-CE-CIV-IR-4846 Plaster work patches & corner beads for retrofitting work & internal walls 113 GF,FF 4-Sep-23 8-Sep-23 A A

3042 97 ELITE18-CON-CE-CIV-IR-4847 Plaster work patches & corner beads for retrofitting work & internal wall 114 GF,FF 5-Sep-23 8-Sep-23 A A

3043 98 ELITE18-CON-CE-CIV-IR-4848 Plaster work for external patches retrofitting work 113,114 A&B 8-Sep-23 13-Sep-23 B B

3044 99 ELITE18-CON-CE-CIV-IR-4849 28 days cylinder concrete test PCC (1:3:6) external side & back side 113,114 A&B 13-Sep-23 18-Sep-23 A A

3045 100 ELITE18-CON-CE-CIV-IR-4850 Fixing MS cover & plaster for OHWT 113,114 A&B 22-Sep-23 23-Sep-23 A A

3046 101 ELITE18-CON-CE-CIV-IR-4851 Instalaltion perlino marbal for floor 113,114 GF,FF,M 22-Sep-23 23-Sep-23 C 4-Oct-23 6-Oct-23 C 9-Oct-23 10-Oct-23 C 28-Oct-23 31-Oct-23 B 8-Dec-23 11-Dec-23 A A

3047 102 ELITE18-CON-CE-CIV-IR-4852 PCC (1:4:8) for under the trench drain foundation 113,114 A&B 2-Oct-23 13-Oct-23 A A

3048 103 ELITE18-CON-CE-CIV-IR-4853 Steel & formwork RCC concrete (1:2:4) block masonory & plaster for meter box 113,114 A&B 2-Oct-23 13-Oct-23 A A

3049 104 ELITE18-CON-CE-CIV-IR-4854 Steel grating angle & formwork for trench drain grating foundation 113,114 A&B 6-Oct-23 13-Oct-23 A A

3050 105 ELITE18-CON-CE-CIV-IR-4855 RCC concrete (1:2:4) for trench drain grating foundation 113,114 A&B 6-Oct-23 13-Oct-23 A A

3051 106 ELITE18-CON-CE-CIV-IR-4856 Cutting side gola membrane bituminous sheet & PCC for top roof 113,114 A&B 26-Oct-23 31-Oct-23 B B
GF to FF &
3052 107 ELITE18-CON-CE-CIV-IR-4857 Dismentling perlino marbal for stair 113,114 28-Oct-23 31-Oct-23 A A
FF to M
3053 108 ELITE18-CON-CE-CIV-IR-4858 Instalaltion wall floor tile for baths & powder room 113,114 GF,FF,MB 28-Oct-23 31-Oct-23 B 8-Dec-23 11-Dec-23 B B

3054 109 ELITE18-CON-CE-CIV-IR-4859 Primer coat 1st coat putty & 2nd coat putty for internal paint 113,114 GF,FF,M 28-Oct-23 31-Oct-23 B B
Instalaltion suspension framing system & gypsum board for celling work GF,FF &
3055 110 ELITE18-CON-CE-CIV-IR-4860 113,114 A&B 28-Oct-23 31-Oct-23 B B
mumty dry area
3056 111 ELITE18-CON-CE-CIV-IR-4861 Installation window sill horizontal 114 GF,FF,MR 28-Oct-23 31-Oct-23 B 9-Dec-23 14-Dec-23 A A

3057 112 ELITE18-CON-CE-CIV-IR-4862 Plaster for HDF floor 113,114 GF,FF 28-Oct-23 31-Oct-23 B B

3058 113 ELITE18-CON-CE-CIV-IR-4863 Vanity frame for baths & powder room 113,114 GF,FF 28-Oct-23 31-Oct-23 B B

3059 114 ELITE18-CON-CE-CIV-IR-4864 Instalaltion black granite for external side partition wall 113,114 A&B 28-Oct-23 31-Oct-23 B 9-Dec-23 14-Dec-23 A A

3060 115 ELITE18-CON-CE-CIV-IR-4865 FDT test 3rd layer sand filling for external side right side & left side 113,114 A&B 30-Oct-23 1-Nov-23 A A

3061 116 ELITE18-CON-CE-CIV-IR-4866 PCC (1:3:6) for external PCC right & left side 113,114 A&B 31-Oct-23 1-Nov-23 B B

3062 117 ELITE18-CON-CE-CIV-IR-4867 Polythene sheet for external side right & left side 113,114 A&B 31-Oct-23 1-Nov-23 A A

118 ELITE18-CON-CE-CIV-IR-4868 07 days cylinder concrete test PCC (1:3:6) external side & right side & left side 113,114 A&B 4-Nov-23 11-Nov-23 A A

119 ELITE18-CON-CE-CIV-IR-4869 PCC (1:4:8) for boundry wall left & right side & partition wall 113,114 A&B 11-Nov-23 16-Nov-23 B B

120 ELITE18-CON-CE-CIV-IR-4870 Installation suspention & framing system for celling GF,FF,Maid room dry area 113,114 A&B 13-Nov-23 16-Nov-23 A A

121 ELITE18-CON-CE-CIV-IR-4871 Installation suspention & framing system for celling GF,FF,Maid room wet area 113,114 A&B 13-Nov-23 16-Nov-23 A A
Installation moisture reisitent board tapping & jointing for celling work
122 ELITE18-CON-CE-CIV-IR-4872 113,114 A&B 13-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A
GF,FF,Maid room wet area
Installation gypsum board tapping & jointing for celling work GF,FF,Maid room
123 ELITE18-CON-CE-CIV-IR-4873 113,114 A&B 13-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A
dry area
124 ELITE18-CON-CE-CIV-IR-4874 Installation wall & floor tile for kitchen 113,114 A&B 13-Nov-23 16-Nov-23 B 8-Dec-23 11-Dec-23 A A
07 days cylinder concrete test PCC (1:4:8) boundry walls left side right side &
125 ELITE18-CON-CE-CIV-IR-4875 113,114 A&B 13-Nov-23 23-Nov-23 B B
partition wall
126 ELITE18-CON-CE-CIV-IR-4876 Block masonory for mechnical wall 113,114 GF,FF 14-Nov-23 23-Nov-23 B B

127 ELITE18-CON-CE-CIV-IR-4877 Plaster work & wall mounted cement board for cistern flushing tank 113,114 GF,FF 14-Nov-23 16-Nov-23 A A

128 ELITE18-CON-CE-CIV-IR-4878 Blcok masonory plaster for duct & DB area 113,114 GF,FF,M 14-Nov-23 24-Nov-23 B B

129 ELITE18-CON-CE-CIV-IR-4879 Primer coat 1st coat putty & 2nd coat putty for celling paint 113,114 GF,FF,M 15-Nov-23 24-Nov-23 B B

130 ELITE18-CON-CE-CIV-IR-4880 Applying primer coat bituminious sheet 4mm & screed for baths floor 113,114 FF,MB 15-Nov-23 24-Nov-23 A A

131 ELITE18-CON-CE-CIV-IR-4881 Instalaltion aluminium door for kitchen & mumty 113,114 A&B 15-Nov-23 23-Nov-23 B 11-Dec-23 14-Dec-23 B B

132 ELITE18-CON-CE-CIV-IR-4882 Installation transfer & booster pump cover with all respect 113,114 A&B 15-Nov-23 23-Nov-23 C 11-Dec-23 14-Dec-23 A A

133 ELITE18-CON-CE-CIV-IR-4883 Instalaltion MS louvers under the OHWT with all respect 113,114 A&B 15-Nov-23 23-Nov-23 C 11-Dec-23 14-Dec-23 A A

134 ELITE18-CON-CE-CIV-IR-4884 Block masonory for OHWT 113,114 A&B 15-Nov-23 23-Nov-23 A A

135 ELITE18-CON-CE-CIV-IR-4885 Plaster for under the OHWT 113,114 A&B 15-Nov-23 23-Nov-23 A A

136 ELITE18-CON-CE-CIV-IR-4886 Instalaltion MS grating for main gate 113,114 A&B 15-Nov-23 24-Nov-23 B 11-Dec-23 14-Dec-23 A A

137 ELITE18-CON-CE-CIV-IR-4887 MS pergola bulkhead with cement board paint 113 A 15-Nov-23 24-Nov-23 B 11-Dec-23 14-Dec-23 A A

138 ELITE18-CON-CE-CIV-IR-4888 Instalaltion vanity miror for baths & powder room 113,114 GF,FF,MB 15-Nov-23 23-Nov-23 B B

139 ELITE18-CON-CE-CIV-IR-4889 Instalaltion vanity marbal for baths & powder room 113,114 GF,FF 15-Nov-23 23-Nov-23 B 11-Dec-23 14-Dec-23 A A

140 ELITE18-CON-CE-CIV-IR-4890 Window jambs prepration 113,114 GF,FF,M 15-Nov-23 23-Nov-23 B B

Form work & RCC concrete (1:2:4) for boundry wall plinth beam left side right
141 ELITE18-CON-CE-CIV-IR-4891 113,114 A&B 16-Nov-23 23-Nov-23 B B
side & partition wall

142 ELITE18-CON-CE-CIV-IR-4892 Steel for boundry wall plinth beam left side right side & partion wall 113,114 A&B 16-Nov-23 23-Nov-23 A A

143 ELITE18-CON-CE-CIV-IR-4893 Instalaltion threshold 113,114 GF,FF,M 16-Nov-23 23-Nov-23 B B

144 ELITE18-CON-CE-CIV-IR-4894 Installation black granite for shower cabin 113,114 GF,FF 16-Nov-23 23-Nov-23 B B

145 ELITE18-CON-CE-CIV-IR-4895 Installation window sill vertical 113,114 GF,FF,MR 16-Nov-23 23-Nov-23 B B

3063 146 ELITE18-CON-CE-CIV-IR-4896 Cementitious coat pond test for baths & powder bath water proofing 113,114 GF,FF,MB 16-Nov-23 23-Nov-23 A A

147 ELITE18-CON-CE-CIV-IR-4897 1st coat 2nd coat & final coat paint for walls 113,114 GF,FF,MF 20-Nov-23 24-Nov-23 B 9-Dec-23 14-Dec-23 A A
Primer 1st coat putty 2nd coat putty 1st coat paint 2nd coat paint & final coat for
148 ELITE18-CON-CE-CIV-IR-4898 113,114 GF,FF,MF 20-Nov-23 24-Nov-23 B 9-Dec-23 14-Dec-23 A A
celling

Page 79 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
149 ELITE18-CON-CE-CIV-IR-4899 Installation glass railling for stairs 113,114 A&B 20-Nov-23 23-Nov-23 B B

150 ELITE18-CON-CE-CIV-IR-4900 Installation of cubical glass partition & glass door for baths 113,114 GF,FF 20-Nov-23 24-Nov-23 B 11-Dec-23 14-Dec-23 A A
07 days cylinder concrete test RCC (1:2:4) boundry wawll plinth beam left side
151 ELITE18-CON-CE-CIV-IR-4901 113,114 A&B 24-Nov-23 30-Nov-23 B B
right side & partition wall
152 ELITE18-CON-CE-CIV-IR-4902 28 days cylinder concrete test PCC (1:3:6) external side & right side & left side 113,114 A&B 25-Nov-23 30-Nov-23 B B

153 ELITE18-CON-CE-CIV-IR-4903 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 114 B 25-Nov-23 28-Nov-23 B B

154 ELITE18-CON-CE-CIV-IR-4904 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 114 B 25-Nov-23 28-Nov-23 B B

155 ELITE18-CON-CE-CIV-IR-4905 Block masonory for manhole gully trap electrical chamber & electrical handhole 114 B 25-Nov-23 28-Nov-23 B B

156 ELITE18-CON-CE-CIV-IR-4906 Peragola paint with all respect 113,114 A&B 28-Nov-23 30-Nov-23 B 9-Dec-23 14-Dec-23 A A

157 ELITE18-CON-CE-CIV-IR-4907 Instalaltion cover for UGWT with paint 113,114 A&B 28-Nov-23 30-Nov-23 B B
07 days cylinder concrete test PCC (1:2:4) boundry wall left side right side &
158 ELITE18-CON-CE-CIV-IR-4908 113,114 A&B 4-Dec-23 7-Dec-23 B B
partion wall
Base primer graffy & weather for external paint elevation 1,2,3,4 OHWT mumty
159 ELITE18-CON-CE-CIV-IR-4909 113,114 A&B 5-Dec-23 7-Dec-23 B B
outer side boundry wall & parapet wall internal side
160 ELITE18-CON-CE-CIV-IR-4910 Instalaltion perlino marbal skirting for stair GF to FF & FF to Mumty 113,114 A&B 5-Dec-23 7-Dec-23 B B

161 ELITE18-CON-CE-CIV-IR-4911 Instalaltion perlino marbal skirting for floor 113,114 GF,FF,M 5-Dec-23 7-Dec-23 B B

162 ELITE18-CON-CE-CIV-IR-4912 Instalaltion perlino marbal ledge wall top 113,114 GF,FF,M 5-Dec-23 7-Dec-23 B B

163 ELITE18-CON-CE-CIV-IR-4913 Instalaltion black granite strip for shower cabin 113,114 GF,FF 5-Dec-23 7-Dec-23 B B

164 ELITE18-CON-CE-CIV-IR-4914 Installation doors wardrobes irron mongries vanity & transition strip final IR 113,114 A&B 7-Dec-23 9-Dec-23 B B
07 days cylinder concrete test PCC (1:2:4) boundry wall plinth beam left side right
165 ELITE18-CON-CE-CIV-IR-4915 113,114 A&B 8-Dec-23 14-Dec-23 B B
side & partion wall
Instalaltion cover slab for manhole gully trap electrical chamber & electrical
166 ELITE18-CON-CE-CIV-IR-4916 113,114 A&B 8-Dec-23 11-Dec-23 B B
handhole with paint
167 ELITE18-CON-CE-CIV-IR-4917 Pudlo plaster for manhole gully trap electrical chamber & electrical handhole 113,114 A&B 8-Dec-23 11-Dec-23 B B

168 ELITE18-CON-CE-CIV-IR-4918 Instalaltion floor skirting for maid room 113,114 A&B 8-Dec-23 11-Dec-23 A A

169 ELITE18-CON-CE-CIV-IR-4919 Plaster roof tile & roof skirting for top roof 113,114 A&B 8-Dec-23 11-Dec-23 B B

170 ELITE18-CON-CE-CIV-IR-4920 Instllation composite stone for external side 113,114 A&B 9-Dec-23 15-Dec-23 B B

171 ELITE18-CON-CE-CIV-IR-4921 Installtion window frames & window glass with all respect 113,114 A&B 9-Dec-23 15-Dec-23 B B

172 ELITE18-CON-CE-CIV-IR-4922 PCC (1:3:6) AC pad & PPRC pad for top roof 113,114 A&B 9-Dec-23 UR UR

173 ELITE18-CON-CE-CIV-IR-4923 Instalaltion pavers & pavers skirting for external side 113,114 A&B 9-Dec-23 15-Dec-23 B B

174 ELITE18-CON-CE-CIV-IR-4924 PCC (1:4:8) under kerb stone & instalaltion kerb stone & side gola 113,114 A&B 9-Dec-23 14-Dec-23 C C

175 ELITE18-CON-CE-CIV-IR-4925 installation cremmo for boundary wall 113,114 A&B 9-Dec-23 14-Dec-23 B B

176 ELITE18-CON-CE-CIV-IR-4926 Peragola jointing with all respect 113,114 A&B 11-Dec-23 14-Dec-23 A A

177 ELITE18-CON-CE-CIV-IR-4927 Fixing of access panel in celling 113,114 A&B 11-Dec-23 14-Dec-23 A A

178 ELITE18-CON-CE-CIV-IR-4928 Instalaltion perlino marbal for boundry wall top top roof column & meter box top 113,114 A&B 11-Dec-23 14-Dec-23 A A

179 ELITE18-CON-CE-CIV-IR-4929 Installation wooden hand rail for stairs 113,114 A&B 11-Dec-23 14-Dec-23 A A

3064

3065 5001 TO 5250 111-112


Dismentlling manhole gully trap electrical chamber & electrical handhole & debris
3066 1 ELITE18-CON-CE-CIV-IR-5001 111,111 B 11-Dec-22 14-Dec-22 B B
remove
3067 2 ELITE18-CON-CE-CIV-IR-5002 Laying & fixing of MS peragola 111,112 B 12-Dec-22 14-Dec-22 B B

3068 3 ELITE18-CON-CE-CIV-IR-5003 Installation MS girders IPE-180 & IPE-280,270 111,112 FF 15-Dec-22 20-Dec-22 C 21-Dec-22 22-Dec-22 B B

3069 4 ELITE18-CON-CE-CIV-IR-5004 Layout columns formwork for retrofitting work 111,112 FF 20-Dec-22 29-Dec-22 A A

3070 5 ELITE18-CON-CE-CIV-IR-5005 Layout MS girder & RCC beams drilling 111,112 20-Dec-22 22-Dec-22 A A

3071 6 ELITE18-CON-CE-CIV-IR-5006 Drilling & mechnical boulting 111,112 FF 21-Dec-22 22-Dec-22 B B

3072 7 ELITE18-CON-CE-CIV-IR-5007 Dismentlling block work under the plinth beam for pile cap & debris remove 111,112 A&B 28-Dec-22 29-Dec-22 B B

3073 8 ELITE18-CON-CE-CIV-IR-5008 Block masonory for under the plinth beam & entrance lobby wall 111,112 A&B 28-Dec-22 4-Feb-23 B B

3074 9 ELITE18-CON-CE-CIV-IR-5009 FDT test 1st layer sand filling for under the floating slab 111 A 8-Feb-23 15-Feb-23 B B

3075 10 ELITE18-CON-CE-CIV-IR-5010 Slab cutting & plaster 111 A 25-Feb-23 1-Mar-23 C C

3076 11 ELITE18-CON-CE-CIV-IR-5011 07 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 111,112 A&B 27-Feb-23 2-Mar-23 B B

3077 12 ELITE18-CON-CE-CIV-IR-5012 FDT test 1st layer sand filling for under the floating slab 112 B 27-Feb-23 3-Mar-23 C 3-Mar-23 7-Mar-23 A A

3078 13 ELITE18-CON-CE-CIV-IR-5013 FDT test 2nd layer sand filling for under the floating slab 112 B 14-Mar-23 17-Mar-23 B B

3079 14 ELITE18-CON-CE-CIV-IR-5014 FDT test 2nd layer sand filling for under the floating slab 111 A 14-Mar-23 17-Mar-23 B B

3080 15 ELITE18-CON-CE-CIV-IR-5015 FDT test 3rd layer sand filling for under the floating slab 112 B 20-Mar-23 24-Mar-23 B B

3081 16 ELITE18-CON-CE-CIV-IR-5016 28 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 111,112 GF 20-Mar-23 24-Mar-23 A A

3082 17 ELITE18-CON-CE-CIV-IR-5017 FDT test 4th layer sand filling for under the floating slab 112 B 22-Mar-23 24-Mar-23 C 27-Mar-23 1-Apr-23 C 3-Apr-23 6-Apr-23 B B

3083 18 ELITE18-CON-CE-CIV-IR-5018 FDT test 3rd layer sand filling for under the floating slab 111 A 22-Mar-23 28-Mar-23 B B

Page 80 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3084 19 ELITE18-CON-CE-CIV-IR-5019 FDT test 4th layer sand filling for under the floating slab 111 A 27-Mar-23 1-Apr-23 C 6-May-23 13-May-23 B B

3085 20 ELITE18-CON-CE-CIV-IR-5020 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 111,112 GF 3-Apr-23 6-Apr-23 B B

3086 21 ELITE18-CON-CE-CIV-IR-5021 RCC concrete 4000 psi & SBR for retrofiting columns 111,112 GF 3-Apr-23 6-Apr-23 B B

3087 22 ELITE18-CON-CE-CIV-IR-5022 Steel & anchor epoxy for beam jackting 111,112 GF 3-Apr-23 6-Apr-23 A A

3088 23 ELITE18-CON-CE-CIV-IR-5023 Steel & anchor epoxy for column jackting 111,112 GF 3-Apr-23 6-Apr-23 A A

3089 24 ELITE18-CON-CE-CIV-IR-5024 Dismentlling for slab thickness increase FF & debris remove 111,112 A&B 7-Apr-23 10-Apr-23 A A

3090 25 ELITE18-CON-CE-CIV-IR-5025 PCC (1:4:8) under the floating slab 112 B 15-Apr-23 17-Apr-23 B B

3091 26 ELITE18-CON-CE-CIV-IR-5026 Polythene sheet 1000 micron under the floating slab 112 B 15-Apr-23 2-May-23 A A

3092 27 ELITE18-CON-CE-CIV-IR-5027 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 111,112 GF 2-May-23 5-May-23 A A

3093 28 ELITE18-CON-CE-CIV-IR-5028 RCC concrete 4000 psi & SBR for retrofiting beams 111,112 GF 8-May-23 9-May-23 B B

3094 29 ELITE18-CON-CE-CIV-IR-5029 PCC (1:4:8) under the floating slab 111 A 8-May-23 9-May-23 B B

3095 30 ELITE18-CON-CE-CIV-IR-5030 Polythene sheet 1000 micron under the PCC floatting slab 111 A 8-May-23 9-May-23 B B

3096 31 ELITE18-CON-CE-CIV-IR-5031 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 111,112 GF 11-May-23 17-May-23 A A

3097 32 ELITE18-CON-CE-CIV-IR-5032 07 days cylinder concrete test PCC (1:4:8) under floating slab 111 A 11-May-23 17-May-23 A A

3098 33 ELITE18-CON-CE-CIV-IR-5033 RCC concrete (1:2:4) for floatting slab 112 B 15-May-23 18-May-23 B B

3099 34 ELITE18-CON-CE-CIV-IR-5034 Steel & filler board for floatting slab 112 B 15-May-23 17-May-23 B B

3100 35 ELITE18-CON-CE-CIV-IR-5035 07 days cylinder concrete test RCC (1:2:4) floating slab 112 B 17-May-23 22-May-23 B B

3101 36 ELITE18-CON-CE-CIV-IR-5036 07 days cylinder concrete test RCC (1:2:4) floating slab 111 A 26-May-23 29-May-23 A A

3102 37 ELITE18-CON-CE-CIV-IR-5037 Steel & filler board for floatting slab 111 A 27-May-23 30-May-23 A A

3103 38 ELITE18-CON-CE-CIV-IR-5038 RCC concrete (1:2:4) for floatting slab 111 A 27-May-23 30-May-23 B B

3104 39 ELITE18-CON-CE-CIV-IR-5039 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 111,112 A&B 3-Jun-23 7-Jun-23 A A

3105 40 ELITE18-CON-CE-CIV-IR-5040 28 days cylinder concrete test PCC (1:4:8) under floating slab 111 A 3-Jun-23 7-Jun-23 B B

3106 41 ELITE18-CON-CE-CIV-IR-5041 28 days cylinder concrete test RCC (1:2:4) floating slab 112 B 7-Jun-23 10-Jun-23 A A

3107 42 ELITE18-CON-CE-CIV-IR-5042 RCC concrete 4000 psi & SBR for slab thikness increase 111,112 A&B 7-Jun-23 17-Jun-23 B B

3108 43 ELITE18-CON-CE-CIV-IR-5043 Steel & anchore epoxy for slab thikness increase 111,112 A&B 7-Jun-23 17-Jun-23 B B

3109 44 ELITE18-CON-CE-CIV-IR-5044 Primer coat & membranes bituminous sheet for external side 111,112 A&B 8-Jun-23 12-Jun-23 C 14-Jun-23 17-Jun-23 B B

3110 45 ELITE18-CON-CE-CIV-IR-5045 7 days cylinder concrete test RCC (4000 psi) slab thickness increase 111,112 A&B 10-Jun-23 17-Jun-23 A A

3111 46 ELITE18-CON-CE-CIV-IR-5046 28 days cylinder concrete test RCC (1:2:4) floating slab 111 A 17-Jun-23 20-Jun-23 A A

3112 47 ELITE18-CON-CE-CIV-IR-5047 Steel & anchore epoxy for columns jackting 111,112 FF 17-Jun-23 20-Jun-23 A A

3113 48 ELITE18-CON-CE-CIV-IR-5048 RCC concrete 4000 psi & SBR for retrofiting columns 111,112 FF 17-Jun-23 20-Jun-23 B B

3114 49 ELITE18-CON-CE-CIV-IR-5049 7 days cylinder concrete test RCC (4000 psi) retrofiting columns 111,112 FF 23-Jun-23 6-Jul-23 B B

3115 50 ELITE18-CON-CE-CIV-IR-5050 RCC concrete 4000 psi & SBR for slab thikness increase 111,112 TR 23-Jun-23 6-Jul-23 B B

3116 51 ELITE18-CON-CE-CIV-IR-5051 Steel & anchore epoxy for slab thikness increase 111,112 TR 23-Jun-23 6-Jul-23 B B

3117 52 ELITE18-CON-CE-CIV-IR-5052 RCC concrete 4000 psi & SBR for retrofitting beams 111,112 FF 23-Jun-23 6-Jul-23 B B

3118 53 ELITE18-CON-CE-CIV-IR-5053 Steel & anchore epoxy for retrofitting beams 111,112 FF 23-Jun-23 6-Jul-23 B B

3119 54 ELITE18-CON-CE-CIV-IR-5054 7 days cylinder concrete test RCC (4000 psi) slab thickness increase 111,112 TR 7-Jul-23 13-Jul-23 B B

3120 55 ELITE18-CON-CE-CIV-IR-5055 7 days cylinder concrete test RCC (4000 psi) retrofiting beams 111,112 FF 7-Jul-23 13-Jul-23 B B

3121 56 ELITE18-CON-CE-CIV-IR-5056 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 111,112 FF 7-Jul-23 13-Jul-23 B B

3122 57 ELITE18-CON-CE-CIV-IR-5057 Primer coat & membranes bituminous sheet for top roof 111,112 A&B 8-Jul-23 13-Jul-23 B B

3123 58 ELITE18-CON-CE-CIV-IR-5058 Pond test for top roof 111,112 A&B 8-Jul-23 13-Jul-23 B B

3124 59 ELITE18-CON-CE-CIV-IR-5059 Surface clearence & side gola for top roof 111,112 A&B 12-Jul-23 14-Jul-23 B B

3125 60 ELITE18-CON-CE-CIV-IR-5060 28 days cylinder concrete test PCC (1:2:4) under floating slab 112 B 12-May-23 13-Jul-23 A A

3126 61 ELITE18-CON-CE-CIV-IR-5061 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 111,112 A&B 14-May-23 17-May-23 A A

3127 62 ELITE18-CON-CE-CIV-IR-5062 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 111,112 TR 17-May-23 20-May-23 A A

3128 63 ELITE18-CON-CE-CIV-IR-5063 FDT test 1st layer sand filling for external side 111,112 A&B 17-May-23 20-Jul-23 A A

3129 64 ELITE18-CON-CE-CIV-IR-5064 FDT test 2nd layer sand filling for external side 111,112 A&B 17-May-23 20-Jul-23 A A

3130 65 ELITE18-CON-CE-CIV-IR-5065 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 111,112 FF 19-May-23 24-Jul-23 A A

3131 66 ELITE18-CON-CE-CIV-IR-5066 Block masonory & lintels for retrofiting work & parttition walls 111,112 GF,FF 19-May-23 24-May-23 C 22-Aug-23 UR UR
Fixing MS girders with MS plates drilling anchoring connector mechnical &
3132 67 ELITE18-CON-CE-CIV-IR-5067 111,112 GF,FF 22-Jul-23 25-May-23 B B
chemical boulting epoxy
3133 68 ELITE18-CON-CE-CIV-IR-5068 FDT test 4th layer sand filling for external side 111,112 A&B 25-Jul-23 27-Jul-23 B B

3134 69 ELITE18-CON-CE-CIV-IR-5069 FDT test 3rd layer sand filling for external side 111,112 A&B 25-Jul-23 27-Jul-23 B B

3135 70 ELITE18-CON-CE-CIV-IR-5070 07 days cylinder concrete test PCC (1:3:6) external side 111,112 A&B 27-Jul-23 4-Aug-23 A A

3136 71 ELITE18-CON-CE-CIV-IR-5071 Block masonory & lintels for retrofiting work & parttition walls 111,112 GF,FF 4-Aug-23 8-Aug-23 B B

3137 72 ELITE18-CON-CE-CIV-IR-5072 Block masonory for partition wall external side 111,112 A&B 7-Aug-23 8-Aug-23 A A

3138 73 ELITE18-CON-CE-CIV-IR-5073

Page 81 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3139 74 ELITE18-CON-CE-CIV-IR-5074 Side gola & laying aggregates for mumty top 111,112 A&B 16-Aug-23 19-Aug-23 A A

3140 75 ELITE18-CON-CE-CIV-IR-5075 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 111,112 A&B 22-Aug-23 24-Aug-23 A A

3141 76 ELITE18-CON-CE-CIV-IR-5076 OHWT concrete uper side 111,112 A&B 23-Aug-23 26-Aug-23 A A

3142 77 ELITE18-CON-CE-CIV-IR-5077 Instalaltion peragola cleats with mechanical bolts all respect 111,112 A&B 29-Aug-23 1-Sep-23 B B

3143 78 ELITE18-CON-CE-CIV-IR-5078 Installation MS porch fence for boundry wall 111,112 A&B 29-Aug-23 30-Aug-23 B 9-Dec-23 14-Dec-23 A A

3144 79 ELITE18-CON-CE-CIV-IR-5079 Removing old plaster for internal walls 112 B 29-Aug-23 1-Sep-23 B B

3145 80 ELITE18-CON-CE-CIV-IR-5080 Dismentlling perlino marbal for floor 111,112 FF 29-Aug-23 1-Sep-23 A A

3146 81 ELITE18-CON-CE-CIV-IR-5081 Plaster for partition wall externals side 111,112 A&B 2-Sep-23 5-Sep-23 A A

3147 82 ELITE18-CON-CE-CIV-IR-5082 Plaster work for external patches retrofitting work 111,112 A&B 8-Sep-23 13-Sep-23 B B

3148 83 ELITE18-CON-CE-CIV-IR-5083 PCC (1:3:6) for external side front & back side 111,112 A&B 14-Sep-23 18-Sep-23 B B

3149 84 ELITE18-CON-CE-CIV-IR-5084 Polythene sheet 1000 micron for extrnal side front side & back side 111,112 A&B 14-Sep-23 18-Sep-23 B B

3150 85 ELITE18-CON-CE-CIV-IR-5085 Fixing MS cover & plaster for OHWT 111,112 A&B 22-Sep-23 23-Sep-23 A A

3151 86 ELITE18-CON-CE-CIV-IR-5086 Installation perlino mabal for floor 111,112 GF,FF,M 22-Sep-23 23-Sep-23 C 28-Oct-23 31-Oct-23 B 8-Dec-23 11-Dec-23 B B

3152 87 ELITE18-CON-CE-CIV-IR-5087 Plaster work patches & corner beads for retrofitting work & internal walls 111,112 GF,FF 23-Sep-23 25-Sep-23 A A

3153 88 ELITE18-CON-CE-CIV-IR-5088 PCC (1:4:8) for under the trench drain foundation 111,112 A&B 2-Oct-23 13-Oct-23 A A

3154 89 ELITE18-CON-CE-CIV-IR-5089 Steel & formwork RCC concrete (1:2:4) block masonory & plaster for meter box 111,112 A&B 2-Oct-23 11-Oct-23 A A

3155 90 ELITE18-CON-CE-CIV-IR-5090 Steel grating angle & formwork for trench drain grating foundation 111,112 A&B 6-Oct-23 13-Oct-23 A A

3156 91 ELITE18-CON-CE-CIV-IR-5091 RCC concrete (1:2:4) for trench drain grating foundation 111,112 A&B 6-Oct-23 13-Oct-23 A A

3157 92 ELITE18-CON-CE-CIV-IR-5092 Installation perlino marbal for floor 111,112 GF,FF,M 13-Oct-23 13-Oct-23 B B

3158 93 ELITE18-CON-CE-CIV-IR-5093 Cutting side gola membrane bituminous sheet & PCC for top roof 111,112 A&B 26-Oct-23 31-Oct-23 B B

3159 94 ELITE18-CON-CE-CIV-IR-5094 Dismentlling perlino marbal for stair GF to FF & FF to Mumty 111,112 A&B 28-Oct-23 31-Oct-23 A A

3160 95 ELITE18-CON-CE-CIV-IR-5095 Installatin window sill horizental 111,112 GF,FF,MR 28-Oct-23 31-Oct-23 B 9-Dec-23 14-Dec-23 A A

3161 96 ELITE18-CON-CE-CIV-IR-5096 Installation black granite for external side partotion wall 111,112 A&B 28-Oct-23 31-Oct-23 B B

3162 97 ELITE18-CON-CE-CIV-IR-5097 Instalaltion wall floor tile for baths & powder room 111,112 GF,FF,MB 28-Oct-23 31-Oct-23 B 8-Dec-23 11-Dec-23 B B

3163 98 ELITE18-CON-CE-CIV-IR-5098 Primer coat 1st coat putty & 2nd coat putty for internal paint 111,112 GF,FF,M 28-Oct-23 31-Oct-23 B 9-Dec-23 14-Dec-23 B B
Core filling cementitious coat primer coat bituminous sheet membrane & pond test
3164 99 ELITE18-CON-CE-CIV-IR-5099 112 B 30-Oct-23 1-Nov-23 A A
for top roof
Core filling cementitious coat primer coat bituminous sheet membrane & pond test
3165 100 ELITE18-CON-CE-CIV-IR-5100 111 A 11-Nov-23 16-Nov-23 B B
for top roof
101 ELITE18-CON-CE-CIV-IR-5101 Jumbolon XPS board 50mm polythene sheet laying & screeding for top roof 111,112 A&B 11-Nov-23 16-Nov-23 B B

102 ELITE18-CON-CE-CIV-IR-5102 PCC (1:4:8) for boundry wall partition wall 111,112 A&B 11-Nov-23 16-Nov-23 B B

103 ELITE18-CON-CE-CIV-IR-5103 Installation cremamo for boundry wall 111,112 A&B 13-Nov-23 16-Nov-23 B B

104 ELITE18-CON-CE-CIV-IR-5104 Installation black granite for partition wall external side 111,112 A&B 13-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A
Instalation suspension & framming system for celling work GF,FF,Maid room dry
105 ELITE18-CON-CE-CIV-IR-5105 111,112 A&B 13-Nov-23 16-Nov-23 A A
area
Instalation suspension & framming system for celling work GF,FF,Maid room wet
106 ELITE18-CON-CE-CIV-IR-5106 111,112 A&B 13-Nov-23 16-Nov-23 A A
area
Installation moisture reisitent board tapping & jointing for celling work
107 ELITE18-CON-CE-CIV-IR-5107 111,112 A&B 13-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A
GF,FF,Maid room wet area
Installation gypsum board tapping & jointing for celling work GF,FF,Maid room
108 ELITE18-CON-CE-CIV-IR-5108 111,112 A&B 13-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A
dry area
109 ELITE18-CON-CE-CIV-IR-5109 Installation window sill vertical 111,112 GF,FF,MR 13-Nov-23 16-Nov-23 B 9-Dec-23 14-Dec-23 A A

110 ELITE18-CON-CE-CIV-IR-5110 Installation wall & floor tile for kitchen 111,112 A&B 13-Nov-23 16-Nov-23 B B

111 ELITE18-CON-CE-CIV-IR-5111 07 days cylinder concrete test PCC (1:4:8) boundry walls partition walls 111,112 A&B 13-Nov-23 23-Nov-23 B B

112 ELITE18-CON-CE-CIV-IR-5112 FDT test 3rd layer sand filling for external side left & right side 111,112 A&B 13-Nov-23 23-Nov-23 A A

113 ELITE18-CON-CE-CIV-IR-5113 FDT test 4th layer sand filling for external side left & right side 111,112 A&B 13-Nov-23 23-Nov-23 A A

114 ELITE18-CON-CE-CIV-IR-5114 Block masonory for mechnical wall 111,112 GF,FF 14-Nov-23 23-Nov-23 A A

3166 115 ELITE18-CON-CE-CIV-IR-5115 Plaster work & wall mounted cement board for cistern flushing tank 111,112 GF,FF 14-Nov-23 16-Nov-23 A A

116 ELITE18-CON-CE-CIV-IR-5116 Blcok masonory plaster for duct & DB area 111,112 GF,FF,M 14-Nov-23 24-Nov-23 B B

117 ELITE18-CON-CE-CIV-IR-5117 Applying primer coat bituminious sheet 4mm & screed for baths floor 111,112 FF,MB 15-Nov-23 24-Nov-23 A A

118 ELITE18-CON-CE-CIV-IR-5118 PCC (1:3:6) for external PCC right & left side 111,112 A&B 15-Nov-23 24-Nov-23 B B

119 ELITE18-CON-CE-CIV-IR-5119 Polythene sheet for external side right & left side 111,112 A&B 15-Nov-23 23-Nov-23 A A

120 ELITE18-CON-CE-CIV-IR-5120 Instalaltion alluminium door for kitchen & mumty 111,112 A&B 15-Nov-23 23-Nov-23 B 11-Dec-23 14-Dec-23 B B

121 ELITE18-CON-CE-CIV-IR-5121 Block masonory for OHWT 111,112 A&B 15-Nov-23 23-Nov-23 A A

122 ELITE18-CON-CE-CIV-IR-5122 Plaster for under the OHWT 111,112 A&B 15-Nov-23 23-Nov-23 A A

123 ELITE18-CON-CE-CIV-IR-5123 Installation vanity frame for baths & powder room 111,112 GF,FF 15-Nov-23 23-Nov-23 B B

124 ELITE18-CON-CE-CIV-IR-5124 Installation vanity marbal for baths & powder room 111,112 GF,FF 15-Nov-23 23-Nov-23 B 11-Dec-23 14-Dec-23 A A

