Professional Documents
Culture Documents
DBN-05
S2-2015
Prepared By :Analyzed By :-
www.huawei.com
Report Content
Methodology
KPI Overview
Coverage Overview
Sample Count Graphs
Poor Coverage Analysis
Abnormal Event Chart
Abnormal Event Analysis
Methodology
Cluster drive Methodology.
UE1 locked on 2G : Short call sequence (90 Sec Call Duration, 20 Sec Wait)
UE2 locked on 2G : Idle Mode
DBN-05
2G Call Performance KPIs
(UE Dedicated mode- 2G Locked; 90 Sec Call Duration, 20 Sec Wait)
2G KPI Description
Unit
Raw KPIs
Corrected KPIs
Total attempts
Setup Failures
Dropped calls
Completed Calls
CSSR
DCR
#
#
#
#
%
%
176
0
1
175
100.0%
0.6%
0
#DIV/0!
#DIV/0!
DBN-05
Rx Level IDLE
DBN-05
Rx Level Dedicated
DBN-05
Rx Quality
DBN-05
Rx Quality - Zoom View & Patches
Spot #1
DBN-05
DBN-05
OBSERVATION : Bad quality patch observed at DXB-AUH border. Missing neighbors at the border.
ACTION: both-way neighbor addition to be done between DXT6241 and neighboring AUH sites.
Abnormal Events
Abnormal Events
CD05.1
KPI Chart
2G - Call Statistics
CALL Attempts
CALL Setup Success
CALL Released (Normal)
CALL Drop
CSSR (%)
DCR (%)
Q2-2014
S2-2014
S1-2015
S2-2015
117
117
152
176
117
117
152
176
117
117
152
175
0
0
0
1
100.000% 100.000% 100.000% 100.000%
0.000% 0.000% 0.000% 0.568%
Summary
S/N Event
Observations / Actions
Call Drop
Bad Quality
patch
Current
Responsible
Last
(Optimization / Updated
Planning)
Optimization
Optimization
Which Quarter it
5.
appeared the first
1. Call
2. Call 3. Poor 4. Poor
Special
time
Setup Fail Drop Quality Coverage
Issues
CD05.1
Spot #1
S2-2015
S2-2015
Observation/
Action Taken/Planned
Observation: Radio conditions fine, call released
normally with disconnect message; no call drop.
Action: No action required
Observation: Bad quality patch observed at DXB-AUH
border. Missing neighbors at the border.
Action: both-way neighbor addition to be done between
DXT6241 and neighboring AUH sites.
Thank You