The document outlines a welder qualification programme with activities from April 2013 to July 2013 including establishing a project plan, getting quotations for third party inspections, preparing draft welding procedure specifications and identifying materials, training on draft WPS, conducting qualification tests in accordance with codes to qualify WPS, welders, and procedure qualification records, and sending accepted test pieces for non-destructive testing and mechanical testing to prepare final WPS, PQR, and WQT documents if qualifications are passed and approved.
Original Description:
QA/QC Engineer or QC Inspector may refer this on how to plan their programme to qualify their WPS and/or welder(s).
The document outlines a welder qualification programme with activities from April 2013 to July 2013 including establishing a project plan, getting quotations for third party inspections, preparing draft welding procedure specifications and identifying materials, training on draft WPS, conducting qualification tests in accordance with codes to qualify WPS, welders, and procedure qualification records, and sending accepted test pieces for non-destructive testing and mechanical testing to prepare final WPS, PQR, and WQT documents if qualifications are passed and approved.
The document outlines a welder qualification programme with activities from April 2013 to July 2013 including establishing a project plan, getting quotations for third party inspections, preparing draft welding procedure specifications and identifying materials, training on draft WPS, conducting qualification tests in accordance with codes to qualify WPS, welders, and procedure qualification records, and sending accepted test pieces for non-destructive testing and mechanical testing to prepare final WPS, PQR, and WQT documents if qualifications are passed and approved.
1.2 Get Quotation for 3rd Party Inspection, NDT and Mechanical Lab Test 1.3 Preparation of draft WPS and Identifying the Materials Involved 1.4 To Buy or Use Existing Material 1.5 Preparation of Test Piece 1.6 Training on draft WPS 1.7 Actual Testing to Qualify WPS/PQR and Welders in Accordance with Code Requirements 1.8 Send All Accepted Test Piece for NDT & Mechanical Lab Test 1.9
To Prepare WPS, PQR and WQT if Passed the NDT & Mechanical Lab Test and Approved by 3rd Party Inspector