125 ELITE18-CON-CE-CIV-IR-5125 Window jambs prepration 111,112 A&B 15-Nov-23 23-Nov-23 B B


Form work & RCC concrete (1:2:4) for boundry wall plinth beam left side right
126 ELITE18-CON-CE-CIV-IR-5126 111,112 A&B 16-Nov-23 23-Nov-23 B B
side & partition wall
127 ELITE18-CON-CE-CIV-IR-5127 Steel for boundry wall plinth beam left side right side & partion wall 111,112 A&B 16-Nov-23 23-Nov-23 A A

128 ELITE18-CON-CE-CIV-IR-5128 Installation perlino marbal & skirting for stair GF to FF & FF to mumty 111,112 A&B 16-Nov-23 23-Nov-23 B 8-Dec-23 11-Dec-23 B B

Page 82 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
129 ELITE18-CON-CE-CIV-IR-5129 Primer coat 1st coat putty & 2nd coat putty for celling paint 111,112 GF,FF,M 16-Nov-23 24-Nov-23 B B

130 ELITE18-CON-CE-CIV-IR-5130 Plaster for HDF floor 111,112 GF,FF 16-Nov-23 23-Nov-23 B B

131 ELITE18-CON-CE-CIV-IR-5131 Cementitious coat pond test for baths & powder bath water proofing 111,112 GF,FF,MB 16-Nov-23 23-Nov-23 A A

132 ELITE18-CON-CE-CIV-IR-5132 Installation of cubical glass partition & glass door for baths 111,112 GF,FF 20-Nov-23 23-Nov-23 B 11-Dec-23 14-Dec-23 A A

133 ELITE18-CON-CE-CIV-IR-5133 07 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam partition wall 111,112 A&B 24-Nov-23 30-Nov-23 B B

134 ELITE18-CON-CE-CIV-IR-5134 07 days cylinder concrete test PCC (1:3:6) external side left side & right side 111,112 A&B 24-Nov-23 30-Nov-23 B B

135 ELITE18-CON-CE-CIV-IR-5135 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 111,112 A&B 25-Nov-23 28-Nov-23 B B

136 ELITE18-CON-CE-CIV-IR-5136 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 111,112 A&B 25-Nov-23 28-Nov-23 B B

137 ELITE18-CON-CE-CIV-IR-5137 Block masonory for manhole gully trap electrical chamber & electrical handhole 111,112 A&B 25-Nov-23 28-Nov-23 C 9-Dec-23 14-Dec-23 B B

138 ELITE18-CON-CE-CIV-IR-5138 Instalaltion cover for UGWT with paint 111,112 A&B 28-Nov-23 30-Nov-23 B B

139 ELITE18-CON-CE-CIV-IR-5139 Installation of glass railing & wooden hand rail for stair GF to FF & FF to Mumty 111,112 A&B 29-Nov-23 30-Nov-23 B 11-Dec-23 14-Dec-23 B B

140 ELITE18-CON-CE-CIV-IR-5140 28 days cylinder concrete test PCC (1:4:8) boundry walls partition walls 111,112 A&B 4-Dec-23 7-Dec-23 B B

141 ELITE18-CON-CE-CIV-IR-5141 Instalaltion vanity miror for baths & powder room 111,112 GF,FF,MB 5-Dec-23 7-Dec-23 B B

142 ELITE18-CON-CE-CIV-IR-5142 Instalaltion threshold 111,112 GF,FF,M 5-Dec-23 7-Dec-23 B B

143 ELITE18-CON-CE-CIV-IR-5143 Installation perlino marbal ledge wall top 111,112 GF,FF,M 5-Dec-23 7-Dec-23 B B

144 ELITE18-CON-CE-CIV-IR-5144 Installation black granite strip for shower cabin 111,112 GF,FF 5-Dec-23 7-Dec-23 B B

145 ELITE18-CON-CE-CIV-IR-5145 Primer & membranes bituminous sheet for top roof 111,112 A&B 5-Dec-23 7-Dec-23 B B

146 ELITE18-CON-CE-CIV-IR-5146 Instalaltion floor tile for baths & powder room 111,112 GF,FF,MB 5-Dec-23 7-Dec-23 B B

147 ELITE18-CON-CE-CIV-IR-5147 PCC (1:4:8) under kerb stone & instalaltion kerb stone & side gola for external side 111,112 A&B 5-Dec-23 7-Dec-23 B B

148 ELITE18-CON-CE-CIV-IR-5148 28 days cylinder concrete test RCC (1:2:4) boundry wall plinth beam partition wall 111,112 A&B 8-Dec-23 14-Dec-23 B B

149 ELITE18-CON-CE-CIV-IR-5149 Plaster roof tile & roof skirting for top roof 111,112 A&B 8-Dec-23 11-Dec-23 B B

150 ELITE18-CON-CE-CIV-IR-5150 Installtion composite stone for external side 111,112 A&B 9-Dec-23 15-Dec-23 B B

151 ELITE18-CON-CE-CIV-IR-5151 Instalaltion window frames & window glass with all respect 111,112 A&B 9-Dec-23 15-Dec-23 B B
Base primer & graffy & weather shield for external paint elevation 1,2,3,4 OHWT
152 ELITE18-CON-CE-CIV-IR-5152 111,112 A&B 9-Dec-23 15-Dec-23 A A
mumty outer side boundry wall & parapet wall internal side
153 ELITE18-CON-CE-CIV-IR-5153 Instalaltion perlino marbal skirting for floor 111,112 A&B 9-Dec-23 15-Dec-23 B B

154 ELITE18-CON-CE-CIV-IR-5154

155 ELITE18-CON-CE-CIV-IR-5155 28 days cylinder concrete test PCC (1:3:6) external side left side & right side 111,112 A&B 9-Dec-23 14-Dec-23 B B

156 ELITE18-CON-CE-CIV-IR-5156 PCC (1:3:6) AC pad & PPRC pad for top roof 111,112 A&B 9-Dec-23 UR UR

157 ELITE18-CON-CE-CIV-IR-5157 Installation pavers & pavers skirting for external side 111,112 A&B 9-Dec-23 15-Dec-23 B B

158 ELITE18-CON-CE-CIV-IR-5158 Pudlo plaster for manhole gully trap electrical chamber & electrical handhole 111,112 A&B 9-Dec-23 14-Dec-23 C C
Installation cover including slab for manhole gully trap electrical chamber &
159 ELITE18-CON-CE-CIV-IR-5159 111,112 A&B 9-Dec-23 14-Dec-23 B B
electrical handhole with paint
160 ELITE18-CON-CE-CIV-IR-5160 Peragola paint with all respect 111,112 A&B 9-Dec-23 14-Dec-23 B B

161 ELITE18-CON-CE-CIV-IR-5161 Instalaltion MS grating for main gate 111,112 A&B 9-Dec-23 14-Dec-23 A A

162 ELITE18-CON-CE-CIV-IR-5162 Peragola jointing with all respect 111,112 A&B 11-Dec-23 14-Dec-23 B B

163 ELITE18-CON-CE-CIV-IR-5163 Fixing of access panel in celling 111,112 A&B 11-Dec-23 14-Dec-23 B B

164 ELITE18-CON-CE-CIV-IR-5164 Instalaltion MS louvers under the OHWT with all respect 111,112 A&B 11-Dec-23 14-Dec-23 A A

165 ELITE18-CON-CE-CIV-IR-5165 Installation transfer & booster pump cover with all respect 111,112 A&B 11-Dec-23 14-Dec-23 A A

166 ELITE18-CON-CE-CIV-IR-5166 Instalation perlino marbal for boundry wall top top roof colum & meter box top 111,112 A&B 11-Dec-23 14-Dec-23 B B

167 ELITE18-CON-CE-CIV-IR-5167 Installation of door wardrobe ironmongries vanity & transition strip Final IR 111,112 A&B 22-Dec-23 27-Dec-23 B B

3167

3168 5251 TO 5500 109-110


Dismentlling manhole gully trap electrical chamber & electrical handhole & debris
3169 1 ELITE18-CON-CE-CIV-IR-5251 109,110 A&B 12-Dec-22 14-Dec-22 B B
remove
3170 2 ELITE18-CON-CE-CIV-IR-5252 Installation MS girders IPE-180 & IPE-280,270 109,110 FF 15-Dec-22 20-Dec-22 C 21-Dec-22 22-Dec-22 B B

3171 3 ELITE18-CON-CE-CIV-IR-5253 Layout columns formwork for retrofitting work 109,110 FF 20-Dec-22 22-Dec-22 A A

3172 4 ELITE18-CON-CE-CIV-IR-5254 Layout MS girder & RCC beams drilling 109,110 A&B 20-Dec-22 22-Dec-22 A A

3173 5 ELITE18-CON-CE-CIV-IR-5255 Drilling & mecgnical boulting 109,110 FF 21-Dec-22 22-Dec-22 B B

3174 6 ELITE18-CON-CE-CIV-IR-5256 Dismentlling block work under the plinth beam for pile cap & debris remove 109,110 A&B 28-Dec-22 29-Dec-22 B B

3175 7 ELITE18-CON-CE-CIV-IR-5257 Block masonory for under the plinth beam & entrance lobby wall 109,110 A&B 12-Jan-23 14-Jan-23 B B

3176 8 ELITE18-CON-CE-CIV-IR-5258 FDT test 1st layer sand filling for under the floating slab 110 B 4-Feb-23 10-Feb-23 A A

3177 9 ELITE18-CON-CE-CIV-IR-5259 07 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 109,110 GF 25-Feb-23 2-Mar-23 B B

3178 10 ELITE18-CON-CE-CIV-IR-5260 FDT test 2nd layer sand filling for under the floating slab 110 B 22-Feb-23 23-Feb-23 B B

Page 83 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3179 11 ELITE18-CON-CE-CIV-IR-5261 FDT test 3rd layer sand filling for under the floating slab 110 B 11-Mar-23 15-Mar-23 A A

3180 12 ELITE18-CON-CE-CIV-IR-5262 FDT test 4th layer sand filling for under the floating slab 110 B 11-Mar-23 21-Mar-23 A A

3181 13 ELITE18-CON-CE-CIV-IR-5263 FDT test 1st layer sand filling for under the floating slab 109 A 14-Mar-23 17-Mar-23 B B

3182 14 ELITE18-CON-CE-CIV-IR-5264 Steel & anchore epoxy for column jacting 109,110 A&B 14-Mar-23 17-Mar-23 B B

3183 15 ELITE18-CON-CE-CIV-IR-5265 Steel & anchore epoxy for beam jacting 109,110 GF 16-Mar-23 17-Mar-23 B B

3184 16 ELITE18-CON-CE-CIV-IR-5266 28 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 109,110 GF 20-Mar-23 24-Mar-23 A A

3185 17 ELITE18-CON-CE-CIV-IR-5267 PCC (1:4:8) under the floating slab 110 B 22-Mar-23 24-Mar-23 B B

3186 18 ELITE18-CON-CE-CIV-IR-5268 Polthene sheet 1000 micron under the PCC floating slab 110 B 22-Mar-23 24-Mar-23 B B

3187 19 ELITE18-CON-CE-CIV-IR-5269 RCC concrete 4000 psi & SBR for retrofiting columns 109,110 GF 22-Mar-23 24-Mar-23 B B

3188 20 ELITE18-CON-CE-CIV-IR-5270 07 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 110 B 23-Mar-23 30-Mar-23 A A

3189 21 ELITE18-CON-CE-CIV-IR-5271 07 days cylinder concrete test PCC (1:4:8) under floating slab 110 B 25-Mar-23 28-Mar-23 B B

3190 22 ELITE18-CON-CE-CIV-IR-5272 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 109 GF 25-Mar-23 30-Mar-23 A A

3191 23 ELITE18-CON-CE-CIV-IR-5273 FDT test 2nd layer sand filling for under the floating slab 109 A 6-Apr-23 8-Apr-23 A A

3192 24 ELITE18-CON-CE-CIV-IR-5274 FDT test 3rd layer sand filling for under the floating slab 109 A 7-Apr-23 10-Apr-23 C 6-May-23 9-May-23 A A

3193 25 ELITE18-CON-CE-CIV-IR-5275 Dismentlling for slab thickness increase FF & debris remove 109,110 A&B 7-Apr-23 10-Apr-23 A A

3194 26 ELITE18-CON-CE-CIV-IR-5276 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 110 B 11-Apr-23 15-Apr-23 C 17-Apr-23 2-May-23 A A

3195 27 ELITE18-CON-CE-CIV-IR-5277 28 days cylinder concrete test PCC (1:4:8) under floating slab 110 B 15-Apr-23 2-May-23 A A

3196 28 ELITE18-CON-CE-CIV-IR-5278 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 109 A 15-Apr-23 2-May-23 A A

3197 29 ELITE18-CON-CE-CIV-IR-5279 RCC concrete 4000 psi & SBR for retrofiting beams 109,110 GF 8-May-23 9-May-23 B B

3198 30 ELITE18-CON-CE-CIV-IR-5280 PCC (1:4:8) under the floating slab 109 A 8-May-23 9-May-23 B B

3199 31 ELITE18-CON-CE-CIV-IR-5281 Polthene sheet 1000 micron under the PCC floating slab 109 A 8-May-23 9-May-23 A A

3200 32 ELITE18-CON-CE-CIV-IR-5282 RCC concrete (1:2:4) for floatting slab 110 B 8-May-23 9-May-23 B B

3201 33 ELITE18-CON-CE-CIV-IR-5283 Steel & filler board for floatting slab 110 B 8-May-23 9-May-23 A A

3202 34 ELITE18-CON-CE-CIV-IR-5284 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 109,110 GF 17-May-23 A A

3203 35 ELITE18-CON-CE-CIV-IR-5285 07 days cylinder concrete test PCC (1:4:8) under floating slab 109 A 11-May-23 17-May-23 A A

3204 36 ELITE18-CON-CE-CIV-IR-5286 07 days cylinder concrete test RCC (3000 psi) floatting slab 110 B 17-May-23 A A

3205 37 ELITE18-CON-CE-CIV-IR-5287 07 days cylinder concrete test RCC (3000 psi) floatting slab 109 A 25-May-23 29-May-23 A A

3206 38 ELITE18-CON-CE-CIV-IR-5288 RCC concrete (1:2:4) for floatting slab 109 A 25-May-23 29-May-23 B B

3207 39 ELITE18-CON-CE-CIV-IR-5289 Steel & filler board for floatting slab 109 A 25-May-23 29-May-23 A A

3208 40 ELITE18-CON-CE-CIV-IR-5290 28 days cylinder concrete test PCC (1:4:8) under floating slab 109 A 3-Jun-23 7-Jun-23 A A

3209 41 ELITE18-CON-CE-CIV-IR-5291 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 109,110 A&B 3-Jun-23 7-Jun-23 A A

3210 42 ELITE18-CON-CE-CIV-IR-5292 28 days cylinder concrete test RCC (3000 psi) floating slab 110 B 3-Jun-23 7-Jun-23 B B

3211 43 ELITE18-CON-CE-CIV-IR-5293 Block masonory & lintels for retrofitting work & partition walls 109,110 A&B 7-Jun-23 12-Jun-23 B B

3212 44 ELITE18-CON-CE-CIV-IR-5294 Primer coat & membranes bituminous sheet for external side 109,110 A&B 8-Jun-23 12-Jun-23 B B

3213 45 ELITE18-CON-CE-CIV-IR-5295 Steel & anchor epoxy for column jackting 109,110 FF 8-Jun-23 14-Jun-23 B B

3214 46 ELITE18-CON-CE-CIV-IR-5296 RCC consrete 4000 PSI & SBR for slab thikness increase 109,110 FF 14-Jun-23 17-Jun-23 B B

3215 47 ELITE18-CON-CE-CIV-IR-5297 Steel & anchore epoxy for slab thikness increase 109,110 FF 14-Jun-23 17-Jun-23 B B

3216 48 ELITE18-CON-CE-CIV-IR-5298 RCC concrete 4000 Psi & SBR for retrofiting columns 109,110 FF 14-Jun-23 20-Jun-23 B B

3217 49 ELITE18-CON-CE-CIV-IR-5299 28 days cylinder concrete test RCC (3000 psi) floating slab 109 A 15-Jun-23 17-Jun-23 B B

3218 50 ELITE18-CON-CE-CIV-IR-5300 07 days cylinder concrete test RCC (4000 psi) slab thikness increase 109,110 FF 17-Jun-23 20-Jun-23 A A

3219 51 ELITE18-CON-CE-CIV-IR-5301 Steel & anchor epoxy for beams jackting 109,110 FF 17-Jun-23 20-Jun-23 A A

3220 52 ELITE18-CON-CE-CIV-IR-5302 RCC concrete 4000 Psi & SBR for retrofiting beams 109,110 FF 17-Jun-23 20-Jun-23 B B

3221 53 ELITE18-CON-CE-CIV-IR-5303 07 days cylinder concrete test RCC (4000 psi) retrofitting columns 109,110 FF 19-Jun-23 20-Jun-23 A A

3222 54 ELITE18-CON-CE-CIV-IR-5304 07 days cylinder concrete test RCC (4000 psi) retrofitting beams 109,110 FF 20-Jun-23 6-Jul-23 A A

3223 55 ELITE18-CON-CE-CIV-IR-5305 RCC concrete 4000 Psi & SBR for slab thikness increase 109,110 TR 23-Jun-23 6-Jul-23 B B

3224 56 ELITE18-CON-CE-CIV-IR-5306 Steel & anchor epoxy for slab thikness increase 109,110 TR 23-Jun-23 6-Jul-23 B B

3225 57 ELITE18-CON-CE-CIV-IR-5307 07 days cylinder concrete test RCC (4000 psi) slab thikness increase 109,110 TR 7-Jul-23 13-Jul-23 B B

3226 58 ELITE18-CON-CE-CIV-IR-5308 28 days cylinder concrete test RCC (4000 psi) slab thikness increase 109,110 FF 7-Jul-23 13-Jul-23 A A

3227 59 ELITE18-CON-CE-CIV-IR-5309 Primer coat & membranes bituminous sheet for top roof 109,110 A&B 8-Jul-23 13-Jul-23 B B

3228 60 ELITE18-CON-CE-CIV-IR-5310 Pond test for top roof 109,110 A&B 8-Jul-23 13-Jul-23 B B

3229 61 ELITE18-CON-CE-CIV-IR-5311 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 109,110 FF 10-Jul-23 13-Jul-23 A A

3230 62 ELITE18-CON-CE-CIV-IR-5312 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 109,110 FF 11-Jul-23 13-Jul-23 A A

3231 63 ELITE18-CON-CE-CIV-IR-5313 Surface clearence & side gola for top roof 109,110 A&B 12-Jul-23 14-Jul-23 B B

3232 64 ELITE18-CON-CE-CIV-IR-5314 28 days cylinder concrete test RCC (4000 psi) slab thikness increase 109,110 TR 17-Jul-23 20-Jul-23 A A

3233 65 ELITE18-CON-CE-CIV-IR-5315 FDT test 1st layer sand filling for external side 109,110 A&B 17-Jul-23 20-Jul-23 A A

Page 84 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3234 66 ELITE18-CON-CE-CIV-IR-5316 FDT test 2nd layer sand filling for external side 109,110 A&B 17-Jul-23 20-Jul-23 A A
Fixing MS girders with MS plates drilling anchoring connector mechnical &
3235 67 ELITE18-CON-CE-CIV-IR-5317 109,110 GF,FF 22-Jul-23 25-Jul-23 B B
chemical boulting epoxy
3236 68 ELITE18-CON-CE-CIV-IR-5318 FDT test 3rd layer sand filling for external side 109,110 A&B 25-Jul-23 27-Jul-23 B B

3237 69 ELITE18-CON-CE-CIV-IR-5319 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 109,110 A&B 27-Jul-23 5-Aug-23 A A

3238 70 ELITE18-CON-CE-CIV-IR-5320 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 109 A 2-Aug-23 5-Aug-23 A A

3239 71 ELITE18-CON-CE-CIV-IR-5321 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 109 A 2-Aug-23 5-Aug-23 A A

3240 72 ELITE18-CON-CE-CIV-IR-5322 Block masonory for manhole gully trap electrical chamber & electrical handhole 109 A 2-Aug-23 5-Aug-23 A A

3241 73 ELITE18-CON-CE-CIV-IR-5323 Block masonory for partition wall external side 109,110 A&B 7-Aug-23 8-Aug-23 A A

3242 74 ELITE18-CON-CE-CIV-IR-5324

3243 75 ELITE18-CON-CE-CIV-IR-5325 Side gola & laying aggregates for mumty top 109,110 A&B 16-Aug-23 19-Aug-23 A A

3244 76 ELITE18-CON-CE-CIV-IR-5326 Blcok masonory for internal side all respect 109,110 A&B 19-Aug-23 26-Aug-23 B B

3245 77 ELITE18-CON-CE-CIV-IR-5327 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 109,110 A&B 22-Aug-23 26-Aug-23 A A

3246 78 ELITE18-CON-CE-CIV-IR-5328 OHWT concrete uper side 109,110 A&B 23-Aug-23 26-Aug-23 A A

3247 79 ELITE18-CON-CE-CIV-IR-5329 Instalaltion peragola cleats with mechanical bolts all respect 109,110 A&B 29-Aug-23 1-Sep-23 B B

3248 80 ELITE18-CON-CE-CIV-IR-5330 Installation MS porch fence for boundry wall 109,110 A&B 29-Aug-23 30-Aug-23 B 9-Dec-23 14-Dec-23 B B

3249 81 ELITE18-CON-CE-CIV-IR-5331 Removing old plaster for internal walls 110 B 29-Aug-23 1-Sep-23 B B

3250 82 ELITE18-CON-CE-CIV-IR-5332 Plaster for partition wall externals side 109,110 A&B 2-Sep-23 5-Sep-23 A A

3251 83 ELITE18-CON-CE-CIV-IR-5333 Plaster work for external patches retrofitting work 109,110 A&B 8-Sep-23 13-Sep-23 B B

3252 84 ELITE18-CON-CE-CIV-IR-5334 PCC (1:3:6) for external side front & back side 109,110 A&B 14-Sep-23 18-Sep-23 B B

3253 85 ELITE18-CON-CE-CIV-IR-5335 Polythene sheet 1000 micron for extrnal side front side & back side 109,110 A&B 14-Sep-23 18-Sep-23 A A

3254 86 ELITE18-CON-CE-CIV-IR-5336 Fixing MS cover & plaster for OHWT 109,110 A&B 22-Sep-23 23-Sep-23 A A

3255 87 ELITE18-CON-CE-CIV-IR-5337 Removing old plaster for internal walls 109,110 A&B 28-Sep-23 13-Oct-23 A A

3256 88 ELITE18-CON-CE-CIV-IR-5338 Plaster work patches & corner beads for retrofitting work & internal walls 109,110 GF,FF 28-Sep-23 13-Oct-23 B B

3257 89 ELITE18-CON-CE-CIV-IR-5339 PCC (1:4:8) for under the trench drain foundation 109,110 A&B 2-Oct-23 13-Oct-23 A A

3258 90 ELITE18-CON-CE-CIV-IR-5340 Steel & formwork RCC concrete (1:2:4) block masonory & plaster for meter box 109,110 A&B 2-Oct-23 11-Oct-23 A A

3259 91 ELITE18-CON-CE-CIV-IR-5341 Steel grating angle & formwork for trench drain grating foundation 109,110 A&B 6-Oct-23 13-Oct-23 A A

3260 92 ELITE18-CON-CE-CIV-IR-5342 RCC concrete (1:2:4) for trench drain grating foundation 109,110 A&B 6-Oct-23 13-Oct-23 A A

3261 93 ELITE18-CON-CE-CIV-IR-5343 Installation black granite for partition wall external side 109,110 A&B 30-Oct-23 1-Nov-23 B B
Core filling cementitious coat primer coat bituminous sheet membrane & pond test
3262 94 ELITE18-CON-CE-CIV-IR-5344 109,110 A&B 11-Nov-23 16-Nov-23 B B
for top roof
3263 95 ELITE18-CON-CE-CIV-IR-5345 Jumbolon XPS board 50mm polythene sheet laying & screeding for top roof 109,110 A&B 11-Nov-23 16-Nov-23 B B

3264 96 ELITE18-CON-CE-CIV-IR-5346 PCC (1:4:8) for boundry wall partition wall 109,110 A&B 11-Nov-23 16-Nov-23 B B
07 days cylinder concrete test PCC (1:4:8) boundry walls left side right side &
97 ELITE18-CON-CE-CIV-IR-5347 109,110 A&B 13-Nov-23 23-Nov-23 B B
partition wall
Form work & RCC concrete (1:2:4) for boundry wall plinth beam left side right
98 ELITE18-CON-CE-CIV-IR-5348 109,110 A&B 16-Nov-23 23-Nov-23 B B
side & partition wall
99 ELITE18-CON-CE-CIV-IR-5349 Steel for boundry wall plinth beam left side right side & partion wall 109,110 A&B 16-Nov-23 23-Nov-23 A A

100 ELITE18-CON-CE-CIV-IR-5350 Installation perlino marbal for floor 109,110 GF,FF 16-Nov-23 23-Nov-23 B 8-Dec-23 11-Dec-23 B B

101 ELITE18-CON-CE-CIV-IR-5351 Installation perlino marbal for stair GF to FF & FF to Mumty 109,110 A&B 16-Nov-23 23-Nov-23 B B
07 days cylinder concrete test PCC (1:2:4) boundry walls plinth beam left side &
102 ELITE18-CON-CE-CIV-IR-5352 109,110 A&B 24-Nov-23 30-Nov-23 B B
right side partition wall
103 ELITE18-CON-CE-CIV-IR-5353 FDT test 3rd layer sand filling for external side left & right side 109,110 A&B 24-Nov-23 UR UR

104 ELITE18-CON-CE-CIV-IR-5354 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 110 B 25-Nov-23 28-Nov-23 B B

105 ELITE18-CON-CE-CIV-IR-5355 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 110 B 25-Nov-23 28-Nov-23 B B

106 ELITE18-CON-CE-CIV-IR-5356 Block masonory for manhole gully trap electrical chamber & electrical handhole 110 B 25-Nov-23 28-Nov-23 C C

107 ELITE18-CON-CE-CIV-IR-5357 PCC (1:3:6) for external side left & right side 109,110 A&B 29-Nov-23 30-Nov-23 B B

108 ELITE18-CON-CE-CIV-IR-5358 Polythene sheet 1000 micron for extrnal side left & right side 109,110 A&B 29-Nov-23 30-Nov-23 B B

109 ELITE18-CON-CE-CIV-IR-5359 07 days cylinder concrete test PCC (1:3:6) external side left & right side 109,110 A&B 1-Dec-23 7-Dec-23 B B
28 days cylinder concrete test PCC (1:4:8) boundry walls left side right side &
110 ELITE18-CON-CE-CIV-IR-5360 109,110 A&B 4-Dec-23 7-Dec-23 B B
partion wall
111 ELITE18-CON-CE-CIV-IR-5361 Installation perlino marbal for stair GF to FF & FF to Mumty 109 A 4-Dec-23 7-Dec-23 B B

112 ELITE18-CON-CE-CIV-IR-5362 Instalaltion cremamo for boundry wall 109,110 A&B 4-Dec-23 7-Dec-23 B B

113 ELITE18-CON-CE-CIV-IR-5363 Plaster roof tile & skirting for top roof 109,110 A&B 4-Dec-23 7-Dec-23 B B

114 ELITE18-CON-CE-CIV-IR-5364 Installation horizontal window sill 109,110 GF,FF,M 4-Dec-23 7-Dec-23 B B
28 days cylinder concrete test PCC (1:2:4) boundry wall plinth beam left side right
115 ELITE18-CON-CE-CIV-IR-5365 109,110 A&B 8-Dec-23 14-Dec-23 B B
side & partition wall
116 ELITE18-CON-CE-CIV-IR-5366 Instalaltion perlino marbal skirting for stair GF to FF & FF to mumty 109,110 A&B 8-Dec-23 11-Dec-23 B B

117 ELITE18-CON-CE-CIV-IR-5367 Plaster for HDF floor GF & FF 109,110 A&B 21-Dec-23 26-Dec-23 B B

118 ELITE18-CON-CE-CIV-IR-5368 Installation suspension & framing system for celing work GF,FF,Mumty dry area 109 A 21-Dec-23 26-Dec-23 B B

119 ELITE18-CON-CE-CIV-IR-5369 Dismentling perlino marble for floor F.F & mumty 109,110 A&B 21-Dec-23 26-Dec-23 A A

120 ELITE18-CON-CE-CIV-IR-5370 Dismentling perlino marble for stair GF to FF & F.F to mumty 109,110 A&B 21-Dec-23 26-Dec-23 A A

Page 85 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
Core filling cementitious coat primer coat bituminous sheet membrane & pond test
121 ELITE18-CON-CE-CIV-IR-5371 109,110 A&B 21-Dec-23 26-Dec-23 B B
for top roof

122 ELITE18-CON-CE-CIV-IR-5372 28 days cylinder concrete test PCC (1:3:6) external side left side right side 109,110 A&B 22-Dec-23 27-Dec-23 B B

123 ELITE18-CON-CE-CIV-IR-5373 Terrazzo layer for OHWT walls & floor 109,110 A&B 23-Dec-23 27-Dec-23 C C

3265

3266 5501 TO 5750 107-108


Dismentlling manhole gully trap electrical chamber & electrical handhole & debris
3267 1 ELITE18-CON-CE-CIV-IR-5501 107,107 A&B 12-Dec-22 14-Dec-22 B B
remove
3268 2 ELITE18-CON-CE-CIV-IR-5502 Dismentlling block work under the plinth beam for pile cap & debris remove 107,108 A&B 12-Dec-22 14-Dec-22 B B

3269 3 ELITE18-CON-CE-CIV-IR-5503 Primer coat for pile cape internal & external side 107,108 A&B 12-Dec-22 14-Dec-22 B B

3270 4 ELITE18-CON-CE-CIV-IR-5504 Installation MS girders IPE-180 & IPE-280,270 107,108 FF 15-Dec-22 20-Dec-22 C 21-Dec-22 22-Dec-22 B B

3271 5 ELITE18-CON-CE-CIV-IR-5505 Layout columns formwork for retrofitting work 107,108 FF 20-Dec-22 29-Dec-22 A A

3272 6 ELITE18-CON-CE-CIV-IR-5506 Layout MS girder & RCC beams drilling 107,108 FF 20-Dec-22 22-Dec-22 B B

3273 7 ELITE18-CON-CE-CIV-IR-5507 Drilling & mecgnical boulting 107,108 FF 21-Dec-22 22-Dec-22 B B

3274 8 ELITE18-CON-CE-CIV-IR-5508 Dismentlling block masonory for partition wall & debris remove 107,108 A&B 28-Dec-22 2-Jan-23 B B

3275 9 ELITE18-CON-CE-CIV-IR-5509 Dismentlling black granite for partition wall & debris remove 107,108 A&B 28-Dec-22 2-Jan-23 B B

3276 10 ELITE18-CON-CE-CIV-IR-5510 Block masonory for under the plinth beam & entrance lobby wall 107,108 A&B 12-Jan-23 14-Jan-23 B B

3277 11 ELITE18-CON-CE-CIV-IR-5511 FDT test 1st layer sand filling for under the floating slab 107,108 A&B 31-Jan-23 8-Feb-23 B B

3278 12 ELITE18-CON-CE-CIV-IR-5512 FDT test 2nd layer sand filling for under the floating slab 107,108 A&B 11-Feb-23 20-Feb-23 B B

3279 13 ELITE18-CON-CE-CIV-IR-5513 07 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 107,108 GF 16-Feb-23 23-Feb-23 A A

3280 14 ELITE18-CON-CE-CIV-IR-5514 FDT test 3rd layer sand filling for under the floating slab 107,108 A&B 18-Feb-23 23-Feb-23 C 23-Feb-23 28-Feb-23 B B

3281 15 ELITE18-CON-CE-CIV-IR-5515 PCC (1:4:8) under the floating slab 107,108 A&B 27-Feb-23 2-Mar-23 B B

3282 16 ELITE18-CON-CE-CIV-IR-5516 Polythene sheet 1000 micron under the PCC floating slab 107,108 A&B 27-Feb-23 2-Mar-23 B B

3283 17 ELITE18-CON-CE-CIV-IR-5517 07 days cylinder concrete test PCC (1:4:8) under floating slab 108 B 3-Mar-23 7-Mar-23 A A

3284 18 ELITE18-CON-CE-CIV-IR-5518 07 days cylinder concrete test PCC (1:4:8) under floating slab 107 A 7-Mar-23 15-Mar-23 B B

3285 19 ELITE18-CON-CE-CIV-IR-5519 28 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 107,108 GF 14-Mar-23 17-Mar-23 B B

3286 20 ELITE18-CON-CE-CIV-IR-5520 28 days cylinder concrete test PCC (1:4:8) under floating slab 108 B 24-Mar-23 28-Mar-23 A A

3287 21 ELITE18-CON-CE-CIV-IR-5521 28 days cylinder concrete test PCC (1:4:8) under floating slab 107 A 29-Mar-23 3-Apr-23 A A

3288 22 ELITE18-CON-CE-CIV-IR-5522 Dismentlling for slab thickness increase FF & debris remove 107,108 A&B 7-Apr-23 10-Apr-23 A A

3289 23 ELITE18-CON-CE-CIV-IR-5523 07 days cylinder concrete test RCC (1:2:4) floating slab 107 A 10-Apr-23 13-Apr-23 B B

3290 24 ELITE18-CON-CE-CIV-IR-5524 Dismentlling wall tile for kitchen 107,108 A&B 11-Apr-23 15-Apr-23 B B

3291 25 ELITE18-CON-CE-CIV-IR-5525 Steel & filler board for floetting slab 107 A 14-Apr-23 17-Apr-23 B B

3292 26 ELITE18-CON-CE-CIV-IR-5526 RCC concrete (1:2:4) for floatting slab 107 A 14-Apr-23 17-Apr-23 B B

3293 27 ELITE18-CON-CE-CIV-IR-5527 07 days cylinder concrete test RCC (1:2:4) floating slab 108 B 15-Apr-23 2-May-23 A A

3294 28 ELITE18-CON-CE-CIV-IR-5528 Steel & filler board for floetting slab 108 B 15-Apr-23 2-May-23 A A

3295 29 ELITE18-CON-CE-CIV-IR-5529 RCC concrete (1:2:4) for floatting slab 108 B 15-Apr-23 2-May-23 B B

3296 30 ELITE18-CON-CE-CIV-IR-5530 28 days cylinder concrete test RCC (1:2:4) floating slab 107 A 2-May-23 5-May-23 A A

3297 31 ELITE18-CON-CE-CIV-IR-5531 Steel & anchor epoxy for column jackting 107,108 GF 4-May-23 8-May-23 A A

3298 32 ELITE18-CON-CE-CIV-IR-5532 RCC concrete (4000 psi) & SBR for retrofiting columns 107,108 GF 4-May-23 8-May-23 B B

3299 33 ELITE18-CON-CE-CIV-IR-5533 28 days cylinder concrete test RCC (1:2:4) floating slab 108 B 6-May-23 9-May-23 A A

3300 34 ELITE18-CON-CE-CIV-IR-5534 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 107,108 A&B 9-May-23 16-May-23 A A

3301 35 ELITE18-CON-CE-CIV-IR-5535 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 107,108 GF 31-May-23 7-Jun-23 A A

3302 36 ELITE18-CON-CE-CIV-IR-5536 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 107,108 GF 6-Jun-23 8-Jun-23 A A

3303 37 ELITE18-CON-CE-CIV-IR-5537 Steel & anchor wpoxy for column jackting 107,108 GF 6-Jun-23 8-Jun-23 A A

3304 38 ELITE18-CON-CE-CIV-IR-5538 RCC concrete 4000 PSI & SBR for retrofiting beams 107,108 GF 6-Jun-23 8-Jun-23 B B

3305 39 ELITE18-CON-CE-CIV-IR-5539 Block masonory & lintels for retrofitting work & partition walls 107,108 GF 7-Jun-23 12-Jun-23 B B

3306 40 ELITE18-CON-CE-CIV-IR-5540 Steel & anchor epoxy for column jackting 107,108 FF 8-Jun-23 12-Jun-23 A A

3307 41 ELITE18-CON-CE-CIV-IR-5541 Primer coat & membranes bituminous sheet for external side 107,108 A&B 10-Jun-23 14-Jun-23 B B

3308 42 ELITE18-CON-CE-CIV-IR-5542 RCC concrete 4000 PSI & SBR for retrofiting columns 107,108 FF 14-Jun-23 20-Jun-23 B B

3309 43 ELITE18-CON-CE-CIV-IR-5543 RCC concrete 4000 PSI & SBR for slab thikness increase 107,108 FF 14-Jun-23 17-Jun-23 B B

3310 44 ELITE18-CON-CE-CIV-IR-5544 Steel & anchor epoxy for slab thikness increase 107,108 FF 14-Jun-23 17-Jun-23 B B

3311 45 ELITE18-CON-CE-CIV-IR-5545 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 107,108 FF 17-Jun-23 20-Jun-23 A A

3312 46 ELITE18-CON-CE-CIV-IR-5546 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 107,108 FF 17-Jun-23 20-Jun-23 A A

3313 47 ELITE18-CON-CE-CIV-IR-5547 RCC concrete 4000 PSI & SBR for slab thikness increase top roof 107,108 TR 17-Jun-23 20-Jun-23 B B

Page 86 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3314 48 ELITE18-CON-CE-CIV-IR-5548 Steel & anchor epoxy for slab thikness increase top roof 107,108 TR 17-Jun-23 20-Jun-23 A A

3315 49 ELITE18-CON-CE-CIV-IR-5549 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 107,108 FF 20-Jun-23 6-Jul-23 A A

3316 50 ELITE18-CON-CE-CIV-IR-5550 Steel & anchor epoxy for beams jackting 107,108 FF 20-Jun-23 22-Jun-23 B B

