Professional Documents
Culture Documents
Site Configuration Manual-Tp Second Phase
Site Configuration Manual-Tp Second Phase
2/2
USMS
Step 5: click ok
3/3
USMS
4/4
USMS
5/5
USMS
6/6
USMS
7/7
USMS
Step 4: Wait a few seconds, Then IP will be obtained and show it in right interface
8/8
Download "v2para.tar.gz",Select FTP, FTP window will pop up. Please do not close.
Step5: Check the ATS download situation, SelectVAS Configure. If the "1" position
data, the download was successful
1.
2.
Step 4: Click "Select DLL File", download protocol. ClickSet Smart Port
If the "3" position display " DI-3000=1": Description sensor failure, check the
wiring,Check Step 5.
If a large number of data, device is working properly.
Check AC meter
Step 1: Login EISUconfig.
Click
If the "3" position display " DI-3000=1": Description sensor failure, check the
wiring,Check Step 3.
If a large number of data, device is working properly.
Check DC meter
number.
If the "3" position display "DI-3000=1": Description sensor failure, check the
wiring,Check Step 3.
If a large number of data, device is working properly.
1.
2.
3.
4.
Select DeviceName
SelectChannal
5.
Step9 Step13)
Step12:Add gassline_monitor.
Server IP:10.218.207.7
Server port:9999(10 model site configure 9999, Other sites
configured to 9998)
APN:zterms