FLOWCHART FOR QUALITY CONTROL INSPECTION
START
Incoming, In-process, Final
e.g. Arrival of material,
earthworks, pilling,
installation (Mounting
Structure, PV Module, CB,
MVPS, LPS), cable trench
preparation, etc.
QA/QC Team to perform
Repair inspection based on
complete! Checklist / Report / ITP
requirements
Operation Team to REJECT
Result?
perform repair work
?
ACCEPT
Operation Team to
proceed to next stage
END