3317 51 ELITE18-CON-CE-CIV-IR-5551 RCC concrete 4000 PSI & SBR for retrofitting beam 107,108 FF 20-Jun-23 22-Jun-23 B B

3318 52 ELITE18-CON-CE-CIV-IR-5552 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 107,108 TR 22-Jun-23 6-Jul-23 A A

3319 53 ELITE18-CON-CE-CIV-IR-5553 Primer coat & membranes bituminous sheet for top roof 107,108 A&B 23-Jun-23 6-Jul-23 B B

3320 54 ELITE18-CON-CE-CIV-IR-5554 Pond test for top roof 107,108 A&B 23-Jun-23 6-Jul-23 B B

3321 55 ELITE18-CON-CE-CIV-IR-5555 28 days cylinder concrete test RCC (4000 psi) retrofitting beams 107,108 GF 23-Jun-23 23-Jun-23 B B

3322 56 ELITE18-CON-CE-CIV-IR-5556 28 days cylinder concrete test RCC (4000 psi) retrofitting columns 107,108 FF 7-Jul-23 13-Jul-23 A A

3323 57 ELITE18-CON-CE-CIV-IR-5557 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 107,108 FF 7-Jul-23 13-Jul-23 A A

3324 58 ELITE18-CON-CE-CIV-IR-5558 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 107,108 FF 11-Jul-23 13-Jul-23 A A

3325 59 ELITE18-CON-CE-CIV-IR-5559 FDT test 1st layer sand filing for external side 107,108 A&B 12-Jul-23 17-Jul-23 A A

3326 60 ELITE18-CON-CE-CIV-IR-5560 FDT test 2nd layer sand filling for external side 107,108 A&B 12-Jul-23 17-Jul-23 A A

3327 61 ELITE18-CON-CE-CIV-IR-5561 Surface clearence & side gola for top roof 107,108 A&B 12-Jul-23 14-Jul-23 B B

3328 62 ELITE18-CON-CE-CIV-IR-5562 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 107,108 TR 13-Jul-23 17-Jul-23 A A

3329 63 ELITE18-CON-CE-CIV-IR-5563 Jumbolon XPS board 50mm polythene sheet laying & screeding for top roof 107,108 A&B 14-Jul-23 17-Jul-23 A A

3330 64 ELITE18-CON-CE-CIV-IR-5564 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 107,108 A&B 20-Jul-23 24-Jul-23 A A
Fixing MS girders with MS plates drilling anchoring connector mechnical &
3331 65 ELITE18-CON-CE-CIV-IR-5565 107,108 GF,FF 22-Jul-23 25-Jul-23 B B
chemical boulting epoxy
3332 66 ELITE18-CON-CE-CIV-IR-5566 28 days cylinder concrete test PCC (1:3:6) external side front side & back side 107,108 A&B 10-Aug-23 16-Aug-23 A A

3333 67 ELITE18-CON-CE-CIV-IR-5567

3334 68 ELITE18-CON-CE-CIV-IR-5568 Side gola & laying aggregates for mumty top 107,108 A&B 16-Aug-23 19-Aug-23 A A

3335 69 ELITE18-CON-CE-CIV-IR-5569 Block masonory for partition wall external side 107,108 A&B 19-Aug-23 26-Aug-23 A A

3336 70 ELITE18-CON-CE-CIV-IR-5570 PCC (1:3:6) for external back & front side 107,108 A&B 21-Aug-23 26-Aug-23 B B

3337 71 ELITE18-CON-CE-CIV-IR-5571 Polythene sheet for external back & front side 107,108 A&B 21-Aug-23 26-Aug-23 A A

3338 72 ELITE18-CON-CE-CIV-IR-5572 OHWT concrete uper side 107,108 A&B 23-Aug-23 26-Aug-23 A A

3339 73 ELITE18-CON-CE-CIV-IR-5573 FDT test 3rd layer sand filling for external side 107,108 A&B 24-Aug-23 26-Aug-23 A A

3340 74 ELITE18-CON-CE-CIV-IR-5574 7 days cylinder concrete test RCC (1:2:4) RETAINING WALL CONCRETE 107,108 A&B 25-Aug-23 26-Aug-23 A A

3341 75 ELITE18-CON-CE-CIV-IR-5575 Instalaltion peragola cleats with mechanical bolts all respect 107,108 A&B 29-Aug-23 1-Sep-23 B B

3342 76 ELITE18-CON-CE-CIV-IR-5576 Plaster for partition wall externals side 107,108 A&B 2-Sep-23 5-Sep-23 A A

3343 77 ELITE18-CON-CE-CIV-IR-5577 Plaster work for external patches retrofitting work 107,108 A&B 8-Sep-23 13-Sep-23 B B

3344 78 ELITE18-CON-CE-CIV-IR-5578 Block masonory for retrofitting work patch 107,108 GF,FF 9-Sep-23 13-Sep-23 B B

3345 79 ELITE18-CON-CE-CIV-IR-5579 28 days cylinder concrete test RCC (1:2:4) retaining wall concrete 107,108 A&B 15-Sep-23 19-Sep-23 A A

3346 80 ELITE18-CON-CE-CIV-IR-5580 Instalaltion MS porch fence for boudary wall 107,108 A&B 15-Sep-23 18-Sep-23 A A

3347 81 ELITE18-CON-CE-CIV-IR-5581 PCC (1:4:8) for under the trench drain foundation 107,108 A&B 16-Sep-23 20-Sep-23 A A

3348 82 ELITE18-CON-CE-CIV-IR-5582 Fixing MS cover & plaster for OHWT 107,108 A&B 22-Sep-23 23-Sep-23 A A

3349 83 ELITE18-CON-CE-CIV-IR-5583 PCC (1:4:8) for under the trench drain foundation 107,108 A&B 2-Oct-23 13-Oct-23 A A

3350 84 ELITE18-CON-CE-CIV-IR-5584 Steel & formwork RCC concrete (1:2:4) block masonory & plaster for meter box 107,108 A&B 2-Oct-23 11-Oct-23 B B

3351 85 ELITE18-CON-CE-CIV-IR-5585 Steel grating angle & formwork for trench drain grating foundation 107,108 A&B 6-Oct-23 13-Oct-23 C C

3352 86 ELITE18-CON-CE-CIV-IR-5586 RCC concrete (1:2:4) for trench drain grating foundation 107,108 A&B 6-Oct-23 13-Oct-23 C C

3353 87 ELITE18-CON-CE-CIV-IR-5587 Plaster work patches & corner beads for retrofiting work & internal wall 108 GF,FF 9-Oct-23 20-Oct-23 B B

3354 88 ELITE18-CON-CE-CIV-IR-5588 Dismentl9ing perlino marbal for floor 108 FF 30-Oct-23 1-Nov-23 B B

3355 89 ELITE18-CON-CE-CIV-IR-5589 Installation perlino marbal for floor 108 GF 30-Oct-23 1-Nov-23 B B

3356 90 ELITE18-CON-CE-CIV-IR-5590 Installation black granite for partition wall external side 107,108 A&b 30-Oct-23 1-Nov-23 B B

3357 91 ELITE18-CON-CE-CIV-IR-5591 Dismentlling perlino marbal for floor 107 FF,M 6-Nov-23 8-Nov-23 A A

92 ELITE18-CON-CE-CIV-IR-5592 Dismentlling perlino marbal for Stair GF to FF & FF to Mumty 107 A 6-Nov-23 8-Nov-23 C C

93 ELITE18-CON-CE-CIV-IR-5593 Dismentlling perlino marbal for floor 108 FF 6-Nov-23 8-Nov-23 A A

3358 94 ELITE18-CON-CE-CIV-IR-5594 Installation suspention & framing system for celling GF,FF,Mumty dry area 108 B 6-Nov-23 8-Nov-23 B B

95 ELITE18-CON-CE-CIV-IR-5595 Dismentlling perlino marbal for floor 107,108 GF 6-Nov-23 8-Nov-23 B B

96 ELITE18-CON-CE-CIV-IR-5596 Primer coat 1st coat putty & 2nd coat putty for internal paint 107,108 GF,FF,M 6-Nov-23 8-Nov-23 B B

97 ELITE18-CON-CE-CIV-IR-5597 Plaster work patches & corner beads for retrofitting work & internla wall 107 GF,FF 7-Nov-23 11-Nov-23 B B

98 ELITE18-CON-CE-CIV-IR-5598 Installation perlino marbal for floor 107,108 FF 11-Nov-23 16-Nov-23 B 8-Dec-23 11-Dec-23 B B

99 ELITE18-CON-CE-CIV-IR-5599 Installation horizontal window sill 107,108 GF,FF,M 11-Nov-23 16-Nov-23 B B

3359 100 ELITE18-CON-CE-CIV-IR-5600 Installation cremamo for boundry wall 107,108 A&B 11-Nov-23 16-Nov-23 B B

101 ELITE18-CON-CE-CIV-IR-5601 Installation perlino marbal & skirting for stair GF to FF & FF to Mumty 108 B 14-Nov-23 16-Nov-23 B B

102 ELITE18-CON-CE-CIV-IR-5602 Plaster for HDF floor 107,108 A&B 14-Nov-23 16-Nov-23 B B

Page 87 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
103 ELITE18-CON-CE-CIV-IR-5603 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 107,108 A&B 25-Nov-23 28-Nov-23 B B

104 ELITE18-CON-CE-CIV-IR-5604 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 107,108 A&B 25-Nov-23 28-Nov-23 B B

105 ELITE18-CON-CE-CIV-IR-5605 Block masonory for manhole gully trap electrical chamber & electrical handhole 107,108 A&B 25-Nov-23 28-Nov-23 C C

106 ELITE18-CON-CE-CIV-IR-5606 Gypsum board jointing and tapping for celling work dry area 108 GF,FF,M 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B
Installation framing system & gypsum board jointing and tapping for celling work
107 ELITE18-CON-CE-CIV-IR-5607 107 GF,FF,M 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B
dry area
Gypsum board jointing and tapping for celling work dry area GF to FF & FF to
108 ELITE18-CON-CE-CIV-IR-5608 107 A 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B
mumty
109 ELITE18-CON-CE-CIV-IR-5609 Installation vertical window sill 107,108 GF,FF,M 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

110 ELITE18-CON-CE-CIV-IR-5610 Plaster roof tile & roof skirting for top roof 107,108 A&B 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B
Cementitious coat pond test for bath and powder bath water proofing GF,FF&maid
111 ELITE18-CON-CE-CIV-IR-5611 107,108 A&B 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B
bath
112 ELITE18-CON-CE-CIV-IR-5612 Installation wall tile floor tile for bath & powder room GF,FF& maid bath 107,108 A&B 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

113 ELITE18-CON-CE-CIV-IR-5613 Installation wall & floor tile for kitchen 107,108 A&B 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

114 ELITE18-CON-CE-CIV-IR-5614 PCC (1:4:8) for boundry wall partition wall 107,108 A&B 2-Dec-23 7-Dec-23 B B

115 ELITE18-CON-CE-CIV-IR-5615 Steel for boundry wall partition wall 107,108 A&B 7-Dec-23 8-Dec-23 B B

116 ELITE18-CON-CE-CIV-IR-5616 Form work & RCC concrete (3000 psi) for boundry wall bed partition wall 107,108 A&B 7-Dec-23 8-Dec-23 B B

117 ELITE18-CON-CE-CIV-IR-5617 NSL layout & excavation for boundry wall bed partition wall 107,108 A&B 8-Dec-23 UR UR

118 ELITE18-CON-CE-CIV-IR-5618 PCC top level & RCC bed top level for boundary wall 107,108 A&B 8-Dec-23 UR UR

119 ELITE18-CON-CE-CIV-IR-5619 07 days cylinder concrete test PCC (1:4:8) boundry wall partition wall 107,108 A&B 8-Dec-23 14-Dec-23 B B

120 ELITE18-CON-CE-CIV-IR-5620 Block masonory for mechnical wall 108 GF,FF 9-Dec-23 14-Dec-23 C C

121 ELITE18-CON-CE-CIV-IR-5621 Plaster work & wall mounted cement board for cistern flushing tank 108 GF,FF 9-Dec-23 14-Dec-23 A A

122 ELITE18-CON-CE-CIV-IR-5622 Block masonory plaster for duct & DB area 107,108 GF,FF,M 9-Dec-23 14-Dec-23 C C

123 ELITE18-CON-CE-CIV-IR-5623 07 days cylinder concrete test RCC (1:2:4) boundry wall concrete partition wall 107,108 A&B 11-Dec-23 UR UR
07 days cylinder concrete test RCC (1:2:4) boundry wall PLINTH BEAM
124 ELITE18-CON-CE-CIV-IR-5624 107,108 A&B 16-Dec-23 26-Dec-23 B B
CONCRETE PARTITION WALL
125 ELITE18-CON-CE-CIV-IR-5625 Steel for boundary wal plinth beam partition wall 107,108 A&B 20-Dec-23 21-Dec-23 B B
Form work and RCC concrete (300 PSI) for boundary wall plinth beam partition
126 ELITE18-CON-CE-CIV-IR-5626 107,108 A&B 20-Dec-23 21-Dec-23 B B
wall
127 ELITE18-CON-CE-CIV-IR-5627 FDT test 3rd layer sand filling for external side left side 108 B 20-Dec-23 26-Dec-23 B B

128 ELITE18-CON-CE-CIV-IR-5628 07 days cylinder concrete test PCC (1:3:6) external side left side 108 B 27-Dec-23 29-Dec-23 B B

129 ELITE18-CON-CE-CIV-IR-5629 FDT test 3rd layer sand filling for external side right side 107 A 27-Dec-23 29-Dec-23 B B

130 ELITE18-CON-CE-CIV-IR-5630 PCC (1:3:6) for external PCC left side 108 B 27-Dec-23 29-Dec-23 C C

131 ELITE18-CON-CE-CIV-IR-5631 Polythene sheet for external side left side 108 B 27-Dec-23 29-Dec-23 B B

132 ELITE18-CON-CE-CIV-IR-5632 28 days cylinder concrete test PCC (1:4:8) boundary wall partition wall 107,108 A&B 29-Dec-23 29-Dec-23 UR UR

3360

3361 5751 TO 6000 105-106


3362 1 ELITE18-CON-CE-CIV-IR-5751 Dismentlling block work under the plinth beam for pile cap & debris remove 105,105 A&B 11-Dec-22 14-Dec-22 B B

3363 2 ELITE18-CON-CE-CIV-IR-5752 Primer coat for pile cape internal & external side 105,106 A&B 12-Dec-22 14-Dec-22 B B

3364 3 ELITE18-CON-CE-CIV-IR-5753 Installation MS girders IPE-180 & IPE-280 106 B 21-Dec-22 22-Dec-22 B B

3365 4 ELITE18-CON-CE-CIV-IR-5754 Drilling & mecgnical boulting 106 B 21-Dec-22 22-Dec-22 B B

3366 5 ELITE18-CON-CE-CIV-IR-5755 Dismentlling block masonory for partition wall & debris remove 105,106 A&B 28-Dec-22 2-Jan-23 B B

3367 6 ELITE18-CON-CE-CIV-IR-5756 Dismentlling black granite for partition wall & debris remove 105,106 A&B 28-Dec-22 2-Jan-23 B B

3368 7 ELITE18-CON-CE-CIV-IR-5757 Block masonory for under the plinth beam & entrance lobby wall 105,106 A&B 12-Jan-23 14-Jan-23 B B

3369 8 ELITE18-CON-CE-CIV-IR-5758 FDT test 1st layer sand filling for under the floating slab 105 A 31-Jan-23 4-Feb-23 A A

3370 9 ELITE18-CON-CE-CIV-IR-5759 FDT test 1st layer sand filling for under the floating slab 106 A 4-Feb-23 10-Feb-23 C 11-Feb-23 15-Feb-23 B B

3371 10 ELITE18-CON-CE-CIV-IR-5760 FDT test 2nd layer sand filling for under the floating slab 105,106 A&B 11-Feb-23 20-Feb-23 B B

3372 11 ELITE18-CON-CE-CIV-IR-5761 07 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 105,106 GF 14-Feb-23 15-Feb-23 B B

3373 12 ELITE18-CON-CE-CIV-IR-5762 FDT test 3rd layer sand filling for under the floating slab 105,106 A&B 18-Feb-23 23-Feb-23 C 23-Feb-23 2-Mar-23 B B

3374 13 ELITE18-CON-CE-CIV-IR-5763 Polythene sheet 1000 micron under the PCC floating slab 105,106 A&B 24-Feb-23 2-Mar-23 C 11-Mar-23 15-Mar-23 A A

3375 14 ELITE18-CON-CE-CIV-IR-5764 PCC (1:4:8) under the floating slab 105,106 A&B 24-Feb-23 2-Mar-23 C 6-Mar-23 9-Mar-23 A A

3376 15 ELITE18-CON-CE-CIV-IR-5765 28 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 105,106 GF 6-Mar-23 15-Mar-23 A A

3377 16 ELITE18-CON-CE-CIV-IR-5766 07 days cylinder concrete test PCC (1:4:8) under floating slab 105 A 9-Mar-23 15-Mar-23 B B

3378 17 ELITE18-CON-CE-CIV-IR-5767 PCC (1:4:8) under the floating slab 106 B 11-Mar-23 15-Mar-23 B B

3379 18 ELITE18-CON-CE-CIV-IR-5768 07 days cylinder concrete test PCC (1:4:8) under floating slab 106 B 20-Mar-23 21-Mar-23 A A

3380 19 ELITE18-CON-CE-CIV-IR-5769 28 days cylinder concrete test PCC (1:4:8) under floating slab 105 A 29-Mar-23 3-Apr-23 A A

3381 20 ELITE18-CON-CE-CIV-IR-5770 28 days cylinder concrete test PCC (1:4:8) under floating slab 106 B 6-Apr-23 10-Apr-23 B B

Page 88 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3382 21 ELITE18-CON-CE-CIV-IR-5771 Dismentlling wall tile for kitchen 105,106 A&B 11-Apr-23 15-Apr-23 B B

3383 22 ELITE18-CON-CE-CIV-IR-5772 07 days cylinder concrete test RCC (1:2:4) floating slab 106 B 14-Apr-23 15-Apr-23 C 17-Apr-23 2-May-23 A A

3384 23 ELITE18-CON-CE-CIV-IR-5773 Steel & filler board for floatting slab 106 B 14-Apr-23 17-Apr-23 B B

3385 24 ELITE18-CON-CE-CIV-IR-5774 RCC concrete (1:2:4) for floatting slab 106 B 14-Apr-23 17-Apr-23 B B

3386 25 ELITE18-CON-CE-CIV-IR-5775 07 days cylinder concrete test RCC (1:2:4) floating slab 105 A 15-Apr-23 2-May-23 B B

3387 26 ELITE18-CON-CE-CIV-IR-5776 Steel & anchor epoxy for column jackting 105,106 GF 15-Apr-23 2-May-23 A A

3388 27 ELITE18-CON-CE-CIV-IR-5777 Steel & filler board for floatting slab 105 A 15-Apr-23 2-May-23 A A

3389 28 ELITE18-CON-CE-CIV-IR-5778 RCC concrete (1:2:4) for floatting slab 105 A 15-Apr-23 2-May-23 B B

3390 29 ELITE18-CON-CE-CIV-IR-5779 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 105,106 GF 2-May-23 5-May-23 A A

3391 30 ELITE18-CON-CE-CIV-IR-5780 28 days cylinder concrete test RCC (1:2:4) floating slab 106 B 3-May-23 8-May-23 A A

3392 31 ELITE18-CON-CE-CIV-IR-5781 RCC concrete (4000 psi) & SBR for retrofitting columns 105,106 GF 4-May-23 8-May-23 B B

3393 32 ELITE18-CON-CE-CIV-IR-5782 28 days cylinder concrete test RCC (1:2:4) floating slab 105 B 6-May-23 9-May-23 A A

3394 33 ELITE18-CON-CE-CIV-IR-5783 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 105,106 A&B 15-May-23 18-May-23 A A

3395 34 ELITE18-CON-CE-CIV-IR-5784 Dismentlling for slab thickness increase top roof & debris remove 105,106 A&B 17-May-23 22-May-23 C 3-Aug-23 4-Aug-23 A A

3396 35 ELITE18-CON-CE-CIV-IR-5785 Steel fixing & anchore epoxy for beam jacktting 105,106 GF 27-May-23 6-Jun-23 B B

3397 36 ELITE18-CON-CE-CIV-IR-5786 RCC concrete 4000 Psi & SBR for retrofitting beams 105,106 GF 27-May-23 30-May-23 B B

3398 37 ELITE18-CON-CE-CIV-IR-5787 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 105,106 GF 31-May-23 7-Jun-23 A A

3399 38 ELITE18-CON-CE-CIV-IR-5788 Steel fixing & anchore epoxy for columns jacktting 105,106 FF 12-Jun-23 14-Jun-23 A A

3400 39 ELITE18-CON-CE-CIV-IR-5789 RCC concrete 4000 Psi & SBR for retrofitting columns 105,106 FF 12-Jun-23 14-Jun-23 B B

3401 40 ELITE18-CON-CE-CIV-IR-5790 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 105,106 FF 14-Jun-23 17-Jun-23 A A

3402 41 ELITE18-CON-CE-CIV-IR-5791 Steel fixing & anchore epoxy for beams jackting 105,106 FF 14-Jun-23 17-Jun-23 B B

3403 42 ELITE18-CON-CE-CIV-IR-5792 RCC concrete 4000 Psi & SBR for retrofitting beams 105,106 FF 14-Jun-23 20-Jun-23 B B

3404 43 ELITE18-CON-CE-CIV-IR-5793 Primer coat & membranes bituminous sheet for external side 105,106 A&B 15-Jun-23 17-Jun-23 C 22-Jun-23 6-Jul-23 B B

3405 44 ELITE18-CON-CE-CIV-IR-5794 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 105,106 A&B 15-Jun-23 17-Jun-23 C C

3406 45 ELITE18-CON-CE-CIV-IR-5795 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 105,106 A&B 15-Jun-23 17-Jun-23 C C

3407 46 ELITE18-CON-CE-CIV-IR-5796 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 105,106 FF 17-Jun-23 20-Jun-23 B B

3408 47 ELITE18-CON-CE-CIV-IR-5797 Steel & anchor epoxy for slab thikness increase 105,106 FF 17-Jun-23 20-Jun-23 B B

3409 48 ELITE18-CON-CE-CIV-IR-5798 RCC concrete 4000 Psi & SBR for for slab thikness increase 105,106 FF 17-Jun-23 20-Jun-23 B B

3410 49 ELITE18-CON-CE-CIV-IR-5799 Steel & anchor epoxy for slab thikness increase top roof 105,106 TR 17-Jun-23 20-Jun-23 A A

3411 50 ELITE18-CON-CE-CIV-IR-5800 RCC concrete 4000 Psi & SBR for for slab thikness increase toop roof 105,106 TR 17-Jun-23 20-Jun-23 B B

3412 51 ELITE18-CON-CE-CIV-IR-5801 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 105,106 GF 22-Jun-23 6-Jul-23 A A

3413 52 ELITE18-CON-CE-CIV-IR-5802 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 105,106 TR,FF 22-Jun-23 6-Jul-23 A A

3414 53 ELITE18-CON-CE-CIV-IR-5803 Primer coat & membranes bituminous sheet for top roof 105,106 TR 22-Jun-23 6-Jul-23 B B

3415 54 ELITE18-CON-CE-CIV-IR-5804 Pond test for top roof 105,106 A&B 23-Jun-23 6-Jul-23 B B

3416 55 ELITE18-CON-CE-CIV-IR-5805 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 105,106 FF 7-Jul-23 13-Jul-23 A A

3417 56 ELITE18-CON-CE-CIV-IR-5806 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 105,106 FF 7-Jul-23 13-Jul-23 A A

3418 57 ELITE18-CON-CE-CIV-IR-5807 Surface clearence & side gola for top roof 105,106 A&B 12-Jul-23 14-Jul-23 B B

3419 58 ELITE18-CON-CE-CIV-IR-5808 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 105,106 TR,FF 13-Jul-23 17-Jul-23 A A

3420 59 ELITE18-CON-CE-CIV-IR-5809 Jumbolon XPS board 50mm polythene sheet laying & screeding for top roof 105,106 A&B 14-Jul-23 17-Jul-23 A A
Fixing MS girders with MS plates drilling anchoring connector mechnical &
3421 60 ELITE18-CON-CE-CIV-IR-5810 105,106 GF,FF 22-Jul-23 25-Jul-23 B B
chemical boulting epoxy
3422 61 ELITE18-CON-CE-CIV-IR-5811 FDT test 1st layer sand filling for external side 105,106 A&B 2-Aug-23 7-Aug-23 A A

3423 62 ELITE18-CON-CE-CIV-IR-5812 FDT test 2nd layer sand filing for external side 105,106 A&B 2-Aug-23 7-Aug-23 B B

3424 63 ELITE18-CON-CE-CIV-IR-5813

3425 64 ELITE18-CON-CE-CIV-IR-5814 Side gola & laying aggregates for mumty top 105,106 A&B 16-Aug-23 19-Aug-23 A A

3426 65 ELITE18-CON-CE-CIV-IR-5815 Block masonory GF,FF with all respect 105,106 A&B 18-Aug-23 22-Aug-23 B B

3427 66 ELITE18-CON-CE-CIV-IR-5816 Block masonory for partition wall external side 105,106 A&B 19-Aug-23 26-Aug-23 A A

3428 67 ELITE18-CON-CE-CIV-IR-5817 PCC (1:3:6) for external back & front side 105,106 A&B 21-Aug-23 26-Aug-23 B B

3429 68 ELITE18-CON-CE-CIV-IR-5818 Polythene sheet for external back & front side 105,106 A&B 21-Aug-23 26-Aug-23 A A

3430 69 ELITE18-CON-CE-CIV-IR-5819 OHWT concrete uper side 105,106 A&B 23-Aug-23 26-Aug-23 A A

3431 70 ELITE18-CON-CE-CIV-IR-5820 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 105,106 A&B 24-Aug-23 26-Aug-23 A A

3432 71 ELITE18-CON-CE-CIV-IR-5821 Instalaltion peragola cleats with mechanical bolts all respect 105,106 A&B 29-Aug-23 1-Sep-23 B B

3433 72 ELITE18-CON-CE-CIV-IR-5822 Plaster for partition wall externals side 105,106 A&B 2-Sep-23 5-Sep-23 A A

3434 73 ELITE18-CON-CE-CIV-IR-5823 Plaster work for external patches retrofitting work 105,106 A&B 8-Sep-23 13-Sep-23 B B

3435 74 ELITE18-CON-CE-CIV-IR-5824 Dismentlling cremamo for external side elevation 1 105 A 9-Sep-23 13-Sep-23 A A

3436 75 ELITE18-CON-CE-CIV-IR-5825 Dismentlling black granite for external side elevation 1 105 A 9-Sep-23 13-Sep-23 A A

Page 89 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3437 76 ELITE18-CON-CE-CIV-IR-5826 28 days cylinder concrete test PCC (1:3:6) external side & back side 105,106 A&B 13-Sep-23 18-Sep-23 A A

3438 77 ELITE18-CON-CE-CIV-IR-5827 Instalaltion MS porch fence for boudary wall 105,106 A&B 15-Sep-23 18-Sep-23 A A

3439 78 ELITE18-CON-CE-CIV-IR-5828 PCC (1:4:8) for under the trensh drain grating foundation 105,106 A&B 16-Sep-23 19-Sep-23 B B

3440 79 ELITE18-CON-CE-CIV-IR-5829 Fixing MS cover & plaster for OHWT 105,106 A&B 22-Sep-23 23-Sep-23 A A

3441 80 ELITE18-CON-CE-CIV-IR-5830 Steel grating angle & formwork for trench drain grating foundation 105,106 A&B 2-Oct-23 13-Oct-23 A A

3442 81 ELITE18-CON-CE-CIV-IR-5831 RCC concrete (1:2:4) for trench drain grating foundation 105,106 A&B 2-Oct-23 13-Oct-23 A A

3443 82 ELITE18-CON-CE-CIV-IR-5832 Steel & formwork RCC concrete (1:2:4) block masonory & plaster for meter box 105,106 A&B 2-Oct-23 UR UR

3444 83 ELITE18-CON-CE-CIV-IR-5833 Plaster work patches & corner beads for retrofitting work & internal walls 106 GF,FF 19-Oct-23 20-Oct-23 B B

3445 84 ELITE18-CON-CE-CIV-IR-5834 Dismentlling cremmo for externla side elevation 1 105 A 30-Oct-23 1-Nov-23 A A

3446 85 ELITE18-CON-CE-CIV-IR-5835 Dismentlling black granite for externla side elevation 1 105 A 30-Oct-23 1-Nov-23 A A

3447 86 ELITE18-CON-CE-CIV-IR-5836 Instalaltion cremmo for external side elevation 1 105 A 30-Oct-23 1-Nov-23 B B

3448 87 ELITE18-CON-CE-CIV-IR-5837 Installation black granite for external side elevation 1 105 A 30-Oct-23 1-Nov-23 B B

3449 88 ELITE18-CON-CE-CIV-IR-5838 Installation black granite for external side 105,106 A&B 30-Oct-23 1-Nov-23 B B

3450 89 ELITE18-CON-CE-CIV-IR-5839 Plaster work patches & corner beads for retrofitting work & internal walls 105 GF,FF 31-Oct-23 1-Nov-23 B B

3451 90 ELITE18-CON-CE-CIV-IR-5840 Dismentlling perlino marbal for floor 106 FF,M 6-Nov-23 8-Nov-23 A UR

91 ELITE18-CON-CE-CIV-IR-5841 Installation perlino marbal for floor 106 GF 6-Nov-23 8-Nov-23 B B

92 ELITE18-CON-CE-CIV-IR-5842 Installation suspention & framing system for celling GF,FF,Mumty dry area 106 B 6-Nov-23 8-Nov-23 B B

3452 93 ELITE18-CON-CE-CIV-IR-5843 Primer coat 1st coat putty & 2nd coat putty for internal paint 106 GF,FF,M 6-Nov-23 8-Nov-23 B B

94 ELITE18-CON-CE-CIV-IR-5844 Dismentlling perlino marbal for floor 105 FF 11-Nov-23 16-Nov-23 B B

95 ELITE18-CON-CE-CIV-IR-5845 Installation horizontal window sill 106 GF,FF,M 11-Nov-23 16-Nov-23 B B

96 ELITE18-CON-CE-CIV-IR-5846 Instalaltin cremamo for boundry wall 105,106 A&B 11-Nov-23 16-Nov-23 B B

97 ELITE18-CON-CE-CIV-IR-5847 Plaster work patches & corner beads for retrofitting work & internal walls 105 GF 16-Nov-23 24-Nov-23 B B

98 ELITE18-CON-CE-CIV-IR-5848 Block masonory for manhole gully trap electrical chamber & electrical handhole 105,106 A&B 25-Nov-23 28-Nov-23 C C

99 ELITE18-CON-CE-CIV-IR-5849 Pudlo plaster for manhole gully trap electrical chamber & electrical handhole 105,106 A&B 25-Nov-23 28-Nov-23 C C

100 ELITE18-CON-CE-CIV-IR-5850 Installation perlino marble & skirting for stair GF to FF & FF to mumty 106 B 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

101 ELITE18-CON-CE-CIV-IR-5851 Installation perlino marble & skirting for floor 105 GF,FF 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

102 ELITE18-CON-CE-CIV-IR-5852 Installation black granite for partition wall external side 105,106 A&B 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

103 ELITE18-CON-CE-CIV-IR-5853 Installation horizontal window sill 105 GF,FF,M 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

104 ELITE18-CON-CE-CIV-IR-5854 Plaster for HDF floor 106 GF,FF 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

105 ELITE18-CON-CE-CIV-IR-5855 Block masonory plaster for duct & DB area 105,106 GF,FF,M 9-Dec-23 14-Dec-23 C C

106 ELITE18-CON-CE-CIV-IR-5856 FDT test 2nd layer sand filling for external side left side 106 B 27-Dec-23 29-Dec-23 C C

3453

3454 6001 TO 6250 103-104


3455 1 ELITE18-CON-CE-CIV-IR-6001 Dismentlling block work under the plinth beam for pile cap & debris remove 103,104 A&B 12-Dec-22 14-Dec-22 B B

3456 2 ELITE18-CON-CE-CIV-IR-6002 Primer coat for pile cape internal & external side 103,104 A&B 13-Dec-22 15-Dec-22 B B

3457 3 ELITE18-CON-CE-CIV-IR-6003 Installation MS girders IPE-180 & IPE-280,270 104 A&B 15-Dec-22 20-Dec-22 C 21-Dec-22 22-Dec-22 B B

3458 4 ELITE18-CON-CE-CIV-IR-6004 Layout columns formwork for retroftting work 103,104 FF 20-Dec-22 22-Dec-22 A A

3459 5 ELITE18-CON-CE-CIV-IR-6005 Drilling & mecgnical boulting 104 FF 21-Dec-22 22-Dec-22 B B

3460 6 ELITE18-CON-CE-CIV-IR-6006 Dismentlling block masonory for partition wall & debris remove 103,104 A&B 28-Dec-22 29-Dec-22 B B

3461 7 ELITE18-CON-CE-CIV-IR-6007 Dismentlling black granite for partition wall & debris remove 103,104 A&B 28-Dec-22 29-Dec-22 B B

3462 8 ELITE18-CON-CE-CIV-IR-6008 Block masonory for under the plinth beam & entrance lobby wall 103,104 A&B 28-Dec-22 29-Dec-22 B B

3463 9 ELITE18-CON-CE-CIV-IR-6009 Dismentllig roof tile for top roof & debris remove 103,104 A&B 2-Jan-23 5-Jan-23 B B

3464 10 ELITE18-CON-CE-CIV-IR-6010 FDT test 1st layer sand filling for under the floating slab 103,104 A&B 9-Jan-23 12-Jan-23 C 4-Feb-23 10-Feb-23 C 16-Feb-23 23-Feb-23 A A

3465 11 ELITE18-CON-CE-CIV-IR-6011

3466 12 ELITE18-CON-CE-CIV-IR-6012 07 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 103,104 GF 7-Feb-23 10-Feb-23 A A

3467 13 ELITE18-CON-CE-CIV-IR-6013 28 days cylinder concrete test RCC (4000 psi) retrofiting columns starter upto SOG 103,104 GF 27-Feb-23 2-Mar-23 B B

3468 14 ELITE18-CON-CE-CIV-IR-6014 FDT test 2nd layer sand filling for under the floating slab 103,104 A&B 28-Feb-23 3-Mar-23 C 3-Mar-23 7-Mar-23 A A

3469 15 ELITE18-CON-CE-CIV-IR-6015 PCC (1:4:8) under the floating slab 103,104 A&B 20-Mar-23 17-Mar-23 C 13-Apr-23 15-Apr-23 C 17-May-23 18-May-23 A A

3470 16 ELITE18-CON-CE-CIV-IR-6016 Polythene sheet 1000 micron under the PCC floating slab 103,104 A&B 14-Mar-23 17-Mar-23 A A

3471 17 ELITE18-CON-CE-CIV-IR-6017 FDT test 3rd layer sand filling for under the floating slab 103,104 A&B 14-Mar-23 17-Mar-23 B B

3472 18 ELITE18-CON-CE-CIV-IR-6018 07 days cylinder concrete test PCC (1:4:8) Under floating slab 103,104 A&B 20-Mar-23 24-Mar-23 B B

3473 19 ELITE18-CON-CE-CIV-IR-6019 Steel & filler board for floatting slab 103,104 A&B 23-Mar-23 28-Mar-23 A A

3474 20 ELITE18-CON-CE-CIV-IR-6020 RCC concrete (1:2:4) for floatting slab 104 B 28-Mar-23 29-Mar-23 B B

Page 90 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3475 21 ELITE18-CON-CE-CIV-IR-6021 Steel & anchor wpoxy for column jackting 103,104 GF 1-Apr-23 5-Apr-23 A A

3476 22 ELITE18-CON-CE-CIV-IR-6022 07 days cylinder concrete test RCC (1:2:4) floating slab 104 B 3-Apr-23 6-Apr-23 B B

3477 23 ELITE18-CON-CE-CIV-IR-6023 RCC concrete (1:2:4) for floatting slab 103 A 3-Apr-23 6-Apr-23 B B

3478 24 ELITE18-CON-CE-CIV-IR-6024

3479 25 ELITE18-CON-CE-CIV-IR-6025 07 days cylinder concrete test RCC (1:2:4) floating slab 103 A 8-Apr-23 11-Apr-23 B B

3480 26 ELITE18-CON-CE-CIV-IR-6026 28 days cylinder concrete test PCC (1:4:8) Under floating slab 103,104 A&B 10-Apr-23 11-Apr-23 B B

3481 27 ELITE18-CON-CE-CIV-IR-6027 Dismentlling wall tile for kitchen 103,104 A&B 11-Apr-23 15-Apr-23 B B

3482 28 ELITE18-CON-CE-CIV-IR-6028 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 103,104 A&B 13-Apr-23 15-Apr-23 C 17-Apr-23 2-May-23 A A

3483 29 ELITE18-CON-CE-CIV-IR-6029 RCC concrete 4000 psi & SBR for retrofitting columns 103,104 GF 15-Apr-23 2-May-23 B B

3484 30 ELITE18-CON-CE-CIV-IR-6030 28 days cylinder concrete test RCC (1:2:4) floating slab 104 B 2-May-23 5-May-23 A A

3485 31 ELITE18-CON-CE-CIV-IR-6031 28 days cylinder concrete test RCC (1:2:4) floating slab 103 A 2-May-23 5-May-23 A A

3486 32 ELITE18-CON-CE-CIV-IR-6032 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 103,104 GF 4-May-23 8-May-23 A A

3487 33 ELITE18-CON-CE-CIV-IR-6033 Dismentlling for slab thickness increase top roof & debris remove 103,104 A&B 17-May-23 22-May-23 C 3-Aug-23 4-Aug-23 A A

