QUOTE
Job Number
Date
K012553
11/14/2015
Project Description:
Design, Build, and Install Floor to ceiling Built-in Cabinets and Shelving along a 15' - 5" wall.
Reference Facebook Messenger Photos and conversation.
DESCRIPTION
MATERIAL
Disposal/Dumping
Countertop (dark high quality wood finish), exact material is TBD
Fasteners/Consumables
Poplar, lumber
Plywood, Birch 3/4" 4' x 8'
Plywood, Birch 1/4" 4' x 8'
EverTrue 3.625-in Pine Pfj Crown Moulding
Millwork, Door Trim
Millwork, Column Trim
Millwork, Shelf Trim
Hardware, Door Pulls
Hardware, Hinges
Hardware, Shelf clips
Finishing Materials
Paint, Sherwin Williams, Proclassic
Primer, Sherwin Williams, Bare Wood
LABOR
Shop Hours
Manufacture of Doors
Construction of base cabinets and shelving
Construction of upper cabinets and shelving
Finishing and Painting
Installation
Final Finishing
UM
lot
sq. ft
lot
board ft.
ea
ea
ln ft
ln ft
ln ft
ln ft
ea
ea
lot
lot
ea
ea
sum
man/hr
man/hr
man/hr
man/hr
man/hr
man/hr
Note: Man Hours quoted are an estimate. The price quoted will not be affected by longer or shorter
actual job site work hours. If the scope of the project is to be adjusted during
construction/installation, a change order is to be provided for approval by the howeowner prior
to the additional work being completed.
QUANTITY
UNIT PRICE
1
16
1
84
12
2
15
54
24
52
8
16
1
1
1
1
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
45.00
600.00
105.00
553.08
539.70
62.30
33.20
60.08
56.70
64.35
54.90
144.38
17.89
85.00
77.50
77.50
MATERIAL SUBTOTAL: $
2,576.58
56
12
12
10
22
20
4
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
45.00
37.50
105.00
6.58
44.98
31.15
2.21
1.11
2.36
1.24
6.86
9.02
17.89
85.00
77.50
77.50
EXTENDED PRICE
1.80
39.00
39.00
39.00
39.00
39.00
39.00
$
$
$
$
$
$
$
100.80
468.00
468.00
390.00
858.00
780.00
156.00
LABOR SUBTOTAL: $
3,220.80
SUBTOTAL: $
SALES TAX: $
GRAND TOTAL: $
5,797.38
5,797.38
TAXABLE
1of1