3488 34 ELITE18-CON-CE-CIV-IR-6034 Steel fixing & anchore epoxy for beam jacktting 103,104 GF 27-May-23 30-May-23 A A

3489 35 ELITE18-CON-CE-CIV-IR-6035 RCC concrete 4000 psi & SBR for retrofitting beams 103,104 GF 27-May-23 30-May-23 B B

3490 36 ELITE18-CON-CE-CIV-IR-6036 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 103,104 GF 31-May-23 7-Jun-23 A A

3491 37 ELITE18-CON-CE-CIV-IR-6037 07 days cylinder concrete test RCC (4000 psi) retrofiting columns 103,104 A&B 6-Jun-23 8-Jun-23 A A

3492 38 ELITE18-CON-CE-CIV-IR-6038 Steel & anchor wpoxy for column jackting 103,104 FF 6-Jun-23 8-Jun-23 A A

3493 39 ELITE18-CON-CE-CIV-IR-6039 RCC concrete 4000 PSI & SBR for retrofiting columns 103,104 FF 6-Jun-23 8-Jun-23 B B

3494 40 ELITE18-CON-CE-CIV-IR-6040 Block masonory & lintels for retrofitting work & partition walls 103 GF 7-Jun-23 12-Jun-23 B B

3495 41 ELITE18-CON-CE-CIV-IR-6041 Steel fixing & anchore epoxy for beam jacktting 103,104 FF 14-Jun-23 17-Jun-23 B B

3496 42 ELITE18-CON-CE-CIV-IR-6042 RCC concrete 4000 PSI & SBR for retrofiting beams 103,104 FF 14-Jun-23 17-Jun-23 B B

3497 43 ELITE18-CON-CE-CIV-IR-6043 PCC (1:4:8) for manhole gully trap electrical chamber & electrical handhole 103,104 A&B 15-Jun-23 17-Jun-23 B B

3498 44 ELITE18-CON-CE-CIV-IR-6044 PCC (1:3:6) for manhole gully trap electrical chamber & electrical handhole 103,104 A&B 15-Jun-23 17-Jun-23 A A

3499 45 ELITE18-CON-CE-CIV-IR-6045 07 days cylinder concrete test RCC (4000 psi) retrofiting beams 103,104 FF 17-Jun-23 20-Jun-23 B B

3500 46 ELITE18-CON-CE-CIV-IR-6046 Steel & anchor wpoxy for slab thickness increase 103,104 FF 17-Jun-23 20-Jun-23 B B

3501 47 ELITE18-CON-CE-CIV-IR-6047 RCC concrete 4000 PSI & SBR for slab thickness increase 103,104 FF 17-Jun-23 20-Jun-23 B B

3502 48 ELITE18-CON-CE-CIV-IR-6048 Steel & anchor wpoxy for slab thickness increase toop roof 103,104 TR 17-Jun-23 20-Jun-23 B B

3503 49 ELITE18-CON-CE-CIV-IR-6049 RCC concrete 4000 PSI & SBR for slab thickness increase toop roof 103,104 TR 17-Jun-23 20-Jun-23 B B

3504 50 ELITE18-CON-CE-CIV-IR-6050 28 days cylinder concrete test RCC (4000 psi) retrofiting beam 103,104 GF 20-Jun-23 6-Jul-23 A A

3505 51 ELITE18-CON-CE-CIV-IR-6051 07 days cylinder concrete test RCC (4000 psi) slab thickness increase 103,104 TR,FF 22-Jun-23 6-Jul-23 A A

3506 52 ELITE18-CON-CE-CIV-IR-6052 Primer coat & membranes bituminous sheet for top roof 103,104 TR 23-Jun-23 6-Jul-23 B B

3507 53 ELITE18-CON-CE-CIV-IR-6053 28 days cylinder concrete test RCC (4000 psi) retrofiting columns 103,104 FF 7-Jul-23 13-Jul-23 B B

3508 54 ELITE18-CON-CE-CIV-IR-6054 28 days cylinder concrete test RCC (4000 psi) retrofiting beams 103,104 FF 7-Jul-23 13-Jul-23 A A

3509 55 ELITE18-CON-CE-CIV-IR-6055 Pond test for top roof 103,104 A&B 8-Jul-23 13-Jul-23 B B

3510 56 ELITE18-CON-CE-CIV-IR-6056 Surface clearence & side gola for top roof 103,104 A&B 12-Jul-23 14-Jul-23 B B

3511 57 ELITE18-CON-CE-CIV-IR-6057 28 days cylinder concrete test RCC (4000 psi) slab thickness increase 103,104 TR,FF 13-Jul-23 17-Jul-23 A A

3512 58 ELITE18-CON-CE-CIV-IR-6058 Primer coat & membranes bituminous sheet for external side 103,104 A&B 18-Jul-23 20-Jul-23 B B
Fixing MS girders with MS plates drilling anchoring connector mechnical &
3513 59 ELITE18-CON-CE-CIV-IR-6059 103,104 GF,FF 22-Jul-23 25-Jul-23 B B
chemical boulting epoxy
3514 60 ELITE18-CON-CE-CIV-IR-6060 FDT test 1st layer sand filling for external side 103,104 A&B 2-Aug-23 7-Aug-23 B B

3515 61 ELITE18-CON-CE-CIV-IR-6061 FDT test 2nd layer sand filling for external side 103,104 A&B 2-Aug-23 7-Aug-23 B B

3516 62 ELITE18-CON-CE-CIV-IR-6062 Block masonory for partition wall external side 103,104 A&B 7-Aug-23 8-Aug-23 A A

3517 63 ELITE18-CON-CE-CIV-IR-6063

3518 64 ELITE18-CON-CE-CIV-IR-6064 Jumbolon XPS board 50mm & polythene sheet laying & screeding for top roof 103,104 A&B 16-Aug-23 18-Aug-23 B B

3519 65 ELITE18-CON-CE-CIV-IR-6065 Side gola & laying aggregates for mumty top 103,104 A&B 16-Aug-23 19-Aug-23 A A

3520 66 ELITE18-CON-CE-CIV-IR-6066 Block masonory 103,104 GF,FF 17-Aug-23 19-Aug-23 B B

3521 67 ELITE18-CON-CE-CIV-IR-6067 PCC (1:3:6) for external back & front side 103,104 A&B 21-Aug-23 26-Aug-23 B B

3522 68 ELITE18-CON-CE-CIV-IR-6068 Polythene sheet for external back & front side 103,104 A&B 21-Aug-23 26-Aug-23 A A

3523 69 ELITE18-CON-CE-CIV-IR-6069 07 days cylinder concrete test PCC (1:3:6) external side front side & back side 103,104 A&B 24-Aug-23 26-Aug-23 A A

3524 70 ELITE18-CON-CE-CIV-IR-6070 Instalaltion peragola cleats with mechanical bolts all respect 103,104 A&B 29-Aug-23 1-Sep-23 B B

3525 71 ELITE18-CON-CE-CIV-IR-6071 Plaster for partition wall externals side 103,104 A&B 2-Sep-23 5-Sep-23 A A

3526 72 ELITE18-CON-CE-CIV-IR-6072 Plaster work for external patches retrofitting work 103,104 A&B 8-Sep-23 13-Sep-23 B B

3527 73 ELITE18-CON-CE-CIV-IR-6073 28 days cylinder concrete test PCC (1:3:6) external side & back side 103,104 A&B 13-Sep-23 18-Sep-23 A A

3528 74 ELITE18-CON-CE-CIV-IR-6074 Instalaltion MS porch fence for boudary wall 103,104 A&B 15-Sep-23 18-Sep-23 A A

3529 75 ELITE18-CON-CE-CIV-IR-6075 PCC (1:4:8) for for under the trench drain grating foundation 103,104 A&B 16-Sep-23 19-Sep-23 A A

Page 91 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
3530 76 ELITE18-CON-CE-CIV-IR-6076 Steel grating angle & formwork for trench drain grating foundation 103,104 A&B 2-Oct-23 13-Oct-23 A A

3531 77 ELITE18-CON-CE-CIV-IR-6077 RCC concrete (1:2:4) for trench drain grating foundation 103,104 A&B 2-Oct-23 13-Oct-23 A A

3532 78 ELITE18-CON-CE-CIV-IR-6078 Steel & formwork RCC concrete (1:2:4) block masonory & plaster for meter box 103,104 A&B 2-Oct-23 UR UR

3533 79 ELITE18-CON-CE-CIV-IR-6079 Sreeding fixing MS cover concrete & plaster for OHWT 103,104 A&B 9-Oct-23 13-Oct-23 B B

3534 80 ELITE18-CON-CE-CIV-IR-6080 Instalaltion black granite for partition wall external side 103,104 A&B 27-Oct-23 28-Oct-23 B B

3535 81 ELITE18-CON-CE-CIV-IR-6081 Instalaltion perlino marbal for floor 103 GF 27-Oct-23 28-Oct-23 B B

3536 82 ELITE18-CON-CE-CIV-IR-6082 Installation wall tile for kitchen 103,104 A&B 27-Oct-23 28-Oct-23 B B

3537 83 ELITE18-CON-CE-CIV-IR-6083 Dismentlling perlino marble for floor 103,104 FF 28-Oct-23 31-Oct-23 A A

3538 84 ELITE18-CON-CE-CIV-IR-6084 Dismentlling perlino marbal for stair GF to FF & FF to Mumty 103,104 A&B 28-Oct-23 31-Oct-23 A A

3539 85 ELITE18-CON-CE-CIV-IR-6085 Installation cremmo for boundry wall 103,104 A&B 28-Oct-23 31-Oct-23 B B

3540 86 ELITE18-CON-CE-CIV-IR-6086 Base primer & graffy for external side elevation 1&4 103,104 A&B 28-Oct-23 31-Oct-23 B B

3541 87 ELITE18-CON-CE-CIV-IR-6087 Installation suspention & framing system for celling GF,FF,Mumty dry area 103,104 A&B 28-Oct-23 31-Oct-23 B B

3542 88 ELITE18-CON-CE-CIV-IR-6088 FDT test 3rd layer sand filling for external side right side 103 A 28-Oct-23 1-Nov-23 A A

3543 89 ELITE18-CON-CE-CIV-IR-6089 PCC (1:3:6) for external PCC right side 103 A 31-Oct-23 1-Nov-23 B B

3544 90 ELITE18-CON-CE-CIV-IR-6090 Polythene sheet for external side right side 103 A 31-Oct-23 1-Nov-23 A A

3545 91 ELITE18-CON-CE-CIV-IR-6091 Plaster work patches & corner beads for retrofitting work & internal walls 103,104 GF,FF 31-Oct-23 1-Nov-23 B B

92 ELITE18-CON-CE-CIV-IR-6092 07 days cylinder concrete test PCC (1:3:6) external side right side 103 A 3-Nov-23 7-Nov-23 A A

93 ELITE18-CON-CE-CIV-IR-6093 Primer coat 1st coat putty & 2nd coat putty for internal paint 103,104 GF,FF,M 11-Nov-23 16-Nov-23 B B

94 ELITE18-CON-CE-CIV-IR-6094 Installation perlino marbal for floor 104 B 11-Nov-23 16-Nov-23 B B

95 ELITE18-CON-CE-CIV-IR-6095 Installation black granite window sill horizontal 103,104 GF,FF,M 11-Nov-23 16-Nov-23 B B

96 ELITE18-CON-CE-CIV-IR-6096 Instalaltion perlino marbal for boundry wall top & meter box top 103,104 A&B 11-Nov-23 16-Nov-23 C C

97 ELITE18-CON-CE-CIV-IR-6097 Installation floor tile for kitchen 103,104 A&B 11-Nov-23 16-Nov-23 B B

3546 98 ELITE18-CON-CE-CIV-IR-6098 Instalaltion window sill vertical 104 GF,FF,MR 15-Nov-23 23-Nov-23 B B

99 ELITE18-CON-CE-CIV-IR-6099 Plaster work patches & corner beads for retrofitting work & internal walls 104 FF 16-Nov-23 24-Nov-23 B B

100 ELITE18-CON-CE-CIV-IR-6100 28 days cylinder concrete test PCC (1:3:6) external side right side 103 A 24-Nov-23 30-Nov-23 B B

101 ELITE18-CON-CE-CIV-IR-6101 Block masonory for manhole gully trap electrical chamber & electrical handhole 103,104 A&B 25-Nov-23 28-Nov-23 C C

102 ELITE18-CON-CE-CIV-IR-6102 Pudlo plaster for manhole gully trap electrical chamber & electrical handhole 103,104 A&B 25-Nov-23 28-Nov-23 C C

103 ELITE18-CON-CE-CIV-IR-6103 Instalaltion window sill verticla 103 GF,FF,MR 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

104 ELITE18-CON-CE-CIV-IR-6104 Installation perlino marbal skirting for floor 103,104 GF,FF 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

105 ELITE18-CON-CE-CIV-IR-6105 Installation perlino marbal marbal for floor 103,104 FF 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

106 ELITE18-CON-CE-CIV-IR-6106 Plaster for HDF floor 103,104 GF,FF 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

107 ELITE18-CON-CE-CIV-IR-6107 Cementitious coat pond test for baths & powder bath water proofing 103,104 GF,FF,MB 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

108 ELITE18-CON-CE-CIV-IR-6108 Instalaltion wall tile for baths & powder room 103,104 GF,FF,MB 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

109 ELITE18-CON-CE-CIV-IR-6109 Instalaltion perlino marbal for stair GF to FF & FF to Mumty 103,104 A&B 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B 22-Dec-23 27-Dec-23 A A

110 ELITE18-CON-CE-CIV-IR-6110 PCC (1:4:8) under kerb stone & installation kerb stone gola for external side 103,104 A&B 30-Nov-23 4-Dec-23 B B

111 ELITE18-CON-CE-CIV-IR-6111 Base primer & graffy for external paint elevation 1,2,3,4 103,104 A&B 30-Nov-23 4-Dec-23 C 5-Dec-23 7-Dec-23 B B

112 ELITE18-CON-CE-CIV-IR-6112 Plaster roof tile & roof skirting for top roof 103,104 A&B 8-Dec-23 11-Dec-23 B B

113 ELITE18-CON-CE-CIV-IR-6113 Block masonory for mechnical wall 103 A 9-Dec-23 14-Dec-23 C C

114 ELITE18-CON-CE-CIV-IR-6114 Plaster work & wall mounted cement board for cistern tank 103 GF,FF 9-Dec-23 14-Dec-23 A A

115 ELITE18-CON-CE-CIV-IR-6115 Block masonory plaster for duct & DB area 103,104 GF,FF,M 9-Dec-23 14-Dec-23 C C

116 ELITE18-CON-CE-CIV-IR-6116 FDT test 3rd layer sand filling for external side left side 104 B 20-Dec-23 26-Dec-23 B B

Instalation gypsum board jointing & tapping for celling work GF,FF & mumty dry
117 ELITE18-CON-CE-CIV-IR-6117 103,104 A&B 22-Dec-23 27-Dec-23 B B
area
Installation suspention & framing system & moisture reistent board tapping and
118 ELITE18-CON-CE-CIV-IR-6118 111 &112 A&B 22-Dec-23 27-Dec-23 B B
jointing for ceiling work GF,FF,Maid room wet area
Core filling cementitious coat primer coat bituminios sheet membrane & pond test
119 ELITE18-CON-CE-CIV-IR-6119 103,104 A&B 22-Dec-23 27-Dec-23 B B
for top roof
Cementitious coat pond test for baths & powder bath water proofing GF,FF& maid
120 ELITE18-CON-CE-CIV-IR-6120 103,104 A&B 22-Dec-23 27-Dec-23 B B
bath
121 ELITE18-CON-CE-CIV-IR-6121 Plaster roof tile & roof skirting for top roof 103,104 A&B 22-Dec-23 27-Dec-23 B B

122 ELITE18-CON-CE-CIV-IR-6122 Installation for glass railing & wooden hand rail for stair GF to FF & FF to mumty 104 A&B 22-Dec-23 27-Dec-23 B B

123 ELITE18-CON-CE-CIV-IR-6123 Installation paver & pavers skirting for external side 103,104 A&B 22-Dec-23 27-Dec-23 B B

124 ELITE18-CON-CE-CIV-IR-6124 Installation threshold GF ff & mumty 103,104 A&B 22-Dec-23 27-Dec-23 B B

125 ELITE18-CON-CE-CIV-IR-6125 Installation black granite strip for shower cabin GF&FF 103,104 A&B 22-Dec-23 27-Dec-23 B B
Primer coat 1st coat putty 2nd coat putty !st coat paint & 2nd coat paint for internal
126 ELITE18-CON-CE-CIV-IR-6126 103,104 A&B 22-Dec-23 27-Dec-23 B B
paint GF,FF& mumty
Primer coat 1st coat putty 2nd coat putty !st coat paint & 2nd coat paint for ceiling
127 ELITE18-CON-CE-CIV-IR-6127 103,104 A&B 22-Dec-23 27-Dec-23 B B
paint GF,FF& mumty

128 ELITE18-CON-CE-CIV-IR-6128 Installation vanity frame for baths & powdr room GF&FF 103,104 A&B 22-Dec-23 27-Dec-23 B B

129 ELITE18-CON-CE-CIV-IR-6129 Installation vanity frame for baths & powdr room GF&FF 103,104 A&B 22-Dec-23 27-Dec-23 B B

130 ELITE18-CON-CE-CIV-IR-6130 Terrazzo layer for OHWT walls 103,104 A&B 23-Dec-23 27-Dec-23 C C

Page 92 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ARC-CIV - CON January 30, 2024

FILE CODE

Area / Level
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-05

VOL #
ITEM
FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location

&
Date of Date of STATUS
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of No. of Date of No. of Date of Date of No. of
Status Status Status Submissio Status Submissio Status Status
Date Date Days Submission Reply Days Submission Reply Days Reply Days Reply Days Submission Reply Days
n n
131 ELITE18-CON-CE-CIV-IR-6131 07 days cylinder concrete test PCC (1:3:6) external side left side 104 B 27-Dec-23 29-Dec-23 B B

132 ELITE18-CON-CE-CIV-IR-6132 PCC (1:3:6) for external PCC left side 104 B 27-Dec-23 29-Dec-23 B B

133 ELITE18-CON-CE-CIV-IR-6133 Polythene sheet for external side left side 104 B 27-Dec-23 29-Dec-23 B B

3547

3548 6251 TO 6500 101-102


Dismentlling manhole gully trap electrical chamber & electrical handhole & debris
3549 1 ELITE18-CON-CE-CIV-IR-6251 101,102 A&B 12-Dec-22 14-Dec-22 B B
remove
3550 2 ELITE18-CON-CE-CIV-IR-6252 Dismentlling perlino marble for floor & debris remove 101,102 A&B 12-Dec-22 14-Dec-22 B B

3551 3 ELITE18-CON-CE-CIV-IR-6253 Dismentlling skirting for floor & debris remove 101,102 A&B 12-Dec-22 14-Dec-22 B B

3552 4 ELITE18-CON-CE-CIV-IR-6254 Dismentlling bath floor tile & debris remove 101,102 A&B 12-Dec-22 14-Dec-22 B B

3553 5 ELITE18-CON-CE-CIV-IR-6255 Dismentlling bath wall tile & debris remove 101,102 A&B 12-Dec-22 14-Dec-22 B B

3554 6 ELITE18-CON-CE-CIV-IR-6256 Dismentlling kitchen wall tile & debris remove 101,102 A&B 12-Dec-22 14-Dec-22 B B

3555 7 ELITE18-CON-CE-CIV-IR-6257 Dismentlling block masonory for walls & debris remove 101,102 A&B 12-Dec-22 14-Dec-22 B B

3556 8 ELITE18-CON-CE-CIV-IR-6258 Dismentlling RCC concrete SOG & debris remove 101,102 A&B 12-Dec-22 14-Dec-22 B B

Page 93 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ELECTRICAL - CON January 30, 2024

Area / Level
FILE CODE

Rev-00 Rev-01 Rev-02 Rev-03 Rev-04


VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
&

Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of No. of STATUS
Status Status Status Status Date of Submission Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Reply Days

1 ELITE18-CON-CE-ELE-IR-0001 Electrical wiring communication & fixtures (sec1 to sec7) 9-Sep-22 13-Sep-22 B 16-Sep-22 19-Sep-22 B B
141,142,143,1
2 ELITE18-CON-CE-ELE-IR-0002 PVC conduit damage (25mm,50mm) during dismantling GF,FF 13-Sep-22 16-Sep-22 B B
44,
3 ELITE18-CON-CE-ELE-IR-0003 Electrical wiring communication & fixtures (sec1 to sec7) 127 to 136 21-Sep-22 27-Sep-22 B B

4 ELITE18-CON-CE-ELE-IR-0004 Light wiring installation (sec-1-b) switch to first light point 111 to 116 MF,Roof 23-Sep-22 28-Sep-22 B B
117,118,119,1
5 ELITE18-CON-CE-ELE-IR-0005 Light wiring installation (sec-1-b) switch to first light point MF,Roof 23-Sep-22 28-Sep-22 C 10-Dec-22 13-Dec-22 B B
20,122 to 131
6 ELITE18-CON-CE-ELE-IR-0006 Light wiring installation (sec-1-b) switch to first light point 132 to 136 23-Sep-22 28-Sep-22 B B
Dismantling & removing of electrical items (sec 1,2,3,4,5,6 & sec GF,FF,MF,T
7 ELITE18-CON-CE-ELE-IR-0007 7& vo)(Dismentlling of electrical work instaled & rework requird as 143,144 yoe B 26-Sep-22 28-Sep-22 B 16-Nov-22 19-Nov-22 C 3-Dec-22 9-Dec-22 B B
per duplex (vo#21, item 20) Complete
8 ELITE18-CON-CE-ELE-IR-0008 PVC conduit damage (25mm,50mm) during dismantling 137 TO 140 GF,FF 28-Sep-22 1-Oct-22 B B

9 ELITE18-CON-CE-ELE-IR-0009 Electrical wiring communication & fixtures (sec1 to sec7) 101 to 126 29-Sep-22 3-Oct-22 B B

10 ELITE18-CON-CE-ELE-IR-0010 Electrical data & power conduiting external area 103,104 30-Sep-22 3-Oct-22 B B

11 ELITE18-CON-CE-ELE-IR-0011 Electrical data & power conduiting external area 105 to 108 1-Oct-22 4-Oct-22 B B

12 ELITE18-CON-CE-ELE-IR-0012 Electrical data & power conduiting external area 109 to 112 3-Oct-22 11-Oct-22 B B

13 ELITE18-CON-CE-ELE-IR-0013 PVC conduit damage (25mm,50mm) during dismantling 127 to 136 3-Oct-22 11-Oct-22 B 10-Dec-22 13-Dec-22 B B
Dismantling & removing of electrical items (sec 1,2,3,4,5,6 & sec
14 ELITE18-CON-CE-ELE-IR-0014 7& vo)(Dismentlling of electrical work instaled & rework requird as 141,142 GF,FF,MF 4-Oct-22 7-Oct-22 B 7-Nov-22 12-Nov-22 C 16-Nov-22 19-Nov-22 C 3-Dec-22 9-Dec-22 B B
per duplex (vo#21, item 20)
15 ELITE18-CON-CE-ELE-IR-0015 Laying of power electrical conduit,s 143,144 GF 10-Oct-22 15-Oct-22 B B

16 ELITE18-CON-CE-ELE-IR-0016 Laying of lighting electrical conduit,s 143,144 GF 10-Oct-22 15-Oct-22 B B

17 ELITE18-CON-CE-ELE-IR-0017 Laying of data electrical conduit,s 143,144 GF 10-Oct-22 15-Oct-22 B B

18 ELITE18-CON-CE-ELE-IR-0018 Laying of power electrical conduit,s 143,144 FF 13-Oct-22 17-Oct-22 C 6-Dec-22 9-Dec-22 B B

19 ELITE18-CON-CE-ELE-IR-0019 Laying of lighting electrical conduit,s 143,144 FF 13-Oct-22 17-Oct-22 C 6-Dec-22 9-Dec-22 B B

20 ELITE18-CON-CE-ELE-IR-0020 Laying of data electrical conduit,s 143,144 FF 13-Oct-22 17-Oct-22 C 6-Dec-22 9-Dec-22 B B

21 ELITE18-CON-CE-ELE-IR-0021 Inatallation of lighting power ELV & DB,s MS back boxes 143,144 GF,FF,MF 1-Nov-22 3-Nov-22 B B

22 ELITE18-CON-CE-ELE-IR-0022 Inatallation of wiring of lighting & power 143,144 GF,FF,MF 1-Nov-22 3-Nov-22 B 11-Nov-22 16-Nov-22 B B

23 ELITE18-CON-CE-ELE-IR-0023 Inatallation of ELV data & vioce cabal 143,144 GF,FF,MF 1-Nov-22 5-Nov-22 C 28-Nov-22 10-Dec-22 B B

24 ELITE18-CON-CE-ELE-IR-0024 Megger testing for power & lighting cabal 143,144 GF,FF,MF 1-Nov-22 5-Nov-22 C 7-Nov-22 14-Nov-22 C 3-Dec-22 9-Dec-22 B B

25 ELITE18-CON-CE-ELE-IR-0025 Forinstallation of lighting power ELV & DB,s MS back boxes 141,142 GF,FF,MF 1-Nov-22 16-Nov-22 C 28-Nov-22 1-Dec-22 C 3-Dec-22 6-Dec-22 C 10-Dec-22 15-Dec-22 B B

26 ELITE18-CON-CE-ELE-IR-0026 Installation of wiring for lighting & power 141,142 GF,FF,MF 11-Nov-22 16-Nov-22 C 28-Nov-22 1-Dec-22 B B
Dismentlling of electrical work instaled & rework requird as per
27 ELITE18-CON-CE-ELE-IR-0027 139A,140B.C A&B Com 16-Nov-22 19-Nov-22 C 3-Dec-22 9-Dec-22 B B
duplex (vo#21, item 20)
Dismentlling of electrical work instaled & rework requird as per
28 ELITE18-CON-CE-ELE-IR-0028 137A,138B.C A&B Com 16-Nov-22 19-Nov-22 C 3-Dec-22 9-Dec-22 B B
duplex (vo#21, item 20)
29 ELITE18-CON-CE-ELE-IR-0029 Installation of ELV,data & voice cabal 141a,142b GF,FF,MF 28-Nov-22 10-Dec-22 B B

30 ELITE18-CON-CE-ELE-IR-0030 Installation of ELV,data & voice cabal 139a,140b GF,FF,MF 28-Nov-22 10-Dec-22 B B

31 ELITE18-CON-CE-ELE-IR-0031 Installation of wiring for lighting & power 139a,140b GF,FF,MF 28-Nov-22 1-Dec-22 B B
139,140,141,1
32 ELITE18-CON-CE-ELE-IR-0032 Installation of wiring for 2-way circuits (VO items) 42,143a & GF,FF,MF 28-Nov-22 1-Dec-22 C 3-Dec-22 6-Dec-22 B B
144b
33 ELITE18-CON-CE-ELE-IR-0033 DB,s installation & termination work 143a,144b GF,FF 29-Nov-22 10-Dec-22 B B
140 to
34 ELITE18-CON-CE-ELE-IR-0034 Laying of main power cable 25mm & 35mm 4/core+ 1-core ECC A 29-Nov-22 10-Dec-22 B B
144b,139a
140 to
35 ELITE18-CON-CE-ELE-IR-0035 Installation of kitchen wiring 29-Nov-22 10-Dec-22 B B
144b,139a
36 ELITE18-CON-CE-ELE-IR-0036 Lighting power ELV & DB,s back boxes 139a,140b GF,FF,MF 29-Nov-22 10-Dec-22 C 12-Dec-22 17-Dec-22 C 20-Dec-22 22-Dec-22 C 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B
140 to
37 ELITE18-CON-CE-ELE-IR-0037 Earthing system-8(1,2,3,4) Complet 30-Nov-22 2-Dec-22 B 3-Dec-22 9-Dec-22 B B
144b,139b
38 ELITE18-CON-CE-ELE-IR-0038 ELV data & voice cabal testing 144b,143a GF,FF,MF 30-Nov-22 2-Dec-22 B B

39 ELITE18-CON-CE-ELE-IR-0039 ELV data & voice cabal testing 142b,141a GF,FF,MF 30-Nov-22 2-Dec-22 B B
138 to
40 ELITE18-CON-CE-ELE-IR-0040 MS 16SWG meter boxes (VO Item) 2-Dec-22 6-Dec-22 B B
144b,137a

1 101 TO 130 143-144


1 ELITE18-CON-CE-ELE-IR-0101 Instalalation of switches & socket (SEC-5) 143a,144b GF,FF,MF 3-Dec-22 9-Dec-22 C 10-Dec-22 13-Dec-22 B B

2 ELITE18-CON-CE-ELE-IR-0102 Instalalation of fitting & fixture (SEC-4) 143a,144b GF,FF,MF 3-Dec-22 9-Dec-22 C 10-Dec-22 13-Dec-22 B B

3 ELITE18-CON-CE-ELE-IR-0103 Instalalation of data patch panel & data rack cabinet (sec-6) 143a,144b GF,FF,MF 10-Dec-22 13-Dec-22 C 10-Dec-22 10-Dec-22 B B

Page 94 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ELECTRICAL - CON January 30, 2024

Area / Level
FILE CODE

Rev-00 Rev-01 Rev-02 Rev-03 Rev-04


VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
&

Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of No. of STATUS
Status Status Status Status Date of Submission Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Reply Days
Testing and commissioning for wiring of power lighting wiring
4 ELITE18-CON-CE-ELE-IR-0104 143a,144b 28-Dec-22 3-Jan-23 B B
ELV destribution boards switches fixture & lighting fixture ect
5 ELITE18-CON-CE-ELE-IR-0105 Installation of TJB telephone junction box 143a,144b B 10-Dec-22 10-Dec-22 B B

6 ELITE18-CON-CE-ELE-IR-0106 Installation of main gate light 12w MS frrame 143a,144b B 10-Dec-22 10-Dec-22 B B

7 ELITE18-CON-CE-ELE-IR-0107 Erthing testing & commissiong sec-8(1,2,3,4) 143a,144b A,B 11-Dec-22 15-Feb-23 B B

8 ELITE18-CON-CE-ELE-IR-0108 Shop drawing & as bilt drawing are complete 143a,144b A,B 14-Feb-23 15-Feb-23 B B

2 131 TO 160 141-142


1 ELITE18-CON-CE-ELE-IR-0131 DB,s Installation & termination work 141a,142b GF,FF 3-Dec-22 6-Dec-22 C 10-Dec-22 13-Dec-22 C 22-Dec-22 25-Dec-22 B B

2 ELITE18-CON-CE-ELE-IR-0132 Megger testing for power & lighting cabal 141a,142b GF,FF,MF 6-Dec-22 9-Dec-22 B B

3 ELITE18-CON-CE-ELE-IR-0133 Laying of power electrical conduits 141a,142b GF,FF,MF 15-Dec-22 21-Dec-22 B B

4 ELITE18-CON-CE-ELE-IR-0134 Installation of 4u data rack cabnit KSP sample 141 GF 7-Mar-23 14-Mar-23 B B

5 ELITE18-CON-CE-ELE-IR-0135

6 ELITE18-CON-CE-ELE-IR-0136 Laying of lighting electrical conduits 141a,142b GF,FF,MF 13-Dec-22 21-Dec-22 B B

7 ELITE18-CON-CE-ELE-IR-0137 Laying of ELV & electrical conduits 141a,142b GF,FF,MF 13-Dec-22 21-Dec-22 B B
Installation & fixing of electrical items conduits wiring power
8 ELITE18-CON-CE-ELE-IR-0138 cabales fiting fixture switches & sockets DB,s communiction 141a,142b GF,FF,MF 15-Feb-23 15-Feb-23 B B
Testing & system
eartithing commissioning
meter boxfor&wiring of power lighting wiring ELV
back boxes
9 ELITE18-CON-CE-ELE-IR-0139 distribution boards switches fixture lighting fixture & earthing 141a,142b GF,FF,MF 1-Mar-23 6-Mar-23 C 7-Mar-23 14-Mar-23 A A
complete

3 161 TO 190 139-140


1 ELITE18-CON-CE-ELE-IR-0161 ELV data & voice cable testing 139a,140b GF,FF,MF 3-Dec-22 6-Dec-22 B B

2 ELITE18-CON-CE-ELE-IR-0162 Megger testing for power & lighting cabal 139a,140b GF,FF,MF 6-Dec-22 9-Dec-22 C 10-Dec-22 15-Dec-22 C 20-Dec-22 22-Dec-22 B B

3 ELITE18-CON-CE-ELE-IR-0163 DB,s Installation & termination work 139a,140b GF,FF 12-Dec-22 5-Dec-22 C 20-Dec-22 25-Dec-22 B B

4 ELITE18-CON-CE-ELE-IR-0164 Laying of power electrical conduits 139a,140b GF,FF,TR 2-Jan-23 5-Jan-23 B B

5 ELITE18-CON-CE-ELE-IR-0165 Laying of lighting electrical conduits 139a,140b GF,FF,TR 2-Jan-23 5-Jan-23 B B

6 ELITE18-CON-CE-ELE-IR-0166 Laying of data & ELV electrical conduits 139a,140b GF,FF,TR 2-Jan-23 5-Jan-23 B B

7 ELITE18-CON-CE-ELE-IR-0167 Installation of bell push button reco sample 139a,140b GF 14-Mar-23 20-Mar-23 C C
Installation of power wiring,lighting wiring,ELV wiring,distribution
8 ELITE18-CON-CE-ELE-IR-0168 139a,140b 21-Mar-23 21-Mar-23 B B
borad,switch fixture,lighting fixture & erthing,complete
Testing & commissioning for wiring of
9 ELITE18-CON-CE-ELE-IR-0169 powe,lighting,wiring,ELV,distribution boards,switches fixture 139a,140b GF,FF,MF 1-Apr-23 7-Apr-23 A A
lighting fixture & earthing complete

4 191 TO 220 137-138


1 ELITE18-CON-CE-ELE-IR-0191 Installation of wiring for lighting & power 137a,138b GF,FF,MF 3-Dec-22 9-Dec-22 B B

2 ELITE18-CON-CE-ELE-IR-0192 Megger testing for power & lighting cabal 137a,138b GF,FF,MF 6-Dec-22 9-Dec-22 C 10-Dec-22 15-Dec-22 C 20-Dec-22 22-Dec-22 B B

3 ELITE18-CON-CE-ELE-IR-0193 Installation of lighting power ELV & DB,s MS back boxes 137a,138b GF,FF,MF 10-Dec-22 13-Dec-22 C 15-Dec-22 21-Dec-22 C 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B

4 ELITE18-CON-CE-ELE-IR-0194 Installation of ELV data & voice cable 137a,138b GF,FF,MF 10-Dec-22 13-Dec-22 C 15-Dec-22 19-Dec-22 C 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B

5 ELITE18-CON-CE-ELE-IR-0195 Installation of earthing system system sec-8 (1,2,3,4) 137a,138b B 12-Dec-22 15-Dec-22 B B

6 ELITE18-CON-CE-ELE-IR-0196 ELV data & voice cable testing 137a,138b GF,FF,MF 12-Dec-22 15-Dec-22 C 20-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B

7 ELITE18-CON-CE-ELE-IR-0197 Installation of wiring for 2 way circuits VO items 137a,138b GF,FF,MF 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B

8 ELITE18-CON-CE-ELE-IR-0198 Installation of kitchen wiring 137a,138b A&B 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B

9 ELITE18-CON-CE-ELE-IR-0199 Laying of main power cable 25mm & 35mm 4/core+1core ECC 137a,138b A&B 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B
Installation of electrical wiring
10 ELITE18-CON-CE-ELE-IR-0200 power,lighting,wiring,elv,distribution 137a,138b GF,FF,MF 14-Apr-23 2-May-23 B B
boards,switches,fixture,lighting fixture & earthing complete
11 ELITE18-CON-CE-ELE-IR-0201 DB,S at GF,FF 137a,138b GF,FF 9-Jun-23 10-Jun-23 B B
Testing & commissioning for wiring of
12 ELITE18-CON-CE-ELE-IR-0202 powe,lighting,wiring,ELV,distribution boards,switches fixture 137a,138b GF,FF,MF 12-Jun-23 14-Jun-23 B B
lighting fixture & earthing complete

Page 95 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ELECTRICAL - CON January 30, 2024

Area / Level
FILE CODE

Rev-00 Rev-01 Rev-02 Rev-03 Rev-04


VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
&

Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of No. of STATUS
Status Status Status Status Date of Submission Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Reply Days

5 221 TO 250 135-136


1 ELITE18-CON-CE-ELE-IR-0221 Installation of ELV data & voice cable 135a,136b GF,FFMF 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 C C

2 ELITE18-CON-CE-ELE-IR-0222 Installation of lighting power ELV data & DB,s MS back boxes 135a,136b GF,FFMF 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B

3 ELITE18-CON-CE-ELE-IR-0223 Installation of wiring for lighting & power 135a,136b 24-Dec-22 25-Dec-22 C 2-Jan-23 5-Jan-23 B B

4 ELITE18-CON-CE-ELE-IR-0224 ELV data & voice cabal testing 135a,136b GF,FFMF 3-Jan-23 5-Jan-23 C C

5 ELITE18-CON-CE-ELE-IR-0225 Installation for wiring for 2-way circuits (vo items) 135a,136b GF,FFMF 4-Jan-23 7-Jan-23 C 16-Jan-23 21-Jan-23 C C

6 ELITE18-CON-CE-ELE-IR-0226 Installation of kitchen wiring 135a,136b 4-Jan-23 7-Jan-23 B B

7 ELITE18-CON-CE-ELE-IR-0227 Megger testing for power & lighting cabal 135a,136b GF,FFMF 4-Jan-23 7-Jan-23 C C

8 ELITE18-CON-CE-ELE-IR-0228 Laying of main power cabal 25mm & 35mm 4/core + 1-core ECC 135a,136b 4-Jan-23 7-Jan-23 B B

9 ELITE18-CON-CE-ELE-IR-0229
Installation of electrical wiring power lighting wiring ELV
10 ELITE18-CON-CE-ELE-IR-0230 distribution boards switches fixture lighting fixture & earthing 135a,136b 18-May-23 20-May-23 B B
Testing & commissioning for wiring of
complete
11 ELITE18-CON-CE-ELE-IR-0231 powe,lighting,wiring,ELV,distribution boards,switches fixture 135a,136b GF,FFMF 9-Jun-23 10-Jun-23 B B
lighting fixture & earthing complete
12 ELITE18-CON-CE-ELE-IR-0232 4 core cabal 35mm,25m & DB,S at GF,FF installed & testing 135a,136b GF,FF 9-Jun-23 10-Jun-23 B B

6 251 TO 280 133-134


1 ELITE18-CON-CE-ELE-IR-0251 Installation of ELV data & voice cabal 133,134 GF,FF,MF 4-Jan-23 7-Jan-23 C C

2 ELITE18-CON-CE-ELE-IR-0252 Installation of Lighting power ELV & dbs MS back boxes 133,134 GF,FF,MF 4-Jan-23 12-Jan-23 B B

3 ELITE18-CON-CE-ELE-IR-0253 ELV data & voice cable testing 133,134 GF,FF,MF 4-Jan-23 7-Jan-23 C C

4 ELITE18-CON-CE-ELE-IR-0254 Installation of wiring for 2-way circuits VO Items 133,134 GF,FF,MF 4-Jan-23 7-Jan-23 C 16-Jan-23 21-Jan-23 C C

5 ELITE18-CON-CE-ELE-IR-0255 Installation of wiring for lighting & power 133,134 GF,FF,MF 4-Jan-23 7-Jan-23 B B

6 ELITE18-CON-CE-ELE-IR-0256 Installation of kitchen wiring 133,134 4-Jan-23 7-Jan-23 B B

7 ELITE18-CON-CE-ELE-IR-0257
Installation of electrical wiring power lighting wiring ELV
8 ELITE18-CON-CE-ELE-IR-0258 distribution boards switches fixture lighting fixture & earthing 133,134 GF,FF,MF 18-May-23 22-May-23 B B
Installation of electrical conduits wiring power lighting wiring ELV
complete
9 ELITE18-CON-CE-ELE-IR-0259 distribution boards swittches fixture lihting fixture & erthing 133,134 GF,FF,MF 9-Jun-23 10-Jun-23 B B
Testing & commissioning for wiring of
complete
10 ELITE18-CON-CE-ELE-IR-0260 powe,lighting,wiring,ELV,distribution boards,switches fixture 133,134 GF,FF,MF 9-Jun-23 10-Jun-23 B B
lighting fixture & earthing complete
11 ELITE18-CON-CE-ELE-IR-0261 Testing & commissioning for earthing system complete 134 GF 18-Jul-23 UR UR
Installation of electrical switches fixture lighing fixturs & earthing
12 ELITE18-CON-CE-ELE-IR-0262 133,134 A&B 11-Dec-23 18-Dec-23 B B
complete 1 to 8 T&C

7 281 TO 310 131-132


Testing & commissioning for wiring of
1 ELITE18-CON-CE-ELE-IR-0281 powe,lighting,wiring,ELV,distribution boards,switches fixture 131,132 A&B 12-Jun-23 13-Jul-23 B B
Installation of electrical
lighting fixture & earthingconduits wiring power lighting wiring ELV
complete
2 ELITE18-CON-CE-ELE-IR-0282 distribution boards swittches fixture lihting fixture & erthing 131,132 A&B 9-Jun-23 10-Jun-23 B B
complete
3 ELITE18-CON-CE-ELE-IR-0283 Installation for earthing system complete 131,132 A&B 18-Jun-23 UR UR

8 311 TO 340 129-130


Installation of electrical conduits wiring power lighting wiring ELV
1 ELITE18-CON-CE-ELE-IR-0311 distribution boards swittches fixture lihting fixture & erthing 129,130 A&B 7-Jul-23 13-Jul-23 B B
Testing & commissioning for wiring of
complete
2 ELITE18-CON-CE-ELE-IR-0312 powe,lighting,wiring,ELV,distribution boards,switches fixture 129,130 A&B 18-Jul-23 18-Jul-23 B B
lighting fixture & earthing complete

9 341 TO 370 127-128


Installation of electrical conduits wiring power lighting wiring ELV
1 ELITE18-CON-CE-ELE-IR-0341 distribution boards swittches fixture lihting fixture & erthing 127,128 A&B 21-Jul-23 27-Jul-23 C 10-Aug-23 12-Aug-23 B B
T&C inspection requstInstallation of electrical conduits wiring
complete
2 ELITE18-CON-CE-ELE-IR-0342 power lighting wiring ELV distribution boards swittches fixture 127,128 A&B 15-Aug-23 18-Aug-23 B B
lihting fixture & erthing complete

Page 96 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ELECTRICAL - CON January 30, 2024

Area / Level
FILE CODE

Rev-00 Rev-01 Rev-02 Rev-03 Rev-04


VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
&

Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of No. of STATUS
Status Status Status Status Date of Submission Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Reply Days

10 371 TO 400 126-126A


Installation of electrical conduits wiring power lighting wiring
1 ELITE18-CON-CE-ELE-IR-0371 126,126a A&B 8-Aug-23 12-Aug-23 B B
power lighting wiring ELV wiring complete
Installation of electrical conduits wiring power lighting wiring ELV
2 ELITE18-CON-CE-ELE-IR-0372 distribution boards swittches fixture lihting fixture & erthing 126,126a A&B 15-Sep-23 20-Sep-23 C 21-Sep-23 23-Sep-23 C 4-Oct-23 6-Oct-23 B B
complete
3 ELITE18-CON-CE-ELE-IR-0373 Electrical distribution board switches fixture meter box complete 126,126a A&B 25-Sep-23 27-Sep-23 B B
T&C of electrical conduits wiring power lighting wiring ELV
4 ELITE18-CON-CE-ELE-IR-0374 126,126a A&B 27-Oct-23 31-09-2023 B B
wiring telecom & data wiring complete

11 401 TO 430 124-125


Installation of electrical conduits wiring power lighting wiring
1 ELITE18-CON-CE-ELE-IR-0401 124,125 A&B 8-Aug-23 12-Aug-23 B B
power lighting wiring ELV wiring complete
Installation of electrical conduits wiring power lighting wiring ELV
2 ELITE18-CON-CE-ELE-IR-0402 distribution boards swittches fixture lihting fixture & erthing 124,125 A&B 14-Aug-23 20-Sep-23 C 21-Sep-23 23-Sep-23 C 4-Oct-23 10/6/2023 B B
complete
3 ELITE18-CON-CE-ELE-IR-0403 Electrical distribution board switches fixture meter box complete 124,125 A&B 25-Sep-23 27-Sep-23 B B
T&C of electrical conduits wiring power lighting wiring ELV
4 ELITE18-CON-CE-ELE-IR-0404 124,125 A&B 27-Oct-23 31-Oct-23 B B
wiring telecom & data wiring complete

12 431 TO 460 122-123


Installation of electrical conduits wiring power lighting wiring
1 ELITE18-CON-CE-ELE-IR-0431 122,123 A&B 8-Aug-23 12-Aug-23 B B
power lighting wiring ELV wiring complete
Installation of electrical conduits wiring power lighting wiring ELV
2 ELITE18-CON-CE-ELE-IR-0432 distribution boards swittches fixture lihting fixture & erthing 122,123 A&B 16-Sep-23 20-Sep-23 C 21-Sep-23 23-Sep-23 C 4-Oct-23 10/6/2023 B B
complete
3 ELITE18-CON-CE-ELE-IR-0433 Electrical distribution board switches fixture meter box complete 122,123 A&B 25-Sep-23 27-Sep-23 B B
T&C of electrical conduits wiring power lighting wiring ELV
4 ELITE18-CON-CE-ELE-IR-0434 122,123 A&B 27-Oct-23 31-Oct-23 B B
wiring telecom & data wiring complete

13 461 TO 490 119-120


Installation of electrical conduits wiring power lighting wiring ELV
1 ELITE18-CON-CE-ELE-IR-0461 distribution boards swittches fixture lihting fixture & erthing 119,120 A&B 15-Sep-23 23-Sep-23 C 25-Sep-23 27-Sep-23 B 27-Oct-23 11/3/2023 B B
Installation of electrical conduits wiring power lighting wiring ELV
complete
2 ELITE18-CON-CE-ELE-IR-0462 distribution boards swittches fixture lihting fixture & erthing 119,120 A&B 15-Sep-23 24-Nov-23 B B
complete
Electrical switches fixture lighting fixtures & earthing complete sec
3 ELITE18-CON-CE-ELE-IR-0463 119,120 A&B 23-Nov-23 23-Nov-23 B B
1to 8
T&C of ele electrical conduits wiring power lighting wiring ELV
4 ELITE18-CON-CE-ELE-IR-0464 119,120 A&B 4-Dec-23 7-Dec-23 B B
wiring telecom & data wiring complete

14 491 TO 520 117-118


Electrical conduit wiring power lighting wiring ELV wiring telecom
1 ELITE18-CON-CE-ELE-IR-0491 117,118 A&B 11-Nov-23 16-Nov-23 B 11-Dec-23 18-Dec-23 B B
and data wiring complete

15 521 TO 550 115-116


1 ELITE18-CON-CE-ELE-IR-0521

16 551 TO 580 113-114


Installation of electrical conduits wiring power lighting wiring ELV
1 ELITE18-CON-CE-ELE-IR-0551 distribution boards swittches fixture lihting fixture & erthing 113,114 A&B 15-Sep-23 23-Sep-23 C 25-Sep-23 27-Sep-23 B 27-Oct-23 11/3/2023 B B
complete
Installation of electricla switches fixture lighting fixtures & earthing
2 ELITE18-CON-CE-ELE-IR-0552 113,114 A&B 22-Nov-23 23-Nov-23 B B
complete
T&C of ele electrical conduits wiring power lighting wiring ELV
3 ELITE18-CON-CE-ELE-IR-0553 113,114 A&B 4-Dec-23 7-Dec-23 B B UR
wiring telecom & data wiring complete

Page 97 of 123
CLUSTER-E - INSPECTION REQUEST LOG - ELECTRICAL - CON January 30, 2024

Area / Level
FILE CODE

Rev-00 Rev-01 Rev-02 Rev-03 Rev-04


VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
&

Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of No. of STATUS
Status Status Status Status Date of Submission Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Reply Days

17 581 TO 610 111-112


Installation of electrical conduits wiring power lighting wiring ELV
1 ELITE18-CON-CE-ELE-IR-0581 distribution boards swittches fixture lihting fixture & erthing 111,112 A&B 15-Sep-23 23-Sep-23 C 25-Sep-23 27-Sep-23 B 27-Oct-23 11/3/2023 B B
complete
2 ELITE18-CON-CE-ELE-IR-0582 Electrical switches fixture lighting fixture & earthing complete 111,112 A&B 4-Dec-23 7-Dec-23 B B

18 611 TO 640 109-110


Electrical conduit wiring power lighting wiring ELV wiring telecom
1 ELITE18-CON-CE-ELE-IR-0611 109,110 A&B 11-Dec-23 18-Dec-23 B B
and data wiring complete

19 641 TO 670 107-108


Electrical conduit wiring power lighting wiring ELV wiring telecom
1 ELITE18-CON-CE-ELE-IR-0641 107,108 A&B 11-Nov-23 16-Nov-23 B B
and data wiring complete

20 671 TO 700 105-106


Electrical conduit wiring power lighting wiring ELV wiring telecom
1 ELITE18-CON-CE-ELE-IR-0671 105,106 A&B 11-Dec-23 18-Dec-23 C C
and data wiring complete

21 701 TO 730 103-104


Electrical conduit wiring power lighting wiring ELV wiring telecom
1 ELITE18-CON-CE-ELE-IR-0701 103,104 A&B 11-Dec-23 18-Dec-23 B B
and data wiring complete

22 731 TO 760 101-102


1 ELITE18-CON-CE-ELE-IR-0731

LEGENDS
Total Submitted 132
Total Approved 120
%
A APPROVED 2 1.52
B APPROVED AS NOTED 118 89.39
C REVISED & RESUBMIT 9 6.82
D REJECTED / REJECTED 0 0.00
E FOR INFORMATION ONLY 0 0.00
UR UNDER REVIEW 3 2.27

Page 98 of 123
CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

1 ELITE18-CON-CE-M&P-IR-0001 Rain pipe dismentling riser to green area 143,144 2-Sep-22 6-Sep-22 4 A A

2 ELITE18-CON-CE-M&P-IR-0002 Rain pipe dismentling riser to green area 141,142 2-Sep-22 6-Sep-22 4 A A

3 ELITE18-CON-CE-M&P-IR-0003 Rain pipe dismentling riser to green area 139,140 2-Sep-22 6-Sep-22 4 A A

4 ELITE18-CON-CE-M&P-IR-0004 FD pipe dismentiling riser to green area 139,140 2-Sep-22 6-Sep-22 4 A A

5 ELITE18-CON-CE-M&P-IR-0005 FD pipe dismentiling riser to green area 141,142 2-Sep-22 6-Sep-22 4 A A

6 ELITE18-CON-CE-M&P-IR-0006 FD pipe dismentiling riser to green area 143,144 2-Sep-22 6-Sep-22 4 A A

7 ELITE18-CON-CE-M&P-IR-0007 Soil pipe dismentiling riser to green area 143,144 2-Sep-22 6-Sep-22 4 A A

8 ELITE18-CON-CE-M&P-IR-0008 Soil pipe dismentiling riser to green area 141,142 2-Sep-22 6-Sep-22 4 A A

9 ELITE18-CON-CE-M&P-IR-0009 Soil pipe dismentiling riser to green area 139,140 2-Sep-22 6-Sep-22 4 A A

10 ELITE18-CON-CE-M&P-IR-0010 PPRC pipe dismentiling riser to green area 139,140 2-Sep-22 6-Sep-22 4 A A

11 ELITE18-CON-CE-M&P-IR-0011 PPRC pipe dismentiling riser to green area 141,142 2-Sep-22 6-Sep-22 4 A A

12 ELITE18-CON-CE-M&P-IR-0012 PPRC pipe dismentiling riser to green area 143,144 2-Sep-22 6-Sep-22 4 A A

13 ELITE18-CON-CE-M&P-IR-0013 AC units removing 143,144 GF,FF 2-Sep-22 6-Sep-22 4 A A

14 ELITE18-CON-CE-M&P-IR-0014 Conseal flushing tank removing 139 to 144 GF,FF 5-Sep-22 7-Sep-22 A A

15 ELITE18-CON-CE-M&P-IR-0015 FD pipe dismentiling 127 to 138 5-Sep-22 7-Sep-22 A A

16 ELITE18-CON-CE-M&P-IR-0016 Soilpipe dismentiling 127 to 138 5-Sep-22 7-Sep-22 A A

17 ELITE18-CON-CE-M&P-IR-0017 PPRC fill line dismentiling 127 to 138 5-Sep-22 7-Sep-22 A A

18 ELITE18-CON-CE-M&P-IR-0018 Conseal flushing tank removing 127 to 138 5-Sep-22 7-Sep-22 A A

19 ELITE18-CON-CE-M&P-IR-0019 Kitchen & riser GI gas pipes dismentle due to retrofitting 143,144 6-Sep-22 10-Sep-22 A A

20 ELITE18-CON-CE-M&P-IR-0020 Manhole pipes dismentiling due to retrofitting wall 143,144 6-Sep-22 10-Sep-22 A A

21 ELITE18-CON-CE-M&P-IR-0021 Manhole pipes dismentiling due to retrofitting wall 110,112,114 6-Sep-22 10-Sep-22 B B

22 ELITE18-CON-CE-M&P-IR-0022 Laying coper pipe & insulation control wire & flexible pipe 119,120 GF,FF 7-Sep-22 10-Sep-22 C 28-Sep-22 3-Oct-22 B B

23 ELITE18-CON-CE-M&P-IR-0023 Laying coper pipe & insulation control wire & flexible pipe 117,118 GF,FF 7-Sep-22 10-Sep-22 C 28-Sep-22 3-Oct-22 B B

24 ELITE18-CON-CE-M&P-IR-0024 Laying coper pipe & insulation control wire & flexible pipe 115,116 GF,FF 7-Sep-22 10-Sep-22 C 28-Sep-22 3-Oct-22 B B

25 ELITE18-CON-CE-M&P-IR-0025 Manhole pipes dismentiling due to Piling 141,142 G.F 17-Sep-22 24-Sep-22 A A

26 ELITE18-CON-CE-M&P-IR-0026 Manhole pipes dismentiling due to Piling 139,140 G.F 17-Sep-22 24-Sep-22 A A

27 ELITE18-CON-CE-M&P-IR-0027 Manhole pipes dismentiling due to Piling 137,138 G.F 17-Sep-22 24-Sep-22 A A

28 ELITE18-CON-CE-M&P-IR-0028 Laying coper pipe & insulation control wire & flexible pipe 113,114 GF,FF 17-Sep-22 24-Sep-22 B B

29 ELITE18-CON-CE-M&P-IR-0029 Laying coper pipe & insulation control wire & flexible pipe 111,112 GF,FF 17-Sep-22 24-Sep-22 B B

30 ELITE18-CON-CE-M&P-IR-0030 Laying coper pipe & insulation control wire & flexible pipe 109,110 GF,FF 17-Sep-22 24-Sep-22 B B

31 ELITE18-CON-CE-M&P-IR-0031 G.I duct installation 113,114 GF,FF 19-Sep-22 23-Sep-22 C C

32 ELITE18-CON-CE-M&P-IR-0032 G.I duct installation 111,112 GF,FF 19-Sep-22 23-Sep-22 C C

33 ELITE18-CON-CE-M&P-IR-0033 G.I duct installation 109,110 GF,FF 19-Sep-22 23-Sep-22 C C

34 ELITE18-CON-CE-M&P-IR-0034 Laying coper pipe & insulation control wire & flexible pipe 107,108 GF,FF 19-Sep-22 23-Sep-22 B B

35 ELITE18-CON-CE-M&P-IR-0035 Laying coper pipe & insulation control wire & flexible pipe 105,106 GF,FF 19-Sep-22 23-Sep-22 B B

36 ELITE18-CON-CE-M&P-IR-0036 Laying coper pipe & insulation control wire & flexible pipe 103,104 GF,FF 19-Sep-22 23-Sep-22 B B

37 ELITE18-CON-CE-M&P-IR-0037 G.I duct dismentiling due to retrofittiing 143,144 GF,FF 21-Sep-22 27-Sep-22 B B

38 ELITE18-CON-CE-M&P-IR-0038 G.I duct dismentiling due to retrofittiing 141,142 GF,FF 21-Sep-22 27-Sep-22 B B

39 ELITE18-CON-CE-M&P-IR-0039 G.I duct dismentiling due to retrofittiing 139,140 GF,FF 21-Sep-22 27-Sep-22 B B

40 ELITE18-CON-CE-M&P-IR-0040 Gully trape pipes dismentling due to piling 139 to 144 GF 22-Sep-22 27-Sep-22 B B

41 ELITE18-CON-CE-M&P-IR-0041 G.I duct dismentiling due to retrofittiing 137,138 GF,FF 22-Sep-22 27-Sep-22 B B

42 ELITE18-CON-CE-M&P-IR-0042 G.I duct dismentiling due to retrofittiing 135,136 GF,FF 22-Sep-22 27-Sep-22 B B

43 ELITE18-CON-CE-M&P-IR-0043 G.I duct dismentiling due to retrofittiing 133,134 GF,FF 24-Sep-22 27-Sep-22 B B

44 ELITE18-CON-CE-M&P-IR-0044 G.I duct dismentiling due to retrofittiing 131,132 GF,FF 24-Sep-22 27-Sep-22 B B

45 ELITE18-CON-CE-M&P-IR-0045 G.I duct dismentiling due to retrofittiing 129,130 GF,FF 24-Sep-22 27-Sep-22 B B

46 ELITE18-CON-CE-M&P-IR-0046 G.I duct dismentiling due to retrofittiing 127,128 GF,FF 24-Sep-22 27-Sep-22 B B

47 ELITE18-CON-CE-M&P-IR-0047 Manhole pipes dismentiling due to piling 133,134 GF 26-Sep-22 1-Oct-22 B B

48 ELITE18-CON-CE-M&P-IR-0048 Manhole pipes dismentiling due to piling 131,132 GF 26-Sep-22 1-Oct-22 B B

49 ELITE18-CON-CE-M&P-IR-0049 Manhole pipes dismentiling due to piling 135,136 GF 26-Sep-22 1-Oct-22 B B

50 ELITE18-CON-CE-M&P-IR-0050 Manhole pipes dismentiling due to piling 129,130 GF 27-Sep-22 1-Oct-22 A A

51 ELITE18-CON-CE-M&P-IR-0051 Manhole pipes dismentiling due to piling 127,128 GF 27-Sep-22 1-Oct-22 A A

Page 99 of 123
CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

52 ELITE18-CON-CE-M&P-IR-0052 Laying coper pipe & insulation control wire & flexible pipe 101,102 GF,FF 27-Sep-22 1-Oct-22 B B

53 ELITE18-CON-CE-M&P-IR-0053 FF washroom FD & soil pipe dismentiling due to retrofitting 143,144 FF 29-Sep-22 3-Oct-22 B B

54 ELITE18-CON-CE-M&P-IR-0054 FF washroom FD & soil pipe dismentiling due to retrofitting 141,142 FF 29-Sep-22 3-Oct-22 B B

55 ELITE18-CON-CE-M&P-IR-0055 FF washroom FD & soil pipe dismentiling due to retrofitting 139,140 FF 29-Sep-22 3-Oct-22 B B

56 ELITE18-CON-CE-M&P-IR-0056 FF washroom FD & soil pipe dismentiling due to retrofitting 137,138 FF 30-Sep-22 3-Oct-22 B B

57 ELITE18-CON-CE-M&P-IR-0057 FF washroom FD & soil pipe dismentiling due to retrofitting 135,136 FF 30-Sep-22 3-Oct-22 B B

58 ELITE18-CON-CE-M&P-IR-0058 FF washroom FD & soil pipe dismentiling due to retrofitting 133,134 FF 30-Sep-22 3-Oct-22 B B

59 ELITE18-CON-CE-M&P-IR-0059 Copper pipe dismentle due to retrofitting 143,144 GF,FF 30-Sep-22 3-Oct-22 B B

60 ELITE18-CON-CE-M&P-IR-0060 Copper pipe dismentle due to retrofitting 141,142 GF,FF 1-Oct-22 12-Oct-22 B B

61 ELITE18-CON-CE-M&P-IR-0061 Copper pipe dismentle due to retrofitting 139,140 GF,FF 1-Oct-22 12-Oct-22 B B

62 ELITE18-CON-CE-M&P-IR-0062 Copper pipe dismentle due to retrofitting 137,138 GF,FF 1-Oct-22 12-Oct-22 B B

63 ELITE18-CON-CE-M&P-IR-0063 FF washroom FD & soil pipe dismentiling due to retrofitting 131,132 FF 1-Oct-22 11-Nov-22 B B

64 ELITE18-CON-CE-M&P-IR-0064 FF washroom FD & soil pipe dismentiling due to retrofitting 129,130 FF 1-Oct-22 11-Nov-22 B B

65 ELITE18-CON-CE-M&P-IR-0065 FF washroom FD & soil pipe dismentiling due to retrofitting 127,128 FF 1-Oct-22 11-Nov-22 B B

66 ELITE18-CON-CE-M&P-IR-0066 Conseal flushing tank removing to retrofitting 122 to 126a FF 3-Oct-22 12-Nov-22 B B

67 ELITE18-CON-CE-M&P-IR-0067 Conseal flushing tank removing to retrofitting 120 to 115 FF 3-Oct-22 11-Nov-22 B B

68 ELITE18-CON-CE-M&P-IR-0068 Copper pipe dismentle due to retrofitting 135,136 FF 3-Oct-22 12-Nov-22 B B

69 ELITE18-CON-CE-M&P-IR-0069 Copper pipe dismentle due to retrofitting 133,134 GF,FF 3-Oct-22 12-Nov-22 B B

70 ELITE18-CON-CE-M&P-IR-0070 Copper pipe dismentle due to retrofitting 131,132 GF,FF 3-Oct-22 12-Nov-22 B B

71 ELITE18-CON-CE-M&P-IR-0071 Copper pipe dismentle due to retrofitting 129,130 GF,FF 3-Oct-22 12-Nov-22 B B

72 ELITE18-CON-CE-M&P-IR-0072 Copper pipe dismentle due to retrofitting 127,128 GF,FF 3-Oct-22 12-Oct-22 B B

73 ELITE18-CON-CE-M&P-IR-0073 GI gas line for kitchen dismentle due to retrofitting 127 to 144 GF 4-Oct-22 12-Oct-22 B B

74 ELITE18-CON-CE-M&P-IR-0074 External GI gas dismentle due to pile and pile caping 127 to 144 GF 4-Oct-22 15-Oct-22 B B

75 ELITE18-CON-CE-M&P-IR-0075 External GI gas dismentle due to retrofitting 127 to 144 GF 4-Oct-22 12-Oct-22 B B

76 ELITE18-CON-CE-M&P-IR-0076 Gully trape pipes dismentling due to piling 122 to 126a 6-Oct-22 12-Oct-22 B B

77 ELITE18-CON-CE-M&P-IR-0077 Gully trape pipes dismentling due to piling 127 to 138 6-Oct-22 11-Oct-22 B B

78 ELITE18-CON-CE-M&P-IR-0078 Manhole pipes dismentle due to piling 122 to 126a 6-Oct-22 12-Oct-22 B B

79 ELITE18-CON-CE-M&P-IR-0079 Powder bath & bath 01 fd & soil pipe testing & installattin 143 GF 9-Oct-22 15-Oct-22 B B

80 ELITE18-CON-CE-M&P-IR-0080 Bath 02 fd & soil pipe testing & installation 143 FF 9-Oct-22 15-Oct-22 B B

81 ELITE18-CON-CE-M&P-IR-0081 CDP pipe 1" ac 01 & ac 02 installation & testing living room 143 GF 9-Oct-22 15-Oct-22 B B

82 ELITE18-CON-CE-M&P-IR-0082 CDP pipe 1" ac 03 & ac 04 installation & testing living room 144 GF 11-Oct-22 15-Oct-22 B B

83 ELITE18-CON-CE-M&P-IR-0083 Powder bath & bath 01 fd & soil pipe testing & installattin 144 GF 11-Oct-22 15-Oct-22 B B

84 ELITE18-CON-CE-M&P-IR-0084 Bath 02 fd & soil pipe testing & installation 144 FF 11-Oct-22 15-Oct-22 B B

85 ELITE18-CON-CE-M&P-IR-0085 AC drain pipe instaltion testing 143,144 FF 13-Oct-22 18-Oct-22 B B

86 ELITE18-CON-CE-M&P-IR-0086 AC drain pipe instaltion testing 141,142 FF 15-Oct-22 18-Oct-22 C 29-Oct-22 7-Nov-22 B B

87 ELITE18-CON-CE-M&P-IR-0087 Powder bath & bath 01 fd & soil pipe testing & installattin 141 GF 17-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 B B

88 ELITE18-CON-CE-M&P-IR-0088 CDP pipe 1" AC 04 installation & testing living room 142 GF 17-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 A A

89 ELITE18-CON-CE-M&P-IR-0089 Bath 02 fd & soil riser pipe testing & installation 141 GF 17-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 B B

90 ELITE18-CON-CE-M&P-IR-0090 CDP pipe 1" AC 02 installation & testing living room 141 GF 17-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 A A

91 ELITE18-CON-CE-M&P-IR-0091 Powder bath & bath 01 fd & soil pipe testing & installattin 142 GF 17-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 C C

92 ELITE18-CON-CE-M&P-IR-0092 Bath 02 fd & soil pipe testing & installation 142 GF 17-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 C C

93 ELITE18-CON-CE-M&P-IR-0093 PPRC fill lin laying testing & clamping 143 GF 17-Oct-22 25-Oct-22 B B

94 ELITE18-CON-CE-M&P-IR-0094 AC drain pipe AC 01 & 02 139 GF 18-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 A A

95 ELITE18-CON-CE-M&P-IR-0095 AC drain pipe AC 03 & 04 140 GF 18-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 A A

96 ELITE18-CON-CE-M&P-IR-0096 Master bath & bath 01 FD & soil pipe grevity test & installation pipe 139 GF 18-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 B B

97 ELITE18-CON-CE-M&P-IR-0097 Bath 02 kitchen riser FD & soil pipe grevity test & installation pipe 139 GF 18-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 C C

98 ELITE18-CON-CE-M&P-IR-0098 Bath 02 kitchen riser FD & soil pipe grevity test & installation pipe 140 GF 18-Oct-22 25-Oct-22 C 29-Oct-22 7-Nov-22 C C
Bath 01 & powder riser FD & soil pipe grevity test & installation
99 ELITE18-CON-CE-M&P-IR-0099 140 GF 18-Oct-22 25-Oct-22 C 29-Oct-22 5-Nov-22 C C
pipe
100 ELITE18-CON-CE-M&P-IR-0100 Installation of GI duct 143,144 24-Oct-22 31-Oct-22 B B

101 ELITE18-CON-CE-M&P-IR-0101 Testing of GI duct 143,144 24-Oct-22 31-Oct-22 B B

Page 100 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

102 ELITE18-CON-CE-M&P-IR-0102 PPRC fill line pressure test & installation 144 GF,FF,TF 31-Oct-22 7-Nov-22 C 9-Dec-22 11-Feb-23 B B
PPRC pipe installation & testing kitchen bath 01 powder bath
103 ELITE18-CON-CE-M&P-IR-0103 144 GF,FF,TF 31-Oct-22 7-Nov-22 C 9-Dec-22 14-Dec-22 A A
02,03,04
114 Type B to 103
104 ELITE18-CON-CE-M&P-IR-0104 Removal of consealed flushing tank A&B 14-Nov-22 16-Nov-22 C 19-Jan-23 23-Jan-23 B B
TypeA
105 ELITE18-CON-CE-M&P-IR-0105 Bath 1&2 PPRC pipe instaallation & testing 143 A 22-Nov-22 24-Nov-22 B B

106 ELITE18-CON-CE-M&P-IR-0106 UPVC pipes & gravity test 130 B 22-Nov-22 24-Nov-22 B B

107 ELITE18-CON-CE-M&P-IR-0107 AC drain pipe (ctp) 129 A 22-Nov-22 24-Nov-22 C C

108 ELITE18-CON-CE-M&P-IR-0108 AC drain pipe (ctp) 130 B 22-Nov-22 24-Nov-22 C C

109 ELITE18-CON-CE-M&P-IR-0109

110 ELITE18-CON-CE-M&P-IR-0110 Installation of consealed tanks 143,144 23-Nov-22 24-Nov-22 A A

111 ELITE18-CON-CE-M&P-IR-0111 Installation of consealed tanks 141,142 23-Nov-22 C 7-Nov-22 13-Dec-22 C 4-Jan-23 7-Jan-23 C C

112 ELITE18-CON-CE-M&P-IR-0112 Installation of UPVC pipes 144 24-Nov-22 1-Dec-22 A A

113 ELITE18-CON-CE-M&P-IR-0113 Installation & polythene 144 24-Nov-22 1-Dec-22 B B

114 ELITE18-CON-CE-M&P-IR-0114 Rain pipe 144 24-Nov-22 1-Dec-22 A A

115 ELITE18-CON-CE-M&P-IR-0115 Piping & testing of UPVC pipes FF 138 FF 29-Nov-22 5-Dec-22 C C

116 ELITE18-CON-CE-M&P-IR-0116 Piping & testing of UPVC pipes GF 138 GF 29-Nov-22 5-Dec-22 C C

117 ELITE18-CON-CE-M&P-IR-0117 Rain pipe 138 29-Nov-22 5-Dec-22 C C

118 ELITE18-CON-CE-M&P-IR-0118 Piping & testing of UPVC pipes FF 137 FF 29-Nov-22 5-Dec-22 C C

119 ELITE18-CON-CE-M&P-IR-0119 Piping & testing of UPVC pipes GF 137 GF 29-Nov-22 5-Dec-22 C C

120 ELITE18-CON-CE-M&P-IR-0120 Rain pipe 137 29-Nov-22 5-Dec-22 C C

121 ELITE18-CON-CE-M&P-IR-0121 Piping & testing of UPVC pipes FF 136 FF 29-Nov-22 5-Dec-22 C C

122 ELITE18-CON-CE-M&P-IR-0122 Piping & testing of UPVC pipes GF 136 GF 29-Nov-22 5-Dec-22 C C

123 ELITE18-CON-CE-M&P-IR-0123 Rain pipe 136 29-Nov-22 5-Dec-22 C C

124 ELITE18-CON-CE-M&P-IR-0124 Piping & testing of UPVC pipes FF 135 FF 29-Nov-22 5-Dec-22 C C

125 ELITE18-CON-CE-M&P-IR-0125 Piping & testing of UPVC pipes GF 135 GF 29-Nov-22 5-Dec-22 C C

126 ELITE18-CON-CE-M&P-IR-0126 Rain pipe 135 29-Nov-22 5-Dec-22 C C

127 ELITE18-CON-CE-M&P-IR-0127 Piping & testing of UPVC pipes FF 143 FF 29-Nov-22 5-Dec-22 C C

128 ELITE18-CON-CE-M&P-IR-0128 Aluminium cladding sample 144 29-Nov-22 5-Dec-22 B B

129 ELITE18-CON-CE-M&P-IR-0129 Piping testing & insulation PPRC pipes 143 FF 29-Nov-22 5-Dec-22 C C

130 ELITE18-CON-CE-M&P-IR-0130 PPRC in FF bath 02 144 29-Nov-22 5-Dec-22 C C

131 ELITE18-CON-CE-M&P-IR-0131 UPVC FF 142 FF 29-Nov-22 5-Dec-22 C C

132 ELITE18-CON-CE-M&P-IR-0132 PPRC FF 142 FF 29-Nov-22 5-Dec-22 C 9-Jan-23 17-Jan-23 C 18-Jan-23 1-Feb-23 C C

133 ELITE18-CON-CE-M&P-IR-0133 UPVC FF 141 FF 29-Nov-22 5-Dec-22 C C

134 ELITE18-CON-CE-M&P-IR-0134 PPRC FF 141 FF 29-Nov-22 5-Dec-22 C 9-Jan-23 17-Jan-23 C 18-Jan-23 1-Feb-23 C C

135 ELITE18-CON-CE-M&P-IR-0135 Testing of UPVC pipes 133,134 29-Nov-22 5-Dec-22 C C

136 ELITE18-CON-CE-M&P-IR-0136 Riser pipe 133 29-Nov-22 5-Dec-22 C C

137 ELITE18-CON-CE-M&P-IR-0137 Riser pipe 134 29-Nov-22 5-Dec-22 C C

138 ELITE18-CON-CE-M&P-IR-0138 PPRC GF 142 GF 30-Nov-22 5-Dec-22 C 9-Jan-23 17-Jan-23 C 31-Jan-23 B B

139 ELITE18-CON-CE-M&P-IR-0139 Testing & insulation of copper pipes 143,144 1-Dec-22 9-Dec-22 C 10-Jan-23 UR UR

140 ELITE18-CON-CE-M&P-IR-0140 Testing & insulation of GI gas pipes 144 1-Dec-22 9-Dec-22 B B

141 ELITE18-CON-CE-M&P-IR-0141 Testing & insulation of GI gas pipes 143 1-Dec-22 9-Dec-22 B B

142 ELITE18-CON-CE-M&P-IR-0142 Testing & insulation of GI gas pipes 142 1-Dec-22 9-Dec-22 C 4-Jan-23 7-Jan-23 C C

143 ELITE18-CON-CE-M&P-IR-0143 Testing & insulation of GI gas pipes 141 1-Dec-22 20-Dec-22 C 4-Jan-23 7-Jan-23 C C

144 ELITE18-CON-CE-M&P-IR-0144 Dismantlling of manhole gully trap 107a,114b GF,FF 15-Dec-22 17-Dec-22 C C

145 ELITE18-CON-CE-M&P-IR-0145 Dismantlling of manhole gully trap 103a,108b GF,FF 15-Dec-22 17-Dec-22 C C

146 ELITE18-CON-CE-M&P-IR-0146 Dismantlling of manhole drain pipes 117a,120b GF,FF 15-Dec-22 17-Dec-22 C C

147 ELITE18-CON-CE-M&P-IR-0147 Dismantlling of HVAC copper pipes 103a,114b GF,FF 15-Dec-22 17-Dec-22 C 9-Aug-23 12-Aug-23 C 16-Aug-23 18-Aug-23 B B

148 ELITE18-CON-CE-M&P-IR-0148 Dismantlling of HVAC copper pipes 117a,126a,b GF,FF 15-Dec-22 17-Dec-22 C 9-Aug-23 12-Aug-23 C 16-Aug-23 18-Aug-23 B B

149 ELITE18-CON-CE-M&P-IR-0149 Dismantlling of GI duct 103a 114b GF,FF 15-Dec-22 17-Dec-22 C C

150 ELITE18-CON-CE-M&P-IR-0150 Dismantlling of GI duct 117a,126b GF,FF 15-Dec-22 17-Dec-22 C C

151 ELITE18-CON-CE-M&P-IR-0151 Dismantlling of plumbing fixtures 122a,144b GF,FF 15-Dec-22 17-Dec-22 C C

152 ELITE18-CON-CE-M&P-IR-0152 Measurement sheet for air circulation system VO 25 A&B 4-Oct-23 5-Oct-23 A A

Page 101 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

153 ELITE18-CON-CE-M&P-IR-0153 Measurement sheet for aluminium cladding on to roof A&B 4-Oct-23 13-Oct-23 B B

Installation M&P items kitchen & maid room accessories for


154 ELITE18-CON-CE-M&P-IR-0154 119 to 144 A&B 29-Nov-23 UR UR
already handed over villas (119 to 144 CE)
T&C M&P items kitchen & maid room accessories for already
155 ELITE18-CON-CE-M&P-IR-0155 122 to 144 A&B 29-Nov-23 5-Dec-23 A A
handed over villas (122 to 144 CE)

1 201 TO 250 143-144


1 ELITE18-CON-CE-M&P-IR-0201 GI Duct 143,144 2-Dec-22 9-Dec-22 C C

2 ELITE18-CON-CE-M&P-IR-0202 External UPVC manhole 143,144 3-Dec-22 9-Dec-22 B B

3 ELITE18-CON-CE-M&P-IR-0203 Installation testing & insulation of UPVC master bath 143 3-Dec-22 9-Dec-22 C C

4 ELITE18-CON-CE-M&P-IR-0204 Installation testing & insulation of PPRC TF 143,144 5-Dec-22 9-Dec-22 C 10-Dec-22 11-Feb-23 B B

5 ELITE18-CON-CE-M&P-IR-0205 Installation testing of AC drain pipe CDP 143,144 6-Dec-22 10-Dec-22 C 14-Dec-22 15-Feb-23 A A

6 ELITE18-CON-CE-M&P-IR-0206 Connection of HDPE pipe with UGWT 143,144 6-Dec-22 10-Dec-22 A A

7 ELITE18-CON-CE-M&P-IR-0207 Installation of indoor AC units 143,144 24-Dec-22 29-Dec-22 B B


Commissioning of potable water and gas system sanitary water
8 ELITE18-CON-CE-M&P-IR-0208 143,144 28-Dec-22 2-Jan-23 C C
system AC unit & miscelleneous items
Testing & commissioning of installation of AC indoor & outdoor
9 ELITE18-CON-CE-M&P-IR-0209 143,144 4-Jan-23 7-Jan-23 B B
units
10 ELITE18-CON-CE-M&P-IR-0210 Testing & commissioning of installation of diffusers in baths 143,144 4-Jan-23 7-Jan-23 C C

11 ELITE18-CON-CE-M&P-IR-0211 Testing & commissioning of installation of external louvers 143,144 4-Jan-23 7-Jan-23 C C

12 ELITE18-CON-CE-M&P-IR-0212 Testing & commissioning of installation of duct VCD 143,144 4-Jan-23 7-Jan-23 C 14-Jan-23 24-Jan-23 C C

13 ELITE18-CON-CE-M&P-IR-0213 Testing & commissioning of installation of duct fans 143,144 4-Jan-23 7-Jan-23 C 14-Jan-23 24-Jan-23 C C

14 ELITE18-CON-CE-M&P-IR-0214 Installation of external louvers 143,144 6-Jan-23 12-Jan-23 B B

15 ELITE18-CON-CE-M&P-IR-0215 Installation of diffusers in bath 143,144 6-Jan-23 12-Jan-23 A A

16 ELITE18-CON-CE-M&P-IR-0216 Installation of volume control damper VCD 143,144 6-Jan-23 12-Jan-23 A A

17 ELITE18-CON-CE-M&P-IR-0217 Installation of inline fans 143,144 6-Jan-23 12-Jan-23 B B

18 ELITE18-CON-CE-M&P-IR-0218 Installation of sanitary items 143 9-Jan-23 14-Jan-23 A A

19 ELITE18-CON-CE-M&P-IR-0219 Installation of sanitary items 144 9-Jan-23 14-Jan-23 A A

20 ELITE18-CON-CE-M&P-IR-0220 Installation of geysor 143,144 14-Jan-23 24-Jan-23 A A

21 ELITE18-CON-CE-M&P-IR-0221 Installation of booster pump 143,144 14-Jan-23 24-Jan-23 A A

22 ELITE18-CON-CE-M&P-IR-0222 Installation of transfer pump 143,144 14-Jan-23 24-Jan-23 A A

23 ELITE18-CON-CE-M&P-IR-0223 Installation of gate vaives 143,144 14-Jan-23 24-Jan-23 A A

24 ELITE18-CON-CE-M&P-IR-0224 Testing & commissioning of geyser 143,144 24-Jan-23 A A

25 ELITE18-CON-CE-M&P-IR-0225 Testing & commissioninG of booster pump 143,144 24-Jan-23 A A

26 ELITE18-CON-CE-M&P-IR-0226 Testing & commissioninG of transfer pump 143,144 24-Jan-23 A A

27 ELITE18-CON-CE-M&P-IR-0227 Testing & commissioninG of sanitary items 143,144 24-Jan-23 A A

28 ELITE18-CON-CE-M&P-IR-0228 Instalation of hose bibs 143,144 Complete 14-Dec-22 11-Feb-23 A A

29 ELITE18-CON-CE-M&P-IR-0229 Instalation of vent cowl 143,144 Complete 14-Dec-22 11-Feb-23 A A

30 ELITE18-CON-CE-M&P-IR-0230 Instalation of floor cleanout plugs 143,144 Complete 14-Dec-22 11-Feb-23 A A

31 ELITE18-CON-CE-M&P-IR-0231 Instalation of gully trap 143,144 Complete 14-Dec-22 11-Feb-23 C C

32 ELITE18-CON-CE-M&P-IR-0232 Instalation of foot valve 143,144 Complete 14-Dec-22 11-Feb-23 A A

33 ELITE18-CON-CE-M&P-IR-0233 Instalation of float valve 143,144 Complete 14-Dec-22 11-Feb-23 A A

34 ELITE18-CON-CE-M&P-IR-0234 Instalation of roof drain 143,144 Complete 14-Dec-22 11-Feb-23 C C

35 ELITE18-CON-CE-M&P-IR-0235 Aluminium cladding 143,144 Complete 14-Dec-22 11-Feb-23 A A

36 ELITE18-CON-CE-M&P-IR-0236 Gas shut off valve 143,144 Complete 14-Dec-22 11-Feb-23 A A

37 ELITE18-CON-CE-M&P-IR-0237 Installation & testing of UPVC pipes 143,144 Complete 14-Dec-22 14-Feb-23 C C

38 ELITE18-CON-CE-M&P-IR-0238 Installation of catch basin 143,144 Complete 14-Dec-22 11-Feb-23 A A

39 ELITE18-CON-CE-M&P-IR-0239 Installation of wall mounted hooks (withdraw) 143,144 Complete 11-Feb-23 15-Feb-23 A A

40 ELITE18-CON-CE-M&P-IR-0240 Installatoin of rain water pipe 143,144 Complete 14-Feb-22 15-Feb-23 B B

41 ELITE18-CON-CE-M&P-IR-0241 Installation of PPRC insulation 143,144 Complete 14-Feb-22 15-Feb-23 A A

42 ELITE18-CON-CE-M&P-IR-0242 Installation of UPVC insulation 143,144 Complete 14-Feb-22 15-Feb-23 A A

43 ELITE18-CON-CE-M&P-IR-0243 Installation of level controler 143,144 Complete 14-Feb-22 15-Feb-23 A A

Page 102 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days
Testing & commissioning of volume control dampers louvers
44 ELITE18-CON-CE-M&P-IR-0244 exhaust fans & exhaust fans & exhaust air grills with all complete 143,144 A&B 5-Oct-23 11-Oct-23 A A
accessories
45 ELITE18-CON-CE-M&P-IR-0245 Installation of aluminium cladding 143,144 A&B 11-Oct-23 20-Oct-23 A A

46 ELITE18-CON-CE-M&P-IR-0246 Installation of hanging & clamping for PPRC at top roof 143,144 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

47 ELITE18-CON-CE-M&P-IR-0247 Installation & termination of floor drain covers 143,144 A&B 9-Dec-23 18-Dec-23 B B

48 ELITE18-CON-CE-M&P-IR-0248 Instalaltion testing & commissioning of 32 mm gate valves 143,144 A&B 9-Dec-23 18-Dec-23 B B

2 251 TO 300 141-142


1 ELITE18-CON-CE-M&P-IR-0251 Testing of PPRC GF 141 2-Dec-22 9-Dec-22 C 9-Dec-22 17-Dec-22 C 18-Dec-22 31-Jan-23 B B

2 ELITE18-CON-CE-M&P-IR-0252 Insulation of PPRC GF 141 2-Dec-22 9-Dec-22 C C

3 ELITE18-CON-CE-M&P-IR-0253 PPRC fill line 141,142 3-Dec-22 9-Dec-22 C 18-Dec-22 31-Jan-23 C C

4 ELITE18-CON-CE-M&P-IR-0254 Installation testing & insulation of UPVC master bath 141 3-Dec-22 9-Dec-22 C C

5 ELITE18-CON-CE-M&P-IR-0255 Connection of HDPE pipe with UGWT 141,142 7-Dec-22 10-Dec-22 A A

6 ELITE18-CON-CE-M&P-IR-0256 External manhole pipes 141,142 GF 9-Dec-22 13-Dec-22 B B

Installation of UPVC pipes,PPRC pipes,GI gas pipes,copper


pipes,ac indoor outdoor units,rain water drain,roof drain,flow
7 ELITE18-CON-CE-M&P-IR-0257 drains,booster pump,transfer pump,foot vaive,float 142 7-Mar-23 14-Mar-23 C C
valve,geysor,exhaust fans,PPRC insulation,UPVC insulation ,AC
copper pipes insulation & sanitary

Testing & commissioning of UPVC pipes,PPRC pipes,GI gas


pipes,copper pipes,ac indoor outdoor units,rain water drain,roof
8 ELITE18-CON-CE-M&P-IR-0258 drain,flow drains,booster pump,transfer pump,foot vaive,float 142 7-Mar-23 14-Mar-23 B B
valve,geysor,exhaust fans,PPRC insulation,UPVC insulation ,AC
copper pipes insulation & sanitary

9 ELITE18-CON-CE-M&P-IR-0259 Installation of automatic level controller 142 7-Mar-23 14-Mar-23 A A

10 ELITE18-CON-CE-M&P-IR-0260 Installation of GI gate valves 142 7-Mar-23 14-Mar-23 B B

11 ELITE18-CON-CE-M&P-IR-0261 Installation of cleanout plugs 142 7-Mar-23 14-Mar-23 A A

12 ELITE18-CON-CE-M&P-IR-0262 Installation of vent cowls 142 7-Mar-23 14-Mar-23 A A

13 ELITE18-CON-CE-M&P-IR-0263 Installation of diffusers 142 7-Mar-23 14-Mar-23 A A

14 ELITE18-CON-CE-M&P-IR-0264 Installation of louvers 142 7-Mar-23 14-Mar-23 B B

15 ELITE18-CON-CE-M&P-IR-0265 Installation of ducts 142 7-Mar-23 14-Mar-23 B B

16 ELITE18-CON-CE-M&P-IR-0266 Installation of items in portable water & gass system 142 B 20-Mar-23 21-Mar-23 A A

17 ELITE18-CON-CE-M&P-IR-0267 Installation of items in portable water & gass system 141 A 20-Mar-23 21-Mar-23 B B

18 ELITE18-CON-CE-M&P-IR-0268 Installation of GI gas system 141 A 20-Mar-23 21-Mar-23 A A

19 ELITE18-CON-CE-M&P-IR-0269 Installation of GI gas system 142 B 20-Mar-23 21-Mar-23 A A

20 ELITE18-CON-CE-M&P-IR-0270 Installation of boster pump 141,142 20-Mar-23 21-Mar-23 B B

21 ELITE18-CON-CE-M&P-IR-0271 Installation of transfer pump 141,142 20-Mar-23 21-Mar-23 A A

22 ELITE18-CON-CE-M&P-IR-0272 Installation of HVAC ducting system 141,142 20-Mar-23 21-Mar-23 A A

23 ELITE18-CON-CE-M&P-IR-0273 Installation of geysor 141,142 20-Mar-23 21-Mar-23 B B

24 ELITE18-CON-CE-M&P-IR-0274 Installation of copper pipe with insulation 141,142 20-Mar-23 21-Mar-23 B B

25 ELITE18-CON-CE-M&P-IR-0275 Installation of indoor & outdoor AC units 141 20-Mar-23 21-Mar-23 A A

26 ELITE18-CON-CE-M&P-IR-0276 Installation of indoor & outdoor AC units 142 20-Mar-23 21-Mar-23 A A

Testing & commissioning of sanitary items,geyser,automatic level


27 ELITE18-CON-CE-M&P-IR-0277 142 20-Mar-23 21-Mar-23 B B
controller,transfer & booster pumps ETC

Testing & commissioning of sanitary items,geyser,automatic level


28 ELITE18-CON-CE-M&P-IR-0278 141 20-Mar-23 21-Mar-23 B B
controller,transfer & booster pumps ETC

29 ELITE18-CON-CE-M&P-IR-0279 Testing & commissioning of HVAC system 141 20-Mar-23 21-Mar-23 B B

30 ELITE18-CON-CE-M&P-IR-0280 Testing & commissinning of HVAC system 142 20-Mar-23 21-Mar-23 B B

31 ELITE18-CON-CE-M&P-IR-0281 Installation & testing of PPRC pipes in all respects 142 20-Mar-23 21-Mar-23 A A

32 ELITE18-CON-CE-M&P-IR-0282 Installation & testing of PPRC pipes in all respects 141 20-Mar-23 21-Mar-23 A A

33 ELITE18-CON-CE-M&P-IR-0283 Testing & testing of UPVC pipes in all respect 141 20-Mar-23 21-Mar-23 A A

34 ELITE18-CON-CE-M&P-IR-0284 Testing & testing of UPVC pipes in all respect 142 20-Mar-23 21-Mar-23 A A
Testing & commissioning of volume control dampers louvers
35 ELITE18-CON-CE-M&P-IR-0285 exhaust fans & exhaust fans & exhaust air grills with all complete 141,142 A&B 5-Oct-23 11-Oct-23 A A
accessories
36 ELITE18-CON-CE-M&P-IR-0286 Installation of aluminium cladding 141,142 A&B 11-Oct-23 19-Oct-23 A A

Page 103 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

ELITE18-CON-CE-M&P-IR-0287 Installation of hanging & clamping for PPRC at top roof 141,142 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0288 Installation & termination of floor drain covers 141,142 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0289 Instalaltion testing & commissioning of 32 mm gate valves 141,142 A&B 9-Dec-23 18-Dec-23 B B

3 301 TO 350 139-140


1 ELITE18-CON-CE-M&P-IR-0301 Installation & testing of PPRC GF,FF 139 GF,FF 3-Dec-22 9-Dec-22 C C

2 ELITE18-CON-CE-M&P-IR-0302 Installation & testing of PPRC GF,FF 140 GF,FF 3-Dec-22 9-Dec-22 C C

3 ELITE18-CON-CE-M&P-IR-0303 Connection of HDPE pipe with UGWT 139,140 6-Dec-22 10-Dec-22 A A

4 ELITE18-CON-CE-M&P-IR-0304 Installation & testing of GI gas pipeline 140 Complete 9-Dec-22 13-Dec-22 C C

5 ELITE18-CON-CE-M&P-IR-0305 External manhole pipes 139,140 GF,FF 9-Dec-22 13-Dec-22 B B

6 ELITE18-CON-CE-M&P-IR-0306 Consealed flushing tanks 139,140 20-Dec-22 24-Dec-22 C 14-Jan-23 24-Jan-23 A A

7 ELITE18-CON-CE-M&P-IR-0307 Sanitary fixtures exhaust air grill etc 140 B 28-Mar-23 7-Apr-23 B 28-Oct-23 11-Nov-23 B B

8 ELITE18-CON-CE-M&P-IR-0308 Installtion & testing of GI gas system 140 B 28-Mar-23 7-Apr-23 A A

9 ELITE18-CON-CE-M&P-IR-0309 Installtion of booster pump 140 B 28-Mar-23 7-Apr-23 A A

10 ELITE18-CON-CE-M&P-IR-0310 Installtion of transfer pump 140 B 28-Mar-23 7-Apr-23 A A

11 ELITE18-CON-CE-M&P-IR-0311 Installation & testing of HVAC system 140 B 28-Mar-23 7-Apr-23 A A

12 ELITE18-CON-CE-M&P-IR-0312 Installtion & testing of water geyser 140 B 28-Mar-23 7-Apr-23 A A

13 ELITE18-CON-CE-M&P-IR-0313 Installation & testing of copper piping with insulation 140 B 28-Mar-23 7-Apr-23 B B

14 ELITE18-CON-CE-M&P-IR-0314 Installation of indoor & outdoor AC units 140 B 28-Mar-23 7-Apr-23 A A


Testing & commissioning sanitary itemes geyser automatic level
15 ELITE18-CON-CE-M&P-IR-0315 140 B 28-Mar-23 7-Apr-23 B B
controller transfer & booster pumps etc
16 ELITE18-CON-CE-M&P-IR-0316 Testing & commissionong of HVAC system 140 B 28-Mar-23 7-Apr-23 B B

17 ELITE18-CON-CE-M&P-IR-0317 Installation & testing of PPRC pipes in all respects 140 B 28-Mar-23 7-Apr-23 A A

18 ELITE18-CON-CE-M&P-IR-0318 Testing of UPVC pipes in all respect 140 B 28-Mar-23 7-Apr-23 A A

19 ELITE18-CON-CE-M&P-IR-0319 Instllation of sanitary fixture vent covels etc 139 A 28-Mar-23 7-Apr-23 B 28-Oct-23 11-Nov-23 B B

20 ELITE18-CON-CE-M&P-IR-0320 Installation & testing of GI gas system 139 A 28-Mar-23 7-Apr-23 A A

21 ELITE18-CON-CE-M&P-IR-0321 Installtion of booster pump 139 A 28-Mar-23 7-Apr-23 A A

22 ELITE18-CON-CE-M&P-IR-0322 Installtion of transfer pump 139 A 28-Mar-23 7-Apr-23 B B

23 ELITE18-CON-CE-M&P-IR-0323 Installation & testing of HVAC ducting system 139 A 28-Mar-23 7-Apr-23 A A

24 ELITE18-CON-CE-M&P-IR-0324 Installation & testing of water geyser 139 A 28-Mar-23 7-Apr-23 B B

25 ELITE18-CON-CE-M&P-IR-0325 Instalation & testing of cpper piping with insulation 139 A 28-Mar-23 7-Apr-23 B B

26 ELITE18-CON-CE-M&P-IR-0326 Installation of indoor & outdoor AC units 139 A 28-Mar-23 7-Apr-23 A A


Testing & commissioning of sanitary items geyser automatic level
27 ELITE18-CON-CE-M&P-IR-0327 139 A 28-Mar-23 7-Apr-23 B B
controller transfer & booster pumps etc
28 ELITE18-CON-CE-M&P-IR-0328 Tsting & commissioning of HVAC system 139 A 28-Mar-23 7-Apr-23 B B

29 ELITE18-CON-CE-M&P-IR-0329 Installation & testing of PPRC pipes in all respects 139 A 28-Mar-23 7-Apr-23 A A

30 ELITE18-CON-CE-M&P-IR-0330 Testing & testing of UPVC pipes in all respect 139 A 28-Mar-23 7-Apr-23 A A
Testing & commissioning of volume control dampers louvers
31 ELITE18-CON-CE-M&P-IR-0331 exhaust fans & exhaust fans & exhaust air grills with all complete 139,140 A&B 5-Oct-23 11-Oct-23 A A
accessories
32 ELITE18-CON-CE-M&P-IR-0332 Installation of aluminium cladding 139,140 A&B 11-Oct-23 20-Oct-23 A A

33 ELITE18-CON-CE-M&P-IR-0333 Installation of hanging & clamping for PPRC at top roof 139,140 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0334 Installation & termination of floor drain covers 139,140 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0335 Instalaltion testing & commissioning of 32 mm gate valves 139,140 A&B 9-Dec-23 18-Dec-23 B B

4 351 TO 400 137-138


1 ELITE18-CON-CE-M&P-IR-0351 Connection of HDPE pipe with UGWT 137,138 6-Dec-22 10-Dec-22 A A

2 ELITE18-CON-CE-M&P-IR-0352 Installation & testing of GI gas pipeline 138 9-Dec-22 13-Dec-22 C C

3 ELITE18-CON-CE-M&P-IR-0353 External manhole pipes GF 137,138 10-Dec-22 17-Dec-22 C C

4 ELITE18-CON-CE-M&P-IR-0354 Installation of sanitary fixtures vent covels etc 137 A 6-Apr-23 2-May-23 A A

5 ELITE18-CON-CE-M&P-IR-0355 Installation & testing of GI gas system 137 A 6-Apr-23 17-Apr-23 A A

Page 104 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

6 ELITE18-CON-CE-M&P-IR-0356 Installation of booster pump 137 A 6-Apr-23 17-Apr-23 B B

7 ELITE18-CON-CE-M&P-IR-0357 Installation of transfer pump 137 A 6-Apr-23 17-Apr-23 B 12-May-23 22-May-23 A A

8 ELITE18-CON-CE-M&P-IR-0358 Installation & testing of HVAC ducting system 137 A 6-Apr-23 17-Apr-23 B 12-May-23 22-May-23 B B

9 ELITE18-CON-CE-M&P-IR-0359 Installation & testing of water geyser 137 A 6-Apr-23 17-Apr-23 B B

10 ELITE18-CON-CE-M&P-IR-0360 Installation & testing of copper piping with insulation 137 A 6-Apr-23 17-Apr-23 C 12-May-23 22-May-23 A A

11 ELITE18-CON-CE-M&P-IR-0361 Installation of indoor & outdoor AC units 137 A 6-Apr-23 17-Apr-23 A A

Testing & commissioning sanitary items geyser automatic level


12 ELITE18-CON-CE-M&P-IR-0362 137 A 6-Apr-23 2-May-23 C 12-May-23 22-May-23 B B
controller transfer & booster pumps etc
Testing & commissioning of testing & commissinnig of HVAC
13 ELITE18-CON-CE-M&P-IR-0363 137 A 6-Apr-23 2-May-23 C 12-May-23 22-May-23 B 9-Oct-23 10/11/2023 A A
system
14 ELITE18-CON-CE-M&P-IR-0364 Installation & testing of PPRC pipes in all respects 137 A 6-Apr-23 17-Apr-23 C 12-May-23 22-May-23 A A

15 ELITE18-CON-CE-M&P-IR-0365 Testing & testing of UPVC pipes in all respect 137 A 6-Apr-23 17-Apr-23 B 12-May-23 22-May-23 A A

16 ELITE18-CON-CE-M&P-IR-0366 Installation of sanitary fixtures vent covels etc 138 B 6-Apr-23 2-May-23 A A

17 ELITE18-CON-CE-M&P-IR-0367 Installation & testing of GI gas system 138 B 6-Apr-23 17-Apr-23 A A

18 ELITE18-CON-CE-M&P-IR-0368 Installation of booster pump 138 B 6-Apr-23 17-Apr-23 A A

19 ELITE18-CON-CE-M&P-IR-0369 Installation of transfer pump 138 B 6-Apr-23 17-Apr-23 B 12-May-23 22-May-23 A A

20 ELITE18-CON-CE-M&P-IR-0370 Installation & testing of HVAC ducting system 138 B 6-Apr-23 17-Apr-23 B 12-May-23 22-May-23 B B

21 ELITE18-CON-CE-M&P-IR-0371 Installation & testing of water geyser 138 B 6-Apr-23 17-Apr-23 B B

22 ELITE18-CON-CE-M&P-IR-0372 Installation & testing of copper piping with insulation 138 B 6-Apr-23 17-Apr-23 C 12-May-23 22-May-23 A A

23 ELITE18-CON-CE-M&P-IR-0373 Installation of indoor & outdoor AC units 138 B 6-Apr-23 17-Apr-23 B 12-May-23 22-May-23 A A
Testing & commissioning sanitary items geyser automatic level
24 ELITE18-CON-CE-M&P-IR-0374 138 B 6-Apr-23 2-May-23 C 12-May-23 22-May-23 B B
controller transfer & booster pumps etc
Testing & commissioning of testing & commissinnig of HVAC
25 ELITE18-CON-CE-M&P-IR-0375 138 B 6-Apr-23 2-May-23 C 9-Oct-23 11-Oct-23 A A
system
26 ELITE18-CON-CE-M&P-IR-0376 Installation & testing of PPRC pipes in all respects 138 B 6-Apr-23 17-Apr-23 C 12-May-23 22-May-23 A A

27 ELITE18-CON-CE-M&P-IR-0377 Testing & testing of UPVC pipes in all respect 138 B 6-Apr-23 17-Apr-23 B 12-May-23 22-May-23 A A
Testing & commissioning of volume control dampers louvers
28 ELITE18-CON-CE-M&P-IR-0378 exhaust fans & exhaust fans & exhaust air grills with all complete 137,138 A&B 5-Oct-23 11-Oct-23 A A
accessories
29 ELITE18-CON-CE-M&P-IR-0379 Installation of aluminium cladding 137,138 A&B 11-Oct-23 20-Oct-23 A A

30 ELITE18-CON-CE-M&P-IR-0380 Installation of hanging & clamping for PPRC at top roof 137,138 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

31 ELITE18-CON-CE-M&P-IR-0381 Installation & termination of floor drain covers 137,138 A&B 9-Dec-23 18-Dec-23 B B

32 ELITE18-CON-CE-M&P-IR-0382 Instalaltion testing & commissioning of 32 mm gate valves 137,138 A&B 9-Dec-23 18-Dec-23 B B

33

5 401 TO 450 135-136


1 ELITE18-CON-CE-M&P-IR-0401 Connection of HDPE pipe with UGWT 135,136 6-Dec-22 10-Dec-22 A A

2 ELITE18-CON-CE-M&P-IR-0402 Installation of sanitary fixtures vent covels air grill etc 136 A 12-May-23 22-May-23 A A

3 ELITE18-CON-CE-M&P-IR-0403 Instalaltion & testing of GI gas system 136 A 12-May-23 22-May-23 A A

4 ELITE18-CON-CE-M&P-IR-0404 Installation of booster pump 136 A 12-May-23 22-May-23 A A

5 ELITE18-CON-CE-M&P-IR-0405 Installation of transfer pump 136 A 12-May-23 22-May-23 A A

6 ELITE18-CON-CE-M&P-IR-0406 Installation & testing of HVAC ducting system 136 A 12-May-23 22-May-23 A A

7 ELITE18-CON-CE-M&P-IR-0407 Instalaltion & testing of water geyser 136 A 12-May-23 22-May-23 B B


Installation & testing of copper piping with insulation & condensate
8 ELITE18-CON-CE-M&P-IR-0408 136 A 12-May-23 22-May-23 A A
pipe
9 ELITE18-CON-CE-M&P-IR-0409 Installation indoor & outdoor AC units 136 A 12-May-23 22-May-23 A A
Testing & commissioning of sanitary items geyser automatic level
10 ELITE18-CON-CE-M&P-IR-0410 136 A 12-May-23 22-May-23 B B
controller transfer & booster pumps etc
11 ELITE18-CON-CE-M&P-IR-0411 Testing & commissioning of HVAC system 136 A 12-May-23 26-Aug-23 B 9-Oct-23 11-Oct-23 A A

12 ELITE18-CON-CE-M&P-IR-0412 Installation & testing of PPRC pipes in all respects 136 A 12-May-23 22-May-23 A A

13 ELITE18-CON-CE-M&P-IR-0413 Instalaltion & testing of UPVC pipes in all respect 136 A 12-May-23 22-May-23 A A

14 ELITE18-CON-CE-M&P-IR-0414 Installation of sanitary fixtures vent covels air grill etc 135 A 24-May-23 29-May-23 A A

15 ELITE18-CON-CE-M&P-IR-0415 Instalaltion & testing of gas system 135 A 24-May-23 29-May-23 A A

16 ELITE18-CON-CE-M&P-IR-0416 Installation of booster pump 135 A 24-May-23 29-May-23 A A

17 ELITE18-CON-CE-M&P-IR-0417 Installation of transfer pump 135 A 24-May-23 29-May-23 A A

18 ELITE18-CON-CE-M&P-IR-0418 Installation of HVAC ducting system 135 A 24-May-23 29-May-23 A A

19 ELITE18-CON-CE-M&P-IR-0419 Installation of water geyser 135 A 24-May-23 29-May-23 C 23-Jun-23 10-Jul-23 A A

Page 105 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days
Installation & testing of copper piping with insulation & condensate
20 ELITE18-CON-CE-M&P-IR-0420 135 A 24-May-23 29-May-23 A A
pipe
Testing & commissioning sanitary items geyser automatic level
21 ELITE18-CON-CE-M&P-IR-0421 135 A 24-May-23 29-May-23 B B
controller transfer & booster pump etc
22 ELITE18-CON-CE-M&P-IR-0422 Testing & commissinning of HVAC system 135 A 24-May-23 14-Jun-23 B 9-Oct-23 11-Oct-23 A A

23 ELITE18-CON-CE-M&P-IR-0423 Installation of indoor & outdoor AC units 135 A 24-May-23 29-May-23 C 15-Jun-23 B B
Installation & testing of PPRC pipes along with insulattion in all
24 ELITE18-CON-CE-M&P-IR-0424 135 A 24-May-23 29-May-23 A A
respect
Installation & testing of UPVC pipes along with insulattion in all
25 ELITE18-CON-CE-M&P-IR-0425 135 A 24-May-23 29-May-23 A A
respect
Testing & commissioning of volume control dampers louvers
26 ELITE18-CON-CE-M&P-IR-0426 exhaust fans & exhaust fans & exhaust air grills with all complete 135,136 A&B 5-Oct-23 11-Oct-23 A A
accessories
27 ELITE18-CON-CE-M&P-IR-0427 Installation of aluminium cladding 135,136 A&B 11-Oct-23 20-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0428 Installation of hanging & clamping for PPRC at top roof 135,136 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0429 Installation & termination of floor drain covers 135,136 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0430 Instalaltion testing & commissioning of 32 mm gate valves 135,136 A&B 9-Dec-23 18-Dec-23 B B

6 451 TO 500 133-134


1 ELITE18-CON-CE-M&P-IR-0451 Connection of HDPE pipe with UGWT 133,134 6-Dec-22 10-Dec-22 A A

2 ELITE18-CON-CE-M&P-IR-0452 PPRC fill line 134 20-Dec-22 24-Dec-22 C C

3 ELITE18-CON-CE-M&P-IR-0453 Installation of sanitary fixtures vent covels air grill etc 133 A 30-May-23 14-Jun-23 B B

4 ELITE18-CON-CE-M&P-IR-0454 Installation & testing of GI gas system 133 A 30-May-23 14-Jun-23 A A

5 ELITE18-CON-CE-M&P-IR-0455 Installation of booster pump 133 A 30-May-23 14-Jun-23 B B

6 ELITE18-CON-CE-M&P-IR-0456 Installation of transfer pump 133 A 30-May-23 14-Jun-23 B B

7 ELITE18-CON-CE-M&P-IR-0457 Installation of HVAC ducting system 133 A 30-May-23 14-Jun-23 B B

8 ELITE18-CON-CE-M&P-IR-0458 Installation of water geyser 133 A 30-May-23 14-Jun-23 B B


Installation & testing of cooper piping with insulation & condensate
9 ELITE18-CON-CE-M&P-IR-0459 133 A 30-May-23 14-Jun-23 B B
pipe
Testing & commissioning of sanitary items geyser automatic level
10 ELITE18-CON-CE-M&P-IR-0460 133 A 30-May-23 14-Jun-23 B B
controller transfer & booster pump etc
11 ELITE18-CON-CE-M&P-IR-0461 Testing & commissinning of HVAC system 133 A 30-May-23 14-Jun-23 A A

12 ELITE18-CON-CE-M&P-IR-0462 Installation of indoor & outdoor AC units 133 A 30-May-23 14-Jun-23 B B


Installation & testing of PPRC pipes along with insulattion in all
13 ELITE18-CON-CE-M&P-IR-0463 133 A 30-May-23 14-Jun-23 B 27-Oct-23 3-Nov-23 A A
respect
Installation & testing of UPVC pipes along with insulattion in all
14 ELITE18-CON-CE-M&P-IR-0464 133 A 30-May-23 14-Jun-23 B B
respect
15 ELITE18-CON-CE-M&P-IR-0465 Installation of sanitary fixtures vent covels air grill etc 134 B 30-May-23 14-Jun-23 A A

16 ELITE18-CON-CE-M&P-IR-0466 Instalaltion & testing of GI gas system 134 B 30-May-23 14-Jun-23 A A

17 ELITE18-CON-CE-M&P-IR-0467 Installation of booster pump 134 B 30-May-23 14-Jun-23 A A

18 ELITE18-CON-CE-M&P-IR-0468 Installation of transfer pump 134 B 30-May-23 14-Jun-23 A A

19 ELITE18-CON-CE-M&P-IR-0469 Installation & testing of HVAC ducting system 134 B 30-May-23 14-Jun-23 A A

20 ELITE18-CON-CE-M&P-IR-0470 Installation & of water geyser 134 B 30-May-23 14-Jun-23 B B


Installation & testing of copper piping with insulation & condensate
21 ELITE18-CON-CE-M&P-IR-0471 134 B 30-May-23 14-Jun-23 B B
pipe
Testing & commissioning of sanitary items geyser automatic level
22 ELITE18-CON-CE-M&P-IR-0472 134 B 30-May-23 14-Jun-23 B B
controller transfer & booster pumps etc
23 ELITE18-CON-CE-M&P-IR-0473 Testing & commissioning of HVAC system 134 B 30-May-23 14-Jun-23 A A

24 ELITE18-CON-CE-M&P-IR-0474 Installation of indoor & outdoor AC units 134 B 30-May-23 14-Jun-23 A A


Installation & testing of PPRC pipes along with insulattion in all
25 ELITE18-CON-CE-M&P-IR-0475 134 B 30-May-23 14-Jun-23 A A
respect
Installation & testing of UPVC pipes along with insulation in all
26 ELITE18-CON-CE-M&P-IR-0476 134 B 30-May-23 14-Jun-23 B B
respect
Testing & commissioning of volume control dampers louvers
27 ELITE18-CON-CE-M&P-IR-0477 exhaust fans & exhaust fans & exhaust air grills with all complete 133,134 A&B 5-Oct-23 11-Oct-23 A A
accessories
28 ELITE18-CON-CE-M&P-IR-0478 Installation of aluminium cladding 133,134 A&B 11-Oct-23 20-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0479 Installation of hanging & clamping for PPRC at top roof 133,134 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0480 Installation & termination of floor drain covers 133,134 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0481 Instalaltion testing & commissioning of 32 mm gate valves 133,134 A&B 9-Dec-23 18-Dec-23 B B

Page 106 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

7 501 TO 550 131-132


1 ELITE18-CON-CE-M&P-IR-0501 Connection of HDPE pipe with UGWT 131,132 6-Dec-22 10-Dec-22 A A

2 ELITE18-CON-CE-M&P-IR-0502 Installation of sanitary fixtures vent covels air grill etc 132 B 16-Jun-22 24-Jun-22 A A

3 ELITE18-CON-CE-M&P-IR-0503 Installation & testing of GI gas system 132 B 2-Jun-22 24-Jun-22 B 27-Oct-23 31-Oct-23 A A

4 ELITE18-CON-CE-M&P-IR-0504 Installation of booster pump 132 B 17-Jun-22 24-Jun-22 B B

5 ELITE18-CON-CE-M&P-IR-0505 Installation of transfer pump 132 B 11-Jun-22 24-Jun-22 B B

6 ELITE18-CON-CE-M&P-IR-0506 Installation of HVAC ducting system 132 B 15-Jun-22 24-Jun-22 B B

7 ELITE18-CON-CE-M&P-IR-0507 Installation of water geyser 132 B 11-Jun-22 24-Jun-22 B B


Installation & testing of cooper piping with insulation & condensate
8 ELITE18-CON-CE-M&P-IR-0508 132 B 5-Jun-22 24-Jun-22 A A
pipe
Testing & commissioning of sanitary items geyser automatic level
9 ELITE18-CON-CE-M&P-IR-0509 132 B 18-Jun-22 24-Jun-22 B B
controller transfer & booster pump etc
10 ELITE18-CON-CE-M&P-IR-0510 Testing & commissinning of HVAC system 132 B 21-Jun-22 24-Jun-22 A A

11 ELITE18-CON-CE-M&P-IR-0511 Installation of indoor & outdoor AC units 132 B 5-Jun-22 24-Jun-22 C 10-Aug-22 12-Aug-22 B B
Installation & testing of PPRC pipes along with insulattion in all
12 ELITE18-CON-CE-M&P-IR-0512 132 B 19-Jun-22 24-Jun-22 B B
respect
Installation & testing of UPVC pipes along with insulattion in all
13 ELITE18-CON-CE-M&P-IR-0513 132 B 17-Jun-22 24-Jun-22 A A
respect
14 ELITE18-CON-CE-M&P-IR-0514 Installation of sanitary fixtures vent covels air grill etc 131 A 13-Jun-22 24-Jun-22 A A

15 ELITE18-CON-CE-M&P-IR-0515 Instalaltion & testing of GI gas system 131 A 3-Jun-22 24-Jun-22 A A

16 ELITE18-CON-CE-M&P-IR-0516 Installation of booster pump 131 A 13-Jun-22 24-Jun-22 A A

17 ELITE18-CON-CE-M&P-IR-0517 Installation of transfer pump 131 A 10-Jun-22 24-Jun-22 A A

18 ELITE18-CON-CE-M&P-IR-0518 Installation & of HVAC ducting system 131 A 11-Jun-22 24-May-22 A A

19 ELITE18-CON-CE-M&P-IR-0519 Installation & of water geyser 131 A 13-Jun-22 24-May-22 A A


Installation & testing of copper piping with insulation & condensate
20 ELITE18-CON-CE-M&P-IR-0520 131 A 29-May-22 24-May-22 A A
pipe
Testing & commissioning of sanitary items geyser automatic level
21 ELITE18-CON-CE-M&P-IR-0521 131 A 15-Jun-22 24-May-22 B B
controller transfer & booster pumps etc
22 ELITE18-CON-CE-M&P-IR-0522 Testing & commissioning of HVAC system 131 A 13-May-22 24-May-22 A A

23 ELITE18-CON-CE-M&P-IR-0523 Installation of indoor & outdoor AC units 131 A 15-Jun-22 24-May-22 C 10-Aug-22 12-Aug-22 A A
Installation & testing of PPRC pipes along with insulattion in all
24 ELITE18-CON-CE-M&P-IR-0524 131 A 12-May-22 24-May-22 B 27-Oct-23 3-Nov-23 A A
respect
Installation & testing of UPVC pipes along with insulation in all
25 ELITE18-CON-CE-M&P-IR-0525 131 A 12-May-22 24-May-22 A A
respect
26 ELITE18-CON-CE-M&P-IR-0526 Measurement sheet for UPVC pipe complete duplex All Dup A&B 10-Jul-22 14-Jul-22 C 13-Jul-22 UR 18-Jul-22 22-Jul-22 B 25-Aug-22 26-Aug-22 B B
Testing & commissioning of volume control dampers louvers
27 ELITE18-CON-CE-M&P-IR-0527 exhaust fans & exhaust fans & exhaust air grills with all complete 131,132 A&B 5-Oct-23 11-Oct-23 A A
accessories
28 ELITE18-CON-CE-M&P-IR-0528 Installation of aluminium cladding 131,132 A&B 11-Oct-23 20-Oct-23 A A

29 ELITE18-CON-CE-M&P-IR-0529 Installation of hanging & clamping for PPRC at top roof 131,132 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0530 Installation & termination of floor drain covers 131,132 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0531 Instalaltion testing & commissioning of 32 mm gate valves 131,132 A&B 9-Dec-23 18-Dec-23 B B

8 551 TO 600 129-130


1 ELITE18-CON-CE-M&P-IR-0551 Connection of HDPE pipe with UGWT 129,130 6-Dec-22 10-Dec-22 A A

2 ELITE18-CON-CE-M&P-IR-0552 Installation of sanitary fixtures vent covels air grill etc 130 B 7-Jul-23 8-Jul-23 A A

3 ELITE18-CON-CE-M&P-IR-0553 Installation & testing of GI gas system 130 B 7-Jul-23 8-Jul-23 A A

4 ELITE18-CON-CE-M&P-IR-0554 Installation of booster pump 130 B 7-Jul-23 8-Jul-23 A A

5 ELITE18-CON-CE-M&P-IR-0555 Installation of transfer pump 130 B 7-Jul-23 8-Jul-23 A A

6 ELITE18-CON-CE-M&P-IR-0556 Installation of HVAC ducting system 130 B 7-Jul-23 8-Jul-23 A A

7 ELITE18-CON-CE-M&P-IR-0557 Installation of water geyser 130 B 7-Jul-23 8-Jul-23 B B


Installation & testing of cooper piping with insulation & condensate
8 ELITE18-CON-CE-M&P-IR-0558 130 B 7-Jul-23 10-Jul-23 B 10-Aug-23 12-Aug-23 B B
pipe
Testing & commissioning of sanitary items geyser automatic level
9 ELITE18-CON-CE-M&P-IR-0559 130 B 7-Jul-23 8-Jul-23 B B
controller transfer & booster pump etc
10 ELITE18-CON-CE-M&P-IR-0560 Testing & commissinning of HVAC system 130 B 7-Jul-23 8-Jul-23 B 9-Oct-23 11-Oct-23 A A

11 ELITE18-CON-CE-M&P-IR-0561 Installation of 1.5 ton indoor & outdoor AC units 130 B 7-Jul-23 10-Jul-23 B 10-Aug-23 12-Aug-23 B B
Installation & testing of PPRC pipes along with insulattion in all
12 ELITE18-CON-CE-M&P-IR-0562 130 B 7-Jul-23 8-Jul-23 B 27-Oct-23 3-Nov-23 B B
respect
Installation & testing of UPVC pipes along with insulattion in all
13 ELITE18-CON-CE-M&P-IR-0563 130 B 7-Jul-23 8-Jul-23 A A
respect
14 ELITE18-CON-CE-M&P-IR-0564 Installation of sanitary fixtures vent covels air grill etc 129 A 21-Jun-23 14-Jul-23 A A

15 ELITE18-CON-CE-M&P-IR-0565 Instalaltion & testing of GI gas system 129 A 5-Jul-23 14-Jul-23 A A

16 ELITE18-CON-CE-M&P-IR-0566 Installation of booster pump 129 A 23-Jun-23 14-Jul-23 A A

17 ELITE18-CON-CE-M&P-IR-0567 Installation of transfer pump 129 A 23-Jun-23 14-Jul-23 A A

Page 107 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

18 ELITE18-CON-CE-M&P-IR-0568 Installation & of HVAC ducting system 129 A 21-Jun-23 14-Jul-23 A A

19 ELITE18-CON-CE-M&P-IR-0569 Installation & of water geyser 129 A 5-Jul-23 14-Jul-23 A A


Installation & testing of copper piping with insulation & condensate
20 ELITE18-CON-CE-M&P-IR-0570 129 A 5-Jul-23 14-Jul-23 C 10-Aug-23 12-Aug-23 B B
pipe
Testing & commissioning of sanitary items geyser automatic level
21 ELITE18-CON-CE-M&P-IR-0571 129 A 9-Jul-23 14-Jul-23 B B
controller transfer & booster pumps etc
22 ELITE18-CON-CE-M&P-IR-0572 Testing & commissioning of HVAC system 129 A 9-Jul-23 14-Jul-23 A A

23 ELITE18-CON-CE-M&P-IR-0573 Installation of indoor & outdoor AC units 129 A 5-Jul-23 14-Jul-23 B 10-Aug-23 12-Aug-23 B B
Installation & testing of PPRC pipes along with insulattion in all
24 ELITE18-CON-CE-M&P-IR-0574 129 A 21-Jun-23 14-Jul-23 A A
respect
Installation & testing of UPVC pipes along with insulation in all
25 ELITE18-CON-CE-M&P-IR-0575 129 A 21-Jun-23 14-Jul-23 A A
respect
Testing & commissioning of volume control dampers louvers
26 ELITE18-CON-CE-M&P-IR-0576 exhaust fans & exhaust fans & exhaust air grills with all complete 129,130 A&B 5-Oct-23 11-Oct-23 A A
accessories
27 ELITE18-CON-CE-M&P-IR-0577 Installation of aluminium cladding 129,130 A&B 11-Oct-23 20-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0578 Installation of hanging & clamping for PPRC at top roof 129,130 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0579 Installation & termination of floor drain covers 129,130 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0580 Instalaltion testing & commissioning of 32 mm gate valves 129,130 A&B 9-Dec-23 18-Dec-23 B B

9 601 TO 650 127-128


1 ELITE18-CON-CE-M&P-IR-0601 Connection of HDPE pipe with UGWT 127,128 6-Dec-22 10-Dec-22 A A

2 ELITE18-CON-CE-M&P-IR-0602 Installation & gravity test of UPVC 127,128 GF 10-Dec-22 15-Dec-22 C C

3 ELITE18-CON-CE-M&P-IR-0603 Sanitry fixtures vent covels air grill etc 127 A 9-Aug-23 10-Aug-23 B 13-Oct-23 17-Oct-23 A A

4 ELITE18-CON-CE-M&P-IR-0604 Installation & testing of GI gas system 127 A 9-Aug-23 10-Aug-23 B B

5 ELITE18-CON-CE-M&P-IR-0605 Installation of booster pump 127 A 9-Aug-23 10-Aug-23 B B

6 ELITE18-CON-CE-M&P-IR-0606 Installation of transfer pump 127 A 9-Aug-23 10-Aug-23 A A

7 ELITE18-CON-CE-M&P-IR-0607 Instalaltion of HVAC system 127 A 9-Aug-23 10-Aug-23 A A

8 ELITE18-CON-CE-M&P-IR-0608 Installation of water geyser 127 A 12-Aug-23 17-Aug-23 A A


Installation & testing of copper piping with insulation & condensate
9 ELITE18-CON-CE-M&P-IR-0609 127 A 9-Aug-23 10-Aug-23 A A
pipe
Testing & commissioning of sanitary items automatic level
10 ELITE18-CON-CE-M&P-IR-0610 127 A 12-Aug-23 18-Aug-23 B B
controller transfer & booster pumps etc
11 ELITE18-CON-CE-M&P-IR-0611 Testing & commissioning of HVAC system 127 A 12-Aug-23 18-Aug-23 B B

12 ELITE18-CON-CE-M&P-IR-0612 Installation of indoor & outdoor AC units 127 A 10-Aug-23 12-Aug-23 B B


Installation & testing of PPRC pipes along with insulation in all
13 ELITE18-CON-CE-M&P-IR-0613 127 A 9-Aug-23 10-Aug-23 A A
respect
Installation & testing of UPVC pipes along with insulation in all
14 ELITE18-CON-CE-M&P-IR-0614 127 A 9-Aug-23 10-Aug-23 A A
respect
15 ELITE18-CON-CE-M&P-IR-0615 Instalaltion of sanitary fixtures vent covels air grill etc 128 B 9-Aug-23 10-Aug-23 B 13-Oct-23 17-Oct-23 A A

16 ELITE18-CON-CE-M&P-IR-0616 Installation & testing of GI gas system (submit ir 17-8-23) 128 B 19-Jul-23 18-Aug-23 A A

17 ELITE18-CON-CE-M&P-IR-0617 Installation of booster pump 128 B 9-Aug-23 10-Aug-23 B B

18 ELITE18-CON-CE-M&P-IR-0618 Installation of transfer pump 128 B 9-Aug-23 10-Aug-23 A A

19 ELITE18-CON-CE-M&P-IR-0619 Installation of HVAC ducting system 128 B 9-Aug-23 10-Aug-23 B B

20 ELITE18-CON-CE-M&P-IR-0620 Instalaltion of water geyser 128 B 12-Aug-23 17-Aug-23 A A


Installation & testing of copper piping with insulation & condensate
21 ELITE18-CON-CE-M&P-IR-0621 128 B 10-Aug-23 12-Aug-23 B B
pipe
Testing & commissioning of sanitary items automatic level
22 ELITE18-CON-CE-M&P-IR-0622 128 B 12-Aug-23 18-Aug-23 B B
controller transfer & booster pumps etc
23 ELITE18-CON-CE-M&P-IR-0623 Testing & commissioning of HVAC system 128 B 12-Aug-23 17-Aug-23 B B

24 ELITE18-CON-CE-M&P-IR-0624 Instalaltion of indoor & outdoor AC 128 B 10-Aug-23 12-Aug-23 B B


Instalaltion & testing of PPRC pipes along with insulation in all
25 ELITE18-CON-CE-M&P-IR-0625 128 B 9-Aug-23 10-Aug-23 A A
respects
Instalaltion & testing of UPVC pipes along with insulation in all
26 ELITE18-CON-CE-M&P-IR-0626 128 B 9-Aug-23 10-Aug-23 A A
respects
Testing & commissioning of volume control dampers louvers
27 ELITE18-CON-CE-M&P-IR-0627 exhaust fans & exhaust fans & exhaust air grills with all complete 127,128 A&B 5-Oct-23 11-Oct-23 A A
accessories
28 ELITE18-CON-CE-M&P-IR-0628 Installation of aluminium cladding 127,128 A&B 11-Oct-23 20-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0629 Installation of hanging & clamping for PPRC at top roof 127,128 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0630 Installation & termination of floor drain covers 127,128 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0631 Instalaltion testing & commissioning of 32 mm gate valves 127,128 A&B 9-Dec-23 18-Dec-23 B B

10 651 TO 700 126-126A

Page 108 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days
Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-0651 126,126a A&B 12-Aug-23 18-Aug-23 B B
& external pipe
2 ELITE18-CON-CE-M&P-IR-0652 Instalaltion of sanitary fixtures vent covels air grill etc 126 A 3-Oct-23 5-Oct-23 B B

3 ELITE18-CON-CE-M&P-IR-0653 Instalaltion & testing of GI gas system 126 A 12-Aug-23 16-Aug-23 A A

4 ELITE18-CON-CE-M&P-IR-0654 Instalaltion of boodter pump 126 A 3-Oct-23 5-Oct-23 B B

5 ELITE18-CON-CE-M&P-IR-0655 Installation of transfer pump 126 A 3-Oct-23 5-Oct-23 B B

6 ELITE18-CON-CE-M&P-IR-0656 Instalaltion of HVAC ducting system 126 A 12-Aug-23 16-Aug-23 A A

7 ELITE18-CON-CE-M&P-IR-0657 Installation of water geyser 126 A 3-Oct-23 5-Oct-23 B B


Installation & testing of cooper piping with insulation & condensate
8 ELITE18-CON-CE-M&P-IR-0658 126 A 12-Aug-23 16-Aug-23 B B
pipe
Testing & commissioning of sanitary items automatic level
9 ELITE18-CON-CE-M&P-IR-0659 126 A 3-Oct-23 5-Oct-23 B B
controller transfer & booster pump etc
10 ELITE18-CON-CE-M&P-IR-0660 Testing & commissioning of HVAC system 126 A 3-Oct-23 13-Oct-23 A A

11 ELITE18-CON-CE-M&P-IR-0661 Instaalltion of indoor & outdoor AC units 126 A 3-Oct-23 5-Oct-23 B B

12 ELITE18-CON-CE-M&P-IR-0662 Intalaltion & testing of PPRC pipes 126 A 12-Aug-23 22-Aug-23 C 23-Aug-23 3-Nov-23 B 14-Dec-23 12/26/2023 B B
Installation & testing of UPVC pipe along with insulation in all
13 ELITE18-CON-CE-M&P-IR-0663 126 A 2-Aug-23 22-Aug-23 B B
respect
14 ELITE18-CON-CE-M&P-IR-0664 Instalaltion of sanitary fixtures vent covels air grill etc 126a B 3-Oct-23 5-Oct-23 B B

15 ELITE18-CON-CE-M&P-IR-0665 Installation & testing of GI gas system 126a B 12-Aug-23 16-Aug-23 A A

16 ELITE18-CON-CE-M&P-IR-0666 Instalaltion of booster pump 126a B 3-Oct-23 5-Oct-23 B B

17 ELITE18-CON-CE-M&P-IR-0667 Instalaltion of transfer pump 126a B 3-Oct-23 5-Oct-23 B B

18 ELITE18-CON-CE-M&P-IR-0668 Instalaltion of HVAC ducting system 126a B 12-Aug-23 16-Aug-23 A A

19 ELITE18-CON-CE-M&P-IR-0669 Installation of water geyser 126a B 3-Oct-23 5-Oct-23 B B

20 ELITE18-CON-CE-M&P-IR-0670 Installation of copper piping with insulation 126a B 12-Aug-23 16-Aug-23 B B


Testing & commissioning of sanitary items automatic level
21 ELITE18-CON-CE-M&P-IR-0671 126a B 3-Oct-23 5-Oct-23 B B
controller transfer & booster pump etc
22 ELITE18-CON-CE-M&P-IR-0672 Testing & commissining of HVAC system 126a B 3-Oct-23 11-Oct-23 B B

23 ELITE18-CON-CE-M&P-IR-0673 Instalaltion of indoor & outdoo AC units 126a B 3-Oct-23 5-Oct-23 B B

24 ELITE18-CON-CE-M&P-IR-0674 Intalaltion & testing of PPRC pipes 126a B 9-Aug-23 18-Aug-23 C 27-Oct-23 3-Nov-23 B 14-Dec-23 12/26/2023 B B
Installation & testing of UPVC pipe along with insulation in all
25 ELITE18-CON-CE-M&P-IR-0675 126a B 18-8-223 22-8-223 A A
respect
Testing & commissioning of volume control dampers louvers
26 ELITE18-CON-CE-M&P-IR-0676 exhaust fans & exhaust fans & exhaust air grills with all complete 126,126a A&B 5-Oct-23 11-Oct-23 A A
accessories
27 ELITE18-CON-CE-M&P-IR-0677 Installation of aluminium cladding 126,126a A&B 11-Oct-23 20-Oct-23 A A

28 ELITE18-CON-CE-M&P-IR-0678 Acoustic insulation in all respect 126,126a A&B 27-Oct-23 31-Oct-23 A A

29 ELITE18-CON-CE-M&P-IR-0679 T&C of foot valves 126,126a A&B 27-Oct-23 31-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0680 Installation of hanging & clamping for PPRC at top roof 126,126a A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0681 Installation & termination of floor drain covers 126,126a A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0682 Instalaltion testing & commissioning of 32 mm gate valves 126,126a A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0683 Instalaltion of hot water insulation for PPRC 126 A 14-Dec-23 26-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0684 Instalaltion of hot water insulation for PPRC 126a B 14-Dec-23 26-Dec-23 B B

11 701 TO 750 124-125


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-0701 124,125 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
2 ELITE18-CON-CE-M&P-IR-0702 Installation of sanitary fixtures vent covels air grill etc 124 A 26-Sep-23 27-Aug-23 B B

3 ELITE18-CON-CE-M&P-IR-0703 Installation & tesing of GI gas system 124 A 21-Aug-23 25-Aug-23 A A

4 ELITE18-CON-CE-M&P-IR-0704 Instalaltion of booster pump 124 A 26-Sep-23 28-Aug-23 B B

5 ELITE18-CON-CE-M&P-IR-0705 Instalaltion of transfer pump 124 A 26-Sep-23 27-Aug-23 B B

6 ELITE18-CON-CE-M&P-IR-0706 Installation of HVAC ducting system 124 A 18-Aug-23 25-Aug-23 A A

7 ELITE18-CON-CE-M&P-IR-0707 Instalaltion of water geyser 124 A 26-Sep-23 28-Sep-23 B B

8 ELITE18-CON-CE-M&P-IR-0708 Instalaltion & testing of copper piping with insulation 124 A 23-Aug-23 26-Aug-23 B B
Testing & commissioning of sanitary items automatic level
9 ELITE18-CON-CE-M&P-IR-0709 124 A 3-Oct-23 13-Oct-23 B B
controller transfer & booster pump etc
10 ELITE18-CON-CE-M&P-IR-0710 Testing & commissioning of HVAC system 124 A 3-Oct-23 13-Oct-23 B B

11 ELITE18-CON-CE-M&P-IR-0711 Installation of indoor & outdoor AC units 124 A 26-Sep-23 28-Sep-23 B B

12 ELITE18-CON-CE-M&P-IR-0712 Instalaltion & testing of PPRC pipes 124 A 21-Aug-23 25-Aug-23 A A

Page 109 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

13 ELITE18-CON-CE-M&P-IR-0713 Installation & testing of UPVC pipes & CDP 124 A 21-Aug-23 25-Aug-23 A A

14 ELITE18-CON-CE-M&P-IR-0714 Instalaltion of sanitary fixtures vent covels air grill etc 125 B 3-Oct-23 13-Oct-23 B B

15 ELITE18-CON-CE-M&P-IR-0715 Installation & testing of GI gas system 125 B 21-Aug-23 25-Aug-23 A A

16 ELITE18-CON-CE-M&P-IR-0716 Installation of booster pump 125 B 3-Oct-23 5-Oct-23 B B

17 ELITE18-CON-CE-M&P-IR-0717 Instalaltion of transfer pump 125 B 3-Oct-23 5-Oct-23 B B

18 ELITE18-CON-CE-M&P-IR-0718 Installation of HVAC ducting system 125 B 18-Aug-23 25-Aug-23 A A

19 ELITE18-CON-CE-M&P-IR-0719 Instalaltion of water geyser 125 B 3-Oct-23 5-Oct-23 B B

20 ELITE18-CON-CE-M&P-IR-0720 Instalaltion & testing copper piping with insulation 125 B 21-Aug-23 25-Aug-23 B B
Testing & commissioning of sanitary items automatic level
21 ELITE18-CON-CE-M&P-IR-0721 125 B 9-Oct-23 13-Oct-23 B B
controller transfer & booster pump etc
22 ELITE18-CON-CE-M&P-IR-0722 Testing & commissining of HVAC system 125 B 9-Oct-23 13-Oct-23 A A

23 ELITE18-CON-CE-M&P-IR-0723 Instalaltion of indoor & outdoor AC units 125 B 3-Oct-23 13-Oct-23 B B

24 ELITE18-CON-CE-M&P-IR-0724 Installation & testing of PPRC pipes 125 B 21-Aug-23 25-Aug-23 A A

25 ELITE18-CON-CE-M&P-IR-0725 Installation & testing of UPVC pipes & CDP 125 B 21-Aug-23 25-Aug-23 A A
Testing & commissioning of volume control dampers louvers
26 ELITE18-CON-CE-M&P-IR-0726 exhaust fans & exhaust fans & exhaust air grills with all complete 124,125 A&B 5-Oct-23 11-Oct-23 A A
accessories
27 ELITE18-CON-CE-M&P-IR-0727 Installation of aluminium cladding 124,125 A&B 11-Oct-23 20-Oct-23 A A

28 ELITE18-CON-CE-M&P-IR-0728 PPRC pipes in all respect 125 B 27-Oct-23 3-Nov-23 A A

29 ELITE18-CON-CE-M&P-IR-0729 Acoustic insulation in all respect 124,125 A&B 27-Oct-23 31-Oct-23 B B

30 ELITE18-CON-CE-M&P-IR-0730 T&C of foot valves 124,125 A&B 27-Oct-23 31-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0731 Installation of hanging & clamping for PPRC at top roof 124,125 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0732 Installation & termination of floor drain covers 124,125 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0733 Instalaltion testing & commissioning of 32 mm gate valves 124,125 A&B 9-Dec-23 18-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0734 Instalaltion of hot water insulation for PPRC 125 A 14-Dec-23 21-Dec-23 A A

12 751 TO 800 122-123


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-0751 122,123 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
2 ELITE18-CON-CE-M&P-IR-0752 Installation of sanitary fixtures vent covels air grill etc 122 A 26-Sep-23 27-Sep-23 B 27-Oct-23 31-Oct-23 B B

3 ELITE18-CON-CE-M&P-IR-0753 Instalaltion & testing of GI gas system 122 A 12-Aug-23 16-Aug-23 A A

4 ELITE18-CON-CE-M&P-IR-0754 Instalaltion of booster pump 122 A 26-Sep-23 27-Sep-23 B B

5 ELITE18-CON-CE-M&P-IR-0755 Instalaltion of transfer pump 122 A 26-Sep-23 27-Sep-23 B B

6 ELITE18-CON-CE-M&P-IR-0756 Installation of HVAC ducting system 122 A 12-Aug-23 16-Aug-23 A A

7 ELITE18-CON-CE-M&P-IR-0757 Instalaltion of water geyser 122 A 26-Sep-23 27-Sep-23 B B


Installation & testing of cooper piping with insulation & condensate
8 ELITE18-CON-CE-M&P-IR-0758 122 A 12-Aug-23 16-Aug-23 B B
pipe
Testing & commissioning of sanitary items automatic level
9 ELITE18-CON-CE-M&P-IR-0759 122 A 3-Oct-23 5-Oct-23 B 27-Oct-23 31-Oct-23 B B
controller transfer & booster pump etc
10 ELITE18-CON-CE-M&P-IR-0760 Testing & commissioning of HVAC system 122 A 3-Oct-23 13-Oct-23 B B

11 ELITE18-CON-CE-M&P-IR-0761 Instalaltion of indoor & outdoor AC units 122 A 26-Sep-23 27-Sep-23 B B


Intalaltion & testing of PPRC pipes along with insulation in all
12 ELITE18-CON-CE-M&P-IR-0762 122 A 12-Aug-23 22-Aug-23 C 23-Aug-23 3-Nov-23 A A
respect
Installation & testing of UPVC pipe along with insulation in all
13 ELITE18-CON-CE-M&P-IR-0763 122 A 8-Aug-23 22-Aug-23 B 13-Oct-23 19-Oct-23 A A
respect
14 ELITE18-CON-CE-M&P-IR-0764 Instalaltion of sanitary fixtures vent covels air grill etc 123 B 26-Sep-23 28-Sep-23 B B

15 ELITE18-CON-CE-M&P-IR-0765 Instalaltion & testing of GI gas system 123 B 4-Aug-23 8-Aug-23 A A

16 ELITE18-CON-CE-M&P-IR-0766 Instalaltion of booster pump 123 B 26-Sep-23 27-Sep-23 B B

17 ELITE18-CON-CE-M&P-IR-0767 Installation of transfer pump 123 B 26-Sep-23 28-Sep-23 B B

18 ELITE18-CON-CE-M&P-IR-0768 Installation of HVAC ducting system 123 B 18-Aug-23 22-Aug-23 A A

19 ELITE18-CON-CE-M&P-IR-0769 Instalaltion of water geyser 123 B 26-Sep-23 28-Sep-23 B 9-Oct-23 11-Oct-23 A A

20 ELITE18-CON-CE-M&P-IR-0770 Installation & testing of copper piping with insulation 123 B 16-Aug-23 23-Aug-23 B B
Testing & commissioning of sanitary items automatic level
ELITE18-CON-CE-M&P-IR-0771 123 B 3-Oct-23 5-Oct-23 B B
controller transfer & booster pump etc
ELITE18-CON-CE-M&P-IR-0772 Testing & commissioning of HVAC system 123 B 3-Oct-23 13-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0773 Installation of indoor & outdoor AC units 123 B 26-Sep-23 28-Sep-23 B B

Page 110 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

ELITE18-CON-CE-M&P-IR-0774 Installation & testing of PPRC pipes 123 B 16-Aug-23 20-Aug-23 A A

ELITE18-CON-CE-M&P-IR-0775 Installation & testing of UPVC pipes & CDP 123 B 16-Aug-23 20-Aug-23 A A

ELITE18-CON-CE-M&P-IR-0776 Dismentlling of copper pipe for retrofitting 123 B 30-Aug-23 31-Aug-23 B B


Testing & commissioning of volume control dampers louvers
ELITE18-CON-CE-M&P-IR-0777 exhaust fans & exhaust fans & exhaust air grills with all complete 122,123 A&B 5-Oct-23 11-Oct-23 A A
accessories
ELITE18-CON-CE-M&P-IR-0778 Installation of aluminium cladding 122,123 A&B 11-Oct-23 20-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0779 Acoustic insulation in all respect 122,123 A&B 27-Oct-23 31-Oct-23 B B

ELITE18-CON-CE-M&P-IR-0780 T&C of foot valves 122,123 A&B 27-Oct-23 31-Oct-23 A A

ELITE18-CON-CE-M&P-IR-0781 Installation of hanging & clamping for PPRC at top roof 122,123 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0782 Installation & termination of floor drain covers 122,123 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0783 Instalaltion testing & commissioning of 32 mm gate valves 122,123 A&B 9-Dec-23 UR UR

13 801 TO 850 119-120


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-0801 119,120 A&B 12-Aug-23 18-Aug-23 B B
& external pipe

2 ELITE18-CON-CE-M&P-IR-0802 Installation of sanitary fixtures vent covels air grill etc 119 A 15-Nov-23 17-Nov-23 A A

3 ELITE18-CON-CE-M&P-IR-0803 Instalaltion & testing of GI gas system 119 A 9-Oct-23 13-Oct-23 B 15-Nov-23 17-Nov-23 A A

4 ELITE18-CON-CE-M&P-IR-0804 Installation of booster pump 119 A 15-Nov-23 17-Nov-23 C C

5 ELITE18-CON-CE-M&P-IR-0805 Installtion of transfer pump 119 A 15-Nov-23 UR UR

6 ELITE18-CON-CE-M&P-IR-0806 Installation of HVAC ducting system 119 A 9-Oct-23 13-Oct-23 B 28-Oct-23 7-Nov-23 B 11-Dec-23 12/13/2023 B B

7 ELITE18-CON-CE-M&P-IR-0807 Installation of water geyser 119 A 15-Nov-23 17-Nov-23 C 9-Dec-23 13-Dec-23 C C


Instalaltion testing & commissioning of copper piping with
8 ELITE18-CON-CE-M&P-IR-0808 119 A 9-Oct-23 16-Oct-23 B 15-Nov-23 17-Nov-23 B 14-Dec-23 12/21/2023 A A
insulation
testing & commissioning of sanitary fixtures automatic level
9 ELITE18-CON-CE-M&P-IR-0809 controller vent covels bottle trap tissue paper holder cleanout plugs 119 A 13-Dec-23 18-Dec-23 B B
etc
10 ELITE18-CON-CE-M&P-IR-0810

11 ELITE18-CON-CE-M&P-IR-0811 Installation of indoor & outdoor AC units 119 A 15-Nov-23 17-Nov-23 A A

12 ELITE18-CON-CE-M&P-IR-0812 Installation & testing of PPRC pipes 119 A 9-Oct-23 13-Oct-23 B 9-Oct-23 13-Oct-23 B 15-Nov-23 17-Nov-23 A A
Installation & testing of UPVC pipes & CDP pipe with acoustic
13 ELITE18-CON-CE-M&P-IR-0813 119 A 9-Oct-23 13-Oct-23 B 9-Dec-23 13-Dec-23 C 14-Dec-23 12/21/2023 B B
insulation
14 ELITE18-CON-CE-M&P-IR-0814 Installation of sanitary fixtures vent covels air grill etc 120 B 15-Nov-23 17-Nov-23 B B

15 ELITE18-CON-CE-M&P-IR-0815 Installation & testing of GI gas system 120 B 9-Oct-23 13-Oct-23 B 15-Nov-23 17-Nov-23 A A

16 ELITE18-CON-CE-M&P-IR-0816 Installation of booster pump 120 B 15-Nov-23 UR UR

17 ELITE18-CON-CE-M&P-IR-0817 Installation of transfer pump 120 B 15-Nov-23 UR UR

18 ELITE18-CON-CE-M&P-IR-0818 Instalaltion of HVAC ducting system 120 B 9-Oct-23 13-Oct-23 B 28-Oct-23 7-Nov-23 B B

19 ELITE18-CON-CE-M&P-IR-0819 Instalaltion of water geyser 120 B 15-Nov-23 17-Nov-23 C 9-Dec-23 13-Dec-23 B B


Instalaltion testing & commissioning of copper piping with
20 ELITE18-CON-CE-M&P-IR-0820 120 B 9-Oct-23 16-Oct-23 B 15-Nov-23 17-Nov-23 A 14-Dec-23 12/21/2023 A A
insulation
testing & commissioning of sanitary fixtures automatic level
21 ELITE18-CON-CE-M&P-IR-0821 controller vent covels bottle trap tissue paper holder cleanout plugs 120 B 13-Dec-23 18-Dec-23 B B
etc
22 ELITE18-CON-CE-M&P-IR-0822 Testing & commissioning of HVAC system 119,120 A&B 11-Dec-23 13-Dec-23 B B

23 ELITE18-CON-CE-M&P-IR-0823 Installation testing & comissioning of indoor & outdoor AC units 120 B 15-Nov-23 17-Nov-23 B B

24 ELITE18-CON-CE-M&P-IR-0824 Installation & testing of PPRC pipes 120 B 9-Oct-23 13-Oct-23 B 15-Nov-23 17-Nov-23 A A
Installation & testing of UPVC pipes & CDP pipe with acoustic
25 ELITE18-CON-CE-M&P-IR-0825 120 B 9-Oct-23 13-Oct-23 B 9-Dec-23 13-Dec-23 C 14-Dec-23 12/21/2023 C 12/23/2023 12/27/2023 B B
insulation
Installation testing and commissioning of volume control dampers
ELITE18-CON-CE-M&P-IR-0826 louvers exhaust fans & exhuast air grills with all complete 119,120 A&B 8-Dec-23 13-Dec-23 B B
accessories

ELITE18-CON-CE-M&P-IR-0827

ELITE18-CON-CE-M&P-IR-0828 Instalaltion of hangging & clamping for PPRC at top roof 119,120 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0829 Installation & termination of floor drain covers 119,120 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0830 Instalaltion testing & commissioning of 32 mm gate valves 119,120 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0831 Instalaltion of hot water insulation for PPRC 119 A 14-Dec-23 21-Dec-23 A A

ELITE18-CON-CE-M&P-IR-0832 Instalaltion of hot water insulation for PPRC 120 B 14-Dec-23 21-Dec-23 A A

Page 111 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

14 851 TO 900 117-118


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-0851 117,118 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
Installation of sanitary fixtures automatic level controler vent covels
2 ELITE18-CON-CE-M&P-IR-0852 117 A 13-Dec-23 21-Dec-23 C 23-Dec-23 27-Dec-23 B B
bottle trap tissue paper holder cleanout etc
3 ELITE18-CON-CE-M&P-IR-0853 Instalaltion of GI gas pipe system 117 A 15-Nov-23 23-Nov-23 A A

4 ELITE18-CON-CE-M&P-IR-0854

5 ELITE18-CON-CE-M&P-IR-0855

6 ELITE18-CON-CE-M&P-IR-0856 Instalaltion of HVAC ducting system 117 A 15-Nov-23 23-Nov-23 A A

7 ELITE18-CON-CE-M&P-IR-0857

8 ELITE18-CON-CE-M&P-IR-0858 Installation of copper piping with insulation 117 A 15-Nov-23 23-Nov-23 B B

9 ELITE18-CON-CE-M&P-IR-0859

10 ELITE18-CON-CE-M&P-IR-0860

11 ELITE18-CON-CE-M&P-IR-0861

12 ELITE18-CON-CE-M&P-IR-0862 Installation & testing of PPRC pipes with insulation 117 A 15-Nov-23 23-Nov-23 B 14-Dec-23 21-Dec-23 C 23-Dec-23 12/27/2023 B B

13 ELITE18-CON-CE-M&P-IR-0863 Installation & testing of CDP & UPVC with acoustic insulation 117 A 15-Nov-23 23-Nov-23 B 9-Dec-23 18-Dec-23 C C
Installation of sanitary fixtures automatic level controler vent covels
14 ELITE18-CON-CE-M&P-IR-0864 118 B 13-Dec-23 21-Dec-23 C 23-Dec-23 27-Dec-23 B B
bottle trap tissue paper holder cleanout etc
15 ELITE18-CON-CE-M&P-IR-0865 Installation of GI gas system 118 B 15-Nov-23 23-Nov-23 B 14-Dec-23 21-Dec-23 A A

16 ELITE18-CON-CE-M&P-IR-0866

17 ELITE18-CON-CE-M&P-IR-0867

18 ELITE18-CON-CE-M&P-IR-0868 Installation of HVAC ducting system 118 B 15-Nov-23 25-Nov-23 A A

19 ELITE18-CON-CE-M&P-IR-0869 Instalaltion of water geyser 117,118 A&B 9-Dec-23 18-Dec-23 C C

20 ELITE18-CON-CE-M&P-IR-0870 Installation & testing of copper piping with insulation 118 B 15-Nov-23 25-Nov-23 B B

21 ELITE18-CON-CE-M&P-IR-0871

22 ELITE18-CON-CE-M&P-IR-0872 Testing & commissioning of HVAC system 117,118 A&B 11-Dec-23 13-Dec-23 C C

23 ELITE18-CON-CE-M&P-IR-0873 Installation of indoor & outdoor AC units 117,118 A&B 11-Dec-23 13-Dec-23 C 14-Dec-23 21-Dec-23 B B

24 ELITE18-CON-CE-M&P-IR-0874 Installation & testing of PPRC pipes & hot water insulation 118 B 15-Nov-23 25-Nov-23 B 14-Dec-23 21-Dec-23 C 23-Dec-23 12/27/2023 B B
Installation & testing of CDP & UPVC pipes with acoustic
25 ELITE18-CON-CE-M&P-IR-0875 118 B 15-Nov-23 23-Nov-23 B 9-Dec-23 18-Dec-23 B B
insulation
Installation testing and commissioning of volume control dampers
ELITE18-CON-CE-M&P-IR-0876 louvers exhaust fans & exhuast air grills with all complete 117,118 A&B 8-Dec-23 13-Dec-23 C C
accessories

ELITE18-CON-CE-M&P-IR-0877

ELITE18-CON-CE-M&P-IR-0878 Instalaltion of hanging & clamping for PPRC at top roof 117,118 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

ELITE18-CON-CE-M&P-IR-0879 Installation & termination of floor drain covers 117,118 A&B 9-Dec-23 18-Dec-23 C C

ELITE18-CON-CE-M&P-IR-0880 Instalaltion testing & commissioning of 32 mm gate valves 117,118 A&B 9-Dec-23 18-Dec-23 B B

15 901 TO 950 115-116


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-0901 115,116 A&B 9-Aug-23 12-Aug-23 C 12-Aug-23 18-Aug-23 B B
& external pipe

2 ELITE18-CON-CE-M&P-IR-0902 Dismentlling of copper pipe 115,116 10-Oct-23 13-Oct-23 B B

3 ELITE18-CON-CE-M&P-IR-0903

4 ELITE18-CON-CE-M&P-IR-0904

5 ELITE18-CON-CE-M&P-IR-0905

6 ELITE18-CON-CE-M&P-IR-0906 Instalaltion of HVAC ducting system 115 A 15-Nov-23 24-Nov-23 C C

7 ELITE18-CON-CE-M&P-IR-0907

8 ELITE18-CON-CE-M&P-IR-0908

9 ELITE18-CON-CE-M&P-IR-0909

10 ELITE18-CON-CE-M&P-IR-0910

Page 112 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

11 ELITE18-CON-CE-M&P-IR-0911

12 ELITE18-CON-CE-M&P-IR-0912 Installation of PPRC pipes 115 A 15-Nov-23 24-Nov-23 C C

13 ELITE18-CON-CE-M&P-IR-0913 Installation of UPVC & CDP pipes 115 A 15-Nov-23 25-Nov-23 C C

14 ELITE18-CON-CE-M&P-IR-0914

15 ELITE18-CON-CE-M&P-IR-0915

16 ELITE18-CON-CE-M&P-IR-0916

17 ELITE18-CON-CE-M&P-IR-0917

18 ELITE18-CON-CE-M&P-IR-0918 Instalaltion of HVAC ducting system 116 B 15-Nov-23 24-Nov-23 C C

19 ELITE18-CON-CE-M&P-IR-0919

20 ELITE18-CON-CE-M&P-IR-0920

21 ELITE18-CON-CE-M&P-IR-0921

22 ELITE18-CON-CE-M&P-IR-0922

23 ELITE18-CON-CE-M&P-IR-0923

24 ELITE18-CON-CE-M&P-IR-0924 Installation of PPRC pipes 116 B 15-Nov-23 24-Nov-23 C C

25 ELITE18-CON-CE-M&P-IR-0925 Installation of UPVC pipes & CDP 116 B 15-Nov-23 25-Nov-23 C C

16 951 TO 1000 113-114


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-0951 113,114 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
Installation of sanitary fixtures automatic level controler vent covels
2 ELITE18-CON-CE-M&P-IR-0952 113 A 15-Nov-23 17-Nov-23 B 13-Dec-23 18-Dec-23 B B
bottle trap tissue paper holder cleanout etc
3 ELITE18-CON-CE-M&P-IR-0953 Installation & testing of GI gas system 113 A 15-Nov-23 17-Nov-23 A A

4 ELITE18-CON-CE-M&P-IR-0954 Installation of booster pump 113 A 15-Nov-23 17-Nov-23 C C

5 ELITE18-CON-CE-M&P-IR-0955 Installation of transfer pump 113 A 15-Nov-23 17-Nov-23 C C

6 ELITE18-CON-CE-M&P-IR-0956 Installation of HVAC ducting system 113 A 15-Nov-23 17-Nov-23 A A

7 ELITE18-CON-CE-M&P-IR-0957 Installation of water geyser 113 A 15-Nov-23 17-Nov-23 C 9-Dec-23 13-Dec-23 C C

8 ELITE18-CON-CE-M&P-IR-0958 Installation testing & comissioning of copper piping with insulation 113 A 15-Nov-23 17-Nov-23 B 14-Dec-23 21-Dec-23 B B
testing & commissioning of sanitary fixtures automatic level
9 ELITE18-CON-CE-M&P-IR-0959 controller vent covels bottle trap tissue paper holder cleanout plugs 113 A 13-Dec-23 21-Dec-23 B B
etc
10 ELITE18-CON-CE-M&P-IR-0960 Testing & commissioning of HVAC system 113,114 A&B 11-Dec-23 13-Dec-23 B B

11 ELITE18-CON-CE-M&P-IR-0961 Installation of indoor & outdoor AC units 113 A 15-Nov-23 17-Nov-23 B 11-Dec-23 13-Dec-23 B B

12 ELITE18-CON-CE-M&P-IR-0962 Instalaltion & testing of PPRC pipes & hot water insulation 113 A 15-Nov-23 17-Nov-23 B 14-Dec-23 21-Dec-23 C 23-Dec-23 12/27/2023 B B
Instalaltion & testing of CDP & UPVC pipes with acoustic
13 ELITE18-CON-CE-M&P-IR-0963 113 A 15-Nov-23 17-Nov-23 B 9-Dec-23 13-Dec-23 C 14-Dec-23 12/21/2023 C 12/23/2023 12/27/2023 B B
insulation
Installation of sanitary fixtures automatic level controler vent covels
14 ELITE18-CON-CE-M&P-IR-0964 114 B 15-Nov-23 17-Nov-23 B 13-Dec-23 18-Dec-23 B B
bottle trap tissue paper holder cleanout etc
15 ELITE18-CON-CE-M&P-IR-0965 Installation & testing of GI gas system 114 B 15-Nov-23 17-Nov-23 B 14-Dec-23 21-Dec-23 C C

16 ELITE18-CON-CE-M&P-IR-0966 Installation of booster pump 114 B 15-Nov-23 17-Nov-23 C C

17 ELITE18-CON-CE-M&P-IR-0967 Installation of transfer pump 114 B 15-Nov-23 17-Nov-23 C C

18 ELITE18-CON-CE-M&P-IR-0968 Installation of HVAC ducting system 114 B 15-Nov-23 17-Nov-23 B 11-Dec-23 13-Dec-23 B B

19 ELITE18-CON-CE-M&P-IR-0969 Installation testing & commissioning of water geyser 114 B 9-Dec-23 13-Dec-23 C C

20 ELITE18-CON-CE-M&P-IR-0970 Installation teting & comissioning of copper piping with insulation 114 B 15-Nov-23 17-Nov-23 B 14-Dec-23 21-Dec-23 C 23-Dec-23 12/27/2023 A A
testing & commissioning of sanitary fixtures automatic level
21 ELITE18-CON-CE-M&P-IR-0971 controller vent covels bottle trap tissue paper holder cleanout plugs 114 B 13-Dec-23 21-Dec-23 B B
etc
22 ELITE18-CON-CE-M&P-IR-0972

23 ELITE18-CON-CE-M&P-IR-0973 Installation of indoor & outdoor AC units 114 B 15-Nov-23 17-Nov-23 A A

24 ELITE18-CON-CE-M&P-IR-0974 Instalaltion & testing of PPRC pipes & hot water insulation 114 B 15-Nov-23 17-Nov-23 B 14-Dec-23 21-Dec-23 B B
Instalaltion & testing of CDP & UPVC pipes with acoustic
25 ELITE18-CON-CE-M&P-IR-0975 114 B 15-Nov-23 17-Nov-23 B 9-Dec-23 13-Dec-23 C 14-Dec-23 12/21/2023 B B
insulation
Installation testing and commissioning of volume control dampers
26 ELITE18-CON-CE-M&P-IR-0976 louvers exhaust fans & exhuast air grills with all complete 113,114 A&B 8-Dec-23 13-Dec-23 B B
accessories
27 ELITE18-CON-CE-M&P-IR-0977

28 ELITE18-CON-CE-M&P-IR-0978 Installation of hanging & clamping for PPRC at top roof 113,114 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

Page 113 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

29 ELITE18-CON-CE-M&P-IR-0979 Installation of hanging & clamping for PPRC at top roof 113,114 A&B 8-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0980 Installation & termination of floor drain covers 113,114 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-0981 Instalaltion testing & commissioning of 32 mm gate valves 113,114 A&B 9-Dec-23 UR UR

17 1001 TO 1050 111-112


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-1001 111,112 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
Installation of sanitary fixtures automatic level controler vent covels
2 ELITE18-CON-CE-M&P-IR-1002 111 A 13-Dec-23 18-Dec-23 B B
bottle trap tissue paper holder cleanout etc
3 ELITE18-CON-CE-M&P-IR-1003 Installation & testing of GI gas system 111 A 15-Nov-23 25-Nov-23 B 14-Dec-23 21-Dec-23 B B

4 ELITE18-CON-CE-M&P-IR-1004

5 ELITE18-CON-CE-M&P-IR-1005

6 ELITE18-CON-CE-M&P-IR-1006 Installation of HVAC ducting system 111 A 15-Nov-23 25-Nov-23 A A

7 ELITE18-CON-CE-M&P-IR-1007

8 ELITE18-CON-CE-M&P-IR-1008 Instalaltion of copper piping with insulation 111 A 15-Nov-23 25-Nov-23 B 14-Dec-23 21-Dec-23 B B
testing & commissioning of sanitary fixtures automatic level
9 ELITE18-CON-CE-M&P-IR-1009 controller vent covels bottle trap tissue paper holder cleanout plugs 111 A 13-Dec-23 21-Dec-23 B B B
etc
10 ELITE18-CON-CE-M&P-IR-1010 Testing & commissioning of HVAC system 111,112 A&B 11-Dec-23 13-Dec-23 C 14-Dec-23 21-Dec-23 B B

11 ELITE18-CON-CE-M&P-IR-1011 Installation of indoor & outdoor AC units 111,112 A&B 11-Dec-23 13-Dec-23 C 14-Dec-23 21-Dec-23 B B

12 ELITE18-CON-CE-M&P-IR-1012 Instalaltion & testing of PPRC pipes & hot water insulation 111 A 15-Nov-23 25-Nov-23 B 14-Dec-23 21-Dec-23 C 23-Dec-23 12/27/2023 B B
Instalaltion & testing of CDP & UPVC pipes with acoustic
13 ELITE18-CON-CE-M&P-IR-1013 111 A 15-Nov-23 25-Nov-23 B 9-Dec-23 18-Dec-23 C 23-Dec-23 12/27/2023 B B
insulation
Installation of sanitary fixtures automatic level controler vent covels
14 ELITE18-CON-CE-M&P-IR-1014 112 B 13-Dec-23 18-Dec-23 B B
bottle trap tissue paper holder cleanout etc
15 ELITE18-CON-CE-M&P-IR-1015 Installation & testing of GI gas system 112 B 15-Nov-23 24-Nov-23 C 14-Dec-23 21-Dec-23 B B

16 ELITE18-CON-CE-M&P-IR-1016

17 ELITE18-CON-CE-M&P-IR-1017

18 ELITE18-CON-CE-M&P-IR-1018 Installation of HVAC ducting system 112 B 15-Nov-23 24-Nov-23 C 11-Dec-23 18-Dec-23 C 23-Dec-23 12/27/2023 A A

19 ELITE18-CON-CE-M&P-IR-1019
Installation & testing & commissioning of copper piping with
20 ELITE18-CON-CE-M&P-IR-1020 112 B 15-Nov-23 24-Nov-23 C 14-Dec-23 21-Dec-23 A A
insulation
testing & commissioning of sanitary fixtures automatic level
21 ELITE18-CON-CE-M&P-IR-1021 controller vent covels bottle trap tissue paper holder cleanout plugs 112 B 13-Dec-23 21-Dec-23 B B
etc
22 ELITE18-CON-CE-M&P-IR-1022

23 ELITE18-CON-CE-M&P-IR-1023

24 ELITE18-CON-CE-M&P-IR-1024 Instalaltion & testing of PPRC pipes & hot water insulation 112 B 15-Nov-23 24-Nov-23 C 14-Dec-23 21-Dec-23 B B
Instalaltion & testing of CDP & UPVC pipes with acoustic
25 ELITE18-CON-CE-M&P-IR-1025 112 B 15-Nov-23 25-Nov-23 C 9-Dec-23 13-Dec-23 C 14-Dec-23 12/21/2023 C 12/23/2023 12/27/2023 B B
insulation
Installation testing and commissioning of volume control dampers
26 ELITE18-CON-CE-M&P-IR-1026 louvers exhaust fans & exhuast air grills with all complete 111,112 A&B 8-Dec-23 21-Dec-23 C C
accessories
27 ELITE18-CON-CE-M&P-IR-1027

28 ELITE18-CON-CE-M&P-IR-1028 Installation of hanging & clamping for PPRC at top roof 111,112 A&B 8-Dec-23 21-Dec-23 C 27-Dec-23 UR UR

29 ELITE18-CON-CE-M&P-IR-1029 Installation & termination of floor drain covers 111,112 A&B 9-Dec-23 UR UR

30 ELITE18-CON-CE-M&P-IR-1030 Instalaltion testing & commissioning of 32 mm gate valves 111,112 A&B 9-Dec-23 18-Dec-23 B B

ELITE18-CON-CE-M&P-IR-1031 Instalaltion testing & commissioning of water geyser 111,112 A&B 9-Dec-23 13-Dec-23 B B

18 1051 TO 1100 109-110


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-1051 109,110 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
2 ELITE18-CON-CE-M&P-IR-1052

3 ELITE18-CON-CE-M&P-IR-1053 Installation & testing of GI gas system 109 A 15-Nov-23 25-Nov-23 A A

4 ELITE18-CON-CE-M&P-IR-1054

5 ELITE18-CON-CE-M&P-IR-1055

6 ELITE18-CON-CE-M&P-IR-1056 Installation of HVAC ducting system 109 A 15-Nov-23 25-Nov-23 A A

Page 114 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

7 ELITE18-CON-CE-M&P-IR-1057

8 ELITE18-CON-CE-M&P-IR-1058 Instalaltion of copper piping with insulation 109 A 14-Dec-23 20-Dec-23 C 23-Dec-23 27-Dec-23 A A

9 ELITE18-CON-CE-M&P-IR-1059

10 ELITE18-CON-CE-M&P-IR-1060

11 ELITE18-CON-CE-M&P-IR-1061

12 ELITE18-CON-CE-M&P-IR-1062 Installation & testing of PPRC pipes 109 A 15-Nov-23 25-Nov-23 B B

13 ELITE18-CON-CE-M&P-IR-1063 Installation & testing of UPVC & CDP pipes 109 A 15-Nov-23 25-Nov-23 C C

14 ELITE18-CON-CE-M&P-IR-1064

15 ELITE18-CON-CE-M&P-IR-1065 Installation & testing of GI gas system 110 B 15-Nov-23 25-Nov-23 B B

16 ELITE18-CON-CE-M&P-IR-1066

17 ELITE18-CON-CE-M&P-IR-1067

18 ELITE18-CON-CE-M&P-IR-1068 Installation of HVAC ducting system 110 B 15-Nov-23 25-Nov-23 A A

19 ELITE18-CON-CE-M&P-IR-1069

20 ELITE18-CON-CE-M&P-IR-1070 Instalaltion of copper piping with insulation 110 B 14-Dec-23 21-Dec-23 C 23-Dec-23 27-Dec-23 A A

21 ELITE18-CON-CE-M&P-IR-1071

22 ELITE18-CON-CE-M&P-IR-1072

23 ELITE18-CON-CE-M&P-IR-1073

24 ELITE18-CON-CE-M&P-IR-1074 Installation & testing of PPRC pipes 110 B 15-Nov-23 25-Nov-23 B B

25 ELITE18-CON-CE-M&P-IR-1075 Installation & testing of UPVC pipes & CDP 110 B 15-Nov-23 25-Nov-23 B B

ELITE18-CON-CE-M&P-IR-1076 Instalaltion & testing of UPVC & CDP 109 A 9-Dec-23 14-Dec-23 C C

19 1101 TO 1150 107-108


31-Dec-99

Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-1101 107,108 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
ELITE18-CON-CE-M&P-IR-1102

ELITE18-CON-CE-M&P-IR-1103 Installation & testing of GI gas system 107 A 15-Nov-23 25-Nov-23 A A

ELITE18-CON-CE-M&P-IR-1104

ELITE18-CON-CE-M&P-IR-1105 Installation of HVAC ducting system 107 A 15-Nov-23 25-Nov-23 B 11-Dec-23 15-Dec-23 C C

ELITE18-CON-CE-M&P-IR-1106

ELITE18-CON-CE-M&P-IR-1107 Instalaltion of copper piping with insulation 107 A 14-Dec-23 20-Dec-23 A A

ELITE18-CON-CE-M&P-IR-1108

ELITE18-CON-CE-M&P-IR-1109

ELITE18-CON-CE-M&P-IR-1110

ELITE18-CON-CE-M&P-IR-1111

ELITE18-CON-CE-M&P-IR-1112 Installation & testing of PPRC pipes 107 A 15-Nov-23 25-Nov-23 B B

ELITE18-CON-CE-M&P-IR-1113 Installation & testing of UPVC & CDP pipes 107 A 15-Nov-23 25-Nov-23 C C

ELITE18-CON-CE-M&P-IR-1114

ELITE18-CON-CE-M&P-IR-1115 Installation & testing of GI gas system 108 B 15-Nov-23 25-Nov-23 B B

ELITE18-CON-CE-M&P-IR-1116

ELITE18-CON-CE-M&P-IR-1117

ELITE18-CON-CE-M&P-IR-1118 Installation of HVAC ducting system 108 B 15-Nov-23 25-Nov-23 A A

ELITE18-CON-CE-M&P-IR-1119

ELITE18-CON-CE-M&P-IR-1120 Instalaltion of copper piping with insulation 108 B 14-Dec-23 20-Dec-23 A A

ELITE18-CON-CE-M&P-IR-1121

ELITE18-CON-CE-M&P-IR-1122

ELITE18-CON-CE-M&P-IR-1123

ELITE18-CON-CE-M&P-IR-1124 Installation & testing of PPRC pipes 108 B 15-Nov-23 25-Nov-23 B B

ELITE18-CON-CE-M&P-IR-1125 Installation & testing of UPVC pipes & CDP 108 B 15-Nov-23 25-Nov-23 B B

Page 115 of 123


CLUSTER-E - INSPECTION REQUEST LOG - M&P - CON January 30, 2024

Area / Level
FILE CODE
Rev-00 Rev-01 Rev-02 Rev-03 Rev-04

VOL #
ITEM

FINAL
& SUBMITTAL REF. SUBMITTAL DESCRIPTION Location
Submission Response No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of Date of Date of No. of STATUS
Status Status Status Status Status
Date Date Days Submission Reply Days Submission Reply Days Submission Reply Days Submission Reply Days

ELITE18-CON-CE-M&P-IR-1126 Instalaltion & testing of UPVC & CDP 107 A 9-Dec-23 15-Dec-23 C C

20 1151 TO 1200 105-106


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-1151 105,106 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
2 ELITE18-CON-CE-M&P-IR-1152 Instalaltion & testing of UPVC & CDP 106 B 9-Dec-23 18-Aug-23 C 23-Dec-23 27-Dec-23 B B

3 ELITE18-CON-CE-M&P-IR-1153 Instalaltion & testing of UPVC & CDP 105 A 9-Dec-23 18-Dec-23 C 23-Dec-23 27-Dec-23 B B

4 ELITE18-CON-CE-M&P-IR-1154 Installation of HVAC ducting system 105,106 A&B 11-Dec-23 18-Dec-23 C 23-Dec-23 27-Dec-23 A A

5 ELITE18-CON-CE-M&P-IR-1155 Instalaltion of copper piping with insulation 105 A 14-Dec-23 21-Dec-23 C C

6 ELITE18-CON-CE-M&P-IR-1156 Instalaltion of copper piping with insulation 106 B 14-Dec-23 20-Dec-23 C C

7 ELITE18-CON-CE-M&P-IR-1157 Installation & testing of PPRC pipes 105 A 14-Dec-23 21-Dec-23 B B

8 ELITE18-CON-CE-M&P-IR-1158 Installation & testing of PPRC pipes 106 B 14-Dec-23 20-Dec-23 C 23-Dec-23 27-Dec-23 B B

21 1201 TO 1250 103-104


Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
1 ELITE18-CON-CE-M&P-IR-1201 103,104 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
2 ELITE18-CON-CE-M&P-IR-1202 Instalaltion & testing of UPVC & CDP 103 A 9-Dec-23 15-Dec-23 B B

3 ELITE18-CON-CE-M&P-IR-1203 Instalaltion & testing of UPVC & CDP 104 B 9-Dec-23 18-Dec-23 B B

4 ELITE18-CON-CE-M&P-IR-1204 Instalaltion of HVAC ducting system 103,104 A&B 11-Dec-23 18-Dec-23 B B

5 ELITE18-CON-CE-M&P-IR-1205 Instalaltion of copper piping with insulation 103 A 14-Dec-23 20-Dec-23 C 23-Dec-23 27-Dec-23 A A

6 ELITE18-CON-CE-M&P-IR-1206 Instalaltion of copper piping with insulation 104 B 14-Dec-23 20-Dec-23 C 23-Dec-23 27-Dec-23 A A

7 ELITE18-CON-CE-M&P-IR-1207 Installation & testing of PPRC pipes 103 A 14-Dec-23 20-Dec-23 B B

22 1251 TO 1300 101-102


1 ELITE18-CON-CE-M&P-IR-1251 Dismentlling of HVAC copper pipe 101,102 GF,FF 9-Aug-23 12-Aug-23 C 16-Aug-23 18-Aug-23 B B
Dismantlling of UPVC pipe internal waste pipe soil pipe & rain pipe
2 ELITE18-CON-CE-M&P-IR-1252 101,102 A&B 12-Aug-23 18-Aug-23 B B
& external pipe
3 ELITE18-CON-CE-M&P-IR-1253 Installation & testing of PPRC pipes 101 A 14-Dec-23 21-Dec-23 B B

LEGENDS
Total Submitted 713
Total Approved 598
%
A APPROVED 280 39.27
B APPROVED AS NOTED 318 44.60
C REVISED & RESUBMIT 90 12.62
D REJECTED / REJECTED 0 0.00
E FOR INFORMATION ONLY 0 0.00
UR UNDER REVIEW 25 3.51

Page 116 of 123


CLUSTER-E - JOB SITE INSTRUCTION LOG - CON January 30, 2024

RECD. DATE
DISCIPLINE
CORRECTIVE ACTION CORRECTIVE ACTION
FILE CODE

Total No. of
CLOSE-OUT
1ST Submission 2nd Submission
VOL #
ITEM

FINAL

Days
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Construct Hill Reply No. of Construct Hill Reply No. of Construct Hill Reply
Response Back Days
Status Response Back Days
Status
Response Back

1 ELITE18-CON-CE-M&P-JSI-0001 Poor Quality work M&P 20-Dec-22 18-May-23 20-May-23 Close Close

2 ELITE18-CON-CE-M&P-JSI-0002 Telecom junction box installation M&P 10-Jan-23 18-May-23 20-May-23 Close Close

3 ELITE18-CON-CE-M&P-JSI-0003 Damaged PVC conduits M&P 10-Jan-23 18-May-23 20-May-23 Close Close

4 ELITE18-CON-CE-ELE-JSI-0004 Damaged PVC conduits ELE 12-Jan-23 8-May-23 15-May-23 Close Close

5 ELITE18-CON-CE-ELE-JSI-0005 Damaged earthing cabal ELE 12-Jan-23 18-May-23 20-May-23 Close Close

6 ELITE18-CON-CE-ELE-JSI-0006 Poor workmanship ELE 12-Jan-23 8-May-23 15-May-23 Close Close

7 ELITE18-CON-CE-ELE-JSI-0007 Telecom junction box installation ELE 19-Jan-23 8-May-23 15-May-23 Close Close

8 ELITE18-CON-CE-ELE-JSI-0008 Poor workmanship ELE 21-Jan-23 8-May-23 15-May-23 Close Close

9 ELITE18-CON-CE-ELE-JSI-0009 Poor workmanship for electrical work installation ELE 21-Jan-23 8-May-23 15-May-23 Close Close

10 ELITE18-CON-CE-ELE-JSI-0010 Indequate LV wires size tempoary power supply (all villa) ELE 14-Jul-23 27-Dec-23 29-Dec-23 OPEN OPEN

11 ELITE18-CON-CE-M&P-JSI-0011 Gyser location villa 124 M&P 18-Jul-23 OPEN OPEN

12 ELITE18-CON-CE-ELE-JSI-0012 Earth bonding of back box not done villa 127,128 ELE 26-Jul-23 OPEN OPEN

SUMMARY
JSI
Decipline Submitted Closed Open UR Total
CIV 0 0 0 0 0
ARC 0 0 0 0 0
M&P 4 0 1 0 1
ELE 8 0 2 0 2
HSE 0 0 0 0 0

Page 117 of 123


CLUSTER-E - JOB SITE INSTRUCTION LOG - CON January 30, 2024

RECD. DATE
DISCIPLINE
CORRECTIVE ACTION CORRECTIVE ACTION
FILE CODE

Total No. of
CLOSE-OUT
1ST Submission 2nd Submission
VOL #
ITEM

FINAL

Days
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Construct Hill Reply No. of Construct Hill Reply No. of Construct Hill Reply
Response Back Days
Status Response Back Days
Status
Response Back

GEN 0 0 0 0 0
Total 12 9 3 0 9

Page 118 of 123


CLUSTER-E - SITE OBSERVATION REPORT LOG - CON January 30, 2024

Total No. of Days


CORRECTIVE ACTION CORRECTIVE ACTION

RECD. DATE
DOCUMENT
DISCIPLINE
FILE CODE

CLOSE-OUT

STATUS
1ST Submission 2nd Submission
VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Response Response No. of Response Response No. of Received Response
Date Back Days
Status Date Back Days
Status
Date Date

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

LEGENDS
Total Submitted 0
CLOSED 0
OPEN 0

Page 119 of 123


CLUSTER-E - NON-CONFORMANCE REPORT LOG - CON January 30, 2024

Total No. of Days


CORRECTIVE ACTION CORRECTIVE ACTION

ISSUE DATE
DISCIPLINE
FILE CODE

Closeout Submission
1ST Submission 2nd Submission
VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Construct Promag No. of Construct Promag No. of Construct Promag
Response Reply Back Days
Status Response Reply Back Days
Status
Response Reply Back

1 ELITE18-CON-CE-M&P-NCR-0001 Improper storage & handling of CPI material M&P 3-Nov-22 6-Jun-22 Close Close

2 ELITE18-CON-CE-ELE-NCR-0002 Joints electrical wires ELE 18-Nov-22 23-Jan-23 27-Jan-23 Close Close

3 ELITE18-CON-CE-M&P-NCR-0003 Rejected matrial used at side M&P 19-Dec-22 21-Dec-22 24-Dec-22 Close Close

4 ELITE18-CON-CE-CIV-NCR-0004 Pile caps cylindrical stregth CIV 24-Nov-22 12-Dec-22 24-Dec-22 Close Close

5 ELITE18-CON-CE-ELE-NCR-0005 Back boxes installation ELE 21-Dec-22 23-Jan-23 27-Jan-23 Close Close

6 ELITE18-CON-CE-ELE-NCR-0006 Joints electrical wires ELE 4-Jan-23 18-May-23 20-May-23 Close Close

7 ELITE18-CON-CE-M&P-NCR-0007 Execution of site work without inspection M&P 5-Jan-23 9-Jan-23 27-Jan-23 Open 8-Feb-23 11-Feb-23 Close Close

8 ELITE18-CON-CE-M&P-NCR-0008 Poor workmanship M&P 5-Jan-23 25-May-23 14-Jun-23 Close Close

9 ELITE18-CON-CE-ELE-NCR-0009 Use of flexible conduit as floor conduiting ELE 10-Jan-23 23-Jan-23 27-Jan-23 Close Close

10 ELITE18-CON-CE-ELE-NCR-0010 Wrong sequence of work ELE 10-Jan-23 18-May-23 20-May-23 Close Close

11 ELITE18-CON-CE-ELE-NCR-0011 Use of flexible conduit as floor conduiting ELE 12-Jan-23 23-Jan-23 27-Jan-23 Close Close

12 ELITE18-CON-CE-ELE-NCR-0012 Joint in main earthing cabal ELE 12-Jan-23 18-May-23 20-May-23 Close Close

13 ELITE18-CON-CE-ELE-NCR-0013 Telecom junction box installation ELE 19-Jan-23 23-Jan-23 4-Feb-23 Close Close

14 ELITE18-CON-CE-M&P-NCR-0014 The celling has closed without inspection of PPRC piping M&P 1-Feb-23 18-May-23 20-May-23 Close Close

15 ELITE18-CON-CE-M&P-NCR-0015 The celling has closed without inspection of copper piping M&P 1-Feb-23 18-May-23 20-May-23 Close Close

16 ELITE18-CON-CE-M&P-NCR-0016 Unapproved material used at site M&P 10-Feb-23 18-May-23 20-May-23 Close Close

17 ELITE18-CON-CE-CIV-NCR-0017 Concrete without inspection at villa 124 CIV 20-Feb-23 22-Feb-23 Close Close

18 ELITE18-CON-CE-CIV-NCR-0018 Damaged aluminum windows villa 141,142 CIV 22-Feb-23 26-May-23 5-Jun-23 Open 30-Nov-23 5-Dec-23 Close Close

19 ELITE18-CON-CE-CIV-NCR-0019 Door protection CIV 3-Mar-23 26-May-23 29-May-23 Close Close


Dumped concrete without inspection & maintaining the level at CLE
20 ELITE18-CON-CE-CIV-NCR-0020
137
CIV 20-Mar-23 12-May-23 17-May-23 Open 6-Jun-23 10-Jun-23 Close Close
Dumped concrete without inspection & maintaining the level at CLE
21 ELITE18-CON-CE-CIV-NCR-0021
136
CIV 25-Mar-23 12-May-23 17-May-23 Open 6-Jun-23 10-Jun-23 Close Close

22 ELITE18-CON-CE-CIV-NCR-0022 False celling clearance CIV 30-Mar-23 6-Jun-23 10-Jun-23 Close Close

23 ELITE18-CON-CE-M&P-NCR-0023 Execution of site work without inspection M&P 31-Mar-23 18-May-23 20-May-23 Close Close

24 ELITE18-CON-CE-M&P-NCR-0024 Execution of site work without inspection M&P 8-Apr-23 25-May-23 29-May-23 Close Close

Page 120 of 123


CLUSTER-E - NON-CONFORMANCE REPORT LOG - CON January 30, 2024

Total No. of Days


CORRECTIVE ACTION CORRECTIVE ACTION

ISSUE DATE
DISCIPLINE
FILE CODE

Closeout Submission
1ST Submission 2nd Submission
VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Construct Promag No. of Construct Promag No. of Construct Promag
Response Reply Back Days
Status Response Reply Back Days
Status
Response Reply Back

25 ELITE18-CON-CE-CIV-NCR-0025 CLE 133 roof leakage CIV 3-May-23 6-Jun-23 15-Jun-23 Close Close

26 ELITE18-CON-CE-ELE-NCR-0026 IT cabinet missing matrial (all villas) ELE 16-May-23 27-Dec-23 28-Dec-23 Open Open

27 ELITE18-CON-CE-M&P-NCR-0027 Installation of matrial without inspection M&P 24-May-23 14-Jun-23 15-Jun-23 Close Close

28 ELITE18-CON-CE-CIV-NCR-0028 CLE 123 first floor columns CIV 31-May-23 8-Jul-23 13-Jul-23 Close Close

29 ELITE18-CON-CE-ELE-NCR-0029 Use of flexible conduit installation 131 DB,FF ELE 2-Jun-23 19-Jul-23 21-Jul-23 Open 27-Jul-23 3-Aug-23 Close Close

30 ELITE18-CON-CE-ELE-NCR-0030 Use of flexible conduit installation 131 mumty level ELE 2-Jun-23 19-Jul-23 21-Jul-23 Open 30-Nov-23 5-Dec-23 Close Close

31 ELITE18-CON-CE-M&P-NCR-0031 Usage of unapproved copper pipe matrial villa 128,130 M&P 10-Jun-23 8-Jul-23 14-Jul-23 Open 4-Aug-23 9-Aug-23 Close Close

32 ELITE18-CON-CE-ELE-NCR-0032 Use of unapproved earthing material (villa earth pit) ELE 17-Jun-23 16-Aug-23 30-Nov-23 Open 30-Nov-23 5-Dec-23 Open Open

33 ELITE18-CON-CE-ELE-NCR-0033 Damaged telecom conduit villa 128 ELE 11-Jul-23 19-Jul-23 21-Jul-23 Close Close

34 ELITE18-CON-CE-ELE-NCR-0034 Poor workmanship for electrical conduits installation villa 127 ELE 11-Jul-23 18-Jul-23 21-Jul-23 Open 27-Jul-23 3-Aug-23 Close Close

35 ELITE18-CON-CE-ELE-NCR-0035 Joints in electrical wires villa 128 ELE 14-Jul-23 19-Jul-23 21-Jul-23 Open 30-Nov-23 5-Dec-23 Open 27-Dec-23 28-Dec-23 Open

36 ELITE18-CON-CE-ELE-NCR-0036 Use of flexible conduit for surface conduits installation villa 126 ELE 14-Jul-23 27-Jul-23 4-Aug-23 Close Close

37 ELITE18-CON-CE-ELE-NCR-0037 Use of flexible conduit for surface conduits installation villa 126a ELE 14-Jul-23 19-Jul-23 21-Jul-23 Close Close

38 ELITE18-CON-CE-CIV-NCR-0038 False celling closure without MEP clearance cle-127 CIV 18-Jul-23 28-Nov-23 29-Nov-23 Close Close

39 ELITE18-CON-CE-ELE-NCR-0039 Improper floor conduit installation villa 128 ELE 20-Jul-23 27-Jul-23 3-Aug-23 Close Close

40 ELITE18-CON-CE-ELE-NCR-0040 Damaged floor conduits villa 127 ELE 20-Jul-23 27-Jul-23 3-Aug-23 Close Close

41 ELITE18-CON-CE-M&P-NCR-0041 Unapproved copper pipe material villa 126 M&P 24-Jul-23 4-Aug-23 9-Aug-23 Close Close

42 ELITE18-CON-CE-M&P-NCR-0042 Unapproved copper pipe material villa 126A M&P 24-Jul-23 4-Aug-23 9-Aug-23 Close Close
Use cutted damaged PVC fitings for surface conduit installation
43 ELITE18-CON-CE-ELE-NCR-0043
vialla 126
ELE 26-Jul-23 27-Jul-23 3-Aug-23 Close Close

44 ELITE18-CON-CE-ELE-NCR-0044 Wrong sequence of work vilaa 122,126a external area ELE 16-Aug-23 30-Nov-23 5-Dec-23 Close Close

45 ELITE18-CON-CE-ELE-NCR-0045 Improper surface conduit installation villa 122,123 ELE 16-Aug-23 17-Aug-23 20-Aug-23 Close Close

46 ELITE18-CON-CE-ELE-NCR-0046 Joints in telecom cables 125,126 ELE 23-Aug-23 30-Nov-23 5-Dec-23 Open Open

46 ELITE18-CON-CE-M&P-NCR-0047 Rectification of PPRC piping 123 M&P 3-Oct-23 20-Dec-23 close Close

46 ELITE18-CON-CE-ELE-NCR-0048 Flase ceilin closure without MEP clarance 111,112,113,114,119,120 ELE 3-Oct-23 30-Nov-23 5-Dec-23 Open Open

47 ELITE18-CON-CE-M&P-NCR-0049 Undersize roof drain 124,125 M&P 9-Oct-23 Open Open

48 ELITE18-CON-CE-M&P-NCR-0050 Cutting of beam due to floor drain 107,109 M&P 20-Oct-23 22-Dec-23 Close Close

49 ELITE18-CON-CE-ELE-NCR-0051 Use of unapproved material weatherproof cover cle-119,120 ELE 20-Nov-23 Open Open

50 ELITE18-CON-CE-ELE-NCR-0052 Cutting of pile cap cle-104 ELE 20-Nov-23 27-Dec-23 Close Close

Page 121 of 123


CLUSTER-E - NON-CONFORMANCE REPORT LOG - CON January 30, 2024

Total No. of Days


CORRECTIVE ACTION CORRECTIVE ACTION

ISSUE DATE
DISCIPLINE
FILE CODE

Closeout Submission
1ST Submission 2nd Submission
VOL #
ITEM

FINAL
SUBMITTAL REF. SUBMITTAL DESCRIPTION
&

STATUS
Construct Promag No. of Construct Promag No. of Construct Promag
Response Reply Back Days
Status Response Reply Back Days
Status
Response Reply Back

51 ELITE18-CON-CE-M&P-NCR-0053 Using oversized insulation on the PPRC pipe at the roo cle-119,120 M&P 23-Nov-23 27-Dec-23 Close Close

52 ELITE18-CON-CE-M&P-NCR-0054 Improper surface conduit intallation cle-103 M&P 23-Nov-23 Open Open

Using unapproved cover for manhole gully trap and catch basin
53 ELITE18-CON-CE-M&P-NCR-0055
grating villa #113,114,119,120 M&P 30-Nov-23 Open Open

54 ELITE18-CON-CE-ELE-NCR-0056 Deviation in B.boxes mounting heights 113,114 ELE 7-Dec-23 Open Open

55 ELITE18-CON-CE-ELE-NCR-0057 Use of unapproved material earth powder 113,114,119,120 ELE 7-Dec-23 Open Open
Using unapproved cover for manhole gully trap and catch basin
56 ELITE18-CON-CE-M&P-NCR-0058
grating 111,112
M&P 8-Dec-23 Open Open

57 ELITE18-CON-CE-M&P-NCR-0059 Undersize roof drain 111,112,113,114 M&P 8-Dec-23 Open Open

58 ELITE18-CON-CE-ELE-NCR-0060 Cut damaged electrical wires villa# 105,106 ELE 15-Dec-23 Open Open

59 ELITE18-CON-CE-M&P-NCR-0061 Non-recommended & low quality CP nozzle villa# 111,112,113,114 M&P 18-Dec-23 Open Open

60 ELITE18-CON-CE-ELE-NCR-0062 Telecom cables & LV wires in same raceway villa# 117,118 ELE 18-Dec-23 Open Open

61 ELITE18-CON-CE-ELE-NCR-0063 Wires jont in electrical circuits 118 ELE 21-Dec-23 Open Open

62 ELITE18-CON-CE-ELE-NCR-0064 Flase ceiling closure without MEP clarance 103,104,107,108 ELE 21-Dec-23 Open Open
Unapproved earthing material installation at site villa#111 to
ELITE18-CON-CE-ELE-NCR-0065
114,119,120,122 to 126a
ELE 22-Dec-23 Open Open

ELITE18-CON-CE-ELE-NCR-0066 Cut/Damaged Electrical wires ELE 3-Jan-24 Open Open

SUMMARY
NCR

Decipline Submitted Closed Open UR Total


CIV 10 10 0 0 10
ARC 0 0 0 0 0
M&P 22 13 6 0 19
ELE 34 20 14 0 34
HSE 0 0 0 0 0
Total 66 43 20 0 63

Page 122 of 123


Date: 30-Jan-24

CLUSTER-E - MAIN SUMMARY - CONSTRUCT

MASTER LOG

Shop Request Material Inspection Inspection Request


Material Document Sub-Contractor Request (MIR) (IR)
CODE DESCRIPTION Drawings For NCR SOR JSI TOTAL
Submittal Submittal Approval
Submittal Information
Civil Ele M&P Civil Ele M&P

A APPROVED 1 11 58 37 38 7 3 1428 2 280 43 10

B APPROVED AS NOTED 10 8 67 85 0 7 2388 118 318

C REVISED & RESUBMIT 3 2 5 3 1 2 100 9 90

D REJECTED

E FOR INFORMATION ONLY

OPEN OPEN 6 20 3

UR UNDER REVIEW 7 9 1 0 1 70 3 25 0

TOTAL 14 28 139 0 43 127 8 13 3986 132 713 63 0 13 0

TOTAL APPROVED 11 19 125 0 37 123 7 10 3816 120 598 43 0 10 0

You might also like